Loading...
8.3 Water Treatment Plant Softening BasinsCITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 11/09/2009 4:00P.M. AGENDA SECTION ORIGINATING DEPARTMENT: APPROVED FOR NO: 8 AGENDA: UTILITIES DEPARTMENT ITEM NO. 3 BY: BY: Martha Tasker Page 1 ITEM: Award of contract for the Water Treatment Plant Softening Basins Rehabilitation, Project No. 09- 2779. BACKGROUND: The water treatment process provides partial water softening of the groundwater and surface water sources, as well as, filtration and disinfection as required to meet federal and state drinking water standards. The two solids contact softening basins are utilized to soften water treated with excess lime and soda ash. The basins were placed into operation in 1999. Each basin is 90 foot in diameter and has a 19 foot side water depth. The basin exterior is constructed of concrete and the internal equipment is constructed of steel. The steel components were field painted prior to being placed in operation. The protective paint coating is revealing numerous areas where the paint system has failed and bare metal is exposed. If these areas are not addressed, more serious corrosion of the steel components will occur. Repainting this type of equipment on a ten year schedule is reasonable. Bids were received on October 27, 2009 as follows: Bidder BidAmount Schedule Koehn Painting Co., LLC th 204 W. 6 Newton, KS 67114 $25,800.00 (1) 12/1/2009 – 3/1/2010 C2i, Inc. 4108 Sherwood Dr. Hutchinson, KS 67502 $176,687.00 11/16/2009 – 4/15/2010 Whitehead Brothers Painting, Inc. 9639 Persimman Point Hillsboro, MO 63050 $289,000.00 2/18/2010 – 5/1/2010 Mongan Painting, Co., Inc. P.O. Box 515 Cherokee, IA 51012 $388,818.00 3/15/2010 – 5/1/2010 Superior Industrial Maintenance Co., Inc 4801 Stough Rd. Concord, NC 28027 $524,350.00 1/10/2010 – 5/1/2010 Engineer’s Estimate $220,000.00 (1) Koehn Painting Co., LLC acknowledges that their bid was submitted in error and that they do not intend to enter into a contract if awarded, and that the bid bond in the form of a cashier’s check in the amount of $1290.00 will be forfeited. (See attached letter.) C2i, Inc. submitted a proposal that fully complies with the project specifications. Staff has contacted three of C2i, Inc. references and each indicated they are satisfied with the quality of C2i, Inc.’s work CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 11/09/2009 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: APPROVED FOR NO: 8 AGENDA: UTILITIES DEPARTMENT ITEM NO. 3 BY: BY: Martha Tasker Page 2 and that they will continue to utilize C2i, Inc. on future projects. The references included food grade, pipeline and fuel storage type projects. Each reference indicated that C2i, Inc. was required to follow a paint system specification, met stringent quality control testing, and comply with strict safety requirements. FISCAL NOTE: A budget allocation of $220,000 for the Water Treatment Plant Softening Basins Rehabilitation is included in the 2009 Capital Improvement Program under the category of Water and Wastewater Enhancements. CONFORMANCE WITH THE STRATEGIC PLAN: Related Strategic Plan goals may include: GOAL #3: The City will provide the highest quality of services, consistent with governing body direction, available resources and staff commitment to quality. Action Item: The City Commission will maintain its commitment to the municipal organization by providing direction and resources that will allow them to meet established expectation. COMMISSION ACTION: It is recommended that the City Co mmission award the contract for the Water Treatment Plant Softening Basins Rehabilitation, Project No. 09-2779 to C2i, Inc. of Hutchinson, Kansas in the amount of $176,687.00