8.8 Landfill Stoarge Building
CITY OF SALINA
REQUEST FOR CITY COMMISSION ACTION
DATE
9/28/09
TIME
4:00 P.M.
AGENDA SECTION
NO:
ORIGINATING DEPARTMENT:
APPROVED FOR
AGENDA:
8
ITEM
NO.
Page 1
DEPARTMENT OF
PUBLIC WORKS
BY t)PfI
8
BY: Michael Fraser
ITEM:
Award bid for construction of a Landfill equipment storage building to Larkin Excavating, Inc.
BACKGROUND:
On August 10, 2009, the City Commission approved the award of contract for the construction of
Landfill Cell #5. At that time the Commission did not approve the authorization of the equipment
building as a part of the project. Staff was to go back and see if constructing the building could be
accomplished at less expense.
When the Engineer's estimate was assembled for the cost of the building, as a part of the cell
construction project, the engineering consultant (Aquaterra Environmental Solutions, Inc.) contacted
Salina Building Systems, a local building construction firm who constructed the prior landfill equipment
shed, to obtain a quote on the cost to disassemble and move the existing structure or construct a new
building.
Salina Building Systems quoted a cost of $20,617 for a new building, and $759 less to relocate the
existing structure. There would be some risk with damage to components during disassembly and
assembly. The engineer's estimate was increased to $22,000 to account for a profit margin and then
used to evaluate the equipment building bid portion of the cell construction contract.
All eight bids received included the cost of an equipment storage building and ranged from $21,300 to
$40,000. Larkin Excavating, Inc. was awarded the contract for the cell construction and submitted a
bid of $21 ,300 for a Lester Building. This cost equates to $18.49 per square foot. A local architectural
firm informed the City that this was a fair and reasonable price for this type of structure, and staff
agrees.
By adding the cost of the structure to Larkin's low bid of $1,533,590 for the cell construction, the total
project would be $1,554,890, and still under the next lowest bid from Maim Construction of
$1,638,341.81. Rebidding the project would not result in any significant savings, and would increase
the cost of constructing this building.
Larkin Excavating, Inc. has agreed to still honor their bid. This additional work can be scheduled into
the overall construction plans if the City Commission approves the award.
The existing equipment storage building stores tractors, a mower, other equipment and hay that is
used in erosion control. The building dates back to the opening of the landfill in the mid 1970's. This
structure is in extremely poor condition and will be disassembled and disposed of once a new building
is constructed.
FISCAL NOTE:
Financing for the construction of Landfill Cell # 5 will be accomplished with the issuance of Temporary
Notes in early 2010. These notes will be repaid from 2011 through 2014.
CITY OF SALINA
REQUEST FOR CITY COMMISSION ACTION
DATE
9/28/09
TIME
4:00 P.M.
AGENDA SECTION
NO:
ORIGINATING DEPARTMENT: APPROVED FOR
AGENDA:
DEPARTMENT OF
ITEM PUBLIC WORKS
NO. BY:
Page 2 BY: Michael Fraser
The most recent five year cash flow pro-forma for the Solid Waste fund provides for an annual
payment of $450,000 for 4 years to retire the notes for Cell 5 Construction. This is sustainable within
the existing rate structure projections, considering operating costs and other capital needs, and would
support a total project cost of up to $1,700,000. The total project cost, including the cell construction
previously awarded ($1,533,590.00) and the cost of the building at $21,300 will be $1,554,890.00. A
3% contingency has also been authorized by the City Commission. In the event the contingency is
needed, the total project cost will be $1,601,536.
The 2009 to 2013 Capital Improvements Program had contemplated a maximum of $2,300,000 for
this project.
CONFORMANCE WITH STRATEGIC PLAN:
Goal 3: The City will provide the highest quality of services, consistent with governing body direction
available resources and staff commitment to quality.
RECOMMENDED ACTION:
Staff recommends that the City Commission award the bid for the construction of the landfill
equipment building to Larkin Excavating, Inc. for the amount of $21,300 and add this amount to the
Municipal Solid Waste Landfill Facility Cell #5 Construction, Project No. 09-2769.
Attachments: Landfill Equipment Building Information
Salina Building Systems, Inc. letter dated 6/24/09
06/25/2008 14:28 FAX 7858236382
SALINA BUILDING SYSTEMS
@002/002
~~
June 25, 2009
Salina Building Systems,. Incol'l'orated
200 E. pac:;il1c:
Salio:)., K:\nsdS 67401
Telepbone (785) 82~-6812
Fax (785) 823.6;;82
E. Andrew Englmd. President
~gina\d B. Leiker, Sec. I Trcas.
Brett O'Conner
Aquaterra Environmental Solutions
7311 W. 130\11 Street, Suite 100
Overland Parle, KS 66213
RE: Saline County Landfill, Storage Building Relocation
Dear Brett:
I am pleased to provide you with this proposal for the completion of the work for
the storJige building at the Saline County Landfill. Thi.s proposal represents all costs for
labor, material, equipment, taxes, and insurance necessitated by the :work. Pricing options
are provided for the construction of a new storage building to match the existing and for
the relocation oftheeKisting building. The scope ofwork and pricing follow:
Relocation
Complete tear down, bundling and tl'ansport to the new site, and
reinstaUation Qfthe existing 36'x32'x16' Lester Building.
Components damaged. during tear down ~ be replaced.
Cost: $19,858.00
New
Provide engineering and design, metal building package complete:.
aud erection seIVices to construct a new 36'x32'x16' Lester
Building to match the existing building.
. Cost: $20,617.00
Pricing is valid .if accepted within. thirty days of the date of the proposal. Pricing
inc1udeslabor, material, equipment, taxes, and worker's compensation and general liability
insurance. The owner will provide builder's risk insurance coverage for the project.
I appreciate the opportunity to provide you with this proposal. If you have any
questions, do not hesitate to calt me.
~ Commercial' Ind\1.~t.rial . Agriculru~ . Ct'lJJvcntional C(lnsnuedon . 8utler Buildings
e
Landfill Equipment Building Information
(Photographs illustrate existing structure at the Landfill)
General Information
. Metal Building: Lester binding similar to a r ---
Morton building
. Local building construction (Salina Building
Systems) quote for Engineer's estimate of
$22,000
. Larkin's Bid: $22,000 (next to the lowest
$21,300)
. Cost $19.09 per square feet
. Architectural firm confirmed the bid is a fair
price the structure
Specific Information . ----,
. Size of structure: 32' deep x 36' wide with a I
16' door opening
. Type of material: Metal (Lester Building Inc.
100 Series)
. Roof Live Load: 20 PSF
. Wind Load: 80 MPH
. No door I open front
. Floor: 9" minimum of %" rock on compacted
sub-grade
. Shed will hold: Dozer and two Compactors
. Electrical:
o Two 11 OV equipment block heaters
o One 11 OV lighting for equipment
o Interior lights
o The building will be metered separately
Buildina Use
. Storage of equipment out of the weather
(snow, ice, cold, rain, and wind)
. Minor Service Work performed in the building
out of the weather
. The old building will be used for equipment
storage
~
~.
....
...
=1