Loading...
8.7 Landfill Electric Extensions CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 09/28/09 TIME 4:00 P.M. AGENDA SECTION NO: 8 ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 BY: ITEM NO. Page 1 DEPARTMENT OF PUBLIC WORKS BY: Michael Fraser ITEM: Authorize Westar Energy to install service extensions in association with City Project Number 09- 2769, Municipal Solid Waste Landfill Facility Cell #5 Construction. BACKGROUND: The Municipal Solid Waste Landfill Facility Cell #5 Construction project requires the extension of electric line service connections by Westar Energy to supply power to two separate locations - the equipment storage shed (which is currently being considered outside the construction contract) and the leachate collection system for Cell #5. These service connections were initially included as part of the specifications for the cell construction contract, but were removed when contractors were not able to obtain estimates from Westar Energy for their portion of the expense. City staff should have included these extra costs when the project was awarded on August 10, 2009. Staff received the following cost estimates "from Westar Energy at the pre-construction conference on August 20, 2009. Estimates for overhead and underground options are provided for the area near where work will take place, or where equipment is to be on a regular basis. Staff believes the underground service (crossing the roadway) is necessary for the leachate collection system, but not for the equipment storage shed. Service Connection Leachate Collection S stem Equipment Stora e Shed Overhead Service $29,618 $2,367 recommended) Under round Service $30,490 recommended $2,960 The City Commission authorized a 3% construction contingency ($46,007.70). Even though this cost could be absorbed by the contingency, it is preferred that the it be reserved for any unforeseen cost overruns rather than expenses that were known at the time of the award. FISCAL NOTE: The 2009 Capital Improvements Program had budgeted $2,300,000 for this project, of which $1,579,597.70 has been authorized by the City Commission. This recommended action would be funded from the $2.3 million project budget within the Capital Improvement Program, and outside of the previously approved construction contract. CONFORMANCE WITH STRATEGIC PLAN: Goal 3: The City will provide the highest quality of services, consistent with governing body direction, available resources and staff commitment to quality. RECOMMENDED ACTION: Staff recommends the City Commission authorize Westar Energy to install service connections in association with the Municipal Solid Waste Landfill Facility Cell #5 Construction Project No. 09-2769 for $30,490 and $2,367 making a total cost of $32,857. t~tar Energy. " .Augu.st.~I.~,9Q9 Mike Fraser Director Of Public Works - City Of Salina 300 W. Ash Street · P.O. Box 736 Salina, KS 67402-0736 RE: Salina Landfill Proposed Overhead Electric Extension (West Side Of Property) Dear Mr. Fraser, This is to confirm our conversation regarding the proposed overhead primary extension to serve the proposed building at the west side of the property for truck heaters; 1 have estimated the cost to extend a single phase overhead primary line approximately 415ft south along the tree line west of the holding pond for the proposed location, The estimated cost is $2.367.00 for the extension with an overhead service to a customer meter pole or building. The estimated cost is $2.960.00 for the extension with. an underground service to a customer meter rack or a building. The amounts above reflect the actual cost to the customer after an allowance has been given for anticipated revenue the new service will genenlC:e. Westar Energy will provide and install all overhead primary facilities to serve the new installation and the overhead or underground service conductors. The customer will be required to supply and install either the meler pole and riser for an overhead service Or the service conduit and meter rack for an underground service. Westar Energy requires a lctter from the City Of Salina staling their intention to pay the required cost after the work is completed before work can begin. Please call me at 18~.571-13j2 or e-mail me if you have any questions or if 1 can be of further assistance, Thank you, Marilyn Connelly Technical Specialist, Design Westar Energy I Salina Service Center 1001 Edison Place I Salina, Kansas 67401-7419 Cell 78S.S17.13S2I Fax 185:822.3529 marilyn.connelly@westarenergy.com Cc: Greg Jackson, Westar Energy Anastasia Welch, AquaterraEnvironmental Solutions, Inc. 1001 Edison PI/Salina. Kansas 67401.7426 .t\Xkstar Energy. .. ........ August 20,2009 Mike Fraser Director Of Public Works - City Of Salina 300 W. Ash Street · P.O. Box 736 Salina, KS 67402~0736 RE: Salina Landfill Proposed Overhead Electric Extension Dear Mr. Fraser, This is to confirm our conversation this morning regarding the proposed overhead primary extension to serve the leachate building at the new landfill cell. I have estimated the cost to extend a two phase three wire overhead primary line approximately 3,04Oft west along the south side of an existing road in the landfill and then south on the east side of a proposed road at the landfill. The estimated cost is $29,618.00 for the extension with an overhead service to a customer meter pole or building. The estimated $30,490.00 for the extension with an underground service to a customer meter rack or a building. The amounts above reflect the actual cost to the customer after an allowance has been given for anticipated revenue the new service will generate. Westar Energy will provide and install all overhead primary facilities to serve the new installation and the overhead or underground service conductors. The customer will be required to supply and install either the meter pole and riser for an overhead service or the service conduit and meter rack for an underground service. Westar Energy requires a letter from the City Of Salina stating their intention to pay the required cost after the work is completed before work can begin. Please call me at 785-493-3012 or e-mail me if you have any questions or if I can be of further assistance. Thank you, . ) ~ Sr. Technical Specialist, Design Westar Energy / Salina Service Center 1001 Edison Place / Salina, Kansas 67401-7419 Ce11785.493.30l2/ Fax 785.822.3520 Craig. matti son @westarenergy.com Cc: Greg Jackson, Westar Energy Anastasia Welch, Aquaterra Environmental Solutions, Inc. 1001 Edison PI/Salina, Kansas 67401.7426