Executive Summary
Energy Conservation Measures
Historical Energy Consumption
Operation & Maintenance
Data on Present Facilities
Measurement and Verification
Environmental Impact
Appendices
A. Standards of Control
B. HV AC Equipment Tables
C. Gas Price Comparison
D. Lighting Usage Hours
E. Utility Tariffs
.
.
.
Section 1
Executive~ Summary
Introduction
A performance contract is an agreement between an energy services company (ESCO) and a
facility owner, under which the ESCO designs, engineers and implements needed facility
improvements and upgrades. The ESCO guarantees the owner that savings from those upgrades
will occur over the course of the performance contract. The guaranteed savings from reduced
utility bills and material savings are then used to pay back the initial capital investment in
equipment and installation. Thus, the owner merely redirects existing budgeted dollars, which
are currently being paid to their utility companies, back into their facilities in the form of capital
improvements. Afterwards, the facility owner retains 100% of the savings to use at its discretion.
In the State of Kansas, the Kansas Energy Office allows public entities to utilize the state's
Facility Conservation Improvement Program (FCIP) to implement these projects. By utilizing
this program, energy experts from the State have been involved in all project development and
oversight and have performed a thorough review of the engineering and energy savings
calculations to ensure that the City of Salina is receiving the best possible project. The Kansas
Energy Office will maintain it's involvement in this project throughout construction and for the
life of the project.
From the onset of this Investment Grade Audit, it has been the intention of Chevron Energy
Solutions to align this energy conservation and capital improvement project with the stated goals
of the City's 2008 Shared Vision Statement and Strategic Plan. In that plan, the City calls for a
well maintained city with the highest possible quality municipal services, the start of efforts to be
an environmentally friendly "green" community, and making practical efforts to preserve natural
resources. This Performance Contract with Chevron Energy Solutions contributes. directly to all
ofthese issues. This program directly conserves energy and water resources in City facilities to
not only save energy dollars that can be reinvested, but to also having a positive environmental
impact on the City's carbon footprint. In fact, the energy savings as a result of the recommended
program equate to removing 74 cars from the road or planting 93 acres of trees each year.
Knowing that water is increasingly becoming a scarce resource, this program also goes to great
lengths to conserve water wherever possible. In addition to the energy and water reductions, this
program provides capital improvements at the Police Station and the Health Department, to give
City employees and citizens a better working and living environment, and provides an
opportunity to make these improvements now instead of little by little over time on an emergency
basis.
The process of implementing a performance based guaranteed energy program, as practiced by
Chevron Energy Solutions through the Facility Conservation Improvement Program includes the
following four phases:
Chevron
~
Energy Solutions
1-1
.
.
.
Section 1
Executive: Summary
Phase
I
II
III
IV
Description
Feasibility Energy Analysis
Investment Grade Audit (IGA)
Implementation
Measurement and Verification
This report documents Phase II of our process, the Investment Grade Audit. In developing this
report, Chevron ES has worked on-site with the City of Salina personnel to address the concerns
of the facilities and uncover areas for energy conservation opportunities.
Beginning the first week in June 2008, Chevron ES staff visited the nine (9) City facilities
included in the scope of the project to collect information. We examined every component and
system that uses energy, including lighting, mechanical systems, building envelope systems,
internal electrical systems, and miscellaneous "plug load" equipment. On following visits, a
detailed survey of each lighting fixture and water fixture in the nine buildings was performed by
specialized teams. Our data was collected by direct observation of equipment, site drawings,
operating schedules and other relevant data. We also conducted interviews with City personnel
to gain a better understanding of operational issues and their objectives for this program. After
several months of analysis and subsequent site visits, Chevron Energy Solutions has been able to
design a program that will maximize savings in order to address deferred maintenance issues
while improving comfort and operational controL
In addition to the physical surveys, Chevron Energy Solutions and the Kansas Energy Office held
several meetings with City Administration to determine which capital improvement issues were
most pressing and could be addressed through this program. Through these discussions, the
much needed improvements at the Health Building and the Police Station were brought to light.
Both of these buildings require significant facility improvements that the City has not been able
to budget necessary funds for a comprehensive solution. This Performance Contracting program
will allow the City to make the necessary changes and improvements to these buildings now to
improve comfort, control and operational maintenance, instead of waiting for available funds
from the City's capital budget.
Through this team effort, Chevron Energy Solutions was able to identify savings opportunities
that will improve the City's facilities and provide a reduction in maintenance costs. Through
implementing an energy savings performance contract, the City of Salina will be able to
pro actively solve facility needs through a proven mechanism ensuring a guaranteed fixed price
and no additional taxpayer burden. This program solves problems now through money that was
previously going to your utility companies and has a tremendous positive impact on the
environment. Our program focused around the six general categories:
. Lighting Conservation Measures
. Mechanical Improvement Measures
. Building Envelope Improvement Measures
Chevron
~
Energy Solutions
1-2
.
.
.
Section 1
Executive Summary
. Equipment Control Conservation Measures
. Water Conservation Measures
. Utility Sourcing Alternatives
Chevron Energy Solutions is pleased to present a customized energy savings improvement
program for the City of Salina. Our meetings with Mr. Jason Gage, Mr. Steve Snyder, Mr. Byron
Erickson and the rest of the City personnel outlined their goal to maximize potential energy
savings and leverage excess savings. We would like to express our thanks to all of the staff
members that provided assistance during our visits and telephone calls:
Jason Gage, City Manager
Steve Snyder, Director - Parks and Recreation
Byron Erickson, Facilities Superintendent
Jim Meyer, Bicentennial Center
John Highkin, Smoky Hill Museum
Michael Spicer, Salina Community Theatre
Jack Rolfs, Director, IT Department
Margaret Kay, Accounting
Cindy Beneke, City of Salina Water Department
Loralee Tibbetts, Health Department
Additionally, we would like to recognize the Chevron Energy Solutions Team:
John O'Herron, Business Development Manager
Ron LaCombe, Senior Project Manager
Randy Jameson, Project Manager
Jacquelynn Morris, Lead Project Engineer
Brandon Well, Energy Analyst
Jason Patterson, Engineering Intern
Steve Schulte, M&V Specialist
Our objective is to provide a comprehensive list of energy conservation measures (ECMs) and
energy related capital improvement measures (CIPs) to assist the City of Salina in tailoring a
program that addresses immediate facility and operational needs as well as long-term
infrastructure needs. Below is an outline of this Investment Grade Audit report:
Section 1 Executive Summary includes a financial proforma of a comprehensive project
scope, as well as a general overview of the recommended projects.
Section 2 Energy Conservation Measures includes a narrative describing each ECM and
CIP and a line-by-line list of potential costs and savings for each ECM.
Chevron
~
Energy Solutions
1-3
.
.
.
Section 1
Executive Summary
Section 3 Historical Energy Consumption includes a summary of electric, natural gas,
water and sewer consumption and cost history.
Section 4 Operations and Maintenance includes details ofthe operations and
maintenance savings and capital avoidance savings associated with
implementation of the ECMs and CIPs, as well as some general O&M
guidelines.
Section 5 Data on Present Facilities summarizes the current types of mechanical,
lighting, heating, ventilation and air-conditioning (HV AC), and control
systems in the buildings.
Section 6 Measurement and Verification, describes the recommended methods of
savings verification employed by Chevron ES to assure that actual savings
meet or exceed projected savings.
Section 7 Environmental Impact, discusses the environmental benefits of the project,
including reduction in emissions and removal/disposal of PCB ballasts.
Appendices include various supporting documentation as listed in the Table of Contents.
Recommendations
The recommended program includes comprehensive water and lighting conservation programs at
all nine buildings, and controls projects, a building improvement project, and alternative sourcing
of natural gas at selected buildings. At Fire Stations No. 1 and No.2, the golf clubhouse, the
Health Department building, and the Salina Community Theatre the program includes
installation of network programmable thermostats. Controls at the Smoky Hill Museum will
receive some modification to reduce energy consumption at this building. The mechanical
projects include replacement of five aging HV AC units at the Health Department. To address
some significant comfort needs at the Police Department building, the feature project in the
program is the replacement of the HV AC air handling units and control system. The program
also includes replacement of a leaking skylight in the Health Department building and
replacement with an insulated roof and ceiling. Utility cost savings will be realized with
consolidation of gas meters at the golf clubhouse and bulk purchasing natural gas for the
Bicentennial building, the Memorial Hall, and the Police building.
Table 1-1 provides a summary of the projects in the recommended program. Detailed
descriptions of each proposed measure, as well as the other measures that were evaluated, are
provided in Section 2 - Energy Conservation Measures. This section also includes several
projects initially considered but not recommended due to length of payback or other reasons.
Chevron ES will work with the City to tailor a program that best meets the City objectives.
Chevron
_ Energy Solutions
...
1-4
.
.
.
Section 1
Executive Summary
Table 1-1
Summary of Energy Conservation Measures for
City of Salina
Annual Eleetric Electric Gas Gas water' Wateri Total Oller. &
Project Demand Energy Dollar Energy Dollar Sewer Sewer Utility Maint. Total Simple
Cost Savings Savings Savings Savings Savings Savings Savings Savings Savings Savings Payback
Enlilrov CO!lS!If1/ation U...""es 1$1 IlkW-mo IkWhI 1$1 Imcfl ISI Icetl ISI ($) ($) 1$1 IYearsl
Investment Grade Audit $12,012
L - Lichtinc Uoorades 11 \ $230,886 1,131 241,504 $18,568 0.0 $0 0 $0 $18,568 $4,413 $22,981 10.0
W - Domestic Water Uoorades (2) $149,785 0 -1,965 -$103 26.3 $298 1,224 $7,688 $7,883 $819 $8,702 17.2
C1 - Networked Proorammable Thermostats $74,628 0 80,059 $4,212 468.5 $5,079 0 $0 $9,291 -$2,945 $6,346 11.8
C2 - Controis Uocrades $4,141 6 16,173 $872 0.0 $0 0 $0 $872 $0 $872 4.7
CIP4 - Renlace Snlit-S""tem Units $172,421 30 3,410 $381 4.6 $44 0 $0 $425 $0 $425 405.7
CIP5 - HVAC Imnrovements I Controls Unarad $643,304 -152 29,474 $611 118.8 $1,380 0 $0 $1,991 $3,500 $5,491 117.2
CIP6 - Remove Sk iicht $61,605 4 2,252 $149 . 38.3 $366 0 $0 $515 $750 $1,265 48.7
U1 - Contract Natural Gas 131 $4,511 0 0 $0 0.0 $12,545 0 $0 $12,545 $0 $12,545 0.4
U2 - Consolidate Gas Meters $4,894 0 0 $0 0.0 $0 0 $0 $0 $294 $294 16.6
Total $1,358,187 1,020 370,$07 $24,690 656.5 $19,712 1.223.8 $7;688 $52,090 $6,831 $58,921 23.1
NOTES: (1) Lighting ECM pricing is based on fixed costs distributed over the projects at each building. Pricing may change if some buildings excluded in final program.
(2) Water ECM pricing is based on fixed costs distributed over the projects at each building. Pricing may change if some buildings excluded from in program.
(3) ECM U1 procurement assistance services pricing is based on a fixed cost distributed among all three buildings. Pricing may change if some buildings excluded from program.
Financials
The financial aspects of the project are presented in the following Table 1-2. Working in
conjunction with the Rod Franz, the City Finance Director, a net present value of comparative
scenarios is presented. A 3.0% annual inflation rate was used for electric and natural gas energy
savings, a 9.0% inflation rate was used for water and sewer savings as determined from the future
rates that have already been established, and 2.5% annual inflation rate was used to project
materials savings. Materials savings only were shown for all operations and maintenance
savings. No in-house City labor costs are included in the materials savings, although a reduction
in labor expended will be recognized with the implementation ofthese ECMs. All projects in
this report are comprehensive including engineering, construction, installation labor, and
materials. The total implementation costs were determined in accordance with paragraph 5.1 of
the Investment Grade Audit Agreement. A breakdown ofthese costs into the State Master
Agreement categories follows in Table 1-3.
Chevron
~
Energy Solutions
1-5
.
Section 1
Executive Summary
Table 1-2
Financial Aspects of Performance Based Energy Program for
City of Salina
Salina, Kansas
Program includes ECMs L 1-L6, C1, C2, W1-W5, U1, U2, CIP4, CIP5, CIP6
Implementation Cost
CEA Fee
Totall!SCO Project Fee
$1,346,175
$12,012
$1,358,181
FCIP fe~ (payable to the Kansas Energy Office)
Total Cost of Project
$29,582
$1,381,769
1 2 I 3 I 4 5 I 6 7 I 8 I 9 10
City of Salina Budaet Plans L2, CIP4, CIP5} ImDlementation of Recommended Program
Operational Net Present Operational Present
Total and Program Value of Net Total and Net Program Value of Net
Capital Energy Maintenance Costs Program Energy Maintenance Costs Program
Year Budget Savinas Savinas {Savinas} Costs Savinas Savinas {Savin as} Costs
0 $0 $0 $4,000 $4,000 $4,000 ($26,045) ($2,616) $1,329,526 $1,329,526
1 $32,000 ($285) $3,967 $35,682 $34,475 ($54,114) ($3,331 ) ($57,445) ($55,502)
2 $442,263 ($1,312) $3,685 $444,636 $415,073 ($56,240) ($3,414) ($59,654) ($55,688)
3 $10,200 ($2,552) ($1,037) $6,611 $5,962 ($58,4 75) ($3,500) ($61,975) ($55,898)
4 $6,000 ($3,415) ($1,304) $1,281 $1,117 ($60,827) ($3,587) ($64,414) ($56,133)
5 $0 ($3,517) ($1 ,335) ($4,852) ($4,085) ($63,303) ($3,677) ($66,980) ($56,395)
6 $0 ($3,623) ($1,362) ($4,985) ($4,055) ($65,912) ($3,769) ($69,681 ) ($56,686)
7 $0 ($3,732) ($1,376) ($5,108) ($4,015) ($68,663) ($3,863) ($72,526) ($57,005)
8 $0 ($3,844) ($1,365) ($5,209) ($3,956) ($71,566) ($3,960) ($75,526) ($57,355)
9 $0 ($3,959) ($1,332) ($5,291 ) ($3,882) ($74,632) ($4,059) ($78,691 ) ($57,738)
10 $0 ($4,078) ($1,280) ($5,358) ($3,798) ($77,873) ($4,160) ($82,033) ($58,155)
11 $0 ($4,200) ($1 ,217) ($5,417) ($3,710) ($81 ,301 ) ($4,264) ($85,565) ($58,607)
12 $0 ($4,326) ($1,157) ($5,483) ($3,629) ($84,930) ($4,371 ) ($89,301 ) ($59,098)
13 $0 ($4,456) ($1,123) ($5,579) ($3,567) ($88,776) ($4,480) ($93,256) ($59,628)
14 $0 ($4,590) ($1,123) ($5,713) ($3,530) ($92,853) ($4,592) ($97,445) ($60,200)
15 $0 ($4,728) ($1,146) ($5,874) ($3,506) ($97,180) ($4,707) ($101,887) ($60,815)
16 $0 ($4,870) ($1,174) ($6,044) ($3,486) ($101,776) ($4,824) ($106,600) ($61,477)
17 $0 ($5,016) ($1,204) ($6,220) ($3,466) ($106,661 ) ($4,945) ($111,606) ($62,187)
18 $0 ($5,166) ($1,234) ($6,400 ) ($3,445) ($111,857) ($5,069) ($116,926) ($62,948)
19 $0 ($5,341 {$1,4651 ($6,586 ($3,4261 ($117,388' i$5,195 ($124,583 ($63,764
Iota resent valUe cost {Savlnasl: !l:40s 072 $214248
.
(1 )
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
. (10)
Notes By Column:
Years after implementing retrofit changes.
City budgeting requirement estimates to address planned or required projects.
Projects include L2 (in four buildings) and partial of CIP4 and CIP5.
Electric and natural gas energy savings are escalated by 3.0% to account for inflation.
Operational and Maintenance Savings estimates are escalated at 2.5% to account for inflation.
Operational and Maintenance Savings for existing Police HVAC replacement cease after year 2.
Net Program Costs (Savings) = (2) - (3) - (4).
Net Present Value based on an annual discount rate of 3.5%
Electric and natural gas energy savings are escalated by 3.0% to account for inflation.
Water I sewer savings are escalated by 9.0% calculated from Resolution 08-6523.
50% of savings recognized for construction year.
Operational and Maintenance Savings are stipulated and escalated at 2.5% to account for inflation.
50% of lighting and water savings recognized for last portion of Construction Period.
Net Program Costs (Savings) = - (3) - (4). Year 0 includes Total Esco Project Fee of +$1,358,187.
Net Present Value based on an annual discount rate of 3.5%
Chevron
~
Energy Solutions
1-6
.
.
.
Section 1
Executive Summary
The Recommended Program in Table 1-2 above will save $54,115 in utility costs and $7,164 in
material and operational costs after the first year. City budget impact of implementation has a
Present Value cost of $405,072 over 19 years. The Recommended Program with additional
energy and utility cost savings measures has a Present Value cost of $214,248, leaving a
residual net present savings of$190,824 with the implementation of the $1,358,187
Recommended Program of improvements.
Table 1-3
Required Kansas Energy Office Pricing Summary per State Master Agreement
1m Diem entation Costs
ESCO Construction
Construction Bonds & Subtotal Engineering Construction Period Overhead Total
ECM No. ECM Descnotion Costs. Insurance Cost Desion Manaoement Interest CQmmissionino M&V & Profit Price
IGA Investment Grade Audit $12,012 $12,012
L Ughting Upgrades $161,685 $3,234 $164,918 $10,720 $9,071 $4,948 $6,597 $6,597 $28,036 $230,886
W Domestic Water Upgrades $104,892 $2,098 $106,989 $6,954 $5,884 $3,210 $4,280 $4,280 $18,188 $149,785
C1 Networked Programmable Thermostats $52,261 $1,045 $53,306 $3,465 $2,932 $1,599 $2,132 $2,132 $9,062 $74,629
C2 Controls Upgrades $2,900 $58 $2,958 $192 $163 $89 $118 $118 $503 $4,141
CIP4 Replace Split-5ystem Units $120,743 $2,415 $123,158 $8,005 $6,774 $3,695 $4,926 $4,926 $20,937 $172,421
CIP5 HV AC Improvements I Controls Upgrad< $450,493 $9,010 $459,503 $29,868 $25,273 $13,785 $18,380 $18,380 $78,116 $643,304
CIP6 Remove Skylight $43,141 $863 $44,004 $2,860 $2,420 $1,320 $1,760 $1,760 $7,481 $61,605
U1 Contract Natural Gas $3,780 $76 $3,856 $0 $0 $0 $0 $0 $656 $4,511
U2 Consolidate Gas Meters $3,427 $69 $3,496 $227 $192 $105 $140 $140 $594 $4,894
. Construction Costs are vaiid for 90 days from October 1, 2008.
Ener2V Savin2s Performance Contract Benefits to the City of Salina:
The City of Salina will derive many benefits from the implementation of a comprehensive energy
performance contract. Just a few of the benefits are listed below.
. Improved Working Environment: New and improved HV AC systems and temperature
controls will provide a more comfortable working environment for the City of Salina staff
and visitors. Additionally, lighting will be upgraded throughout all facilities. New
lighting systems are designed to meet the llluminating Engineers Society (IES) standards.
. Cost Control: Performance contracting provides a means to divert monies to facility
improvements that would otherwise be spent on paying utility bills. Many of the items
planned for replacement are well beyond their useful, functional life. Therefore, these are
items that the City will need to replace in the near future. Through this performance
contract, the City of Salina is able to pro actively make these improvements at one time,
utilizing energy saVIngs and very favorable Interest rates to help fund the replacements
and also lesson the burden on taxpayers. This program has a guaranteed fixed cost which
also eliminates change orders from the construction.
Chevron
V
Energy Solutions
1-7
.
.
.
Section 1
Executive Summary
. Energy Savings and Environmental Impact: The proposed energy conservation
measures will reduce energy consumption and costs. The reduced energy consumption
will result in less power plant consumption from the electric utility and much less natural
gas usage as well. Other examples of positive environmental actions with some of the
ECMs include removal of hazardous light ballasts. Implementation of the project will
make a strong statement about the City's commitment to energy efficiency and
environmental responsibility.
. Reduced Maintenance: Several ofthe ECMs will significantly reduce maintenance
costs and hours. No financial savings have been claimed for the City of Salina Facilities
Department in-house labor savings. However, several of the projects will result in
significant labor savings, freeing up the maintenance staff to address other items.
Conclusion
Chevron Energy Solutions recommends that the City of Salina move forward with a guaranteed
energy savings performance contract. The evaluation shows that the resulting energy and
materials savings will significantly reduce the cost of funding a wide range of projects that will
benefit the City for years to come. The preparation of this report would not have been possible
without the cooperation of City of Salina personnel. Chevron ES found the entire staff at the
City of Salina extremely cooperative and supportive throughout the duration of the Investment
Grade Audit. The spirit of cooperation exhibited by the City of Salina staff was instrumental in
the successful completion of this Investment Grade Audit and will no doubt contribute to the
successful implementation of the projects.
Chevron
_ Energy Solutions
-
1-8
..
.
.
Section 2
Energy Conservation lMeasures
Various energy conservation measures (ECMs) and energy related capital improvement
measures (CIPs) were evaluated at the City of Salina. The measures considered covered the
categories of building envelope, lighting, water conservation, heating, ventilation, and air
conditioning (HV AC), and energy management systems (EMS). Table 2-1 on the following
page presents a summary by project type. Table 2-2 presents a summary of costs, consumption
savings, dollar savings, and simple payback for each measure.
Following Table 2-2 are descriptions for each ECM and CIP with an explanation ofthe existing
system operations, and an explanation of how these systems can be modified or replaced to
provide more efficient and reliable operation.
The primary method utilized for calculating energy and water savings was modeling of the
individual ECMs through detailed analysis in spreadsheets utilizing bin weather data, annual
load variation, equipment energy use, and schedule parameters. The savings were calculated as
the difference between existing equipment definition (efficiencies, full load energy use and
capacities, part-load profiles, and operating schedule) and proposed equipment modification or
replacement.
The type of calculation described above is very accurate for well-defined ECMs. For instance,
water consumption savings for domestic water retrofits were determined by individually
subtracting the rated water flow ofthe retrofit from the existing fixture water flow. Sample field
measurements of existing lighting fixture electric usage were taken to calibrate the
manufacturer's data.
Chevron
~
2-1
Energy Solutions
.
.
.
Section 2
Energy Conservation Measures
City of Salina
Energy Conservation Measures
Lighting
Included in Recommended Pro ram
L 1 De-lamp and Install Specular Reflectors
L2 T12 to T8 Fluorescent Conversion
L3 32 Watt to 28 Watt Fluorescent Conversion
L4 Incandescent to Compact Fluorescent
L5 LED Exit Signs
L6 Metal Halide to New Fluorescent Fixtures
Mechanical and Building Envelope
CIP4 Replace SplikSystem Units
CIP5 HVAClmprovements I Controls Upgrade
CIP6 Remove Skylight
Controls
Water
Utilities
C1 Networked Programmable Thermostats
C2 Controls Upgrades
W1 Replace Faucet Moderators
W2 Replace Toilets
W3 Retrofrt and Replace Urinal Flush Valves
W4 . Replace Faucet and Spray Valves
W5 Replace Water-Cooled Ice Machines
U1 Contract Natural Gas
U2 Consolidate Gas Meters
Not in Recommended Pro ram
CIP1 Replace Unit Heaters with Infrared Radiant Heat
CIP2 Replace Boiler
CIP3 Replace Condlmsing Unites)
CIP7 Ceiling Modification I Insulation
NRControls Upgrade
NR Install Trash Compactor
NR Replace Condensing Units
NR Replace Steam Boiler and Rezone Piping
NR Replace Window AC with Centralized Cooling
NR Install ArenaGeiling and HVAC
NR Downsize Water Meter
Table 2-1
....
Q)
c:
Q)
U
tli
"2
c:
2
c:
Q)
t.l
iii
E
::l
Q)
Ul
::l
::!
J:
~
o
E
en
N
~
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Chevron
U
Energy Solutions
2-2
.
=
l"I'J
~
~
~
=
Q
.-
...
~
I>
;..
~
l"I'J
=
Q
U
~
ell
;..
~
=
~
.
M
=
Q
.,]
N
I
N
Q)
:c
t'lS
I-
...
.E
II)
Q)
...
~
II)
t'lS
Q)
:E
c
o
; t'lS
t'lS C
~a;
1I)fJ)
C....
o 0
(,) ~
~-
~(,)
Q)
C
W
....
o
~
t'lS
E
E
~
fJ)
.!l~Ui
Q. III ...
l: ,g III
.= >0 >CD
0:'~
III
ili m
'0 ,5 ti
"'" ~;;;;
o
olI~
~ .i
8'~
III
~,-:o
'> !!
III
o
->0
.m~
Q.....
"'"5
III
m
.5 Ii
~ ...
o
III
~,-:o
'> !!
III
o
III
1 ~ ~ ~
-;3:.-u
3t~~.g
o
i:'-
S;
III CD
3t0
...
III III
III =
C) 0
e
III
~,-:o
'> !!
III
o
>0111
1Ile'~'i
~~">_Ii
W~-
u ...
i:4!
b 0
me
III
~,-:o
'> !!
III
o
~~~:c
u ... c: ::..
CD ~ '> ~
iijw ~;:;:
ili "CI III 0
::I Ii ~ e
~ e; '~ ~
0::::
-
gUiIi
of' 8 ;;:;
a.
l:II CII
"CI "CI
ii 8
o Ncqr--O......'<I" r--N r--co '<I" CO
or-:........t<riccir-:.or-:<ri<riocci
~T"'"T"" ('t)(V)('l')OT""~('l') or-
'<1"...... 10
T""C\lCCNC\llt)CJ)U').,,-lt)C\I
CO O'<l"r--......o)'<I"NO) CO 10
O)r--MCO'<l"'<I"CO'<l"'<I"N......
NCOcDfh~~~fh.o~w
N~~ ~~~ ~~
~
10'<1"
'<1"0)
ION
N~
......
~
MO)IOOOOOOOOOO'<l"
T""T"'""=:tER-OOtR-t:.9-01OfhfhO')
'<I"COo) co...... lOr-- N
..t~N ~M M~ ~
fh fi( f;f3- 6'7
CX)('I)T"'"NNLOCDlt)T"'"LOC\l
CO CO O)r--......o)'<I"NO)...... 10
IOCONCOCOMCO'<l"O)IO......
COr--:o)tI7fhT"'"T"'"th~fhut
o ~ ~ EIT EIT EIT
100
'<I" EIT
10
N
......
EIT
000000000000
~CO~ElTElTEIT~EITEITEITEIT
co
r-:-
~
00
EIT EIT
0'<1"00000000000
N
N_
......
OCOO)OOIOO'<l"OCOO)
ElTO)r--ElTO)O)~'<I"COCOM
NO .......("1') E/7('t)("t').,,-
fhL6 foA-r-"' ~f;f3-(h
~ EIT EIT
100
'<I" EIT
10
N
......
EIT
OMIOOOOOCOCOMOOO
o cci<rio<riOO..t<ri<riN 00
C\lCO CON T"'"('l')T"'"
'<I" ...... ......
co ('t)NC\lNOO)T'""T"'"o)M 00
CCOT"'"......C\Ifh'VCX)T""~T"'"fhl;h
LOT"'"NCOER- CX)('l')COT"'"fh
ct5~..t~ ":EIT~EIT
...... EIT EIT
EIT
'<I"IOO)MM
OCOIOr--N
~CDOT"'"'o::t
~ ~g~
N
OOO'<l"Nr--
(O"C""'"I"---LO.......
O)'<I"'<I"N......
..tMai'N
N N
00
c;;oocooo~g~-.;:tT"'"OO
...... ......
.
C\ICOIOOO-c-O.......LOT""":::I"I.C)(W')T""v
~~ ~~~~~~~~n~~ ~~_
NOai'..t..tMNai'NM":":'<I"'<I"
......M'<I"r--ElTIOCOCOr--'<I"COCOEITEIT
ER-NT""W fl7T"""fhT"'"COtR-fh
EIT EIT EIT ~ EIT
1--
...J ...J J:_
~~~U)......
N_
......
D.,.
D.,.J:_J: a. J: a.:2 t!)
Nt!) ai
0)
-0
ltl
~
:J
III
l!!
::I
III
III
CD
:i
c:
o
i
~
CD
III
c:
o
o
~
CD
C
W
l!!
'" 2
a; m
1;) J: CiJ
o "0 ~
E ~~~.~
IN CD ~ ~ ..... .....
I';;;~ E .~'~,~ ~
0)(1) :i: c:J:::: ~~
~~ en ~EJ9 ::~~
-gE 2 a2~ c(/)JB
~ :s :3" Eltl ",!l! ,,!(! E - 2 ,~ ~
-0'" (1)- '-'~m'" -s,ltl"-'''''
::I 0) <D ::'-oJ: <Dc 2l..!,. g1~.._2"jii "'ltl
<(-O_"'o'ltl~ 0""'-
~~~a:~5S~&gg'g~t!)
l!!.Q-o~:J(I)(J)(J)(I)E>(J):2z2
...J'-_ 0000- ~ ltl
t!) ~cn-c.!!lltlltlltlltlOOc'O:!:!
- c' (I) 0 O2 g. g. c. <( E = I!! (5
5i"" E~~O)(J)(J)(J)>(J)'(j)c'"
E-s, 0(1) 00:: 0::0:: 0:: J:O:: 0 05
__-~'Ozc..> I I I I I I I ()()
~ -7.:- I I a:~~~~~~ I I
~:i~o~ooooooo;S
E
e!
Ol
o
0-
E
,g
-c
(J)
-c
::I
E~
Ol Ql
~ tJl
~~
0..=0
.5 S
E~
.g E
o
'"
E
e!
Ol
e
a.
Cij
r:
<;::
.5
-c
Ql
-c-c
::I (J)
~~-;
QlOOl
~ ~ ~
c: CI) 'fi
:Q~>-
~~~
~ E g
g ~ :2
-go:
& ~ ui
r: Ql Ol
Ol Ol r:
-5 ffi ~
~ -5 ~
E ~ :g
~E.c
:2 g>;;
a: '0 m
~ Ol
cD a.. 5
~ g> ~
~~~
-5.E~
cu ..c "C
~~~
Ol (J) -c
J!!1\it5
~ J!! 8
'oo.=- .~ ~
o x
~ a~
i:55
E; CD -g
~ ~ rJ
~~~
::> .-
]!:g~
"'C t5 "0
j!! =0 .~
~ .21 (f)
o '" (J)
~ 8'~
~~~
5 q::: CD
"'C c: g
IDO]!
'" -c tJl
ca Q) "00
.c '" tJl
.~ ~ m
orne
c: .- CD
:2 g> E
0.."0 ~
:2 ':5. 5
u:2e
wuo.
.~~ ::;
~*:2
:::is:&::
=-~fi
cij
W
I-
o
Z
l""l
.
N
i:f
(J)
o
:S
Cij
0)
J:
J:
Qi"
'"
::I
o '-
:E-m
.2 (J)
~~
8~
. ::I
t!)E
._ E
'- 0
20
c .
t5"'"
]j E
c ::I
c (J)
~ ~
~~
i'i'i:f
~~
o
~~
o .
~0
o
;:;0.
S CD
me
~ Q)
u:: .2
.'0
N'7
';':n..
~~
cJ:
2:ii
S <5
~~
.!:: ::i
u.,
::i
\/I
c:
o
";:;
::J
'0
VI
>.
01
....
QJ
c:
W
u;
(J)
-0
o
o
m
c
B
'5
ell
il)
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
Ll
ECM Title:
De-lamp and Install Specular Reflectors
ECM Description:
All nine (9) City of Salina facilities surveyed under the scope of this study utilize light fixtures
that operate three or four linear lamps. These fluorescent luminaires
are candidates for retrofit with a specular reflector. This ECM
considers de-lamping the three or four lamp fixtures down to two 28
watt T8 lamps. This can be achieved without sacrificing light quality
by retrofitting the fixtures with enhanced aluminum specular reflectors,
and new electronic ballasts. This ECM also considers retrofitting
fixtures from two U-tube lamps to two 17 watt T8lamps, reflectors,
and new electronic ballasts. There are 866 retrofits included in this
ECM.
Most of these fixtures have a poor reflective cavity design, resulting in light being trapped in the
luminaires and never emerging as "usable" light. This energy is converted to heat within the
luminaire, which shortens lamp and ballast life and contributes to additional cooling load.
The lighting industry has seen continued advances in the field oflight reflection, which has
resulted in the introduction of specular reflectors. With the specular reflector system, up to half
of the lamps and ballasts can be removed without reducing the light level at the work surface.
Each reflector is custom designed using sophisticated optical engineering and computer-aided
design. The reflector is bent at optimum angles for each fixture type. The enhanced aluminum
material optimizes reflectivity and overall performance. The reflector produces uniform lighting
that is comfortable and aesthetically pleasing without changing the appearance of existing
fixtures. Use ofthis reflector causes almost all ofthe light energy within a fixture to be
transmitted as usable light. Resulting light levels are less diverse because of the reflector's
geometric design. This induces even distribution of light and reduces glare.
This ECM will reduce the number of ballasts required to operate the same number oflamps
because the older magnetic ballast can operate a maximum of only two lamps, while electronic
ballasts can control up to four lamps. With new electronic ballasts, areas that have luminaires
mounted end-to-end can be tandem ballasted. Tandem ballasted fixtures house the ballast in one
luminaire, while operating lamps in one, or more ofthe nearby luminaires.
Due to the significant reduction in the amount of lamps and ballasts to maintain, this lighting
ECM will generate considerable maintenance savings. The new lamps and electronic ballasts
have average life ratings of approximately 24,000 and 50,000 hours respectively and are
guaranteed by the manufacturer for 3 years (lamps) and 5 years (ballasts).
Chevron
~
Energy Solutions
2-4
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
L2
ECM Title:
Tl2 to T8 Fluorescent Conversion
ECM Description:
Eight (8) of the City of Salina facilities surveyed currently utilize fluorescent fixtures that
operate Tl2lamps. Standard magnetic core and coil ballasts are used to operate these lamps.
This ECM considers retrofitting the existing fluorescent fixtures with T8 lamps and new
electronic ballasts. There are 870 retrofits included in this ECM.
The combination ofT8lamps and electronic ballasts is one of the most technologically advanced
fluorescent lighting systems available. It is proven to be more energy
efficient than the conventional Tl2lamps and magnetic ballasts. The
electronic ballasts operate at high frequencies to reduce the power
requirements, while maintaining the appropriate light level. Electronic
ballasts reduce the tendency of fluorescent lamps to flicker or ballasts to
hum. T8 lamps use rare earth phosphor minerals, which provide superior
color rendition similar to the familiar energy saver or warm white lamps.
The combination ofT8lamps and electronic ballasts also operate
approximately 30 degrees cooler than comparable Tl2lighting systems,
offering the potential for summer cooling savings and longer lamp and ballast life.
In addition to energy savings, this lighting ECM creates maintenance
savings as well. Magnetic ballasts can control a maximum of two
lamps, while electronic ballasts can control up to four lamps, therefore,
reducing the number of ballasts to maintain. Some areas that have
luminaires mounted end-to-end can be tandem ballasted. Tandem
ballasted fixtures house the ballast in one luminaire, while operating
lamps in one, or more of the nearby luminaires.
Additional maintenance savings will also be achieved by replacing the existing, older lamps and
ballasts which may be nearing the end of their useful life ratings. The new lamps and electronic
ballasts have expected life ratings of approximately 24,000 and 50,000 hours respectively and
are guaranteed by the manufacturer for 3 years (lamps) and 5 years (ballasts).
Chevron
~
Energy Solutions
2-5
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
L3
ECM Title:
32 Watt to 28 Watt Fluorescent Conversion
ECM Description:
Seven (7) City of Salina facilities utilize fluorescent fixtures containing 32 watt T8 lamps and
standard electronic ballasts. A reflector retrofit is not feasible
with these fixtures and most contain only one or two lamps.
Some of the T8 lamps in these fixtures have burned out or are
nearing the end of their lamp life. This ECM considers
replacing all the existing 32 watt lamps in one or two lamp
fixtures with new 28 watt T8 lamps. The existing electronic
ballasts will be re-used wherever possible. There are 507
retrofits included in this ECM.
Once a lamp bums out after years of usage, the illuminance that was originally designed for the
area is no longer achieved. Light levels lower than the original design can adversely affect
workplace efficiency, safety, and productivity.
In addition, lamps nearing the end of their life expectancy experience a decrease in efficacy
(lumens per watt) which is commonly referred to as lumen depreciation. Depreciated or burned
out lamps consume the same amount of energy as a new lamp of the same wattage but produce
less light than what was designed. Group re-Iamping ensures the most foot-candles per energy
dollar.
Group re-Iamping maximizes labor efficiency and reduces the number of workplace
interruptions. This ECM ensures lamp continuity throughout the facilities, which will result in all
fluorescent fixtures having uniform lumen output, and color temperature. The proposed 28 watt
T8 lamps will fit in the existing standard T8 bi-pin sockets without luminaire modification. The
new lamps have expected lives of approximately 24,000 hours, and they are 100% guaranteed by
the manufacturer for 3 years.
Chevron
~
Energy Solutions
2-6
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
ECM Title:
ECM Description:
L4
Incandescent to Compact Fluorescent
The City of Salina utilizes incandescent light fixtures in many of its facilities. This ECM
considers replacing these lamps with new screw-in compact
fluorescent lamps. There are 601 retrofits included in this ECM.
Incandescent sources provide such desirable qualities as instant
light, good color rendition, low replacement cost, and ease of
control in dimming situations. However, they are the least efficient
type of light source currently available. Of the total input power, only 10% emerges as visible
light, 90% is converted into heat energy, which contributes to additional cooling load. The
typical efficacy of an incandescent source is 20 lumens per watt and the typical life of an
incandescent bulb ranges between 750 and 1,000 hours.
Compact fluorescent lamps are a much more efficient light source with the
typical efficacy of 50 to 70 lumens per watt, and having an average rated
lamp life of 10,000 hours. Long lamp life results in reduced maintenance
costs associated with lamp replacements. The higher efficiency, lower
wattage compact fluorescent lamps can provide light levels iOf the same
intensity as an incandescent lamp up to 150 watts without sacrificing light
quality.
Chevron ES studied the replacement ofthe 300 watt PAR 56 spotlights currently used at the
Salina Community Theater and the Bicentennial Center. A one for one replacement of those
particular fixtures with compact fluorescent fixtures is feasible but would sacrifice lumen output
and dimming capability. A dimmable compact fluorescent PAR lamp with the equivalent lumen
output of a 300 watt halogen lamp is not yet available. This measure does not include or
recommend the replacement of those particular fixtures due to their specialized application.
Chevron
~
Energy Solutions
2-7
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
L5
ECM Title:
LED Exit Signs
ECM Description:
A combination of incandescent and compact fluorescent exit signs was found at seven (7) of the
City of Salina facilities surveyed. This ECM recommends replacing or
retrofitting the incandescent and compact fluorescent exit signs with new
light emitting diode (LED) exit fixtures including battery backups.
There are 67 retrofits included in this ECM.
The typical life of an incandescent exit light bulb ranges from 2,000 to
3,000 hours with an efficacy light source rating of 20 lumens per watt.
Of the total input power, only 10% emerges as visible light in an
incandescent lamp. Exit signs generally operate 8,760 hours per year; therefore, on average,
incandescent exit signs must be re-Iamped as often as 3 times a year, and up to once every 1 to
1 ~ years for fluorescent.
Chevron ES recommends replacing these fixtures with a LED exit fixture. LED fixtures meet or
exceed standards for exit lighting levels, while using only 2 watts of energy. These LED exit
fixtures have a five-year warranty and a twenty-five year projected life. This will reduce nearly
all maintenance labor and material costs associated with replacing bulbs.
Chevron
~
Energy Solutions
2-8
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
L6
ECM Title:
Metal Halide to New Fluorescent Fixtures
ECM Description:
Metal halide lamps are currently being used at Memorial Hall in the Arena and Access TV
Studio. This ECM recommends removing the 12
existing metal halide fixtures in the Arena and
installing 12 new 2'x4' high intensity fluorescent T8
fixtures. This ECM also includes replacing the metal
halide fixture in the Access TV Studio with 3 new T8
fluorescent fixtures. There are 15 retrofits included in
this ECM.
A standard metal halide (MH) lamp provides desirable qualities such as 100 lumens per watt and
a lamp life of 15,000-20,000 hours. However, the MH fixture generates a significant amount of
heat which adds to the facilities' cooling load. MH lamps also degrade rapidly between 12,000
and 15,000 hours. A typical metal halide lamp has a lumen output depreciation of approximately
40% over its average life rating and are-strike (re-start) time period of approximately 15
minutes.
The new fluorescent fixtures use significantly less energy and can generate nearly the same light
output as the MH fixtures due to the addition of reflectors. The reflectors in the 2'x4'
fluorescent fixtures distribute the light more evenly which minimizes shadows, reduces glare and
creates a more balanced brightness. The new fluorescent lamps have a greater average life
expectancy of 24,000 hours. In addition, the fluorescent fixtures are instant start (on/oft), and
generate substantially less heat than the MH lamps. Fluorescent lamps also produce a constant
and more uniform lumen output during an average life cycle in the areas they are used.
Chevron Energy Solutions recommends retrofitting the selected metal halide lamps with new
fluorescent fixtures with T8 lamps, and electronic ballasts. Due to the quicker re-strike period,
constant lumen output, and elimination of heat produced by metal halide lamps, this retrofit is
recommended for Memorial Hall.
Chevron
~
Energy Solutions
2-9
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
C1
ECM Title:
Networked Programmable Thermostats
ECM Description:
The Golf Clubhouse, Fire Station No.1, and Fire Station No.2 are equipped with primarily
standard, non-programmable thermostats that control their split systems and rooftop HV AC
units. The Health Department has a mix of non-programmable and programmable thermostats
controlling the split systems. At the Health Department, only one ofthe programmable
thermostats was found to have an active set back schedule programmed. This thermostat's clock
was set 12 hours in advance, causing the set back temperature to control during the building's
occupied hours instead of the unoccupied hours. Other programmable thermostats at the Health
Department were programmed with a time schedule, but were set with a constant temperature at
every time. If there is a temperature complaint at one of these building, maintenance personnel
must physically visit the site to assess the complaint. With a centralized system, much of this
time could be used more productively.
This measure proposes installing a wireless mesh networked solution from Millennial Net, an
industry leader in wireless mesh networking. The wireless system will allow an easy installation,
without having to run network cable through the buildings. Each building will have a Wi-Site
controller connected to the internet that will communicate with the networked programmable
thermostats and the web-based server. The web-based server receives data from each building's
Wi-Site; there is no communication initiated from the web-based server to the Wi..Site. There is
a monthly fee for hosting the web-based server maintenance of$30/month per site, which is
included as a cost (negative savings) in the O&M savings of Table 2-2. This hosting fee includes
all programming, scheduling, system monitoring and server maintenance.
The proposed networked programmable thermostat system will provide supervisory control of
the HV AC equipment at the Salina Community Theater, Golf Clubhouse, Fire Station No.1, Fire
Station No.2, and the Health Department. The system will enable the equipment during
occupied hours, and the existing local controls will control the equipment to maintain the space
temperature set point per the Standards of Control (see Appendix A). The system will allow the
equipment to operate during unoccupied hours to maintain a setback temperature.
This system will also allow all equipment controlled in these buildings to be monitored via the
Internet. Chevron ES has discussed connecting to the Internet with the City's IT Department and
found that due to security concerns, the system cannot use the City's existing intranet for access.
Since the system is not allowed to connect to the Internet at Fire Stations No.1, No.2, or the
Golf Clubhouse via the City of Salina's interface, it is proposed that a cellular Internet
connection be used at each of these sites. The estimated monthly cost per site for the cellular
connection is approximately $40, which has been included as a cost (negative savings) in the
O&M savings column of Table 2-2 for these three buildings. The City may choose from several
Chevron
U
Energy Solutions
2-10
.
.
.
Section 2
Energy Conservation Measures
options for the Internet connection, from a standard phone line or dedicated DSL line, or the
cellular connection mentioned above.
At the Salina Community Theatre and the Health Department, pricing is based on using a direct
gateway connection to the existing building's network for Internet access.
In addition to the networked programmable thermostats at the Salina Community Theatre, this
ECM includes minor ductwork modifications to provide improved control for the tandem air
handling unit. This unit serves rooms on all three floors of the building, including the rehearsal
room in the basement and offices on the main floor. Thermostatically controlled dampers and a
bypass duct with a local pressure-controlled damper actuator will be installed to better manage
airflow to these spaces based on occupancy.
The fire stations are occupied 24 hours a day, 7 days a week, but opportunity exists for savings
when the building is empty while the staff is out on an emergency call or when some areas are
unoccupied for extended periods oftime. At Fire Station No.1 and Fire Station No.2,
occupancy sensors will be installed for each thermostat to signal the rooftop air handling units to
go into unoccupied temperature mode when no occupancy is detected for a period of time.
The HV AC equipment will be scheduled according to the occupancy schedule of the spaces, as
listed in Appendix A - Standards of Control. It is imperative that maintenance personnel verify
the equipment schedules with the occupied schedules at least once a year to maintain the
proposed savings. Failing to maintain these schedules will prevent a large portion of the energy
savings from materializing. All of the schedules will be adjustable from the central location.
The scheduled "ON/OFF" time for most HV AC equipment will coincide with the occupancy
schedule for the area served by each piece of equipment.
In addition, the City of Salina will need to inform the occupants that the new temperature
controls are to be installed; and a procedure for permanent schedule changes and adjusting
temperature set points will need to be established.
The installation contractor will provide a complete I-year material and labor warranty for all
EMS components. Chevron ES will perform a point-by-point commissioning during the
installation to ensure that the EMS works properly.
The City of Salina will be responsible for the followin2 items:
1. Maintaining temperatures and operating schedules as detailed in Appendix A - Standards of
Control of this CEA Report.
2. Maintaining and repairing the thermostats after the I-year material and labor warranty
expIres.
Chevron
_ Energy Solutions
...
2-11
.
.
.
Section 2
Energy Conservation Measures
3. Installing (if extra lines are currently not available) and maintaining a dedicated Ethernet line
in each building for the system to have remote monitoring and control capability for the
Health Department and the Salina Community Theater.
4. Providing and maintaining dedicated Internet systems for Fire Station No.1, Fire Station No.
2, and Golf Clubhouse.
5. Ongoing monthly fees for remote web-server system.
All electrical installations will comply with the National Electric Code, the equipment shall be
UL or ETL (or other approved insurance organization) listed, and the overall installation will
conform to all Uniform Building Codes.
Savings are based on utilizing temperature bin data, and the corresponding occupied and
unoccupied hours. The reduction in energy usage was calculated based on shutting offHV AC
equipment during unoccupied hours and maintaining a temperature set back/set up. The hours of
operation for the existing, and for the proposed changes is located in the Standards of Controls
Table, located in Appendix A.
Chevron
~
Energy Solutions
2-12
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
C2
ECM Title:
Controls Upgrades
ECM Description:
The Smoky Hill Museum has an existing energy management system that is working well for the
building. The existing energy management system operates the building to maintain the space
temperature set point 24 hours a day, regardless of building occupancy to ensure that the exhibits
are maintained within desired parameters. During the audit survey, it was noted that several
office areas could be set back in unoccupied hours without causing any changes to the
temperature and humidity control of the exhibit areas or storage areas.
This measure includes programming time for the Invensys representatives to modify the
programs to initiate set back during unoccupied hours for the office areas. There are eight (8)
variable volume (V A V) reheat boxes serving these dedicated office areas. Implementing a
setback program would eliminate excessive heating or cooling of these spaces when unoccupied.
Savings are based on utilizing temperature bin data, and the corresponding occupi1ed and
unoccupied hours. The reduction in energy usage was calculated based on setting the office area
V A V boxes to their minimum position during unoccupied hours and eliminating or reducing the
electric reheat coil use. The hours of operation for the existing, and for the proposed changes is
located in the Standards of Controls Table, located in Appendix A.
Chevron
~
Energy Solutions
2-13
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
CIPl (not in recommended program)
ECM Title:
Replace Unit Heaters with Infrared Heaters
ECM Description:
Five hot water unit heaters provide space heating for the garage/apparatus bay at Fire Station No.
1. One unit heater has been disconnected, but may be used if needed. The unit heaters have a
constant flow heating coil, and the fan cycles on and off to maintain
the space thermostat's set point temperature. The apparatus bay
previously had an ice-melt system for the bay and the adjacent
driveway. The ice-melt system has been decommissioned and not
used for several years. The hot water boilers serving the building
were sized for the loads of the unit heaters and the ice-melt system.
With the ice-melt system no longer in use, the boilers are oversized
for their current load -- the four working unit heaters. Existing Unit Heater
This measure proposes abandoning the existing two hot water boilers in place, removing the unit
heaters, demolishing the existing hot water piping in the apparatus bay and equipment room, and
installing five new gas-fired infrared unit heaters to serve those
spaces. New gas lines, gas exhaust pipes and electrical power will
be provided for each new infrared heater. Coring or drilling
through the walls and/or roof for the new exhaust pipe and gas pipe
as required is included in the budget. Included is replacement of
the electrical disconnects and breakers based on using the existing
electric panels and available capacity. No new electrical panels or
circuit breaker panels are included in the price.
Proposed Infrared Heater
In the heating season, opening the garage doors allows a substantial amount of cold outside air
into the building. End-switches will be provided for the infrared units located near garage doors
to prevent their use when the garage doors are open. With an infrared system, the floor and
occupants are warmed by the radiant heat instead of the air. Ceiling space is at a premium in the
apparatus bay at Fire Station No.1. Chevron ES recommends installing two of the heaters in the
rear ofthe apparatus bay and one in the equipment room (small garage). The finaI arrangement
will be determined during engineering design.
Savings for this measure were calculated based on improved combustion efficiency of the radiant
heaters at full and part loads over those of the existing atmospheric boiler; elimination of
distribution losses with the hot water piping; and shutting offunits at times of wasted heating
such as when garage doors are opened. The calculated savings were compared for
reasonableness to the existing heating load as established from the most recent 12 months of
natural gas usage data.
Chevron
~
Energy Solutions
2-14
Section 2
Energy Conservation Measures
.
ECM Number:
CIP2 (not in recommended program)
ECM Title:
Replace Boiler
ECM Description:
The boiler at the Police Administration Building is near the end of its rated useful life, and is
oversized for its current load. The boiler was originally designed to provide hot water for
heating to the air handling units, as well as floor radiant heat to
the former jail/holding area. The floor radiant heat was
eliminated several years ago when the space was converted to
more evidence storage.
At Fire Station No.2, the boiler is over 50 years old, and is at
the end of its rated useful life. This cast iron boiler has an
atmospheric burner, which has a standing pilot liight that burns
whether the boiler is firing or not. This boiler was also
originally designed to provide floor radiant heat to the first
floor, as well as to hot water radiators throughout the building.
When the building was remodeled (around 2006), the floor
radiant heat was
disconnected along with the
radiators on the upper floor.
Only the hot water unit
heaters in the apparatus bay and three hot water radiators on
the ground floor remain in service.
.
Police Administration Building
Boiler
This measure includes replacing the existing boiler at the
Police Administration Building with a more efficient boiler
with similar capacity, to ensure adequate capacity is available
if measure M5 is selected. If the City of Salina chooses to
implement measure M5, the additional outside air required to
ventilate the building would likely result in increased heating
consumption.
This measure also includes replacing the existing boiler at
Fire Station No.2 with a slightly smaller higher efficiency
boiler. For both buildings, new PVC fresh air intake and
exhaust will be routed from the basement to the outside wall.
A new concrete curb will be added, the existing hot water pumps and valves will be reused. One
new boiler control valve is included for each boiler. The new boilers will need power for the
combustion fan and burner controls. Included in the pricing are new breakers based on using the
existing electric panels and available capacity. No new electrical panels or circuit breaker panels
.
Chevron
~
Energy Solutions
Fire Station #2 Boiler
2-15
.
.
.
Section 2
Energy Conservation Measures
are included in the price. A new boiler kill switch will also be installed for each boiler. At both
facilities, the existing air separator and expansion tanks will be reused.
Savings for this measure were calculated based on applying the efficiency of the new boilers to
the existing building heating load for each building, which was based on the most recent 12
months of natural gas usage data at each building.
Chevron
V
Energy Solutions
2-16
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
CIP3 (not in recommended program)
ECM Title:
Replace Condensing Unit(s)
ECM Description:
The Golf Clubhouse has a General Electric brand condensing unit that is at the end of its rated
useful life. This condensing unit provides cooling for the south portion of the building. At the
Health Department, the six (6) existing Lennox condensing units serving the north side ofthe
building are all 14 to 15 years old, and are rated at 10 SEER or below. This measure includes
replacing these existing condensing units with new, more efficient condensing umts. The new
condensing units will be rated at a minimum of 14 SEER.
Existing refrigerant lines will be reused as much as possible. New connections to the new
condensing units are included in the price. Insulation on the
exterior portions of the new refrigerant line connections will be
installed. Existing coil drains and routing will be reused.
Included is replacement of the electrical disconnects and
breakers based on using the existing electric panels and available
capacity. No new electrical panels or circuit breaker panels are
included in the price. New air hoods on the proposed Golf
Clubhouse units are not included. Modifications to the existing
CU enclosure at the Golf Clubhouse are not included. The new
condensing units will utilize refrigerant R22 to match the
existing air conditioning coil on the inside unit. The inside
furnaces and air conditioning coils on the existing units at both
the Health Department and the Golf Clubhouse are all 14-15
years old, but are in very good condition, and all units at the
Health Department have high efficiency heaters.
Savings for this measure were calculated using cooling load
variation with each annual temperature bin. Existing and
proposed condensing unit efficiencies were applied to the existing load; the energy savings is the
difference between the existing and proposed energy usage. The new unit efficiencies were
based on 14 SEER for the condensing units at the direction of the City of Salina.
Golf Clubhouse
Condensing Unit
Heat pumps were considered for this measure but are not recommended due to the increased cost
of the heat pump installation as compared to the cost of a high efficiency condensing unit,
coupled with the fact that the heat pumps are slightly less efficient than the proposed condensing
units.
Chevron
~
Energy Solutions
2-17
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
CIP4
ECM Title:
Replace Split-System Units
ECM Description:
The south portion of the Health Department building is conditioned with five olde:r split systems,
each consisting of a furnace with cooling coil in the attic and a
condensing unit mounted on the roof. These five (5) split systems are
near the end of their rated useful life, and are not operating efficiently.
The existing furnaces have standing pilot lights which use gas year
round, regardless of need. Due to their age and use, the condensing
units for cooling are operating at lower efficiencies than current design
condensing units. These five split systems do not provide fresh outside
ventilation air for the occupants of the building as typically required by
current building codes.
This measure proposes removing the existing five split systems and
replacing with five new, more efficient units. The new split systems will
have outside air ducted to them to provide ventilation, new spark-
ignition furnaces, and high efficiency condensing units. Adding the
code-required ventilation will cause an increase in energy required to heat and cool the air, and
this increased usage is included in the energy use shown on the ECM Summary Table. Each
outside air damper will be mechanically interlocked with its corresponding supply fan to open
when the fan is operating and close when the fan is off. A labor premium for attic: work was
included in the price for this measure, and a new access ladder similar to the ladders installed for
the south end attic mechanical rooms will be installed.
Furnace #1 at
Health Department
The existing condensing units utilize R22, and the proposed condensing units will use R41Oa.
Changing the condensing unit's refrigerant type would typically require changing the inside coil
and possibly refrigerant lines to match the pressure rating of the new refrigerant. Replacing the
R22 condensing unit to an R410a condensing unit is not usually cost effective as a stand alone
measure when the inside coil must be replaced also. Replacing the entire five split systems
affords the City of Salina on opportunity to switch refrigerants to the future refrigerant
replacement for R22 now.
New balancing dampers will be provided in main branch lines to enable balancing air flow. The
existing ductwork and diffusers will be reused. Outside air or ventilation ductwork will be
routed from proposed new outside air louvers (to be located in the attic space) to each new split
system. New refrigerant lines will be run from the new condensing units to the inside furnaces.
Existing coil drains and routing will be re-used. Included is replacement of the electrical
disconnects and breakers based on using the existing electric panels and available capacity. No
new electric panels or circuit breaker panels were included in the price.
Chevron
_ Energy Solutions
...
2-18
.
.
.
Section 2
Energy Conservation Measures
Savings for this measure were calculated based on temperature bin data to determine the existing
load and the proposed load of the new units with the addition of the outside air. Existing split
system heating efficiencies and condensing unit efficiencies were applied to the existing load;
proposed heating efficiencies and condensing unit efficiencies were applied to the proposed load.
The new unit efficiencies were based on a minimum 14 SEER for the condensing units, and 90%
for the new gas furnaces. Heat pumps were considered for this measure but are not
recommended due to the increased cost of the heat pumps compared to the cost of a high
efficiency condensing unit coupled with the fact that the heat pumps are slightly less efficient
than the proposed condensing units.
Chevron
V
Energy Solutions
2-19
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
CIP5
ECM Title:
HV AC Improvements/Controls Upgrade
ECM Description:
The air handling units (AHUs) serving the Police Administration building are the original
equipment installed when the building opened in 1969. These existing air handling units are
multi-zone units, which mix a stream afhot air and cold air ta deliver the required temperature
air to each zone. The zone mixing dampers are nat accessible far maintenance and, as such, may
not be working effectively. The hat and chilled water cails in these units have canstant flow and
no contral valve to vary the flow as laad changes. Instead, each zone damper modulates to blend
the amaunt of hat and cold air required for its zane.
The use af various spaces in the building has changed over the years, and the current air
distributian system is not as effective as it shauld be. In the winter, some exteriar rooms do nat
get enaugh heat and in the summer, some interior spaces are toa warm. This building has been a
problem far the city maintenance staff for years.
Chevran ES recommends replacing the 3 existing air handling units with variable air volume air
handling units and electric zone reheat cails ta provide the best cantrol and comfort far the
occupants.
The existing air handling units will be remaved from the building, and replacement air handling
units will be installed. The new air handling units will each be equipped with a supply fan and
assaciated VFD, hat water preheat and heating cails, and a chilled water coil. The: new AHUs
will alsa have full economizer capability, but will not have a dedicated return fan. Temporary
heating and caaling units will be used to serve the spaces during construction, as required. Same
ductwork may need ta be replaced, but the majority af the existing ductwark will be reused; the
engineering design phase will determine to what extent the ductwork needs to be madified or
replaced. A new stand-alone energy management system far HV AC contral will be installed as
part afthis project and is included in the cost estimate.
Canverting from a constant volume air handling unit to a variable valume air handling unit
typically generates significant energy savings. Currently, at the Police building, the outside air
dampers are closed in the winter and summer in arder to meet space temperature requirements.
With the new air handling unit installation, more outside air will be introduced into the building
in order to meet building code ventilation requirements. Caaling and heating this additiana1
autside air has a negative impact of the energy savings, but will provide improved occupant
comfort. The addition of terminal reheat cails will alsa increase the energy usage, but these
provide the mast cast-effective way to solve the comfart and cantra1 problems in this building.
Chevron
U
2-20
Energy Solutions
.
.
.
Section 2
Energy Conservation Measures
The building load model will be refined during the engineering phase of the projec:t to accurately
determine load and airflow requirements for the building. In order to complete the computer
model, additional data and site work to determine how effectively the conditioned air is being
delivered to the spaces now may be required before the detailed scope can be finalized. For
instance, more ductwork modifications, or increased duct sizes may be required pe:nding the
analysis. Material and labor costs for these potential changes have been incorporated into the
budget pricing for this ECM.
In order to install the electric zone reheat, an electrical service upgrade will likely be required. A
budget for the electrical upgrade has been included in the cost estimate. The need for the
electrical upgrade and a firm quantity for the work will be determined during the engineering
phase of the project.
The City of Salina has indicated that their asbestos testing shows no asbestos in the corridor
ceilings where the majority of the ductwork is located. Any asbestos testing or abatement
required is not included in this scope of work.
Chevron
~
2-21
Energy Solutions
.
.
.
Section 2
ECM Number:
CIP6
Energy Conservation Measures
ECM Title:
Remove Skylight
ECM Description:
The Health Department building has a large skylight in the lobby area. The City of Salina
indicated to Chevron ES that the skylight has developed leaks over the past several years, and
would like the skylight removed. The City allocates funds to
their budget on a yearly basis to caulk and seal around the
skylight. The Health Department provides and replaces a sun
screen every 2-3 years.
Existing Sunscreen
This measure recommends removing the existing skylight and
installing a new roof structure and TPO roof to match the
existing roof material. Rigid roof deck insulation will be
installed and a new drop ceiling will be added, with batt
insulation above the ceiling tiles.
The existing cove lighting and air diffusers are located below the
proposed drop ceiling height, and may be suitable for reuse. For
safety reasons, this work will need to happen when the building is
unoccupied, and a labor premium for evening or weekend work
has been included in the budget.
Savings for this measure result from the reduction in solar load
with removal of the skylight, and from the increased thermal
resistance of the new roof and ceiling structure. Temperature bin
data was used to account for annual load variations.
Chevron
U
Energy Solutions
Existing LoveLighting
and Skvlieht
2-22
Section 2
.
Energy Conservation Measures
ECM Number:
CIP7 (not in recommended program)
ECM Title:
Ceiling Modification/Insulation
The Police Administration Building has a large office on the top floor with skylights and
clerestory windows around the perimeter. This area was the old courtroom, and is now the Chief
of Police's office, secretary's office, and
conference area. Due to the high ceilings,
low airflow, and insufficient roof
insulation, this space is difficult to keep
comfortable year-round. The City of
Salina has indicated that their asbestos
testing shows positive results for asbestos
in the ceiling of this room and provided a
contractor estimate to abate the area of
work. The cost of this abatement is not in
Chevron ES' scope of work, but is
included in the financial analysis of the
project for direct contracting by the City of
Salina. This scope of work is dependent upon having the asbestos removed.
ECM Description:
.
Clerestory Windows in Chief of Police Office
This measure recommends installing a new drop ceiling with additional insulation above the new
ceiling tiles. To keep some of the natural sunlight, 4 Solatubes or equivalent
brand will be installed in the existing skylight wells and routed to the new
drop ceiling. The remaining skylight glazing not replaced with Solatubes will
be removed and weatherproofed.
The existing air diffusers are located below the proposed drop ceiling height
which is just below the clerestory windows level with the ledge shown in the
picture, and the existing diffusers will be blanked off. The ductwork will be
Solatube routed to the new drop ceiling and new diffusers will be installed. New
recessed troffer lighting fixtures will need to be installed in the drop ceiling to
replace the existing lighting fixtures on a one-to-one basis.
Savings for this measure were calculated based on using temperature bin data and the reduction
in load due to the increased resistance of the new roof and ceiling structure.
.
Chevron
~
Energy Solutions
2-23
Section 2
Energy Conservation Measures
.
Water ECMs WI through W5
The City of Salina uses few low consumption water devices in the facilities surveyed under the
scope of this study. The facilities use more water than necessary due to the inefficient manner in
which the existing devices distribute water. In many areas of the country, the use of water has
become more of a concern in recent years due to depletion of natural raw water sources,
deterioration of water infrastructure, and environmental concerns, all resulting in e:scalating cost
of water and sewer rates. Utility charges for potable water and sewage is now increasing at a
rate greater than other utilities such as electricity and natural gas.
Chevron ES proposes a comprehensive program of water conservation that includes all areas of
consumption in the buildings. The proposed changes fall directly in line with the City's Strategic
Plan for 2008, specifically goal #7:
"The City will recognize the importance of its natural resources and make practical efforts to
preserve them."
Action item #1 of goal #7 states that the City is planning a comprehensive approach to water use
and conservation, which our project provides for the buildings included in our scope. On the
following pages are details of the proposed Energy Conservation Measures (ECM) for all
. facilities surveyed.
.
Chevron
U
Energy Solutions
2-24
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
WI
ECM Title:
Replace Faucet Moderators
ECM Description:
All City of Salina facilities surveyed contain kitchen and lavatory faucets that are designed to
mix hot and cold water to the desired temperature. All faucets surveyed
deliver water through moderators with internal parts that have deteriorated
over time. These moderators allow a higher than necessary flow rate for
their particular application. On average, these fixtures flow rates are
approximately 3 to 4 gallons per minute. There are 143 retrofits included
in this ECM.
This ECM recommends replacing worn or damaged moderators with new pressure compensating
moderators that utilize an o-ring to deliver the proper water flow rate for the task for which the
faucet was designed. For lavatory faucets, existing moderators shall be replaced with 0.5 gallon
per minute moderators. Kitchen faucet moderators shall be replaced with 1.5 gallon per minute
moderators. This ECM also recommends replacing the o-rings, washers, and packing for faucets
that are leaking. These upgrades will decrease water consumption, sewer, and maintenance
costs. Since a portion of the water saved will have been heated, thermal energy will also be
saved.
Automatic sensors for faucets were considered, but are not included in this project due to the
increased maintenance cost to replace batteries and adjust the sensors. Hard-wired sensors were
not considered due to the substantial cost of running power to each fixture.
Chevron
!IIII!!!!! Energy Solutions
-
2-25
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
W2
ECM Title:
Replace Toilets
ECM Description:
All facilities surveyed contain toilets and flush valves that are not rated for low water
consumption. These flush valves will occasionally hang up, using an excessive amount of water.
In most cases, the diaphragms and vacuum breaker's rubber internal
part will start to deteriorate after five years which can cause leaks
that are not easily detected. These flush valves use between 3 to 5
gallons per flush, depending upon type. Recent technology has
helped manufacturers develop toilets and flush valves that eliminate
waste more efficiently. There are 146 retrofits included in this
ECM.
The Federal government established the Energy Poliey Act of 1992
(EPAct), a national policy that required by 1997 that all new water
closets use no more than 1.6 gallons of water per flush. Since that
time, water closet manufacturers have redesigned their china to effectively complete the flush
process with 1.6 gallons or less.
This ECM recommends replacing the inefficient toilets at all facilities surveyed with new, low
water consumption toilets that exceed the EP A requirements. Since the
existing toilets are not designed for low water consumption, they must
be replaced along with their flush valves. Retrofit kits for flush valves
shall be used where low flow toilet china already exists. These retrofit
kits convert the existing 3 to 5 gallon per flush valves to 1.28 gallons per
flush. Toilets with tanks that usually use 3.5 gallons per flush will be
replaced with new tank toilets rated at 1.0 gallon per flush. All ADA
compliant toilets will be replaced with new ADA compliant toilets. At
the Bicentennial Center, the pricing includes installation of an access
door to the pipe chase. The access door is required for the modifications to the flush valves.
Automatic sensors for flushometers were considered, but are not included in this project due to
the increased maintenance cost to replace batteries and adjust the sensors. Hard-wired sensors
were not considered due to the substantial cost of running power to each fixture.
Chevron
~
Energy Solutions
2-26
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
W3
ECM Title:
Retrofit and Replace Urinal Flush Valves
ECM Description:
The existing urinal flush valves located at all City of Salina facilities are from five to fifteen
years old. Due to the age and condition ofthe flush valves' internal
parts, these valves use approximately 2 to 3 gallons per flush. These
flush valves will occasionally hang up, using more water than required.
The flush valve diaphragms and vacuum breaker's rubber internal part
will start to deteriorate after five years which can cause leaks that are not
easily detected. There are 55 retrofits included in this ECM.
The Federal government established the Energy Policy Act of 1992.
(EP Act), a national policy that required by 1997 that all new urinals use no more than 1.0 gallon
per flush. Since that time, urinal flush valve manufacturers have designed 1.0 gallon per flush
retrofit kits for urinal flush valves.
This ECM recommends the installation of retrofit kits to the existing flush valves. These retrofit
kits which include spuds, handle kits, vacuum breakers, water saving diaphragms and o-rings
will reduce the 2 to 3 gallons per flush valves to 1.0 gallon per flush and eliminate wasteful
leaks. This upgrade will result in a reduction of water consumption and sewer costs. The
standardization of all flush valves and newer internal parts will lower maintenance costs.
Chevron
~
Energy Solutions
2-27
.
.
.
Section 2
ECM Number:
W4
ECM Title:
ECM Description:
Energy Conservation Measures
Replace Faucet and Spray Valves
This ECM includes replacement of an older lavatory faucet at Smoky
Hill Museum with a new, more efficient push-button faucet. This ECM
also includes replacement of the dishwashing spray valves at the
Bicentennial Center. There are 4 retrofits included in this ECM.
These upgrades will decrease water consumption, thermal energy,
and will reduce maintenance cost. Applicable sewer costs will also
decrease in proportion to the decrease in water usage.
Chevron
~
Energy Solutions
2-28
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
W5
ECM Title:
Replace Water-Cooled Ice Machines
ECM Description:
This ECM considers replacing the existing ice machines located at Fire Station No. 1 and the
Golf Clubhouse with newer ice machines that utilize air cooled condensers. The existing ice
machines currently utilize water cooled condensers. The existing water cooled condensers
consume more than ten times the amount of water required for actual ice production. There are
two retrofits included in this ECM.
The main benefit for replacing the existing ice machines is water
savings, but maintenance savings can also be realized since water
cooled condensers generally require more maintenance than air
cooled condensers.
Savings for this measure result from the elimination of water use to
cool the ice compressors. The electrical penalty for switching to air-
cooled vs. water cooled was calculated based on manufacturer's data
and data loggers for run-time from a previous job.
Chevron
~
Energy Solutions
2-29
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
VI
ECM Title:
Contract Natural Gas
ECM Description:
Kansas Gas Service (KGS) furnishes natural gas for all buildings in the scope of the project,
except for the Health Department and Smoky Hill Museum. The Health Department obtains
natural gas under a contract that Saline County has with Seminole Energy Services. With
contracted natural gas, the Health Department has realized a lower natural gas rate than paid for
use at the City buildings. Refer to Section 3, Historical Energy Consumption for comparison of
rates.
The ECM proposes contracting natural gas for the Bicentennial Center, the Memorial Hall, and
the Police Department. With contracted natural gas, a third party would supply the commodity
and Kansas Gas Service distribution would provide delivery services within the City. The reason
that only these three buildings are recommended is because ofthe restrictions of Kansas Gas
Service for delivery ofthe natural gas. To qualify for delivery of natural gas from a third party, a
minimum annual usage of 1,500 mcf per building or contiguous properties is required. (See
KGS's Small Transport Service tariff in Appendix D) The annual usage at the Bicentennial
Center and at the Memorial Hall each exceeds the 1,500 minimum. In discussions with KGS, the
Police Department building is considered to be contiguous to the Memorial Hall. Chevron ES
explored allowing Fire Station No. I to be considered contiguous to these buildings also, but
KGS commented that since other properties separate Fire Station No. I from Memorial Hall or
the Police Department Building, that it would not qualify.
Contracting third party natural gas supply does not guarantee a lower rate each month, but over
time this approach has been shown to reduce annual natural gas expenses. Different approaches
can be taken to contracting the gas by locking in annual rates for a fixed amount or by buying
each month at the "first of month" price. When a price is set, typically an amount of usage is
also defined. When more or less than the contract amount is used, the excess or overage will be
charged at a different rate. Chevron ES will work with the City's procurement department to
assist in evaluating historical usage and purchasing options.
To estimate savings, Chevron ES was furnished the historical rates from Seminole Energy
Services for the last two years. These rates were compared to the commodity portion ofthe
historical natural gas bills from KGS, shown in Table CI of Appendix C. In addition to the
commodity, KGS Small Transportation Service tariff for delivery has a small discount over the
delivery rate in the General Sales Service tariff now used with KGS supply. These comparisons,
shown in Table C2 of Appendix C, show the result of an average savings of $2. 792/mcf for the
period from September, 2006 through May, 2008. This is based on all usage of the buildings
being charged at the "first of month" rate over by Seminole Energy Services. It is rather
optimistic to assume that each month's usage can be predicted accurately, so there will be some
Chevron
~
Energy Solutions
2-30
.
.
.
Section 2
Energy Conservation Measures
influence of excess or under usage, which can change this savings rate. To check this, Chevron
ES compared the historical Seminole Energy Services blended rates to the commodity portion
paid by the Health Department. This comparison is shown in Table C3 in Appendix C,
indicating a historical savings over use of KGS gas of $2.1 08/mef for the same September, 2006
through May, 2008 period. This equates to 74% ofthe analysis using only the "fIrst of month"
rates. Chevron ES proposes that forecasted natural gas cost savings be based on a natural gas
savings rate of $2.1 O/mcf. This amount is then multiplied by baseline natural gas usage at the
buildings less any natural gas savings from implementation of ECMs. The baseline usages are
shown in Section 3 - Historical Energy Consumption.
Chevron
~
Energy Solutions
2-31
.
.
.
Section 2
Energy Conservation Measures
ECM Number:
U2
ECM Title:
Consolidate Gas Meters
ECM Description:
The Golf Clubhouse has two natural gas meters -- one serving the usage of the furnaces and
domestic hot water on the south portion of the building, and the
other serving the lightly used north "First Tee" area furnaces. As
the north meter only serves the heating needs of the north furnaces,
it typically has zero use at least five months per year. Evenso, the
City incurs a service charge and fee on this meter of$23.52/month
with no usage.
This ECM proposes consolidating all natural gas use of the
Clubhouse onto the south gas meter. This includes the addition of
natural gas piping from the south furnace room to the north
furnace room. This piping will be routed above the drop ceiling
across the rooms between the two furnace rooms. Kansas Gas Service will remove the unused
meter back to the gas main.
NOTE: The gas utility information furnished by the City included data for two additional meters
at the Golf Course, but not serving the Clubhouse. These meters showed as much or more use as
the Clubhouse gas use, including use throughout the summer. One of these meters was identified
as serving the North Maintenance building. As other buildings at the Golf Course were not in
the contract scope, the source of the natural gas use at these other Golf facilities was not
investigated.
Chevron
~
Energy Solutions
2-32
.
.
.
Section 2
Energy Conservation Measures
Energy Conservation Measures Not Recommended
This section provides a brief description of energy conservation measure projects that were
evaluated or considered, but later found not to be economically viable. While these projects may
offer some energy savings, they typically would have to be funded through an additional capital
outlay and/or through excess savings from other projects.
Title:
Controls Upgrade
Description:
The Bicentennial Center has a supervisory local control system for some of its HVAC
equipment. Every air handling unit cycles to maintain the space temperature set point when
operating. Due to the sporadic occupancy at the building, the maintenance staff have been
manually duty cycling or alternating run times for the arena area of the building -- only half of
the units run when the building is not hosting an event. Some of the local controls: that Chevron
ES personnel observed during our survey did not appear to be operational or could not be
confirmed due to inaccessible outside air dampers or bypass dampers. From the temperature
readings observed, it is likely that the majority of the outside air dampers were closed. This
measure is not recommended due to the high cost to install a new controls system and the
negative payback resulting from increasing the outside air usage when the building operation is
conformed to building codes.
Title:
Install Trash Compactor
Description:
The Smoky Hill Museum has six roll-off trash carts that are serviced weekly. The building has
sporadic use, and does not always use all six containers each week. The City is charged for
picking up all six containers whether they are all used or not. Chevron ES investigated installing
a trash compactor as well replacing the trash carts with a single trash dumpster. The trash
dumpster offered a potential savings of $30 per month over the use ofthe six carts. Chevron ES
found that the savings available with the large dumpster were offset by the cost of the required
concrete slab and enclosure fence.
Title:
Replace Condensing Units
Description:
The Salina Community Theatre has some older condensing units that provide cooling for the
ground floor restrooms and the green room. Chevron ES discovered that due to the small size
and intermittent loads in these spaces, replacing these units with modem high efficiency units
was not cost-effective and is not recommended.
Chevron
~
Energy Solutions
2-33
.
.
.
Section 2
Energy Conservation Measures
Title:
Replace Stearn Boiler and Re-Zone Piping
Description:
The Memorial Hall has a small stearn boiler that installed in 1993-1994, with a new condensate
return system installed in February of2008. The boiler is rated at 15 psi operating stearn
pressure, but currently operates at 3 psi to maintain the space temperature set point of the single
controlling thermostat in the lobby. The boiler stearn serves several original stearn radiators
throughout the building. Some of the radiators are equipped with occupant controlled
thermostatic regulating valves, which help control the temperature in that space. Although the
boiler was installed after many of the building's original stearn radiators were taken out of
service, it is still oversized for the current load, and operates inefficiently to maintain such a low
stearn pressure.
Chevron ES considered replacing the stearn boiler with a smaller, more efficient stearn boiler,
and re-zoning the existing stearn piping to enable better control of the building heat and
temperature setback when the building or portions of the building are unoccupied. This measure
is not recommended due to the long payback of replacing the boiler and modifying the piping.
Savings for this measure would be negatively impacted by the pending planned renovations in
the ACCESS TV studio area, wHich would reduce the building stearn load.
Chevron ES recommends a planned removal of the stearn systems in the building, and replacing
with either a hot water system or packaged heat pumps similar to the planned renovations of the
ACCESS TV studio.
Title:
Replace Window Air Conditioning with Centralized Cooling
Description:
The USD 350 offices on the south end ofthe Memorial Hall building use window air
conditioners to provide cooling, while stearn radiators supply heat. Chevron ES considered
replacing the window air conditioners with packaged AC units and installing duct\;vork to better
distribute airflow to the spaces. With the change to a packaged unit, more space in the affected
rooms would be cooled than are currently being cooled with the window air conditioners, which
would offset any savings with the more efficient AC system. Architectural modifications to the
space would be required to allow for installation of the ductwork to maintain an aesthetically
pleasant work environment. Due to the limited occupancy of the areas using window air
conditioners, their intermittent use, and the resulting long payback, this measure is not
recommended.
Chevron
~
Energy Solutions
2-34
.
.
.
Section 2
Energy Conservation Measures
Title:
Install Arena Ceiling and HV AC
Description:
The arena at Memorial Hall currently houses a local youth gymnastics program. The gymnastics
program holds several meets and public events throughout the year with a full audience in
attendance. The arena currently has no cooling, and limited heating capability. These events
would be more comfortable for the gymnasts and their audience if the space were air
conditioned. The City of Salina asked Chevron ES to investigate installing a drop ceiling over
the arena area, and installing heating and cooling to serve the space. Further discussions with the
City indicated that the work at the Police Department building (ECM M5) was of higher priority
than upgrading Memorial Hall. As this project would increase energy use and ECM M5 was a
priority, focus was place on development ofECM M5 for use of excess savings generated from
the other City projects in the program. The City confirmed that there would be no increased
revenue generated by making the proposed changes and agreed that the measure should not be
included in the project due to the increased operating cost and lack of any additional economic
benefit.
Title:
Downsize Water Meter
Description:
The Memorial Hall has the largest water meter of the nine buildings in scope, yet it has an annual
usage equivalent to buildings with only a 1" to 2" meter. The Memorial Hall's peak monthly
water usage is less than that of the Golf Clubhouse, which has a 1" water meter. \Vith the
upcoming water rate changes, the 3" meter will incur a service charge of $63. 15/month. A 1 W'
meter's service charge is to be $14.89/month. With a change to a more appropriately sized water
meter, the Memorial Hall could realize an annual reduction of up to $579.
Chevron ES has discussed this matter with the City Municipal Utilities Department and they are
investigating the feasibility of a meter changeout to reduce costs at the Memorial Hall. But, as of
the issuance of this report Chevron ES was unable to get a conclusive answer to this request. As
such, this ECM has been left under "Not Recommended".
Chevron
~
Energy Solutions
2-35
'.
.
.
Section 3
Historical Energy Consumption
Historical Energy Consumption
The consumption and costs of electricity, natural gas, water and sewer historical usages for the
nine City of Salina facilities affected by the scope are provided in this section. The purposes of
presenting historical energy consumption and costs are to calibrate energy savings calculations, to
determine a basis for which energy savings can be evaluated, and to establish baselines for future
savings reference. The following pages include electric, natural gas, and water consumption
histories. The electric, natural gas, and water rate tariffs are provided in Appendix. D.
Approx.imated overall energy use of the nine City buildings are given in the below chart:
Energy Load Summary
III Lights - 9%
. Cooling - 26%
o HV AC motors - 13%
o Plug Loads - 15%
. Heating & DHW 35%
III other Misc. - 2%
Electri~
A comprehensive list of electric meters and accounts serving the nine buildings are identified in
Table 3-1. Only meter usages and accounts serving areas affected by projects in this report were
analyzed.
Table 3-1
Electric Meters
Building Address Account No. Meter No. Rate
Bicentennial Center Kenwood Park 7630776810 04963871 Medium General Service
Fire Station No. 1 222 W. Elm 3293260986 05832488 Small General Service
Fire Station NO.2 1110 S. Santa Fe 9273875307 85513046 Small General Service
Golf Clubhouse, Cart Shed, Maint. Shop 2500 E Crawford 5848604405 04712388 Small General Service
Health Deoartment 125 W. Elm 9103587961 8888733 Small General Service
Memorial Hall 410 W. Ash 3688865628 01109857 Small General Service
Police Department 253 N. 10th 6657383578 03443179 Small General Service
Salina Community Theater 303 E. Iron 1596344723 04351468 Small General Service
Smokv Hill Museum 211 W. Iron 0938010970 01956018 Small General Service
Chevron
~
3-1
Energy Solutions
.
.
.
Section 3
Historical Energy Consumption
All buildings, except the Bicentennial Center, have electrical usage charged under Westar
Energy's Small General Service (North Area) tariff. Under the Small General Service (SGS)
rate, the first 1,200 kWh on monthly consumption is charged at a higher rate than all remaining
consumption for a month. The SGS rate structure also has a demand charge for the maximum
demand usage over 5 kW in each month. While the consumption charge is constant throughout
the year, the demand charge changes seasonally with a summer (June through September) rate
that is more than twice the non-summer demand rate charge. In addition to the energy rate and
demand charges, there is a fixed $12 customer charge, several riders that are a function of
consumption, and a 5% franchise fee that varies with the total charge of each month's bill.
The Bicentennial Center electrical usage is charged under Westar Energy's Medium General
Service (MGS) tariff. This tariff is available for facilities with demand use over 200 kW. The
MSG tariff offers lower consumption rates than the SGS tariff, but a constant yearly demand rate.
The summer (June through September) consumption rates are slightly higher than the non-
summer consumption rates. The MGS tariff also has a monthly fixed charge of $1 00, several
riders that are a function of consumption, and a 5% franchise fee on the total charge of each
month's bill.
The electrical rates used in the savings calculations are based on the most recent tariff rates. As
the amount of the riders can vary each month, the actual total charge per kWh varies from month
to month, primarily due to Fuel Charge Surcharge, which has been trending higher over the past
six months of available data. All buildings use substantially in excess of the 1,200 kWh tier of
the SGS tariff, so the lower tier energy charge is used in the determination of the impact of
energy savings measures at the buildings. For the rates to be representative ofthe charges at the
time of implementation, the impact of the Westar Energy rate increase application is included.
(See Appendix D.)
Table 3-2
Electrical Consumption Rate Determination
Base Tariff Surcharges Franchise Expected Total
Rate E1ffective Rate
($/kWh) ($/kWh) Fee Increase ($/kWh)
SGS - all months $0.022923 $0.02060 5% 15% $0.0526
MGS - June-Sept $0.016367 $0.02122 5% 15% $0.0454
MGS - Oct-May $0.01211 $0.0402
Surcharges are based on sum ofthe average ofthe Fuel Charge, Property Tax Surcharge,
Transmission Service Charge, and Environmental Cost Recovery Rider over the last twelve
billing cycles.
The effective electric demand rates are not impacted by any surcharges or riders.
Chevron
~
Energy Solutions
3-2
.
.
.
Section 3
Historical Energy Consumption
Table 3-3
Electrical Demand Rate Determination
Base Tariff Rate Franchise Expected Total Effective
($/kW) Fee Increase Rate ($/kW)
SGS - June-SeDt $6.25 5% 15% $7.547
SGS - Oct-May $2.83 $3.417
MGS - all months $6.83 5% 15% $8.247
Generally, electric usage increases slightly from year to year. This was not always the case for all
buildings at the City of Salina but, with a few exceptions, there was reasonable agreement on
electric consumption from year to year. To represent recent electric growth and to smooth out
minor anomalies, the average of the most recent two years of data was used to establish the
historical baseline for each building. One exception to this is in the data for Fire Station No.2,
which shows a significant drop in electric usage for most of 2006. This was identified as the
time that the fire station was being renovated. Also, note that the electric use data for the Golf
Clubhouse includes the maintenance shop and the cart shed electrical usage, and these three
buildings are metered together. A summary of the historical usage and most recent year charges
are given in Table 3-4 through Table 3-12 along with the most recent two year baseline usage.
Chevron
~
Energy Solutions
3-3
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Facility:
Account:
Rate Code:
Meter:
Bicentennial Center
7630776810
Medium General Service
04963871
Table 3-4a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Month 200$ 200. 2007 2008 2 Year Avg Year Costs
Jan 242,800 212,400 280,800 261,600 271 ,200 $12,185
Feb 206,000 219,200 247,600 195,600 221,600 $1'1,149
Mar 175,200 216,800 171,600 180,800 176,200 $11,524
Apr 180,400 174,000 182,000 152,400 167,200 $8,935
May 190,000 212,400 174,000 186,000 180,000 $13,332
Jun 205,600 231,200 195,600 213,400 $1:3,084
Jul 194,800 222,000 170,800 196,400 $1'1,248
Aug 200,000 190,800 188,000 189,400 $1'1,139
Sep 192,800 176,800 188,000 182,400 $9,377
Oct 164,000 194,400 149,200 171,800 $7,694
Nov 239,600 220,000 224,800 222,400 $11,159
Dec 236,800 235,200 271,200 253,200 $12,724
Total 2,428,000 2,505,200 2,443,600 2,445,200 $133,550
Note: Costs have the monthly fixed Service Charge removed,
Table 3-4b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Month 2005 2006 2007 2008 2 Year Ava
Jan 739 663 709 632 671
Feb 706 738 661 609 635
Mar 706 715 538 510 524
Apr 706 704 601 362 482
May 706 591 528 554 541
Jun 663 620 561 591
Jul 597 536 590 563
Aug 650 632 578 605
Sep 698 702 537 620
Oct 547 554 501 528
Nov 484 623 601 612
Dec 865 604 629 617
M~im!Jm 865 738 709 671
Historical Electric Consumption
300,000
-+-2005J
__ 2006
-+- 2007
__ 2008
-Baseline
250,000
200,000
:i'
3: 150,000
~
100,000
50,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Energy Solutions
3-4
.
.
.
Section 3
Historical Energy Con.sumption
Facility:
Account:
Rate Code:
Meter:
Fire Station No.1
3293260986
Small General Service
05832488
Table 3-5a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Month ~05 ~006 2007 2008 2 Year Ava Year C.osts
Jan 11 ,207 9,905 10,457 11,596 11,027 $568
Feb 10,327 10,334 10,514 10,154 10,334 $562
Mar 9,409 10,542 10,096 10,537 10,317 $665
Apr 11,890 12,639 10,764 9,985 10,375 $630
May 13,378 14,970 13,392 13,018 13,205 $893
Jun 16,462 16,932 16,313 16,623 $1,117
Jul 20,447 21,741 19,315 20,528 $1,179
Aug 17,189 18,319 20,942 19,631 $1,237
Sep 15,802 12,532 16,240 14,386 $854
Oct 10,290 11,935 11,828 11,882 $586
Nov 10,658 10,742 12,403 11,573 $622
Dec 11,882 11,161 13,007 12,084 $658
Total 158,941 161,752 165,271 161,962 $9,573
Note: Costs have the monthly fIXed Service Charge removed.
Table 3-5b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Month 2005 2006 2067 2008 2 Year Ava
Jan 26 26 29 30 30
Feb 28 30 33 33 33
Mar 28 30 34 29 32
Apr 35 38 37 31 34
May 39 45 42 39 41
Jun 43 42 42 42
Jul 43 49 47 48
Aug 43 51 41 46
Sep 42 37 39 38
Oct 36 42 26 34
Nov 24 34 34 34
Dec 27 31 36 34
Maximum 43 51 47 48
Historical Electric Consumption
25,000
20,000
15,000
:c
~
10,000
5,000
-+- 2005
___ 2006
-..- 2007
__ 2008
-Baseline
o
~ ~ ~ ~ - ~ ~ ~ - ~ ~ ~
Chevron
~
Energy Solutions
3-5
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Facility:
Account:
Rate Code:
Meter:
Fire Station No.2
9273875307
Small General Service
85513046
Table 3-6a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Month 2005 2006 20Q7 2008 2 Year Ava Year Costs
Jan 5,040 5,080 8,839 8,812 8,826 $432
Feb 4,600 4,520 7,807 7,625 7,716 $410
Mar 4,400 2,720 7,077 6,678 6,878 $427
Apr 6,400 2,520 8,374 7,630 8,002 $479
May 7,520 2,000 9,597 12,027 10,812 $864
Jun 9,840 2,640 12,470 12,470 $837
Jul 9,320 3,526 14,752 14,752 $Im
Aug 7,720 3,558 13,219 13,219 $775
Sep 5,680 3,259 1 0,465 10,465 $520
Oct 4,520 5,234 7,078 7,078 $353
Nov 4,960 7,039 9,212 8,126 $455
Dec 5,680 9,217 8,932 9,075 $447
Total 75,680 51,313 117,822 117,417 $6,870
Note: Costs have the monthly fixed Service Charge removed.
Table 3-6b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Month 2005 2006 2007 2008 2 Year Ava
Jan 16 16 19 22 21
Feb 15 17 19 20 20
Mar 15 8 20 19 20
Apr 20 8 27 22 25
May 20 8 27 30 29
Jun 24 9 30 30
Jul 20 12 32 32
Aug 19 14 33 33
Sep 16 14 28 28
Oct 16 15 24 24
Nov 16 19 22 21
Dee 15 19 22 21
M;lXimum 24 19 33 33
Note: Data dunng 2006 renovation up to Oct., 2006 not Included In averages.
15,000
:c
!
Energy Solutions
Historical Electric Consumption
25,000
20,000
10,000
--200J'"
-- 2006
__ 2007
-- 2008
-Baseline
5,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
3-6
.
.
.
Section 3
Historical Energy Consumption
Facility:
Account:
Rate Code:
Meter:
Golf Clubhouse, Maint shop, Cart shed
5848604405
Small General Service
04712388
Table 3-7a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Month 2005 2006 2007 2008 2 Yellr Avg Year Costs
Jan 10,560 12,000 10,240 9,600 9,920 $478
Feb 14,720 13,280 12,960 11,840 12,400 $649
Mar 15,040 14,080 13,120 14,080 13,600 $896
Apr 17,120 16,480 19,040 13,760 16,400 $933
May 15,520 26,720 20,000 20,960 20,480 $1,588
Jun 18,880 27,840 21,280 24,560 $1,660
Jul 18,240 31,040 28,320 29,680 $1,813
Aug 17,600 24,640 23,680 24,160 $1,499
Sep 12,000 15,840 18,080 16,960 $1,050
Oct 13,440 13,600 13,520 13,560 $733
Nov 12,480 15,680 11,840 13,760 $665
Dec 12,320 11,840 11,680 11,760 $618
Total 177,920 223,040 203,760 207,240 $12,582
Note: Costs have the monthly fixed Service Charge removed.
Oct. 2007 consumption and cost was estimated.
Table 3-7b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Month 2005 2006 2007 2008 2 Year Ava
Jan 35 29 29 27 28
Feb 50 51 44 37 41
Mar 53 53 53 42 48
Apr 58 64 71 66 69
May 51 83 68 73 71
Jun 50 81 83 82
Jul 58 97 80 89
Aug 58 90 75 83
Sep 45 58 76 67
Oct 43 47 - 24
Nov 29 51 56 54
Dec 34 36 41 39
Maximum 58 91 83 89
Historical Electric Consumption
35,000
30,000
-+- 2005
__ 2006
---.- 2007
-*- 2008
-Baseline
25,000
:c 20,000
3:
:!f.. 15,000
10,000
5,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Chevron
!III!!!!!! Energy Solutions
-
3-7
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Facility:
Account:
Rate Code:
Meter:
Health Dept.
9103587961
Small General Service
8888733
Table 3-8a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Month 2005 2006 2007 2008 2 Year Ava Year Costs
Jan 10,800 11,440 12,080 13,040 12,560 $680
Feb 10,480 11,520 11,920 12,160 12,040 $703
Mar 9,840 11,760 11,120 12,800 11,960 $847
Apr 11,840 11,280 11,680 10,720 11,200 $722
May 16,320 14,400 14,320 14,320 14,320 $1,082
Jun 20,240 17,760 19,600 16,080 18,680 $1,497
Jul 23,360 24,480 21 ,440 22,960 $1,550
Aug 21,360 21,040 24,080 22,560 $1,620
Sep 19,120 15,200 17,040 16,120 $1,085
Oct 12,400 12,480 13,680 13,080 $773
Nov 12,640 12,240 13,200 12,720 $694
Dec 12,800 12,800 12,560 12,680 $691
Total 181,200 176,400 182,720 180,880 $11,945
Note: Costs have the monthly fixed Service Charge removed.
Table 3-8b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Month 2005 2006 20117 2008 2 Year Ava
Jan 50 46 51 48 50
Feb 50 19 47 50 49
Mar 46 47 50 49 50
Apr 69 55 58 49 54
May 71 74 68 68 68
Jun 79 75 70 73
Jul 81 90 86 88
Aug 85 90 91 91
Sep 78 66 74 70
Oct 70 75 80 78
Nov 54 49 47 48
Dee 52 49 53 51
Maximum 85 90 91 91
Historical Electric Consumption
25,000
__200f']
__ 2006
--2007'
--*- 2008
-Baseline
20,000
:c
!
15,000
10,000
5,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nav Dec
Energy Solutions
3-8
.
.
.
Section 3
Historical Energy Con.sumption
Chevron
~
Facility:
Account:
Rate Code:
Meter:
Police Dept
6657383578
Small General Service
03443179
Table 3-9a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Mont'" 2005 2006 2007 2008 2 Year Ava Year Costs
Jan 31,200 38,000 41,200 35,600 38,400 $1,658
Feb 33,840 35,840 38,320 33,360 35,840 $1,701
Mar 33,280 41,760 46,240 37,840 42,040 $2,331
Apr 38,720 48,560 40,560 42,560 41,560 $2,551
May 46,560 53,280 49,600 50,960 50,280 $3,356
Jun 43,040 55,040 59,200 51,040 57,120 $3,990
Jul 62,800 64,000 58,800 61,400 $3,476
Aug 57,280 57,600 58,880 58,240 $3,329
Sep 56,240 50,640 55,520 53,080 $2,725
Oct 43,120 45,840 42,880 44,360 $1,958
Nov 38,080 40,960 41,120 41,040 $1,988
Dee 37,280 44,000 36,400 40,200 $1,728
Total 521,440 575,520 568,720 563,560 $30,790
Note: Costs have the monthly fIXed Service Charge removed.
Table 3-9b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Mont'" 2005 2006 2007 2008 2 YltCIr Ava
Jan 65 94 100 70 85
Feb 73 107 90 67 79
Mar 70 103 114 93 104
Apr 106 114 111 98 105
May 101 133 108 103 106
Jun 121 123 119 121
Jul 119 132 124 128
Aug 125 125 124 125
Sep 116 113 106 110
Oct 119 111 101 106
Nov 94 97 95 96
Dee 69 99 68 84
Maximum 125 133 124 128
Historical Electric Consumption
70,000
60,000
50,000
:E' 40,000
s:
; 30,000
-- 2005
__ 2006
--2007
-*- 2008
-Baseline
20,000
10,000
o
Jan Feb Mar Apr May Jun JuJ Aug Sep Oct Nov Dec
Energy Solutions
3-9
.
.
.
Section 3
Chevron
~
Historical Energy Consumption
Facility:
Account:
Rate Code:
Meter:
Salina Community Theater
1596344723
Small General Service
04351468
Table 3-10a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Month 2085 2008 2007 2088 2 Year Avo Year (:osts
Jan 16,160 14,240 14,320 10,960 12,640 $572
Feb 16,960 16,400 15,360 16,080 15,720 $928
Mar 17,360 15,200 14,640 14,880 14,760 $986
Apr 16,960 19,840 17,520 12,000 14,760 $825
May 20,960 18,800 22,720 17,200 19,960 $1,280
Jun 27,120 30,080 26,880 28,480 $2,030
Jul 31,280 30,880 30,000 30,440 $2,015
Aug 23,920 27,520 27,840 27,680 $1,808
Sep 20,960 24,400 23,440 23,920 $1,396
Oct 13,840 17,040 14, 000 15,520 $785
Nov 13,600 13,680 13,680 13,680 $690
Dee 17,280 12,320 13,680 13,000 $713
Total 236,400 240,400 234,080 230,560 $14,030
Note: Costs have the monthly fixed Service Charge removed.
Table 3-10b
Electric Demand History and Baseline
Electric Demand (kW) Recent
MOllth 2005 2006 2007 2008 2 Year Ava
Jan 42 44 47 67 57
Feb 59 60 49 67 58
Mar 50 56 60 58 59
Apr 66 75 73 74 74
May 80 69 95 74 85
Jun 94 94 95 95
Jul 88 90 95 93
Aug 95 95 95 95
Sep 98 90 87 89
Oct 58 73 80 77
Nov 53 43 39 41
Dee 44 43 45 44
Maximum 98 95 95 9S
Historical Electric Consumption
35,000
30,000
-- 2005
-- 2006
.....2007
~ 2008
-Baseline
25,000
::c 20,000
3:
; 15,000
10,000
5,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Energy Solutions
3-10
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Facility:
Account:
Rate Code:
Meter:
Smoky Hill Museum
938010970
Small General Service
01956018 & K1956018
Table 3-11a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Montl1 21111~ 2006 2007 2008 2 V,aT Ava Veal' CO$ts
Jan 64,800 70,500 85,500 80,400 82,950 $3,788
Feb 44,400 68,400 72,300 86,700 79,500 $4,441
Mar 34,200 56,100 60,000 71,100 65,550 $4,298
Apr 31,500 49,500 52,800 58,200 55,500 $3,568
May 48,900 51,000 54,115 56,400 55,258 $3,827
Jun 49,800 55,200 61,200 58,200 $4,030
Jul 49,200 62,700 51,900 57,300 $3,198
Aug 59,100 56,100 53,700 54,900 $3,166
Sep 50,400 50,400 49,500 49,950 $2,573
Oct 44,700 58,200 50,700 54,450 $2,315
Nov 73,500 54,600 69,000 61,800 $3,337
Dec 88,500 93,000 90,900 91,950 $4,277
Total 639,000 725,700 751,615 767,308 $42,818
Note: Costs have the monthly fixed Service Charge removed.
Table 3-11b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Month 200$ 2006 2007 20118 2 Year Ava
Jan 165 147 181 177 179
Feb 135 168 184 186 185
Mar 96 140 137 150 144
Apr 111 127 143 162 153
May 106 133 133 126 130
Jun 132 130 130 130
Jul 138 127 128 128
Aug 126 130 133 132
Sep 126 137 129 133
Oct 117 149 120 135
Nov 198 184 162 173
Dec 183 172 - 86
Maximum 19B 184 184 185
100,000
90,000
80,000
70,000
60,000
I 50,000
40,000
30,000
20,000
10,000
o
Energy Solutions
Historical Electric Consumption
__ 2005
__ 20015
__ 2007
__ 20015
-Baseline
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
3-11
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Facility:
Account:
Rate Code:
Meter:
Memorial Hall
3688865628
Small General Service
01109857
Table 3-12a
Electric Consumption History and Baseline
Electric Consumption (kWh) Recent Most Recent
Month 2005 2006 2007 200$ 2 Year Ava Year Costs
Jan 22,960 22,720 22,320 24,800 23,560 $'1,171
Feb 23,360 22,480 23,360 22,720 23,040 $'1,190
Mar 22,240 24,160 22,400 22,480 22,440 $'1,385
Apr 25,360 23,760 21,840 22,960 22,400 $'1,384
May 24,480 25,680 24,640 25,040 24,840 $'1,688
Jun 24,880 28,480 27,200 27,840 $'1,898
Jul 23,840 29,360 27,200 28,280 $'1,706
Aug 27,120 31,040 36,880 33,960 $2,176
Sep 27,840 25,040 30,080 27,560 $'1,600
Oct 23,040 23,440 24,720 24,080 $'1,141
Nov 25,440 24,640 26,400 25,520 $'1,256
Dee 24,080 25,360 23,600 24,480 $'1,168
Total 294,640 306,160 310,640 308,000 $11,762
Note: Costs have the monthly fixed Service Charge removed.
Table 3-12b
Electric Demand History and Baseline
Electric Demand (kW) Recent
Month 2005 2006 2007 2008 2 Year Ava
Jan 49 51 52 53 53
Feb 54 54 52 55 54
Mar 53 54 58 54 56
Apr 55 60 60 54 57
May 59 63 73 61 67
Jun 66 68 78 73
Jul 50 77 72 75
Aug 71 86 92 89
Sep 71 64 73 69
Oct 58 64 61 63
Nov 48 57 53 55
Dee 49 54 59 57
Maximum 71 86 92 89
Historical Electric Consumption
40,000
35,000
30,000
25,000
--200J
___ 2006
......2007
__ 2008
-Baseline
:c
:!: 20,000
:::!.
15,000
10,000
5,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Energy Solutions
3-12
.
.
.
Section 3
Historical Energy Consumption
Natural Gas
A listing of the natural gas meters and accounts serving the buildings in scope are identified in
Table 3-13. Only usages ofthose meters and accounts serving areas affected by projects in this
report were analyzed. Seven of the buildings have natural gas furnished and delivered by Kansas
Gas Service (KGS) under the General Sales Service rate. The Health department purchases its
natural gas from Seminole Energy Services and delivery from Kansas Gas Service.. The
remaining building, Smoky Hill Museum is an all electric building and does not use natural gas.
Table 3-13
Natural Gas Meters
Buildin(J Address Account No. Meter No. Rate Utilitv
Bicentennial Center Kenwood Park 510346073154747045 1209426433 General Service Kansas Gas Service
Fire Station No. 1 222 W. Elm 510038084154747564 1209321450 General Service Kansas Gas Service
Fire Station No.2 1110 S. Santa Fe 510395322154747345 0406873044 General Service Kansas Gas Service
Golf Clubhouse 2500 E Crawford 510172027154748500 0403264013 General Service Kansas Gas Service
510213303154748264 1005252310 General Service Kansas Gas Service
Health Deoartment 125 W. Elm 102658 2202139 contract Seminole Enerov Services
Small TranSDortation Service Kansas Gas Service
Memorial Hall 410 W. Ash 510222211162148900 1208590037 General Service Kansas Gas Service
Police Deoartment 253 N. 10th 510553773154747900 1209321453 General Service Kansas Gas Service
Salina Community Theater 303 E. Iron 510249755154748682 0406873417 General Service Kansas Gas Service
Smokv Hill Museum 211 W.lron no Qas - all electric
The KGS General Sales Service tariff consists of a fixed monthly service charge; a delivery
charge, gas hedge, and other surcharges based on usage; a rate for the cost of gas that varies each
month; and a 5% franchise fee on the total charge of each month's bilL To arrive at the effective
natural gas rate used in the savings calculations, the monthly bill was determined after removal of
the $23.35fmonth service charge with the 5% franchise fee. The Golf Clubhouse has two natural
gas meters, so the bills for these two monthly bills were aggregated for the analysis. The average
natural gas rate for each of the months from June, 2007 through May, 2008 was determined and
averaged. Because of the upward trend in natural gas costs, the most recent data is the closest to
representing where gas rates may be today. The averages from the seven buildings were quite
similar, varying only because of the billing periods that kept the monthly bills from using the
same surcharges and gas costs. A rate of $11.617 fmcf was used as the basis for the savings
calculations for the seven buildings using a twelve-month average.
Chevron
~
Energy Solutions
3-13
.
.
.
Section 3
Historical Energy Consumption
Table 3-14
Most Recent Year Natural Gas Rates ($/mcf)
Bicentennial Fire Station Fire Station Golf Memorial Police Community
Center NO.1 NO.2 Clubhouse Hall Dept. Theater
Jun 2007 $11.7692 $11.7680 $11.7693 $11.7699 $11.7792 $11.7695 $11.7719
Jul2007 $11.6637 $11.7699 $11.6635 $11.6629 $11.7690 no bill $11.6645
Auq 2007 $10.9350 $11.6629 $10.9347 $10.4709 $11.6662 $11.71593 $10.9393
Sep 2007 $10.4715 $10.4709 $10.4705 $10.4706 $10.4675 $11.6625 $10.4713
Oct 2007 $10.1089 $10.4706 $10.1091 $10.7205 $10.4719 $10.4693 $10.1092
Nov 2007 $10.7207 $10.7205 $10.7207 $10.7207 $10.1088 $10.1088 $10.7208
Dee 2007 $10.8304 $10.7207 $10.8304 $10.8305 $10.7207 $10.7:208 $10.8305
Jan 2008 $10.7698 $10.8304 $10.7698 $10.7699 $10.8304 $10.8304 $10.7699
Feb 2008 $11.6143 $10.7699 $11.6141 $11.6142 $10.7698 $10.7700 $11.6142
Mar 2008 $13.2042 $11.6143 $13.2041 $13.2053 $11.6143 $11.6143 $13.2041
Apr2008 $13.4328 $13.2044 $13.4327 $13.4340 $13.4327 $13.4328 $13.4334
May 2008 $14.6420 $14.6405 $14.6418 $14.6425 $14.6413 $13.4331 $14.6443
Averages $11.6802 $11.5536 $11.6801 $11.6927 $11.5227 $11.5073 $11.6811
The Health Department uses natural gas contracted from Seminole Energy Services. In addition
to the commodity, transportation is purchased from Kansas Gas Service. The KGS charge has
the same fixed service charge component and franchise fee as at the other buildings. Once the
monthly fixed charge is removed, all remaining charges vary directly with natural gas use. The
average natural gas cost at the Health Building for the last twelve months is given in Table 3-15
showing the average of $9. 566/mcf.
Table 3-15
Most Recent Year Natural Gas Rates - Health Department ($/mcf)
Jun 2007
Jul2007
Au 2007
Se 2007
Oct 2007
Nov 2007
Dec 2007
Jan 2008
Feb 2008
Mar 2008
A r 2008
Ma 2008
Avera e
Most Recent Year
$9.8356
$8.8994
$8.2516
$7.6328
$8.1771
$8.8643
$8.9248
$9.2861
$10.2820
$10.7483
$11.5183
$12.3746
$9.5662
A summary of the historical natural gas usages are given in Table 3-16 through Table 3-23 along
with the most recent year baseline usage.
Chevron
.
Energy Solutions
3-14
.
.
.
Section 3
Chevron
~
Historical Energy Consumption
Table 3-16
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Bicentennial Center
510346073154747045
General Service
403264013
Natural Gas Consumption (mct) Recent
Month 2005 2006 2007 2008 Year AVA
Jan 580 373 623 1,106 1,106
Feb 370 372 400 641 641
Mar 243 213 133 351 351
Apr 101 65 96 290 290
May 35 31 13 71 71
Jun 16 8 7 7
Jul 6 6 6 6
Aug 6 11 13 13
Sep 34 37 33 33
Oct 132 215 132 132
Nav 514 420 392 392
Dec 585 Not available 610 610
Annual Use 2,622 2,460 3,652
1,200
1,000
800
LL.
U 600
:i
400
200
Historical Gas Consumption
E+- 2005
__ 2006
-.- 2007
-*- 2008
Jan
March
May
July
Sept
Nav
Energy Solutions
3-15
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Table 3-17
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Fire Station No.1
510038084154747564
General Service
403264013
Natural Gas Consumption (mct) Recent
Month 2005 2006 2007 2008 Year Avg
Jan 198 106 157 179 179
Feb 132 146 171 133 133
Mar 86 101 78 103 103
Apr 83 70 87 65 65
May 63 61 30 13 13
Jun 12 11 12 12
Jul 12 12 11 11
Aug 12 11 11 11
Sep 14 12 12 12
Oct 16 63 12 12
Nov 79 99 109 109
Dee 190 152 186 186
Annual Use 897 843 874 845
Historical Gas Consumption
200
E-.- 2005
-1_ 2006
......- 2007
-)Eo- 2008
160
120
u..
(.)
::i
80
40
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nov Dee
Energy Solutions
3-16
.
.
.
Section 3
Historical Energy Consumption
Chevron
W
Table 3-18
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Fire Station No.2
510395322154747345
General Service
403264013
Natural Gas Consumption (mcf) Recent
Month 2005 2006 2007 2008 V.ar Avg
Jan 56 55 105 101 101
Feb 40 45 60 71 71
Mar 38 30 37 44 44
Apr 38 5 17 40 40
May 19 6 15 40 40
Jun 14 7 12 12
Jul 16 5 11 11
Aug 10 14 12 12
Sep 12 9 13 13
Oct 17 31 21 21
Nov 66 66 66 66
Dee 59 103 114 114
Annual Use 383 375 484 546
Historical Gas Consumption
150
-+- 2005
-_ 2006
-.- 2007
-*- 2008
125
100
LI.
(.) 75
:::i
50
25
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nav Dee
Energy Solutions
3-17
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
u.
(,J 75
::lE
Table 3-19
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Golf Clubhouse
510172027154748500and 510213303154748264
General Service
0403264013 and 1005252310
Natural Gas Consumption (mct) Recent
Month 2005 2006 2007 2008 Year Avg
Jan 59 42 81 80 80
Feb 37 51 36 51 51
Mar 10 24 13 12 12
Apr 3 1 6 5 5
May 1 1 1 1 1
Jun 1 1 1 1
Jul 1 1 1 1
Aug 1 1 1 1
Sep 1 1 1 1
Oct 4 9 4 4
Nov 59 49 49 49
Dee 55 61 81 81
Annual Use 231 242 273 285
Note: Data is sum of usage of both gas meters.
Historical Gas Consumption
150
[ ~
-~
-..- ~
--*"'" ~
125
100
50
25
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Energy Solutions
3-18
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Table 3-20
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Memorial Hall
510222211162148900
General Service
403264013
Natural Gas Consumption (mef) Recent
Month 2005 2006 2007 2008 Year AVQ
Jan 471 285 409 463 463
Feb 326 362 398 394 394
Mar 234 285 81 248 248
Apr 39 26 91 163 163
May 1 2 2 15 15
Jun 1 2 2 2
Jul 1 2 3 3
Aug 1 2 2 2
Sep 1 2 3 3
Oct 32 100 45 45
Nov 234 353 271 271
Dee 489 412 451 451
Annual Use 1,832 1,832 1,757 2,059
Historical Gas Consumption
600
~-..... 2 005
--1_ 2006
-.- 2007
-X'- 2008
500
400
LL
(,) 300
:IE
200
100
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Energy Solutions
3-19
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Table 3-21
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Police Department
510553773154747900
General Service
403264013
Natural Gas Consumption (mef) Recent
Month 2005 2006 2007 2008 Year Avg
Jan 96 71 143 86 86
Feb 80 88 75 77 77
Mar 51 61 78 76 76
Apr 5 60 29 81 81
May 4 40 6 39 39
Jun 5 4 3 5 3
Jul 4 4 3 3
Aug 4 3 5 5
Sep 3 5 5 5
Oct 4 4 5 5
Nov 29 17 22 22
Dee 90 93 84 84
Annual Use 375 450 455 485
Historical Gas Consumption
150
-+- 2005
-_ 2006
-.- 2007
-*- 2008
125
100
u..
U 75
:i
50
25
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Energy Solutions
3-20
.
.
.
Section 3
Historical Energy Consumption
Chevron
~
Table 3-22
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Salina Community Theater
510249755154748682
General Service
403264013
Natural Gas Consumption (met) Recent
Month 2005 2006 2007 2008 Year Ava
Jan 134 62 84 127 127
Feb 75 134 137 106 106
Mar 43 45 88 47 47
Apr 6 5 22 23 23
May 9 3 25 5 5
Jun 6 2 3 3
Jul 2 3 2 2
Aug 4 3 2 2
Sep 3 3 2 2
Oct 20 13 3 3
Nov 52 53 10 10
Dee 63 84 68 68
Annual Use 417 410 446 398
Historical Gas Consumption
150
~+- 20 05
-......... 2006
-+- 2007
-*- 2008
125
100
u.
U 75
::&
50
25
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nav Dee
Energy Solutions
3-21
.
.
.
Section 3
Historical Energy Consumption
Chevron
U
Table 3-23
Gas Consumption History
Facility:
Account:
Rate Code:
Meter:
Health Dept
102658
General Service
2202139
Natural Gas Consumption (mcf) Recent
Month 2005 2006 2007 2008 Year Ava
Jan 95 52 99 103 103
Feb 58 59 87 82 82
Mar 46 33 31 58 58
Apr 16 9 30 26 26
May 6 4 5 6 6
Jun 4 3 4 4
Jul 4 3 4 4
Aug 4 4 4 4
Sep 4 4 4 4
Oct 13 15 10 10
Nav 38 37 47 47
Dee 86 72 83 83
Annual Use 374 295 408 431
Historical Gas Consumption
150
--+- 2005
_2006
-..- 2007
-*- 2008
125
100
LI.
u 75
:2
50
25
Jan
March
May
Sept
July
Nav
Energy Solutions
3-22
.
.
.
Section 3
Historical Energy Consumption
Water
Water and sewer service for the City of Salina buildings is furnished by the Municipal Utilities
Department of the City. A listing of the water meters and accounts serving the buildings in scope
are identified in Table 3-24. Only meter usages and accounts serving areas affected by projects
in this report were analyzed.
Table 3-24
Water and Sewer Accounts
Address Account No. Meter Size Utility
Bicentennial Center 19199-12562 2" City of Salina
19195-12556 5/8" City of Salina
Fire Station No.1 15505-9806 1 %" City of Salina
Fire Station No.2 7437-4388 2" City of Salina
Golf Clubhouse 35481-24182 1" City of Salina
Health Department 15593-39666 1 %" City of Salina
Memorial Hall 15333-9678 3" City of Salina
Police Department 215-162 2" City of Salina
Salina Community Theater 16211-10512 2" City of Salina
Smoky Hill Museum 1691-1008 2" City of Salina
To encourage water conservation, the City has recently changed the water and sewer rate
structure to incorporate an "excess use charge" to apply when a meter's monthly use exceeds
120% of the "Winter Quarter Average" use. The new water rate structure along with new water
rates increases in sewer rates, and increases in meter charges go into effect November 1, 2008.
Resolution 08-6523 also sets the water, sewer and meter rates for five years. These rates are
shown in Table 3-25. The water and sewer savings rates used in the savings calculations are
based on the 2009 rates. The average escalation of total rate per ccf over the next five years is
9.0%.
Table 3-25
Water and Sewer Rates per Resolution 08-6523
2009 2010 2011 2012 2013 Average annual
rate of increase
Water base rate ($/ccf) $2.34 $2.55 $2.82 $3.12 $3.49 10.5%
Water excess rate ($/ccf) $4.68 $5.10 $5.64 $6.24 $6.98 10.5%
Sewer ($/ccf) $2.88 $3.08 $3.35 $3.64 $3.90 7.9%
For each building, monthly baseline water use was established using the averages from 2005
through 2007, using all available data furnished by the City. To determine effective combined
water and sewer rate for each building, a forecast was developed for post-retrofit water use. It is
assumed that, on average, each month's future usage is at this post-retrofit value. Knowing the
post-retrofit usages, the months exceeding 120% of the "Winter Quarter Average" can be
Chevron
.
Energy Solutions
3-23
.
.
.
Section 3
Historical Energy Consumption
determined. The water savings in these months is based on the "excess use" rate and the water
savings in other months is based on the base rate. Each month's rate is weighted by the monthly
forecasted quantity of water savings in ccf to arrive at an equivalent annual average water rate.
All usages also have a $0.032/kgal ($0.023936/ccf) charge for the state water fee and for sewer
usage for the types ofECMs considered; For 2009, the minimum base savings rate is:
$2.34/ccf(water) + $2.88/ccf(sewer) + $0.02394/ccf(state fee) = $5.244/ccf
The maximum savings rate for any month occurs when usage exceeds 120% of the "Winter
Quarter Average":
$4.68/ccf(water) + $2.88/ccf(sewer) + $0.02394/ccf(state fee) = $7.584/ccf
The savings rates fall in between these values for all buildings as shown in the ECM Summary
table of Section 2. Note that the savings rates at the Golf Clubhouse and at Smoky Hill Museum
are at the minimum rate of $5.244/ccf as each month's post-retrofit usage is expected to be below
120% of the defined minimum "Winter Quarterly Average" of 800 ccf. Another interesting
observation is that the Police Department savings rate is near the maximum rate year-round.
This is because of the shape of the annual water use curve which shows that the three minimum
use months are coincident with when the "Winter Quarter Average" use is established.
A summary of the historical water usages are given in Table 3-26 through Table 3..34 along with
the three year historical average usage.
Chevron
~
Energy Solutions
3-24
.
.
.
Section 3
Historical Energy Consumption
Table 3-26
Water Usage History and Baseline
Facility: Bicentennial Center
Account: 19199-12562
Meter Size: 2"
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 10,800 9,300 10,000 10,030
Feb 16,700 23,900 17,800 19,470
Mar 20,100 18,400 17 ,200 18,570
Apr 31,400 26,500 31,000 29,630
May 26,200 16,800 23,900 22,300
Jun 14,800 20,600 19,300 18,230
Jul 15,000 8,700 13,200 12,300
Aug 6,100 6,700 2,200 5,000
Sep 8,000 8,800 3,000 6,600
Oct 17,800 10,500 2,600 10,300
Nov 13,800 11 ,800 3,300 9,630
Dee 7,700 9,200 2,300 6,400
Total 188,400 171,200 145,800 168,460
Historical Water Consumption
35,000
30,000
25,000
-
Gl
Gl 20,000
u..
Co)
:s 15,000
:l
0
10,000
5,000
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Month
Chevron
~
Energy Solutions
-+- 2005
___ 2006
-.- 2007
_Average
3-25
.
.
.
Section 3
Historical Energy Consumption
Table 3-27
Water Usage History and Baseline
Facility: Fire Station No. 1
Account: 15505-9806
Meter Size: 1 W'
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 2,800 5,100 3,600 3,830
Feb 3,100 4,700 3,100 3,630
Mar 3,300 4,800 3,100 3,730
Apr 4,900 3,300 4,200 4,130
May 3,400 4,600 3,800 3,930
Jun 4,300 6,400 4,800 5,170
Jul 5,500 6,800 6,300 6,200
Aug 7,800 7,200 6,700 7,230
Sep 8,100 7,100 8,500 7,900
Oct 6,600 4,300 3,900 4,930
Nov 4,900 4,100 3,800 4,270
Dee 4,200 4,200 3,900 4,100
Total 58,900 62,600 55,700 59,050
Historical Water Consumption
9,000
8,000
7,000
Q) 6,000
t!. 5,000
u
:0 4,000
:II
o 3,000
2,000
1,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Month
Chevron
.
Energy Solutions
-+- 2005
___ 2006
--.- 2007
_Average
3-26
.
.
.
Section 3
Historical Energy Consumption
Table 3-28
Water Usage History and Baseline
Facility: Fire Station No.2
Account: 7437-4388
Meter Size: 2"
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 1,600 1,600 1,300 1,500
Feb 1,700 1,600 1,500 1,600
Mar 1,600 1,800 1,100 1,500
Apr 1,900 1,100 1 ,400 1,470
May 1,600 700 1,200 1,170
Jun 220 600 1,600 810
Jul 330 900 1,300 840
Aug 3,500 700 2,200 2,130
Sep 2,700 600 1 ,400 1,570
Oct 1,700 1,200 1,500 1,470
Nov 2,100 500 1,600 1 ,400
Dee 1,900 1,200 1 ,400 1,500
Total 20,850 12,500 17,500 16,960
Historical Water Consumption
5,000
4,000
1) 3,000
Q)
I.L.
U
:a 2,000
::I
U
1,000
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee:
Month
Chevron
~
Energy Solutions
-+-
_2006
-..- 2007
-et-Average
3-27
.
.
.
Section 3
Historical Energy Consumption
6,000
5,000
- 4,000
G)
G)
u.
u 3,000
:s
;:,
0 2,000
1,000
0
Table 3-29
Water Usage History and Baseline
Facility: Municipal Golf course clubhouse
Account: 35481-24182
Meter Size: 1"
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 400 1,900 1,100 1,130
Feb 300 500 800 530
Mar 800 600 900 770
Apr 1,700 1,000 1 ,400 1,370
May 1,500 2,100 1,900 1,830
Jun 1,600 3,100 2,500 2,400
Jul 2,100 2,800 3,500 2,800
Aug 2,000 2,600 3,700 2,770
Sep 4,000 1,900 5,700 2,950
Oct 1,000 900 2,100 1,330
Nov 600 700 1,100 800
Dee 300 600 600 500
Total 16,300 18,700 25,300 19,180
Note: Data of Sept, 2007 not Included in Pre-Retrofit average. High value due to leaks"
Historical Water Consumption
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Month
-.- 2005
___ 2006
-.- 2007
-&-Average
Chevron
~
Energy Solutions
3-28
.
.
.
Section 3
Historical Energy Consumption
Table 3-30
Water Usage History and Baseline
Facility: Health Department
Account: 15593-39666
Meter Size: 1 W
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 1,100 1,000 900 1,000
Feb 1,200 1,300 1,100 1,200
Mar 1,200 1 ,400 1,000 1,200
Apr 1,500 1,300 1,100 1,300
May 1,200 1,000 1,100 1,100
Jun 1,100 1,100 2,200 1,470
Jul 1,700 1,500 1,100 1 ,430
Aug 1 ,400 1,500 1,900 1,600
Sep 1,700 1,500 2,200 1,800
Oet 2,400 1,100 1,000 1,500
Nov 1 ,400 1,000 1,600 1,330
Dee 1,100 1,000 1,100 1,070
Total 17,000 14,700 16,300 16,000
Historical Water Consumption
5,000
4,000
-
II) 3,000
II)
II..
U
:s 2,000
:::l
0
1,000
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nov Dee
Month
Chevron
I!IIIII!!!I Energy Solutions
-
--+- 2005
_ 2006
-.- 2007
-B-Average
3-29
.
.
.
Section 3
Historical Energy Consumption
Table 3-31
Water Usage History and Baseline
Facility: Memorial Hall
Account: 15333-9678
Meter Size: 3"
Water Consumption (cu ft) 3 Year
Month Z005 2006 2007 2008 Averaae
Jan 900 1,000 900 930
Feb 1,800 2,000 1,700 1,830
Mar 2,200 1,200 1,500 1,630
Apr 1,700 1,700 1 ,400 1,600
May 1,500 3,700 1,000 2,070
Jun 1 ,400 1,200 1,100 1,230
Jul 1,300 1,000 700 1,000
Aug 1,500 1,500 2,900 1,970
Sep 1,300 1,600 1,000 1,300
Oet 1 ,400 1,700 1,700 1,600
Nov 1 ,400 1 ,400 1,500 1 ,430
Dee 3,300 4,200 3,200 3,570
Total 19,700 22,200 18,600 20,160
Historical Water Consumption
5,000
4,000
-
: 3,000
u.
u
:0 2,000
:::I
(J
1,000
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nov Dee
Month
Chevron
~
Energy Solutions
-.- 2005
_2006
-.- 2007
~Average
3-30
.
.
.
Section 3
Historical Energy Consumption
Table 3-32
Water Usage History and Baseline
Facility: Police Department
Account: 215-162
Meter Size: 2"
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 1,800 1,800 1,700 1,770
Feb 1,900 1,900 2,100 1,970
Mar 1,700 1,900 1,700 1,770
Apr 3,200 2,200 2,100 2,500
May 2,100 4,400 1,900 2,800
Jun 3,900 4,600 2,100 3,530
Jul 6,500 4,100 3,500 4,700
Aug 5,200 3,900 6,600 5,230
Sep 5,800 5,800 6,200 5,930
Oct 6,100 5,500 5,900 5,830
Nov 4,100 6,000 6,300 5,470
Dee 2,900 4,800 3,800 3,830
Total 45,200 46,900 43,900 45,330
Historical Water Consumption
7,000
6,000
5,000
1
IL 4,000
u
:s 3,000
~
(J
2,000
1,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Month
Chevron
~
Energy Solutions
-+- 2005
_2006
.....- 2007
_Average
3-31
.
.
.
Section 3
Historical Energy Consumption
Table 3-33
Water Usage History and Baseline
Facility: Salina Community Theater
Account: 16211-10512
Meter Size: 2"
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 1,600 700 1,000 1,100
Feb 3,300 1,700 400 1,800
Mar 1,500 1,100 1,600 1 ,400
Apr 1,700 900 500 1,030
May 2,000 1,900 1,000 1,630
Jun 2,600 1,700 900 1,730
Jul 4,100 4,400 3,300 3,930
Aug 4,200 2,400 3,200 3,270
Sep 2,100 2,000 2,800 2,300
Oct 3,400 3,300 3,900 3,530
Nov 1,600 1,700 1,100 1,470
Dee 1,900 2,300 800 1,670
Total 30,000 24,100 20,500 24,860
Historical Water Consumption
5,000
4,000
-
I 3,000
I&.
U
:c 2,000
:J
U
1,000
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Month
Chevron
~
Energy Solutions
-+- 2005
_ 2006
-+- 2007
_Average
3-32
.
.
.
Section 3
Historical Energy Consumption
Table 3-34
Water Usage History and Baseline
Facility: Smoky Hill Museum
Account: 1691-1008
Meter Size: 2"
Water Consumption (cu ft) 3 Year
Month 2005 2006 2007 2008 Averaae
Jan 1,300 1,100 700 1,030
Feb 1,300 1,200 1,100 1,200
Mar 1,100 1,200 900 1,070
Apr 1,200 1,100 800 1,030
May 1 ,400 900 500 930
Jun 110 1,600 700 800
Jul 800 900 600 770
Aug 600 700 1,100 800
Sep 110 700 1,000 600
Oct 900 900 800 870
Nov 800 1,700 700 1,070
Dee 1,100 500 3,000 1,530
Total 10,720 12,500 11,900 11,700
Historical Water Consumption
5,000
4,000
1)
.f 3,000
u
:s
= 2,000
o
1,000
o
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee
Month
Chevron
~
Energy Solutions
--+- 2005
_ 2006
-..- 2007
_Average
3-33
.
.
.
Section 4
Operation & Maintenance
A. OPERATIONAL AND MAINTENANCE (O&M) SAVINGS
As mechanical and lighting systems age, they require more maintenance, which can strain a
facility's physical and capital resources. The proposed project will significantly reduce
maintenance by replacing old, maintenance intensive mechanical, plumbing, and lighting
equipment. Maintenance cost savings associated with individual energy conservation measures
are documented in this section.
The projects included in this report involve new equipment with a full service life ahead of them
at the beginning of the program. As such, future expenditures for certain equipment
replacements are avoided or greatly reduced. Future funds that would be used for replacement of
equipment covered in this program can be diverted to other facility needs. These avoided
replacement costs are not included in the financial aspects of the program. However, specific
reductions in replacement parts are included in the financial aspects of the project and are
quantified in this section. Some median estimates of service life are provided by ASHRAE for
some of the types of equipment covered in this program.
Hot Water Boilers
Pumps (base mounted)
Air-cooled Condensers
Rooftop Air Conditioners
Gas-Fired Furnaces
Hot Water Unit Heaters
24 - 30 years
20 years
20 years
15 years
18 years
20 years
ECMs LI-L6: Lighting ECMs
The maintenance savings related to lighting retrofits includes the benefits of replacing existing
lamps that have part of their expected life used with new lamps having a full life expectancy, and
of the use of new lamps and ballasts with longer lives than existing lamps. The replacement
costs for the retrofit assumes that lamps will have to be replaced every five years and that the
ballasts will last for twenty years. The tables on the following pages provide the basis for
determination of the lighting maintenance savings. Table 4-1 provides the existing maintenance
costs, while Table 4-2 provides the expected maintenance costs after the lighting retrofit has been
completed. Table 4-3 shows the savings over a term of20 years. No lighting maintenance costs
are shown during the first three years after the retrofit as all of the components will be new and
will be under warranty.
The annual average lighting maintenance savings of $4,413 is prorated by building and presented
in Section 2 - Energy Conservation Measures, Table 2-2.
Chevron
~
4-1
Energy Solutions
.
.
.
Section 4
Operation & Maintenance
Table 4-1 Existing Lighting Maintenance Costs
Average LAMPS BALLASTS TOTAL
Annual Rated Annual Lamp Rated Annual
Burn Lamp Quantity Average Material Replacement Ballast Quantity Average Material Ballast Annual
Hours Type Cost Type Cost Replacement Material Cost
Life Hours Cost Life Hours Cost
2,500 T-12 4,457 20,000 $ 1.00 $ 557.13 Magnetic 2,474 40,000 $ 12.00 $ 1,855.50 $ 2,412.63
2,500 T-8 1,649 24,000 $ 1.50 $ 257.66 Electronic 664 50,000 $ 10.00 $ 332.00 $ 589.66
2,500 HID 69 10,000 $ 5.00 $ 86.25 HID 69 40,000 $ 50.00 $ 215.63 $ 301.88
2,500 CFL 187 10,000 $ 2.00 $ 93.50 CFL 0 10,000 $ 12.00 $ - $ 93.50
2,500 Incand. 992 1,200 $ 0.50 $ 1,033.33 - - - $ - $ - $ 1,033.33
8,760 Exit-Incan. 136 1,200 $ 1.00 $ 992.80 - - - $ - $ - $ 992.80
8,760 Exit-CFL 5 10,000 $ 2.00 $ 8.76 CFL 0 10,000 $ 12.00 $ - $ 8.76
8,760 Exit-LED 28 90,000 $ 10.00 $ 27.25 - - - $ - $ - $ -
$ 5,432.55
Table 4-2 Upgraded Lighting Maintenance Costs
Average LAMPS BALLASTS TOTAL
Annual Rated Annual Lamp Rated Annual
Bum Lamp Quantity Average Material Replacement Ballast Quantity Average Material Ballast Annual
Hours Type Cost Type Cost Replacement Material Cost
Life Hours Cost Life Hours Cost
2,500 T-12 0 20,000 $ 1.00 $ - Magnetic 11 40,000 $ 12.00 $ 4.13 $ 4.13
2,500 T-8 4,898 24,000 $ 2.00 $ 510.21 Electronic 2,159 50,000 $ 12.00 $ 647.70 $ 1,157.91
2,500 HID 56 10,000 $ 5.00 $ 35.00 HID 56 40,000 $ 50.00 $ 87.50 $ 122.50
2,500 CFL 806 10,000 $ 2.00 $ 201.50 CFL 0 10,000 $ 12.00 $ - $ 201.50
2,500 Incand. 373 1,200 $ 0.50 $ 194.27 - - - $ - $ - $ 194.27
8,760 Exit-Incan. 0 1,200 $ 1.00 $ - - - - $ - $ - $ -
8,760 Exit-CFL 0 10,000 $ 2.00 $ - CFL 0 10,000 $ 12.00 $ - $ -
8,760 Exit-LED 99 90,000 $ 10.00 $ 48.18 - - - $ - $ - $ -
$ 1,680.30
Chevron
~
4-2
Energy Solutions
.
.
.
Section 4
Operation & Maintenance
Chevron
~
Table 4-3 Lighting Maintenance Cost Comparison
Existing Upgraded
Maintenance Maintenance Maintenance
YEAR Cost Cost Savings
1 $5,433 $0 $5,433
2 $5,433 $0 $5,433
3 $5,433 $0 $5,433
4 $5,433 $17 $5,416
5 $5,433 $34 $5,399
6 $5,433 $168 $5,265
7 $5,433 $420 $5,012
8 $5,433 $672 $4,760
9 $5,433 $1,008 $4,424
10 $5,433 $1,344 $4,088
11 $5,433 $1,596 $3,836
12 $5,433 $1,680 $3,752
13 $5,433 $1,680 $3,752
14 $5,433 $1,680 $3,752
15 $5,433 $1,680 $3,752
16 $5,433 $1,680 $3,752
17 $5,433 $1,680 $3,752
18 $5,433 $1,680 $3,752
19 $5,433 $1,680 $3,752
20 $5,433 $1,680 $3,752
Total $108,651 $20,382 $88,269
Average Annual Maintenance Savings $4,413
Energy Solutions
4-3
.
.
.
Section 4
Operation & Maintenance
CIP 1: Replace Unit Beater with Infrared Radiant Beat (not in recommended program)
With the installation on the direct-fired infrared heaters, the existing boilers will be
decommissioned and no longer need to be maintained. Chevron ES was furnished an estimate of
$600/year that the City of Salina will save in a reduction of ongoing maintenance costs
associated with the boiler at Fire Station No.1.
CIP 2: Replace Boiler at Fire Station No.2 (not in recommended program)
The replacement ofthe 50 year old boiler at Fire Station No.2 with a modern high efficiency
boiler will lead to a reduction in maintenance costs associated with the aging boiler. Chevron ES
was furnished an estimate of $800/year that the City of Salina spends annually on maintenance
parts and costs associated with the existing boiler at Fire Station No.2. It is assumed that
maintenance costs on the new boiler will be half this amount.
CIP 2: Replace Boiler at the Police Department (not in recommended program)
The replacement of the aging boiler at the Police Department with a modern high efficiency
boiler will lead to a reduction in maintenance costs associated with the boiler. Chevron ES was
furnished an estimate of $3,200/year that the City of Salina spends annually on maintenance parts
and costs associated with the aging boiler at the Police Department. With an allowance for
annual maintenance costs of the new high efficiency boiler, an annual O&M savings of $2,700 is
estimated to be realized with the boiler replacement.
CIP 5: BV AC Improvements / Controls Upgrade
The upgrade of the 40 year old HV AC system including air handling units and controls will lead
to a reduction in the annual maintenance, parts, and subcontracted repair expenditures by the City
for maintaining the air handling units, dampers, ductwork, and fans. Chevron ES was furnished
an estimate of $4,000/year for the amount of these annual expenditures. With a small allowance
for annual costs to keep the new system in optimal operating condition, an annual O&M savings
of$3,500 is estimated to be realized with the HV AC replacement. This annual O&M savings is
used in the financial analysis until the year of capital cost avoidance with equipment replacement.
CIP 6: Remove Skylight
Removal of the skylight at the Health Department building will not only provide energy savings
in conditioning the space, but also provide a reduction in annual maintenance costs associated
with the skylight. Chevron ES was provided an estimate of $200 that the City spends annually to
caulk and seal the skylight to prevent leakage. The City also spends $1,650 every three years to
replace the skylight screen installed to reduce the radiation into the lobby space. Overall, the
removal of the skylight and replacement with conventional roofing and an insulated ceiling will
lead to an O&M savings of$750/year.
Chevron
~
4-4
Energy Solutions
.
.
.
Section 4
Operation & Maintenance
ECM Cl: Networked Programmable Thermostats
Chevron ES was provided an estimate of $300/year for maintenance and replacement of
thermostats affected by this ECM. This O&M savings was distributed over the buildings
affected by this ECM roughly by the number of thermostats at each building. At Fire Station No.
1, Fire Station No.2, and the Golf Clubhouse an annual O&M savings of$45 is used. At the
Health Department building and the Salina Community Theatre an O&M savings of $80/year is
used.
Section 2 - Energy Conservation Measures describes that for ECM C1, these annual maintenance
savings will be more than offset with the $30 web server maintenance fee and with the
approximate $40/month ISP service required at the two fire stations and the Golf Clubhouse.
ECM Wl-W5: Domestic Water Retrofits
O&M savings assume reduced parts and maintenance costs will result after new plumbing
systems have been installed. Replacing/retrofitting existing toilet and urinal flush valves with
new flush valves as described in Section 2 - Energy Conservation Measures, will not only reduce
the water usage per flush but will also result in maintenance savings from fewer repairs to
existing flush valves. The annual baseline assumption is that on average, 20% of the flush
valves, tank toilets, and sink aerators will need to be rebuilt / replaced each year. Using a cost
differential of $20 for each flush valve and tank toilet and $0.50 for each sink, an annual avoided
maintenance cost is obtained:
(29 tank toilets + 172 flush valves) x 0.20 x $20.00 + 144 sinks x 0.20 x $0.50 = $819
This is based on the assumption that parts have, on average, a five-year life.
Chevron
~
Energy Solutions
4-5
.
.
.
Section 4
Operation & Mai.ntenance
B. CAPITAL COST AVOIDANCE
Much of the major equipment proposed in the ECMs and CIPs replaces existing equipment that
is near or beyond its useful live. This existing equipment will need to be replaced within the
term of the financing period if the measures are not implemented. Implementation of these
projects now will save the City the expense of replacing equipment over the coming years when
the end oftheir useful lives is reached. To conservatively estimate the replacement year ofthe
major pieces of equipment, the ASHRAE median service life plus 35% was used. Ifthe
replacement year has already past, indicating that the equipment is beyond its typical useful life,
2009 was used as the replacement year.
Generally, the current subcontracted cost estimate was escalated at 2.5% per year, for inflation, to
arrive at the cost of replacement at the end of the equipment's life. These estimates include
equipment, supplies, labor, bonds, and contractor overhead and profit. An exception to this is the
cost of the split-system replacements at the Health Department building. These are discussed
below. Table 4-4 summarizes the basis ofthe capital cost avoidance estimates. These resulting
one time cost savings are grouped by year and shown at the appropriate year in the cash flow
Proforma in the Section 1 - Executive Summary.
Table 4-4 Capital Cost Avoidance Estimates
A5ttRAE 2009
Median Estimated Cost Estimate Cost at
Installed Service Replacement for Time of
Building ECM I CIP Equipment Year Life Year Replacement Replacement
Included in Recommended Program
I
Health Department
I CIP4 2 South Split System Units (1) 1984 18 2008 $29,000 $29,000
CIP4 3 South Split System Units (2) 1984 18 2010 $43,500 $45,702
Police Administration
I CIP5 Air HandlinQ Units 1967 30 2011 $370,599 $389,361
Not 1m;luded in Recommended Program
I
Fire Station #1
I CIP1 Hot Water Boiler 1991 24 2024 $40,562 $58,746
Fire Station #2
I CIP2 Hot Water Boiler 1956 24 2009 $40,562 $40,562
Golf Clubhouse
I CIP3 Tandem Condensing Units 1980 20 2009 $15,944 $15,944
Health Department
I CIP3 6 North Condensing Units 1993 20 2020 $31,920 $41,882
Police Admi1nistration
CIP2 Boiler 1975 24 2009 $68,965 $68 965
Notes: (1) $29,000 budgeted In 2008 to replace two umts.
(2) Remaining 3 south units prorated at 2008 budget to be replaced in two years.
Chevron
~
Energy Solutions
4-6
Section 4
Operation & Maintenance
.
CIP 1: Replace Unit Heater with Infrared Radiant Heat (not in recommended program)
The capital cost avoidance amount associated with this CIP is based on the direct subcontracted
replacement cost of the hot water boiler at Fire Station No. I if it were to remain using the hot
water unit heaters in lieu of changing to direct-fired infrared heaters.
CIP 2: Replace Boiler (not in recommended program)
The capital cost avoidance amount associated with this CIP is based the direct subl.::ontracted
replacement costs of the 52 year old boiler at Fire Station No.2 and the 33 year old boiler at the
Police Department building with high efficiency hot water boilers as described for CIP 2 in
Section 2 - Energy Conservation Measures.
CIP 3: Replace Condensing Unit(s) (not in recommended program)
The capital cost avoidance amount associated with this CIP is based the direct subcontracted
replacement costs of the 15 ton south condensing unit at the Golf Clubhouse, and the six (6)
north roof-mounted condensing units at the Health Department building as described for CIP 3 in
Section 2 - Energy Conservation Measures.
. CIP 4: Replace Split System Units
The capital cost avoidance amount for replacement ofthe split-systems at the Health Department
building savings is based on the budgeted amount that the City had allocated in 2008 for
replacement of two of the five units. The City planned to replace two split systems in 2008 for
$29,000. Even though the other three south units are ofthe same age, the analysis assumes that
they will be replaced in two years at the same current cost per unit increased for inflation:
($29,000/2) x 3 units = $43,500 [2008 cost]
$43,500 x (1 + 2.5% inflationlyr) (2 years) = $45,702 [2010 cost]
CIP 5: HV AC Improvements / Controls Upgrade
The capital cost avoidance amount used for replacement of the HV AC systems and controls at
the Police Department is based on the direct subcontracted replacement costs of the project, as
described in Section 2 - Energy Conservation Measures, less the electrical upgrade amount in the
CIP pricing.
.
Chevron
~
Energy Solutions
4-7
.
.
.
Section 4
Operation & Maintenance
ECMs LI-L2: Lighting ECMs
The City of Salina Facilities Department has plans over the next several years to convert Tl2
fluorescent fixtures to T8 fluorescent fixtures at several of the buildings in scope. With
implementation of ECMs LI and L2, all remaining Tl2lamps will get converted to T8lamps,
making it unnecessary for the City to budget for this retrofit work. Based on discussions with
Byron Erickson, City of Salina Facilities Superintendent, the following are the basis for the
capital cost avoidance with implementation of the lighting ECMs.
Table 4-5 Estimates for City T12 to T8 Conversions
(Material Only) .
Health Department
Police Department
Memorial Hall
Community Theatre
Total:
2008
$3,000
2009 2010 2011 Remarks
$3,000 $3,000 % of fixtures I year
$3,000 $3,000 $3,000 % of fixtures I year
$1,200 $1,200
$3,000 $3,000 % fixtures I year
$7,200 $10,200 $6,000
$3,000
C.
OPERATION AND MAINTENANCE PRACTICES
A good operation and maintenance program is vital in minimizing energy consumption and
attendant costs. O&M work should be performed on a fixed schedule. O&M items may be
added to reflect unique characteristics of a building as well as to accommodate future changes to
a facility. An effective O&M program will result in minimum equipment problems and a
smoother running facility. The remarks given herein are intended for consideration to augment
the current O&M efforts. As Chevron Energy Solutions has found that the City of Salina
Facilities Department generally follows good O&M practices, suggestions listed below may
repeat some practices currently in effect. No energy savings are calculated for the following
general O&M items.
D. GENERAL OPERATION AND MAINTENANCE
Administration
Q Review importance of conserving energy with staff annually; indicate what they can do to
reduce the waste of energy dollars.
Q Name an Energy Manager and assign specific tasks to be handled by that person.
Chevron
~
Energy Solutions
4-8
.
.
.
Section 4
Operation & Maintenance
1:1 Where possible, schedule more maintenance and custodial work during daylight hours to
overlap with normal occupied hours.
1:1 When custodial work is done after normal occupied hours, use an area cleaning schedule,
which causes work to progress from one end of a floor or building to the other end. Turn
off lights and reduce room temperatures as each zone is completed.
1:1 When practical, concentrate activities in one area ofbuilding(s) so remainder can be
treated as an unoccupied area.
Building Envelope
1:1 Replace cracked and broken windows as soon as they are found.
1:1 Paint interior spaces colors to improve effectiveness oflighting (usually light, flat colors).
1:1 Inspect roofs annually and perform preventive maintenance to avoid roofleaks.
1:1 Repair roof leaks as soon as they become evident.
1:1 Check door weather stripping and repair or replace as needed.
1:1 Seal cracks and openings.
Primary Heating System
1:1 Inspect boilers each year; repair as needed.
1:1 Run combustion test annually and adjust to maximize operating efficiency.
1:1 Check water circulating piping for leaks prior to heating season start and correct all leaks
found.
1:1 Check water valves for leakage annually and repair as needed.
1:1 Use a water treatment program to minimize corrosion and water hardness deposits on
heat transfer surfaces.
Chevron
~
Energy Solutions
4-9
.
.
.
Section 4
Operation & Maintenance
Heating. Ventilating. and Air Conditioning (HV AC)
o Inspect filters on all HV AC equipment quarterly; clean or replace as needed.
o Check calibration of thermostats and temperature sensors annually and repair as needed.
o Install locking covers over thermostats and temperature sensors to prevent tampering.
o Repair leaky valves as soon as they are discovered.
o Clean heating and cooling coils annually.
o Set temperatures (heating/cooling, occupied/unoccupied) per established guidelines.
o Review EMS program seasonally and implement needed changes.
o Set EMS alarms at a level to avoid printout of excessive alarms.
Domestic Hot Water (DHW) System
o Turn off DHW heater when hot water is not required for an extended time. Turn off
domestic hot water pumps during unoccupied times.
Lighting Systems
o Turn off lights whenever a space is to be unoccupied for a period of more than five
minutes.
o Whenever burned out lamps (tubes and bulbs) are replaced, clean the light fixture and
lens at the time of replacement.
o Whenever fluorescent ballasts fail, replace with high efficiency ballasts.
o Clean light fixtures annually using detergent and water.
o Use group relamping in buildings when practical.
o Replace yellowed lenses in fluorescent light fixtures.
Chevron
~
Energy Solutions
4-10
.
.
.
Section 4
Operation & Maintenance
Electrical System
Cl Turn off refrigerators and deep freezers when they are not needed for an extended period
of time.
Cl When electric motors fail, replace them with energy efficient units.
Potable Water
Cl Check water faucets and taps for leaks monthly and correct leaks as soon as they are
found.
Cl Check faucets and water closets for leaks monthly.
Chevron
~
Energy Solutions
4-11
.
.
'.
Section 5
Data on Present: Facilities
Data important to energy use at the City of Salina is covered in this section of the report. The
data was collected on a building-by-building basis including outside area lighting and thermal
energy distribution systems. Each building was visited by a survey team to collect data and to
identify potential opportunities for energy cost reduction. Areas of concern encompassed factors
that impact the usage of thermal energy and electrical energy. The survey considered building
envelopes, heating, ventilation, and air conditioning (HV AC) equipment, lighting, miscellaneous
equipment, process equipment, etc. Information was collected on building use schedules as well
as HV AC equipment usage and lighting schedules. Available plans and HV AC control drawings
for each building were reviewed to augment data collected during the survey work. In addition,
energy usage information was assembled from a tabulation of utility bills.
Building characteristics, general HV AC equipment information, temperature control, and
operating schedules used to develop computer models and energy savings are given in this report
section. More detailed information on HV AC equipment is located in Appendix B ofthe report.
Chevron
V
Energy Solutions
5-1
.
.
.
Section 5
Data on Present Facilities
Bicentennial Center
I. General Description:
A. Building Type: Convention Center,
Concert and Sports Arena
B. Gross Square Footage: 108,240
c. Year of Original Construction:
approximately 1978
D. Building Schedules: The Center is typically occupied from 7:00 am to 5:30 pm
Monday through Friday, and most every Saturday and Sunday from 7:00 am to
10:00 pm or later for events.
II.
Lighting:
The facility uses majority of fluorescent troffer fixtures with T -12 lamps in the
convention center, second floor training/meeting rooms, arena main concourse, dressing
rooms, offices, restrooms, and storage areas. Many incandescent can fixtures are used to
illuminate the main lobby and hallway. A number of metal halide fixtures provide light
for the Sports and Concert arena floor.
III. Water:
The water fixtures in the Convention Center consist of floor mounted flushometer toilets,
wall mounted flushometer urinals, lavatory faucets, utility faucets, and dishwashing pre-
rinse sprayers. The water fixtures in the Sports and Concert arena are wall mounted
flushometer toilets, wall mounted flushometer urinals, lavatory faucets, utility faucets,
and dishwashing pre-rinse sprayers. None of the plumbing fixtures in the facility utilize
low consumption valves or moderators. Toilets use approximately 3 to 5 gallons per
flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow approximately
2 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
The majority of the Arena is conditioned by several large air handling units with DX
cooling and electric heating. Some units have natural gas unit heaters, and some air
handling units appear to have natural gas heating capability that is not used.
Chevron
~
Energy Solutions
5-2
.
.
.
Section 5
Data on Present: Facilities
All units are controlled locally by their respective space temperature thennostat. A
supervisory control system monitors and displays temperatures for the exhibition hall and
main arena air handling units. This control system can only enable or disable the
equipment. The exhibition hall main air handling units have a local mixed air controller
that is not operational. The maintenance staff at the building currently duty-cycles the air
handling units when the building is not hosting events. Only about half of the air
handling units operate when the building is sparsely occupied, and air handling units are
alternated to even out run time.
The arena public restrooms are heated with electric strip radiant heaters and controlled by
a wall mounted controller.
The majority of the exhibition hall is conditioned with split system units, and packaged
roof top units.
V. Domestic Hot Water:
Electric domestic water heaters provide hot water for the building.
Chevron
~
Energy Solutions
5-3
.
.
.
Section 5
Data on Present Facilities
Fire Station #1
I. General Description:
A. Building Type: Fire
Station
B. Gross Square
Footage: 15,810
C. Year of Original Construction: Unknown
D. Building Schedules: The building is occupied 24 hours per day 7 days per week
year round.
II.
Lighting:
The apparatus bay of the station uses eight foot fluorescent fixtures containing T -12
lamps. The remainder of the station is illuminated primarily by fluorescent troffer
fixtures also with T -12 lamps. Several incandescent fixtures provide light in the
restroom, and storage areas. A few compact fluorescent lamps are used in the basement.
III.
Water:
The water fixtures in the facility consist of floor mounted flushometer toilets, wall
mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers. The station
also has an Ice-O-Matic ice machine with a water cooled condenser. Estimates indicate
the ice machine uses on average approximately 384 gallons of water per day. No
plumbing fixtures in the facility utilize low consumption valves or moderators. Toilets
use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per
flush, and faucets flow 2 to 3 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
The apparatus bay and equipment shop area of the building are heated with hot water unit
heaters, each controlled by a wall mounted thermostat. The unit heater fans cycle to
maintain the space temperature set point. The hot water coil in the unit heaters does not
have a control valve to regulate hot water flow. Hot water is provided to the unit heaters
by two boilers located in the basement mechanical room. The boilers are manually
scheduled to run approximately October through late April or early May, depending on
weather conditions.
Chevron
_ Energy Solutions
-
5-4
.
.
.
Section 5
Data on Present Facilities
The office and living areas are conditioned by packaged rooftop units with direct-
expansion (DX) cooling and direct-fired natural gas heating.
V. Domestic Hot Water:
A natural gas domestic water heater serves this building.
Chevron
.
Energy Solutions
5-5
.
.
.
Section 5
Data on Present Facilities
A. Building Type: Fire Station
Fire Station #2
I. General Description:
B. Gross Square Footage: 10,150
C. Year of Original Construction:
Unknown
D. Building Schedules: The building is occupied 24 hours per day 7 days per week
year round.
II. Lighting:
III.
The station uses a majority of fluorescent fixtures with two T -8 lamps. The apparatus
bay contains industrial fluorescent T -8 fixtures while the remainder of the facility uses
troffer fluorescent T -8 fixtures. Several incandescent and compact fluorescent fixtures
are used in the restrooms and storage areas.
Water:
The water fixtures in the facility consist of floor mounted flushometer toilets, wall
mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers. No
plumbing fixtures in the facility utilize low consumption valves or modera1tors. Toilets
use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per
flush, and faucets flow 2 to 3 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
The apparatus bay of the building is heated with hot water unit heaters, each controlled
by a wall mounted thermostat. The south lobby area is heated with hot water perimeter
radiation. Hot water is provided to the unit heaters and the perimeter radiation by a boiler
located in the basement mechanical room.
The office and living areas are conditioned by packaged rooftop units with direct-
expansion (DX) cooling and direct-fired natural gas heating.
V. Domestic Hot Water:
Chevron
U
A natural gas fired domestic water heater serves this building.
Energy Solutions
5-6
.
.
.
Section 5
Data on Present Facilities
A. Building Type: Golf Clubhouse and
Pro Shop
Golf Clubhouse
I. General Description:
II.
III.
B. Gross Square Footage: 8,109
C. Year of Original Construction: Unknown
D. Building Schedules: During the summer months from May to September, the
building is occupied 6:30 am to 9:30 pm, seven days per week. During the spring
and fall months the building is occupied from 7:30 am to 7:00 pm also seven days
per week. For the three winter months the facility is occupied from 8:00 am to
6:00 pm Monday through Saturday.
Lighting:
The majority of the building is illuminated by fluorescent troffer fixtures. Most of these
fixtures use T -8 lamps but some use T -12 lamps. A few wraparound fluorescent fixtures
with T -8 lamps are used in the hallway. The clubhouse also uses a few incandescent
lights in the mechanical room and storage areas.
Water:
The water fixtures in the facility consist of floor mounted flushometer toilets, wall
mounted flushometer urinals, lavatory faucets, kitchen faucets, and a shower. The
facility also has a Manitowoc ice machine with a water cooled condenser. Estimates
indicate the ice machine uses on average approximately 252 gallons of water per day. No
plumbing fixtures in the facility utilize low consumption valves or moderators. Toilets
use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per
flush, and faucets flow 2 to 3 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
V.
Chevron
~
The building is conditioned with several split systems equipped with natural gas fired
heating and DX cooling. The split systems are controlled with standard space
thermostats.
Domestic Hot Water:
A small electric domestic water heater serves the main lobby restrooms. A natural gas
fired domestic water heater serves the north area restrooms.
Energy Solutions
5-7
.
.
.
Section 5
Data on Present Facilities
A. Building Type: Health
Maintenance Facility
Health Department
I. General Description:
B. Gross Square Footage: 16,892
C. Year of Original Construction:
Unknown
D. Building Schedules: The building is typically occupied from 7:00 am to 5:30 pm
Monday through Friday.
II. Lighting:
III.
The facility uses a majority of fluorescent troffer fixtures with T -12 lamps. Many
wraparound and strip fluorescent T -12 fixtures are also used in storage areas and
restrooms. A few incandescent light fixtures are used in hallways.
Water:
The water fixtures in the facility consist of floor mounted flushometer toile:ts, wall
mounted flushometer urinals, lavatory faucets, kitchen faucets, and a utility faucet.
Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3
gallons per flush, and faucets flow approximately 2 to 3 gallons per minute: on average.
IV. Heating, Ventilation, and Air Conditioning:
V.
Chevron
~
The building is conditioned with several split system units equipped with natural gas
heating and DX cooling. The south portion of the building has older natural gas furnaces
with standing flame pilot lights located in the attic and aging condensing units located on
the roof. The north portion of the building has higher efficiency furnaces, and both the
furnaces and condensing units were replaced approximately 15 years ago. Several
programmable thermostats are installed at the Health Department, but only one of them
was observed to be programmed with a setback temperature. The clock was set
incorrectly on this thermostat, causing the set back temperature to be in eftect during
occupied hours. The other programmable thermostats had time programs scheduled, but
with no change in the temperature set point.
Domestic Hot Water:
An electric and a natural gas fired domestic water heater serve this building.
Energy Solutions
5-8
.
.
.
Section 5
Data on Present Facilities
A. Building Type: Multi-purpose
arena/office.
Memorial Hall
I. General Description:
II.
III.
B. Gross Square Footage: 47,435
C. Year of Original Construction: 1922
D. Building Schedules: The main portions ofthe building are occupied from 8:00
am to 5:00 pm Monday through Friday and frequently on Saturday and Sunday
for Gymnastics practices/events. During the summer months classrooms on the
second and third floor are occupied from 7:30 am to 7:30 pm Monday through
Saturday for adult education classes.
Lighting:
The facility contains a majority of fluorescent fixtures most of which operate T-12 lamps,
but a considerable number of fixtures with T -8 lamps are also used in office areas, arena
seating, and in hallways. Incandescent lighting fixtures are used primarily in small
storage areas. High-intensity discharge fixtures illuminate the arena, and compact
fluorescent lamps light the main lobby, foyer, and some hallways.
Water:
The water fixtures in the facility consist of floor mounted flushometer toilets, floor and
wall mounted flushometer urinals, and lavatory faucets. With the exception of one urinal,
all plumbing fixtures in the facility do not utilize low consumption valves lOr moderators.
Toilets use approximately 3 to 5 gallons per flush, urinals use approximate:ly 2 to 3
gallons per flush, and faucets flow approximately 2 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
The majority of the building is heated with steam radiators served by a Superior brand
steam boiler located in the basement. The boiler is rated for 15 psi, but is operated to
maintain approximately 3 psi, and is typically operated from November to early May.
Most of the radiators are equipped with thermostatic control valves, and the boiler cycles
to maintain the single space temperature sensor located in the main floor entrance area.
Several of the USD 350 offices on the south end of the building are equipped with
window air conditioners. Two split-system fan coil units are used on the third floor for
cooling. A split-system also serves an office area in the basement.
Chevron
~
Energy Solutions
5-9
.
.
.
Section 5
Data on Present Facilities
Packaged heat pump units condition server room 105 and the Access TV studios.
Controls: The systems are controlled manually with thermostats. The majority of the
equipment runs 24 hours a day, seven days a week and maintains the space: temperature at
approximately 730P.
V. Domestic Hot Water:
A natural gas water heater serves the basement and main arena area and small circulating
pump located in the basement boiler room. The three restrooms on the west side of the
building are served by a 50 gallon natural gas water heater with a small circulating pump.
The southeast side of the building is served by several small electric water heaters.
Chevron
~
Energy Solutions
5-10
.
.
.
Section 5
Data on Present Facilities
A. Building Type: Museum
Smoky Hill Museum
I. General Description:
II.
III.
B. Gross Square Footage: 39,857
C. Year of Original Construction:
Unknown
D. Building Schedules: The Museum is generally occupied from 8:00 am to 5:00 pm
Tuesday through Saturday and 12:00 pm to 5:00 pm on Sunday. TIlle Museum is
closed on Monday.
Lighting:
Much of the fluorescent lighting in the facility has been upgraded from T -12 to 32 watt
T -8 light fixtures. Fluorescent lighting is used in the basement, first floor offices, and on
the entire second floor. The facility uses a majority of incandescent spotlights and
floodlights for museum exhibits, displays, and in some storage areas.
Water:
The water fixtures in the facility consist of floor mounted flushometer toilets, wall
mounted flushometer urinals, lavatory faucets, and a kitchen faucet in the break room.
No plumbing fixtures in the facility utilize low consumption valves or moderators.
Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3
gallons per flush, and faucets flow approximately 2 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
V.
The building is conditioned by three air handling units with DX cooling. Two large
condensing units for these air handling units are located on the roof; the other condensing
unit is located at grade on the east side of the building. The air handling units are
variable volume terminal reheat units with electric reheat coils and direct expansion (DX)
cooling coils. The air handling units are also equipped with several humidifiers to
maintain space humidity set points. These air handling units run continuously and are
controlled by an Invensys energy management system to maintain both the exhibit and
office area space temperature and humidity set points 24 hours a day.
Domestic Hot Water:
A small electric domestic water heater serves this building.
Chevron
~
Energy Solutions
5-11
.
.
.
Section 5
Data on Present Facilities
A. Building Type: Performing Arts Theater
Salina Community Theater
I. General Description:
II.
III.
B. Gross Square Footage: 15,225
C. Year of Original Construction:
Unknown
D. Building Schedules: The building is typically occupied from 8:00 am to 5:00 pm
Monday through Friday. The building schedule varies for rehearsals,
productions/performances but is generally occupied three nights a week from 5:00
pm to 8:00 pm, and on weekends from 12:00 pm to 8:00 pm.
Lighting:
Approximately half of the lighting in the building is from fluorescent T -12 fixtures and
half of the lighting is from incandescent fixtures. Incandescent lights are used mainly in
the theater, lobby, foyer, and studio. Fluorescents are used throughout the offices,
storage areas, practice/rehearsal room, stage, dressing rooms, and restrooms.
Water:
The water fixtures in the facility consist of floor and wall mounted flushometer toilets,
wall mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers. Toilets
use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per
flush, and faucets flow approximately 2 to 3 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
The building is conditioned by packaged rooftop units (RTUs) and split-systems. The
RTUs and split systems have natural gas heating and DX cooling. Standard space
thermostats control the split systems and R TU s to maintain the space temperature set
point 24 hours/day.
V. Domestic Hot Water:
Chevron
~
Three natural gas fired domestic water heaters serve this building.
Energy Solutions
5-12
.
.
.
Section 5
Data on Present Facilities
Police Station
I. General Description:
A. Building Type: Police Department
Facility
B. Gross Square Footage: 29,440
C. Year of Original Construction: 1968
D. Building Schedules: The building is occupied 24 hours per day 7 days per week
year round.
II. Lighting:
The facility uses a combination of T -8 and T -12 fluorescent light fixtures. Some of these
fixtures are recessed troffer fixtures and some are surface mounted box fixtures. The
facility also uses a number of eight foot strip fixtures. Some incandescent and compact
fluorescent fixtures are used in hallways and storage areas.
III.
Water:
The water fixtures in the facility consist of floor and wall mounted flushometer toilets,
floor mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers.
Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3
gallons per flush, and faucets flow approximately 2 to 3 gallons per minute on average.
IV. Heating, Ventilation, and Air Conditioning:
The building is primarily conditioned by three multizone air handling units, equipped
with hot water heating and chilled water cooling. Neither the hot water nor chilled water
coils have control valves for flow control. The multizone zone dampers modulate to
maintain their space temperature set point.
A hot water boiler located in the basement mechanical room provides heating hot water
for the three air handling units. The boiler is manually scheduled to run October through
early May. Each air handling unit is equipped with a hot water coil pump. A hot water
booster pump serving the former floor radiant heating system was operating at the time of
our survey.
A Trane air-cooled chiller provides chilled water for the three air handling units. Each air
handling unit is equipped with a cooling coil pump.
Chevron
W
5-13
Energy Solutions
.
.
.
Section 5
Data on Present Facilities
Two small cooling-only split systems provide air conditioning for the detention area on
the main floor and an office area in the basement.
V. Domestic Hot Water:
A natural gas domestic water heater located in the basement mechanical room serves this
building.
Chevron
~
Energy Solutions
5-14
.
.
.
Section 6
Measurement & Verification
The heart of any performance contract is the guarantees with which it is associated. Not only the
guaranteed price of the installation but the guaranteed savings generated from the installation of
the energy conservation measures. While the installation guarantee is easy to track and verify,
the savings guarantee is more complex, can be done in different ways, and can be left open to
interpretation. However, when done correctly, not only can the savings be measured and
verified, but the customer can achieve many additional benefits from the equipment installed,
over and above the guaranteed savings.
The following section introduces Chevron Energy Solutions' Energy Management Group, and
outlines some of the services it can provide. Specifically, these topics will address:
· Energy Management Group Overview - Including its staff, experience, and capabilities.
· Measurement and Verification (M& V) of Savings - What are the options, when should
they be applied, and what are the benefits of each.
· Client Specific Recommendation - Based on the parameters of this analysis, these are our
recommendations for a workable M&V plan that gives the greatest ongoing benefit, and
ongoing Monitoring Services. These are included in the base Monitoring fee.
· Monitoring Services - The scope of Standard Services included and Optional Extended
Services from the Energy Management Group.
Measurement & Verification of Savin2:s
One key to successfully achieving the predicted savings of any project is the accuracy of
measurement techniques employed, and the validity of the energy baselines. To assure
confidence in these processes, Chevron Energy Solutions will follow the International
Performance Measurement and Verification Protocol (IPMVP). This protocol is recognized by
the National Association of Energy Service Companies (NAESCO) as the standard guideline of
how savings resulting from energy conservation projects should be measured.
The IPMVP defines four broad options for measurement and verification of energy savings.
Each option is applicable to specific situations; and, oftentimes, more than one option is possible.
Multiple options are often implemented on a single project. The broad categories of the IPMVP
layout as follows:
· Option A - Partially Measured Retrofit Isolation - End-use measurements, some
stipulations.
· Option B - Retrofit Isolation - Complete end-use measurements.
· Option C - Whole Building - Energy use analysis on multiple systems.
· Option D - Calibrated Simulation - Computer modeled building savings.
Chevron
~
Energy Solutions
6-1
.
.
.
Section 6
Measurement & Vt~rification
Often overlooked is the necessity of identifying the M&V plan coincidently with the project
development. In some cases, it is necessary to drop or ignore a portion of savings associated
with a specific retrofit for the simple reason that that portion is unreasonably expensive to
measure.
Implementation of a verification plan for the diverse types ofECM's typically involved in a
performance contract usually requires a combination of methods to successfully measure savings.
Even for a given ECM, verification categories may be crossed by combining a stipulated and an
end-use measurement component into the savings calculation. Factors that guide the selection of
an M& V method for each ECM include:
* Cost of measurement vs. savings
* Timing of measure installation
* Likelihood of future ECM's at the same facility
* Likelihood of future construction at the facility
* Degree of sub-metering within the facility
* Complexity ofECM's to be installed
* Level of interaction between ECM's
* Dynamics of the facility's energy baselines
* Likelihood of sustainable savings from the measures
Due to the variables and dynamics that are unique to each performance contract, and often to
each facility within a performance contract, an individual measurement and verification plan
must be developed for each situation. While the specifics may vary, the general method
employed will always follow one of the methods outlined in the IPMVP.
The following paragraphs detail the M&V methods being recommended for the City of Salina:
Option A - Partially Measured Retrofit Isolation
This option allows for the energy savings to be calculated using a sampling of field
measurements combined with stipulated parameters. The savings, once calculated, are usually
stipulated to for the life of the project. Ongoing actual measurements mayor may not be used in
this verification technique depending on whether the predicted savings and/or volatility of the
measures implemented warrant the expenditure on additional field measurements.
A possible application for using this option would be for lighting efficiency improvements whose
performance may be relatively stable and not interdependent with other measures. The savings
for the lighting upgrade would be quantified by measuring before and after power consumption
for a representative sample oflighting circuits and by stipulating or agreeing to the hours of
operation of each circuit.
Entirely Stipulated Savings
While not directly defined as an IPMVP option, the protocol recognizes that there are instances
when measurement and verification of the savings is not warranted. In cases where the cost of
measurement is too high as compared to the savings, where the parameters preclud1e accurate
measurements, or where the confidence of the savings projections is high, the Client and
Chevron
~
Energy Solutions
6-2
Section 6
Measurement & Verification
.
Chevron Energy Solutions may agree to stipulate to those projected savings for the term of the
project without any additional measurement and verification of the savings.
Recommended Measurement and Verification Pro2ram
The table below represents a proposed M&V approach which balances M&V cost with the value
of savings associated with each component.
.
% of Energy
Savings $ of
Savings M&V Recommended
ECM(s) Building(s) Component Option Program *
Bi-Centennial Center
Community Theater
Fire Station No. 1
Fire Station No.2 Electricity
L1 thru L6 Golf Clubhouse A 47.5%
Health Department (kWh)
Memorial Hall
Police Department
Smoky Hill Museum
Bi-Centennial Center
Community Theater
Fire Station No. 1
Fire Station No.2 Water & Sewer
WI thru W4 Golf Clubhouse (cd) A 15.2%
Health Department
Memorial Hall
Police Department
Smoky Hill Museum
W5 Fire Station No. 1 Water & Sewer Stipulated 4.4%
(Ice Machines) Golf Clubhouse (cd)
Bi-Centennial Center
Community Theater
Fire Station No. 1
Fire Station No.2 Electricity and
All others Golf Clubhouse Natural Gas Stipulated 37.2%
Health Department (kWh & mct)
Memorial Hall
Police Department
Smoky Hill Museum
.
* Savings associated with ECM VI have no associated units of energy savings. These
savings dollars are excluded from the calculation.
Chevron
_ Energy Solutions
...
6-3
.
.
.
Section 7
Environmental Impact
Purpose
The City of Salina has retained Chevron ES to identify and evaluate energy conservation
measures (ECMs) that could be implemented through a performance contract to produce
improvements in energy utilization. Chevron ES has conducted thorough surveys of the heating,
ventilation and air conditioning (HV AC) systems, lighting systems, building energy controls,
water-use areas, and building envelopes of buildings at the City of Salina. The purpose of the
survey was to locate and analyze mechanical, controls, lighting, water systems, and equipment to
determine which ECMs could be implemented to provide the maximum reduction of energy
usage at the minimum cost for the City of Salina. The recommended ECMs in this project
address and achieve these goals.
Greening Measures for the City of Salina
The ECMs that were discussed in Section 2 will reduce the amount of energy used to heat and
cool the buildings while simultaneously increasing occupant comfort:
. HV AC Improvements and Controls
. Replace Split - System Units
. Replace Condensing Units
. Replace Boilers
. Replace Unit heaters with Inferred Radiant Heat
However, there are additional benefits beyond energy savings that will be realized through the
implementation of many the ECMs:
Lighting and PCB Ballast Disposal: All PCB-contaminated materials will be incinerated
pursuant to the U.S. Environmental Protection Agency Final Rules 40 CFR 761.70. All
uncontaminated (less than 50 ppm PCB's) metal components of the ballast shall be recycled,
recovered, or reclaimed. Chevron ES will insure that the ballast disposal company provides a
manifest and certificate of destruction pursuant to 40 CFR Subpart K.
Environmental Impact on Pollution
Direct Emission Reductions: Every mcf of natural gas that is burned by the City of Salina to
generate heat will produce NOx, SOx, and CO2 emissions. Reducing the amount of natural gas
required to meet the building heating load results in a direct reduction in emissions. The existing
annual emissions of NO x, SOx, and CO2 compared to the projected annual emissions for the
Recommended Program presented in Section 1 is shown in Figures 7-1 through 7-3 below.
These results are determined from the energy savings that would be generated by the proposed
ECMs that reduce natural gas consumption.
Chevron
U
Energy Solutions
7-1
.
.
.
Section 7
Chevron
~
2,000
III
:5!
1,000
10
III
:5!
o
1,000
III
C
o
I-
o
Energy Solutions
Environmental Impact
Figure 7-1
Annual NOx Generation
1,679
1,553
Baseline
Recommended Program
Figure 7-2
Annual 502 Generation
5.1
4.7
Baseline
Recommended Program
Figure 7-3
Annual CO2 Generation
512
473
Baseline
Recommended Program
7-2
.
.
.
Section 7
Environmental Impact
Indirect Emission Reduction
Indirect emissions are defined as the emissions associated with generating electricity at the
utility's power plant, which is assumed to utilize fossil fuels to generate steam. Chevron ES has
identified ECMs that would result in reduced electrical consumption, and if implemented, these
ECMs would aid in the reduction of emissions such as NOx, S02, and C02 produced during
electrical generation. Every annual 1 0,000 kWh reduction in electricity use equates to the carbon
sequestering of 2.5 acres of pine or fir forest or equivalent to taking 2 average cars off the road
each year.
fit tit ~
The corresponding environmental impacts of implementing the Recommended Program
presented in Section 1 is shown in Table 7-1 below, and is based on the projected electrical
energy savmgs.
Table 7..1
Actual Program with Annual Savings of 370,907 kWh
Emission (Ib/vear)
Types of Fuel Saved CO2 NOx S02
Coal not burned: 879,132 1,385 2,593
Gas not burned: 7,315 18 65
Total Fossil Fuels not burned: 886,447 1,403 2,658
The project equates to:
93 Acres of Pine or Fir Forest Planted per Year
74 Cars off the Road per Year
Chevron
~ Energy Solutions
...
7-3
Appendix A
Standards of Control
.
.
.
<C
~
o
z
W
Q.
Q.
<C
as
c
.-
-
as
fJ)
-
o
~
(3
o
...
-
c
o
o
-
o
UJ
"0
...
as
"tS
c
as
-
fJ)
1
III
ell
Q.
ell
a-
D.
"1:1
CD
'5,
" ".
8 e
.~i i 0
o-::J" ~
01:" f:!
0._ Ii
!t!
~
i
'5,
" ".
U e
=lil" b
i c:=! ~
os ::l CD b
~ 1 ~ ~
'5,~
~
c3
CD
"S
"1:1"1:1
CD CD
Ci,7.i
~1Il
uo
00(
>
:r
>.
'"
~
'"
o
.c
N
~
.e
:t::
o
lt
'"
'"
Q.
'"
g
'"
o
"1:1
CD
rn
'"
al
b
~
M
~
b
l!!
b
~
>.
'"
32
[!!
'"
o
.c
N
~
.e
:t::
o
lt
'"
1II
Q.
'"
8
o
'"
o
"0
III
1II
al
o
II)
~
M
~
b
~
o
~
""
CD
CD
~
~
"0
~
o
o
o
N
o
o
co
o
~
~
M
~
:::.
l!!
b
~
""
CD
CD
~
rn
~
"0
II)
o
o
00
~
o
o
~
o
in \0 Ct,
~ ~~
<') <') <')
~ ~ ~
boo
~ 92t:
o 00
~ ~ ~
"" "" ""
8l 8l 8l
~ ~ ~
~ ~I'l'
1II 1II1ils
"0 "0"0
~ ~ ~
8" gl~
~ ~:!2
, [!!
o.c
Ov
13N
o
o
~
o
"1:1
CD
'5,
" ".
8 !
cnO:;J \o~\O\ofofo~:n\o:n 0
a:5 i .....,....,.... 1'-,........................... r-- !:::
8-1:-;-:-:-:-:-:-:-:-:- 0
ullE g~gRRg~gg:e g
.~t!
u
u
o
0)
c::
;:;
III
OJ(
W
"1:1
CD
'is.
" ".
U f
.eg~~refe~fere ~
123.:-:-00 :-:- -
J:i e ~gggRg ~
1~
u
u
o
o
<')
~
-
M
~
b
~
-
b
~
'C c: "C c: "C c: "t: c: 'C C"t: C
CD LL:;'U.::JU.:::JU.::::::ILL:JL1.:::J
"S I en I rn I CI) I en I (I) I en
'C 515 51g 61g 5:; 5~ 6~
jl:iirn:iirn:iirn:iirn:iirn:iirn
~ iif~iif~iif~iif~iif~iifiif
CJ~:!2:e:!2:e:!2~:e:e~~~
0(> ....~ee?~e?....e?e?~~e?
._ ..c:..c:..c:..c:..c:..c:..c:..c-C.c..c:.c
:r~~~~~~~~~~~~
"1:1
CD
~
CD
rn
os
e
0(
Q)
'"
:Q
":;
al
rn
1II
l!!
<(
2l
==
o
"0
'"
1II
Q)
'"
os:
:.::;
ci
z
'"
~
S
rn
l!!
u:
rn
1II
l!!
<(
2l
==
o
"0
'"
1II
Q)
'"
'S:
:.::;
N
ci
z
'"
o
~
en
l!!
u:
<(
CD
rn
'"
o
J::
.c
'"
U
"5
o
rn
CD
(J
==
o
"E
CD
E
1::
1II
a.
CD
Cl
~
Oi
CD
:c
<(
~
8 rn
rn '"
'" l!!
.- 1II
rn ~
1II CD
~~
CD=
~<(
o
~
$
1II
CD
J::
I-
&;0
'c
'"
E
E
o
U
1II
.S
Oi
rn
E
'"
CD
rn
'"
:ii
:c
~
o
E
rn
Appendix B
BV AC Equipment Tables
.
f:
<(
N
~
:c
<(
-d
]!
:S
f!
o
'"
::J
'0
'"
~
-d
]!
:5
N
"T ~ ~
~~ -,!. EE
:c ~ ~..... :i
oE r---~ ~o
i~ ~~ -gO
1j2! ~U) ~.~
:O~-5ii~ 'E-
~~tazd 'j~
~6'!!!~'!-6.S1\i
'cNO<eO)".;]"Ci-
:Jqj~~6.~~~
~B~2~m-8'j
.",oin"'><(E E
(!!::2N"Ea..5UJO 0
2i-g "8 'l''jijD.':: e
~~..~~~5m ~
'OOC")IC:::Z~O 8
~~~~2Nm~ OJ
.-oc:,;.:or-li)= .5
Se~~~~a.1ii ~
al '0 l'l . f! 2-d i!! "'
..':il::..ca is 6 aJ. Q) ~
&Woo~.~:8f!
~~c;.:8.!!Q)
c..a.. ,g - c: - 15 E
E~15Zt2~c:'"
~:Cu~-i:iQi:B"D
<("C l!!-a 0'- ct:j
offi5og,5~o
~
"0
c:
'"
C5
"0
c:
'"
<(
o
~
s
~
s
~
xxx
000
~
:c
o
~
:c
o
"'~'"
'"
~ ~
C::!~~
N<ON
.... ....
....
aj
~
00
.
o 0
<0 <0
a a
'" '"
N N
o
'"
~
<0
o
N
o
....
~
<0
o
N
Ul~lt)
-ciT"'"
'"
'"
..
c:
o
~
:;
::!!
..
c:
o
~
:;
::!!
o
000
000
",0",
>~>
<00<0
~o~
O(!)O
mOm
a:: I.!! a::
msm
<0
N
~
.g.g .g
00'0
.. .. ..
www
eT!!~
.. .. ..
c: c: c:
.... ..
(!)(!)(!)
..
"'
::J
o
.<:
OJ
c:
~
~
..
.,
::J
o
.<:
OJ
c:
1i
~
'"
c:
c:
..
E
III
'"
m
15
o
;:;:
~
u:
.
s
~
~
:c
o
'"
~
oj
o 0
'" '"
~ ~
o 0
N N
'"
..
c:
o
'l'
~
::!!
~
c:
..
"'
::J
o ..
.<: c:
~ f!
ii .-
~
15
o
;:;:
"0
c:
N
'"
~
:c
<(
N
:c
i
~
~
::!!
b l>-
'0 VJ
'" c:
C1. 0
rl 0
a~
C1. m
~ ~
'2
::J
,..
'2
o
OJ
.5
o
o
o
.! ~ (p
=s ~ ~
'E'E 'E
::J::J ::J
.<:.c: .c:
E E E
~ ~ ~
rn 'U Q) U) CD
.~ .~~.~~
.9 .9;.3~
6 (5 II) 6 Q)
C1. C1.E C1.E
~ ~i=~i=
..
c:
o
Z
x
o
x X
o 0
'"
~
".;
'"
o
..
c:
~
..
c;,
c:
en
'"
..
.<:
..
a::
o
m
o
....
U
N
....
~
.. ..
c c:
~ ~
E
o
o
a::
ii:
o
o
E
o
o
a::
,..
C1.
o
o
~
:c
<(
N
:c
N
oj
....
@)
15
<;
::!!
u..
(/)
c:
o
o
~
m
m
<(
X
o
'"
~
1ii
..
.c:
~
'"
..
.c:
..
a::
..
c:
f!
I-
15
o
;:;:
f!
u:
15
o
;:;:
"0
8
..
(/)
N
~
:c
<(
'"
~
:c
<(
.
.
as
.....
as
C
Q)
.....
as
-
a.
Q)
E
as
z
~
Q)
-
.-
o
m
.
.
.
.
.
'" '"
~
J: ""
<D
< E <D
.. 0 Z
C e
l!! D- " s::s::
< u u
<D :> 2: .. ..
0; ., :> 0 <D <D
<D '" l!! l!
01 ..
C 2: .. C i!! .. ..
./: <D l!! .C '" '"
., :> " <D
9l <D .. ",-0 r-- :> :>
C i'l i'l"" I tUti
., 0 lU~ "" > >
'" IE
C i'l C C
:> :i 0 '" C ..eJ!
~ .c 0 0- .!!! """"
"' "' l!! !~
:> '" '" :> C C
C ~ 0 00 53 .. ..
<D 00
:!! '" CJ) CJ)J!! !~ '" .,
C ~ ~ :> '" '"
<D <D '" :g i l!! l!!
;g. :!! ~ ....i:
0 2: E E <D E E
:; ~ <D " 0 0:2 88
E CJ) CJ)Z ON
- ............-.......... "''''
r-- ~ '" C'\It'-....r--
0 ": N~,..;,..;
0 0 0 0 0 0",
"' "' ~ '" '" "'0
"" "" N N NN
"'
N
0
N N N,,",,"
~ N N N
N N N
IX: IX: IX: IX:
'" "''''
. '" r-- ""
::: "$. ~
0 0 0 0
~ ~ "' '"
"" N
~ 0
0 ~
0 0
0 Ci
'"
~ 0
12
0 IX:
"' Iii
r--
"'
.g
1i
C C "
[ij
~ ~ i!
lD lD <D
C
<D
<:l
')I '" "f ~r;;
J: :i: J: -lD
< < < Ii. 0
..J
C D-
.. '"
2:- 5i ::>
CD
::> ~ u
0 0
.
.
as
.....
as
C
S
as
-
a.
CD
E
as
z
~
CD
.....
as
~
.
.....
o
:E:
o
;;
fA
CD
E
o
c
.
.
.
.
CIS
'1ii
c
S
CIS
CI)
E
ClS
Z
rn
CI)
u
CIS
C
...
::s
u..
e
'~
5l
$
'2
::J
'"
~
::J
o
E
I~
'8
'0
~
~
1-1-
I- -
<'l
o?
I- _
o
<'l
'"
-
-
xx
00
.!!!
e
.!!!
e
.!!!
e
o
'2
2
'0
..
iiJ
o
U
..
iiJ
o
co
o
o
~~
e~
m
..
e
., l!
,l!! t;:i
.. 0
> e
e
..
..J
.,
E
e 15
1 g:9
i!2
..
E
I-
a;
Ie
e ..
O.c
;:;:0
:c:t=
:2~
x
w
'- -
-
.5 Qi
om
.c~
'::0
..-
I=;~
l:=
e .,
,- ..
:!;!CJ
00
o e
., '"
,- ..
".c
~ 8
- ..
OlE
:5::J
",u-
ti ~
E ~
5~
~
g
'E
o
E
<( ,5
~~ "0
.. ,il! 5l
IE ::J
uig ~
'28 E
E ~ 'is
tDC ~
i ~ '0
~ <( . lE
1~0C3::
Gi~~~
o
e
::J
..,
~~
~~
-
;e;e U')
dd ci
---c
CD
x-g
00
U
}
e e
.. ..
xxx-gx'"
00080
}
g g g
00 0
~~ m
~
~
00 0
'2'2 '2
e e e
tl tl tl
.... ..
iiJ iiJ iiJ
~
.,., '"
.... ..
Cl Cl Cl
~
::J
1i
Z
e~
::J ::J
10m
zz
'-
Iii
co
~
m
W
co
o
:;
..J
m
ffi!J5 0;
::!ia:: 0
i1ii1i ~
9i ~
if w '"
ClCl m
a::a:: <'l
-
o
:a
..
iiJ
~
CD
e
CD
Cl
-
~
o
o
u::
'lil
~
~ ~ e e
~~ ~ ~
a::a:: m m
E5 -g
g]lg> ..
~gl B
~8~~;g~
:ag~e:Ra::
:nii~ t
c e u: u-.:
8a.
..
l!!
<(
8
==
o
-
LL
~:g:: ~
~ <'l ::!!
~~ ~
<(
o
o
0,
r::.
'"
'"
'"
o
o
o
~
r::.
o
o
o
<Ii
co
o
'2
2
tl
"
iiJ
.,
..
Cl
~
~
Z
0;
o
'"
~
~
U
'"
m
'"
'"
a::
::!!
Z
::t.
<(
JC:.!! .!e.!!
c: ui ~ en
~.. 95 'S'5:g;;
en '5 !i lii:6~3
~ ~ ~l ll~5i
,g., ",e e~e;:j
c: .c: Q) cu c:
,9 'E :t=g. oo~ii
"....:r2 ==.!.:Ii is c5 ~
~ <( ~lI:: !3 e ' 0
~ '0; l:':l~,~~~E':'
m i!! E"'''''''''''~~
.~ '5~~~:e5~3ii
::J "'::J::J'2l:el:l:",,,,
,~ t~,~:!~-i~~~~
9' e_9inO",0000
.....,;-........""E..EEEE
"'8",,,,,,,:5~.Q~~~~
~~~~~'j:E ~:E:E:E:E
zi!!ZZZI-::!io::!i::!i::!!::!i
~~
~~
e e
.. "
xx-gxxxxx-gxxxx
0080000080000
} }
g gggg g
o 0000 ~
~ ~~~?J ~
0000
0000
0000
...-riai..-
cnmcom
g gggg g ggg8
~ ~~~~ ~ ~~~~
Q) OOCOLO,..... ~ ~~I'-~
I I !! II
a. :e- :::,
e e e
e e e e
'0 '0 '0'0
CD G) CD CD
iiJ iiJ iiJiiJ
1: ~ 1: 1:.S:l
:3' ;3131;3 2
:Q :Q:q:9 1i
ii: ii: ii:ii:iiJ
t1J en en U) II) fh en UJ (I) (I)
CIS \Vasnsm as ClSasllSta
Cl Cl Cl Cl Cl Cl Cl Cl Cl Cl
~ !f!ee e! l'!1!1!1!
~ ~~~~ ~ ~~fi~
Z ZZZZ Z ZZZZ
co mmm..-
o NNW I
(,0 "It'"V tv) 1.0
ill tn ill ffi li-
e ggm8
~ ooota
3 333~
m mmm
~~ ~
$ 88J;8
~ ~~~~
'" <'l~O'"
16 1616~16
N N N(!)N
Cl Cl Cl Cl
(,) to) (.) U
:a ii~~
Q) Q) Q) Q)
iiJ iiJiiJ iiJ
~
"
e
..
Cl
~ ~
e e
~~;~ ~
e e e
" " "
ClClCl
)( )( x ><
0000
c: c: c: c:
c c: c: c:
~~~~
'"
10
co ,.:.
~ ~
~ ci
~ ~
E ~
a::
.,
E
o e
lfi e ,2
CiS 1i:N
1! 0:::00
tV -g.:;
55 tU~
Cl ~ ~
o
..J
~~ E
,,:r~8
NfD......l:l::
~~~B
""-M...... c:
~;'!E~
Cf) E E ct: ~
E a:: a:: U
a::
;t ~ 11;t~
<( <( <(<(<(u-
E
~ ~ ~
cn~Sl~W
e.Qf!!~;g
~ ~~~.~
CD ::l=
Cl ~
's
e
.ll!
.2:
e
o
<(<(g:
00'6
000
eeU
-
e
.ll!
E
..
co
cO
,
'"
-r-
'-
Ii;
e
..
"
"G
~
'0;
o
'2
2
'0
"
..
'"
..
I
-fi
..
"
I
m
::!i
'"
~
'2
::J
E
"
'"
e
.l9
-
-
-
m~H~:
o
o
o
<i
co
I-
o 0
o 0
o 0
uf uf
o '"
~
I-
-I-
..
IICDI; ~~
00
~~~$l
i:J: cncnrnE
:2 13ffl a::
U uu
- UU
~ <(<(
a. a.
;;~~n
:t:i:u...u..
<(<(
00
UU
CD "
iiJiiJ
~
a.a.u-
",,,,Z
, ,0
~100
U;>~~
com",
i'iiiiiJ:
UUI
m
::J
x X
00'"
e e ::J
e e ::J
~~o::
o
:a
"
iiJ
I-
I-
'-
Kl
Cl
~
::J
1i
Z
I-
11i
..J
:2
ii:
I-
"'., .,
.. .. ..
ClClCl
~~~
::J::J ::J
Qiii'tU
ZZZ
I-
o
'2
2
'0
"
iiJ
g'!
~
10
o
::!i
U
m
Z
u-
a::
::!!
~
N~u'J
~O'"
~o~
U..!-J,
:!~~
N'r"(O
~U~
~I-
E~~
tD22
:StVCD
<(..J..J
..
i!!
..
'"
1::
..
-e
CD
E
CD
.,
..
m
-I-
:5B
Eg~
~ ~a::-g
e ..
" a;
~~~
~~
a::
1-1-
'"
"
..
..,
..!!!
-0
Z
IN~
~"'I
",$...,
:ttJ:~
-'-
.
.
.
C') C') C')C')
10 10 10
..... 0) 0)0)
-.: ......:-.:
cO ~ ~~
..... ..... .....
0 00
CO V vv
0 ~ ~~
N CO CO CO
0 00
N NN
111 10 1010
0 00
10 10 10 10
N N NN
...... ...... ...... ......
..... ..... ..... .....
888
t\l t\l t\l
I- I- I-
~
:c
u
~ ~~
:c :c:c
~
u
~ ~~
0.
E E E
:::J :::J:::J
a.. a.. a..
.
~
~
..
.c
i:.-.;
.. ~
~i~
"::!i~
~g ~.5
cn-u.. ...
i'~~.~~
lIl~m~~<
~i!~~go
"",UNOogO
"IltO:::..-U.....Z
M(I') _ (").....
..: ""=""'= ...'"
~ "'''' NN
."" "''''
00 00
"'''' "''''
"'~
'" '" '" ~ "'''' '" "''''
. ~ ~ ~ ~ !:: ~ ~;:
"'''' "''''
00 00
"'''' "''''
- - ~ ~
0 ~~
~
W ~ ~
.. .. ..
Cl ClCl
i! ee
~ 33
.. ..
Z zz
'" '" '" ~g 0 ~~
... ... '" '"
.
>< >< ><
Cl Cl Cl
~~ ~ ~~
....1lg.. x
~ ~
~....
~X>ON
::> ::> :J :::>
~ ~ ~ ~
E .. ~
~~~ .!!:8
~~ tf o~.s
<( ED ()..r;: . .
, , I tI)::> =>
~i:!~ ~t::
."" '"
Appendix C
Gas Price Comparison
.
.
.-
:....
~
c.
e
o
u
~
CJ
.-
:....
~
{of.)
~
(J
.
u
~
.-
"'C
=
~
.
In
CD
OJ
...
as
.t:
o
:::...
~
'0
o
E
E
o
o
In
as
C)
Ci
...
:::t
-
as
Z
Ci
u
";:
o
-
In
i:
CD
u
":;
...
CD
en
In
as
C)
In
as
In
C
as
~
....
o
CD
:a
as
I-
Q)2~::-
cn~\j-
'" c:: 0 U
~(/)E.€
>(,9E~
<(:.::8-
c
CI)
E
1;:
.~
CI)
Q
CI)
.!:!
'0
l1.
"'~-
0-0;;::
....ou
(/)EE
(,9E~
:.::8-
.~ &C
13mE
C.t::.- _
~()~
<IlE;=
en '" U
'" -0 E
(,9<1l~
J:'!?
<('0
Z E
:5:~
-~'5
~ (,9 E
()o~
ii
J:
:!
C5
E
..
:!!
"'~c:
~"813
(/)EE
(,9E~
:.::8-
.~ 2l,;;::
"50;~
C.c:~
~()~
Q);;::
en '" U
~al.€
J:~
<(;;::
Z ~
:5:~
-~'fi
~ (,9 E
()o~
~
~
oil
tJ
ii
'E
c:
oil
C
oil
(J
iii
m~
(5"00;::
.... 0 U
(/)EE
(,9Ei!!
:.::8
.~ ~c
.c: ~ U
U '" E
C.c:~
~()~
GlE;=
en '" U
'" -0 E
(,9Gl~
J:~
<(13
ZE
:5:i!!
--~13
~ (,9 E
uo~
OOMC\lCOtO(,Qf'-CX)MLOLO
1"--'0:::1"0('1")0> 0>1.0<0...... N(o 0')
('I')I"-O>C'\I,...............('I')OOO)('I")......
~ocioo)aio)mai,....:,...:ai
......,.........,...Efl-W&'7(fl(flEA-ffl-Efl
tfl (fl W !fl
ac::nO'>C\lcococo""","como...q-
CO.q-('l')MO>O'>O>l'-vMO)......
IOcnC\lC\l,...............OO>CO-q......
~o,...:cimaiaioiaicocciai
........................f/7W(flWEf7f:17Efl-f:17
t1} W EF.t (fl
I.ON"Ctcn""," "Ct-.::tMI"--............('l')
d~ddd6d66d~d
fhtflEA-EA-tfl-eA-EA-tfltflWEA-W
OOcY')('f')('l') C"')('I') ('l')('l')OO 0
OOV'O::f'"'O:::t" "Ctv-v-.:;t'ooo
gg~~~~~~~ggg
0000000
WeA-Efl- WEA-fR-W
000........-,...,...,...............,........
NNNCOCOCOCOCOCOrococo
(")(f')('f')..q-.q-..q-'o:::t"-.::t"Ctq-...q-"Ct
NNC\lNNNNNC"JNNN
ciciciocicicidcicicici
W(flEflffl-ER-ER-WEflEfiWEA-W
COO'>MLONNN............r--OC")
tOlO.......C\lLOI.OLONNO>MN
O'lO'>O>NC") ('l'){f')NLOr-MM
,..........LO<oteCO<.OLOMmOlq-
cicimcri"":"":-"":""':cci""':t.cicri
............Wffltflffl(fl(fl(:,C}EA-WEfl-
Y> Y>
omO)NCOCOtOI"--COcnO..q-
COv('f')(")o>o>mt--vMO),...
l.t)O)NN..................Ocnc.o'V,..-
"":ci"":ciaiaiaiaiaicricOai
.....,.............tflffl-tf.)-f:I7(flffl-f:hER-
ER- ER- ER- ER-
l()C\Iq-m'"d"-o:::t-q-(t)........T"""~C""l
ddcid~dciddddd
U7ER-ER-tflER-WER-EA-EA-ER-ER-ER-
OOMMC""lC")MC"')MOOO
OO"l::t"C:t..q-"l::t..q-...q--q-OOO
gg~~~~~rq~ggg
0000000
EA- ER- W ER- ~ ER- W
OOOT"""T"""T"""~__~______
NNC\lCOcx) co co CO CO CO co co
C""l('l')M"l::t-vv-v-vv'V",,"-v
"!,,,!NNNNNNNNNN
oocicic:icicidcicicici
WWER-ER-(:RoER-U7WWWWER-
COmMl()NNN____f"-C""lM
tOlt)........NIJ')l()IJ')NNO'>MN
C>O)C>NC") (l")C")Nlt)........(I")C""l
........--LOtOCOtO(O\,()(I")Q)m"""
c:icioicci""':""':""':""':cri""':1riai
----ER-U7ER-WER-WfflfhWffl
Y> Y>
O'>--NN<.OCO........CO........O"""LO
-q-NMMO'>O)........-vIJ')O'>__LO
~~"!"'!~,.-OO'>lt)V,...M
oooomoioiaioicrioioi
,...,...,...,...fflWfFJ-EA-EA-EA-U7ER-
EA-ER-WER-
Nmo,>o,>..q--vC""l........CO__C""llt)
dciddddddd~dd
EA-EA-ER-ER-ER-EA-ER-EA-ER-EA-ER-(:Ro
OOMMMMMC""lC""lOOO
OO......"l::t-vv-v-q--.;;tOOO
gg~~~~~~~ggg
0000000
ER- U7 (;F) (;Roo U7 ER- EA-
",.c:
c-
._ c
== 0
CO:2:
00______,.-,...____,...,...,.-
NNCOCOCOCOCOCOO::>cococo
C'lC'l'<t"'<t"'<t"'<t"'<t"'<t"'<t"'<t"'<t"'<t"
NNNNNNNNNNNN
cicicicicicicicidooo
~U7ER-U7EA-E&fhb'7b'7U7U7ER-
O'>Ml.Ol()NN,...__........C")(\")CO
I.O,......NNLOlt)C'\INO)(\")N__
Q)mNNC""lC""lNlt)........(I")('l')CO
__L()CO~IDCOl()Mo)o)......CO
ci05a:icri""':""':""':cci.....:t.ria:ia:i
--U7ER-U76CfEA-EA-U7EA-U7U7(;F)
Y>
corocoro(QCOCOCOCOCOIDCO
9 9 999",9 9 99 9 9 9
c:..c ffi a~ c:"'5 OlQ.ti > u
J!l.f:2:<(~~""~Jjo~t3
CO('l')'V........COCOC""l,.-__O..............
OOMm("')MOO>-.:;tO>COq-
'V-vNmCOCOCON('I')........MCO
a:iaidai05oioimcc:i"":a:icci
ER-U7__EA-f;R-tflER-ER-ER-WEA-ER-
Y>
v-q---........COCOCOv,...o>OO
MM........,...... ('l')('I')('l')M'o:;t....... 0'>0l
-q-'oc:tN__COCOtOLOMO>LOIO
aiaidcioioiaio:icri""':c:cic:ci
EA-ER-____(;I)-fhEA-f:I7f:17U7U7fA.
Y> Y>
lOLOO>COtOCOCOLOOO::>T"""__
vvv'o:;tV'V"Ct"Ct..q-M..q-..q-
dciciciociciciciocio
ER-EA-Wf;;hW(;I)-EflER-f:I7(;F}f:I7f:17
OOCOCOCOCOCOCOCOOOO
oO..q-",,"-v-q-oq-'Vvooo
gg~~~~~~~ggg
0000000
ER- ER- U7 U7 EA- ER- ER-
wro;X;U;U;L;;u;;;;u:;u:;u:;;n
'o:;tq-q-........,............................................................
NNN______T"""__T"""______
dcicicicicicicicicicici
(fl(flWER-U7U7EflfA.U7WEI}OO
..q-q-MLOLOLOl()o>C"')COM('l')
(OromNo>mmm..;::f-MtOCO
MM..;::f-M__T""""-""CONOO
,..............cotO~T"""'T"""OCO..q-oo
cricriccicciccicc:icciaicri""':aicci
ER-ER-WER-EA-ER-fflfflWfflfA.EI)
LO..q-................cococo..q-T"""NmO
LOM........r-MM('l')('l')..q-T"""........O>
('l')'VT"""__cotOCOU")C"'l-q-cnLO
oioiciciaiaioioicri""':""':cri
ER-ER-__,...EflEflER-oo.fflEl}ffloo.
Y> Y>
L01.OCOCOCOCOCOLOOLOCO__
"'>tvv-q--v..;::f-<o::tv"'>tC"'lMoq-
cicic:icicicicicicicicic:i
f;flfflfflEflWfAfflEA-fflfflfflffl
OOCOCOC:OC:OC:OCOCOOOO
OO..;::f-"'>tvvV",,"'o:::tooo
cici~~~~~~~cicici
fflffl . . . . . . .U7fflW
0000000
ffl Efl ffl Efl ffl Efl ffl
;x;;x;;nLOU:;U;lOil)U;U;LOU;
"'>t"'>tr--.-r--.r--.........................r--.-r--.-................
NNT""",...,.-T"""~T"""T""T""~T"""
dciciciciciciciddcio
EflEflfflEflfflffltl7Eflffl-Eflffl-Efl
CO'o:::t1.OLO LOLOJ.t)O)cr')('I") (OM
__CDNNmmmmvvMCD
CDMM(\")T""~T""~C:OaJNO
CO........COCO__,.-__OaJaJ-vO
ccicciccicciccicciccicri&:O&:O""':cci
fflEflfflfflEl}EI}fflfflfflfflfflffl
~~u;~~~~:g~~g~
vMN<OCOCOLOCOMmLO.......
oioicioicnoiciaicri""':cricri
Eflffl__fflER-oo.Eflfflfflfflfflffl
Y>
IOvmCOtDCOLONOCQT""N
vvvvvv..q--q-..q-M-v-v
c:ic:icicicidcicicicicici
WfflfflEflWfflEflU7(flEA-ER-W
oocococococococoooo
OOv<o::tv..;::f-..q-vvOOO
. .aJCOCOC:OCOaJCO . . .
OOCOCOCOCOCOCOCOODO
fflffl . . . . . . .fflWffl
0000000
(;R- ffl ffl Efl ffl U7 ffl
rococoU:;U;U:;U;U;u:;u:;u:;LO
V...q-..;::f-................r--.................r--.r--.-r--.r--.-
NNN"""""""-__T"""T""T-T""
cicicic:icidc::icicidcici
ffl-EflfflEflffl-EflfflfflEflEA-fi7ffl
v(Y')LOLOI.()1.t)O>tOcr')(O('I")(Y')
c.omNOlO>O>O>LO..;::f-MCOa
M..q-MT""T""__"-NCONO<D
r---tO<D,.-,.-<c-OMCO..q-O__
cricxicciccicx:icciair'tci.....:ccicxi
EflEflEflfflEflER-U7U7Efl-EflER-ffl
r--.-r--.r--.r--.r--........,......r--.I'-l"-r--.,......
999999999999
CoO '- '- >'c:s Olo.- > u
J!l.f~~~~""~Jj8~t3
NM(J)v'T"""
M........NLOCO
........ (J)........ C") T"""
a::iccio~N
-Efl -Efl T""" T""" T-
ffl Y> Y>
NNO..;::f-'o:;t
1.0 (J)MLOLO
........ <0 1.t) M ("')
cciccici~~
EflU7T""T"""'T"""
Y> Y> Y>
N~Ovv
vvLOLOlO
cieicicid
fA Efl Efl fA. fA.
oo__~,...
00........................
. . v v..q-
OOmmOl
fflER- . . .
000
ffl Y> Y>
__ T"" T"" C"') M
1J".)1.t)lt)mm
r---r---r--..NN
T""" T""" T- 0 0
ciaocid
ffl (fl fA fi7 ffl
C")<DCO.....<o::t
ONtO........ ........
c.oOO("')(I')
<C-T"""mcoco
ccicricrioici
fA-. ffl E;f} ER- ffl
NNO..q-..;::f-
IOmMLOCO
.......COl.t)(I')LO
criccici~N
ffl (fl __ T- __
ffl Y> Y>
N--O"'l::tO
-q-oq-LOIO(O
ciddcici
Efl (fl (fl fA- E:A-
OO____T"""
00.....................
cic:i~~~
fflffl . . .
000
Y> Y> Y>
-C- -c- T"" C""l C""l
LOL01.t)mo>
r--.................NN
'T"""T"""T""OO
cicicicid
Efl fA- ffl EA- ffl
(I') CD COvO>
ONtD........CO
COOOMCX)
-C-'T"""o>com
ccicrio:icrici
ffl Efl ffl Efl __
Y>
N<.O<.Ovv
CD M N U") <.0
COLOT"""('l')Lt)
cria)~~N
ffl ffl __ 'T""" __
Y> Y> Y>
T""lt)MvO
<O::tVlt)lt)CO
ciocicici
fA. Efl ffl ffl EI}
aOT""T"""'T"""
00....................
. . '<t" '<t" '<t"
DOmmen
fflffl . . .
000
Y> Y> Y>
__ To- M ('l') (Y')
lOLOo>o>cn
..............NNN
-C-T"""OOD
ciddcid
ffl ffl ffl ffl EA-
coco........vo>
NCDm........co
OO__MCO
T"""cnc.ocom
cricciaioici
WfflEfl-Efl'T"""
Y>
coo::> CO coco
99999
ffi~ffio.~
..., u.:2: <(:2:
......
U
en
Gl
e>
'"
.c:
U
1:-
.~
Q;
-0
(/)
(,9
:.::
<Il
-0
:J
U
.s
15
c
o
-0
en
Gl
ro
c::
U\
C
.S!
+--
::J
-0
VI
>-
~
CIl
C
W
jl)
.
.
'.
Appendix C
Gas Price Comparison
Chevron
~
Table C2
Natural Gas Commodity Rate Comparison
Average Seminole HistoriGal
KGS Rate Historical Commodity Delivery Savings
Billing Commodity Rates (1) Savings Savings (2) Potential
Month ($/mcf) ($/mcf) ($/mcf) ($/mcf) ($/mcf)
Sep-06 $9.818 $6.04 $3.517 $0.0991 $3.616
Oct-06 $7.923 $3.81 $2.680 $0.0991 $2.780
Nov-06 $7.365 $6.69 $2.424 $0.0991 $2.524
Dec-06 $9.195 $7.03 $2.325 $0.0991 $2.424
Jan-07 $9.408 $5.82 $3.614 $0.0991 $3.713
Feb-07 $9.403 $7.33 $2.012 $0.0991 $2.111
Mar-07 $10.234 $6.99 $3.264 $0.0991 $3.363
Apr-07 $9.997 $6.40 $3.238 $0.0991 $3.337
May-07 $9.638 $6.96 $2.678 $0.0991 $2.777
Jun-07 $9.638 $7.24 $2.398 $0.0991 $2.497
Jul-07 $9.603 $6.43 $3.104 $0.0991 $3.2103
Aug-07 $9.291 $5.54 $3.265 $0.0991 $3.3164
Sep-07 $8.341 $5.07 $3.271 $0.0991 $3.370
Oct-07 $7.790 $5.66 $2.319 $0.0991 $2.418
Nov-D7 $8.387 $6.55 $2.040 $0.0991 $2.140
Dec-07 $8.644 $6.50 $2.252 $0.0991 $2.3.51
Jan-08 $8.732 $6.52 $2.172 $0.0991 $2.271
Feb-08 $8.973 $7.66 $1.876 $0.0991 $1.975
Mar-08 $10.729 $8.37 $2.756 $0.0991 $2.855
Apr-08 $11.354 $8.59 $2.764 $0.0991 $2.864
May-D8 $12.161 $9.99 $2.574 $0.0991 $2.6'73
Average Historical Savings (Sept, 2006 thru May, 2008): $2.792
(1) Total Commodity Rates furnished by Seminole Energy.
(2) Based on current differences between KGS General Service and Small
Transportation Service delivery rates. ($1.9746 - $1.8802)*1.05 = $0.0991
Energy Solutions
C-2
Appendix C
Gas Price COlnparison
.
.
.
Chevron
U
Table C3
Health Department
Natural Gas Commodity Savings
Seminole
Average Health Dept
KGS Rate Commodity Historical
Billing Commodity Rate Savings
Month ($/mcf) ($/mcf) ($/mcf)
Jan-06 $11.370 $11.189 $0.181
Feb-06 $10.740 $8.940 $1.799
Mar -06 $10.903 $9.790 $1.113
Apr-06 $10.232 $6.827 $3.405
May-06 $9.196 $6.510 $2.686
Jun-06 $9.196 $5.263 $3.933
Jul-06 $9.156 $5.620 $3.536
Aug-06 $9.367 $6.644 $2.723
Sep-06 $9.818 $7.408 $2.410
Oct-06 $7.923 $6.576 $1.347
Nov-06 $7.365 $7.864 ($0.499)
Dec-06 $9.195 $8.290 $0.905
Jan-07 $9.408 $7.140 $2.267
Feb-07 $9.403 $7.673 $1.731
Mar-07 $10.234 $8.474 $1.760
Apr-07 $9.997 $6.399 $3.598
May-07 $9.638 $7.000 $2.638
Jun-07 $9.638 $7.280 $2.358
Jul-07 $9.603 $6.344 $3.260
Aug-07 $9.291 $5.696 $3.595
Sep-07 $8.341 $5.077 $3.264
Oet-07 $7.790 $5.622 $2.168
Nov-07 $8.387 $6.4 73 $1.914
Dee-07 $8.644 $6.493 $2.151
Jan-08 $8.732 $7.004 $1.728
Feb-08 $8.973 $7.948 $1.025
Mar-08 $10.729 $8.451 $2.278
Apr -08 $11.354 $9.188 $2.166
May-08 $12.161 $9.951 $2.210
Avg. Savings (Sept, 2006 - May, 2008): $2.108
Avg. Savings (Jan, 2006 - May, 2008): $2.195
Energy Solutions
C-3
Appendix D
Lighting Usage Hours
.
.
"'C
UJ c
<C CD
UJ CD
z~
~ f
~ :s
<C 0
zJ:
~Ii
u.::::)
o CD
>- .S:
!::~
o CD
::i
.
]iUj'
-CO~
SI-O)
(/) - 0)
"~~ 3:
33co
.....CI.O
<(-
li-
-"(/)
~~
-0)
~ 3:
CN
~~
~
::J
o
I
~
CO
(/)
::J
g
:;;:;
..c:
:g
.:oJ
~
"m
Cl
]i
o
I-
.2::
~
0)
~
ii;
-C 0
C N
::J
en
ii;
"E 0
.a N
CO
en
ii;
-C 0
";:: N
U.
ii;
-c
~
::J
..c:
I-
10
-C
(/)
0)
C
-C
~
1ii'
-C
(/)
0)
::J
I-
10
-C
C
o
::iE
o
o
o
"'"
o
o
(t)
"'"
o
v
.....
o
N
o
N
o
N
o
N
o
o
o
<0
"'"
1.0
N
<0
o
N
.....
N
.....
co
.....
co
.....
co
.....
co
.....
co
.....
co
.....
o
o
o
1.0
v
.....
N
1.0
o
o
.....
co
N
.....
<0
.....
<0
.....
<0
.....
<0
.....
<0
.....
o
o
1.0
V
(t)
0)
<0
V
o
0)
co
N
.....
v
.....
v
.....
v
.....
v
.....
v
.....
o
o
o
v
.....
"'"
.....
v
o
CO
co
N
.....
N
.....
N
.....
N
.....
N
.....
N
.....
o
o
1.0
(t)
o
1.0
<0
(t)
o
"'"
v
co
.
.....
.....
.....
.....
N
.....
N
.....
N
.....
o
o
o
(t)
0)
N
.....
(t)
o
<0
o
1.0
.....
.....
.....
.....
.....
.....
.....
.....
.....
.....
o
o
1.0
N
"'"
o
~
o
1.0
o
N
co
o
.....
o
.....
o
.....
o
.....
o
o
(t)
N
0)
0)
(t)
N
<0
V
o
N
co
0)
0)
0)
0)
o
o
o
N
<0
CO
o
N
o
v
o
o
co
co
co
co
co
o
o
1.0
.....
V
<0
1.0
.....
o
(t)
o
o
<0
<0
<0
<0
<0
o
o
o
.....
(t)
v
o
.....
o
N
o
o
v
v
v
v
v
o
1.0
"'"
N
CO
"'"
1.0
.....
o
o
("')
(t)
(t)
(t)
(t)
o
o
1.0
.....
N
1.0
o
.....
o
o
N
N
N
N
N
o
o
(t)
o
c,
....
(t)
.....
(t)
oo;t 0
o <0
~. ~
<0
co
N <0
.....
o
o ~
.....
u') V
N N
o
<0
-
o
.....
.....
I.n v
o N
0)
Ol
CO
a.
.....
~n v
c:i N
.....
~n
("! v
o N
.....
~ v
(~ N
.....
10
C'o! v
(~ N
roo>...... N (t) V 1.0 <0 "'" co 0) 0..... N (t) V 1.0 c:o "'"
Q)Q.O -c-~-r-~~~'r-~
~~z
. CITY OF SALINA, KANSAS
Lighting Usage Hours SummarY
Qty ot Area
Buildina Name Area Type Annual Hrs Type
Bi-Centennial Ctr ARENA 1000 1
Bi-Centennial Ctr ARENA 750 1
Bi-Centennial Ctr ARENA 300 1
Bi-Centennial Ctr BREAK ROOM 1500 1
Bi-Centennial Ctr CONCESSION 500 2
Bi-Centennial Ctr CONCOURSE 500 15
Bi-Centennial Ctr DRESSING 300 3
Bi-Centennial Ctr DRESSING ROOM 300 7
Bi-Centennial Ctr EXHIBITION HALL 1500 4
Bi-Centennial Ctr GREEN ROOM 300 2
Bi-Centennial Ctr HALLWAY 2300 11
Bi-Centennial Ctr KITCHEN 2300 4
Bi-Centennial Ctr LAUNDRY ROOM 1000 1
Bi-Centennial Ctr LOBBY 2500 6
Bi-Centennial Ctr LOUNGE 2000 1
Bi-Centennial Ctr MECHANICAL 300 5
Bi-Centennial Ctr MEETING ROOM 750 9
Bi-Centennial Ctr OFFICE 2000 13
Bi-Centennial Ctr RESTROOM 1000 25
Bi-Centennial Ctr RESTROOM-MEN 2300 5
. Bi-Centennial Ctr RESTROOM-MEN 750 4
Bi-Centennial Ctr RESTROOM-WMN 2300 5
Bi-Centennial Ctr RESTROOM-WMN 750 4
Bi-Centennial Ctr STAIRS 2000 7
Bi-Centennial Ctr STORAGE 1000 16
Bi-Centennial Ctr STORAGE 300 15
Bi-Centennial Ctr STORAGE/SHOP 2000 3
Bi-Centennial Ctr VESTIBULE 2500 2
Bi-Centennial Ctr VESTIBULE 2000 1
Community Theater BREAK ROOM 2000 1
Communi y Theater DRESSING ROOM 1500 2
Communi v Theater HALLWAY 2300 7
Communi v Theater LOBBY 3000 2
Communi y Theater LOBBY 2300 1
Communi v Theater LOUNGE 2000 3
Community Theater MEZZANINE 750 4
Community Theater OFFICE 2000 6
Communi w Theater PAINT STORAGE 300 2
Communi W Theater PRACTICE ROOM 1500 1
Communi y Theater RECEPTION 2000 1
Communi W Theater RESTROOM 1500 2
Communi V Theater RESTROOM-MEN 2000 3
Communi v Theater RESTROOM-WMN 2000 3
Community Theater RESTROOM-WMN 300 1
Community Theater STAGE 500 3
. Community Theater STAIRS 2300 3
Community Theater STAIRS 2000 4
Page 2 ot6
.
.
.
CITY OF SALINA. KANSAS
Lighting Usage Hours Summary
Qty of Area
Buildina Name Area Tvpe Annual Hrs Type
Community Theater STORAGE 2000 3
Community Theater STORAGE 1500 2
Communi y Theater STORAGE 1000 2
Communi v Theater STORAGE 500 2
Communi v Theater STORAGE 300 4
Communi v Theater STORAGE 100 1
Communi w Theater STUDIO 1500 2
Communi IN Theater STUDIO-BALCONY 1000 1
Communi w Theater THEATER 750 3
Communi ry Theater UNDER BALCONY 750 1
Fire Station NO.1 APPARATUS ROOM 6000 3
Fire Station No. 1 BEDROOM 6000 2
Fire Station No. 1 CONFERENCE ROOM 2000 3
Fire Station No. 1 DINING ROOM 2500 1
Fire Station No. 1 HALLWAY 6000 2
Fire Station NO.1 HALLWAY 4000 1
Fire Station No. 1 HALLWAY 3000 3
Fire Station No. 1 KITCHEN 3000 1
Fire Station No. 1 LAUNDRY ROOM 1500 1
Fire Station No. 1 --c- OFFICE . 2000 14
Fire Station No. 1 POLE ROOM 1500 1
Fire Station No. 1 RECREATION ROOM 2000 2
Fire Station No. 1 RESTROOM 1000 2
Fire Station No. 1 RESTROOM-MEN 7000 2
Fire Station No. 1 RESTROOM-WMN 3000 2
Fire Station No. 1 SHOP 6000 2
Fire Station No. 1 SHOP 3000 1
Fire Station No. 1 SHOWER ROOM-MEN 500 1
Fire Station No. 1 SHOWER ROOM-WMN 300 1
Fire Station No. 1 STAIRS 6000 1
Fire Station No. 1 STORAGE 300 11
Fire Station No. 1 WEIGHT ROOM 1500 1
Fire Station No. 2 APPARATUS BAY 6000 2
Fire Station No. 2 BEDROOM 5000 1
Fire Station No. 2 CONFERENCE ROOM 1500 2
Fire Station No. 2 DINING ROOM 2000 1
Fire Station No. 2 DRESSING ROOM 3000 1
Fire Station No. 2 HALLWAY 3000 3
Fire Station No. 2 KITCHEN 2000 1
Fire Station No. 2 LIVING ROOM 2500 3
Fire Station NO.2 LOBBY 2000 2
Fire Station No. 2 MECHANICAL 500 2
Fire Station No.2 OFFICE 2300 2
Fire Station NO.2 POLE ROOM 750 2
Fire Station No. 2 RESTROOM 1000 1
Fire Station NO.2 RESTROOM-MEN 7000 4
Fire Station No. 2 RESTROOM-MEN 3000 1
Page 3 of6
.
.
.
CITY OF SALINA, KANSAS
Lighting Usage Hours Summary
Qty of Area
BuildinQ Name Area Type Annual Hrs Type
Fire Station No. 2 RESTROOM-WMN 3000 2
Fire Station No. 2 SHOWER ROOM 1000 1
Fire Station NO.2 SHOWER ROOM 300 1
Fire Station NO.2 STAIRS 4000 2
Fire Station NO.2 STORAGE 300 3
Fire Station No.2 WEIGHT ROOM 1000 1
Golf Clubhouse CONFERENCE ROOM 1500 4
Golf Clubhouse HALLWAY 1000 1
Golf Clubhouse LOBBY 3500 3
Golf Clubhouse MECHANICAL 300 2
Golf Clubhouse OFFICE 1000 2
Golf Clubhouse PRO SHOP 3500 5
Golf Clubhouse RESTROOM 750 3
Golf Clubhouse RESTROOM-MEN 2500 2
Golf Clubhouse RESTROOM-WMN 2500 2
Golf Clubhouse STORAGE 3500 1
Golf Clubhouse STORAGE 750 1
Golf Clubhouse STORAGE 300 4
Health Department BREAK ROOM 2000 2
Health Department CONFERENCE ROOM 1500 5
Health Department EXAM ROOM 2500 8
I-tealth Department HALLWAY 3000 19
Health Department LAB 2300 2
Health Department M & I ROOM 2300 1
Health Department MAIL ROOM. 2500 1
Health Department MECHANICAL 1000 2
Health Department NURSES STATION 2500 1
Health Department OFFICE 2300 29
Health Department RECEPTION 3000 2
Health Department RESTROOM 1000 1
Health Department RESTROOM-MEN 2000 1
Health Department RESTROOM-MEN 1500 2
Health Department RESTROOM-WMN 2000 1
Health Department RESTROOM-WMN 1500 2
Health Department STORAGE 2300 3
Health Department STORAGE 500 1
Health Department STORAGE 2000 2
Health Department STORAGE 500 1
Health Department STORAGE 1000 1
Health Department STORAGE .500 1
Health Department VESTIBULE 3000 2
Health Department VESTIBULE . 500 1
Health Department WAITING ROOM 3000 1
Memorial Hall ARENA 3000 1
Memorial Hall ARENA SEATING 2500 4
Memorial Hall ELEVATOR 3000 1
Memorial Hall FOYER 3000 1
Page 4 of6
.
.
.
CITY OF SAUNA, KANSAS
lighting Usaae Hours Summary
Qty of Area
Buildina Name Area Tvpe Annual Hrs Type
Memorial Hall . HALLWAY 3000 24
Memorial Hall LOBBY 3000 2
Memorial Hall OFFICE 2500 6
Memorial Hall OFFICE 1000 9
Memorial Hall PRACTICE ROOM 1000 1
Memorial Hall RECEPTIONIST 2500 1
Memorial Hall RESTROOM 1000 1
Memorial Hall RESTROOM 300 3
Memorial Hall RESTROOM-MEN 1000 2
Memorial Hall RESTROOM-MEN 500 1
Memorial Hall RESTROOM-WMN 1000 1
Memorial Hall RESTROOM-WMN 500 4
Memorial Hall STAIRS 2500 1
Memorial Hall STAIRS 1000 8
Memorial Hall STAIRS 750 2
Memorial Hall STAIRS 500 1
Memorial Hall STORAGE 1500 1
Memorial Hall STORAGE 1000 3
Memorial Hall STORAGE 750 2
Memorial Hall STORAGE 500 11
Memorial Hall STORAGE 300 13
Memorial Hall STORAGE 100 5
Memorial Hall STUDIO 750 3
Memorial Hall TICKETS 750 1
Police Station BREAK ROOM 7000 1
Police Station CONFERENCE ROOM 750 2
Police Station DARK ROOM 1000 1
Police Station EVIDENCE ROOM 6000 1
Police Station . GARAGE 6000 2
Police Station HALLWAY 7000 12
Police Station HALLWAY 6000 7
Police Station HALLWAY 3000 9
Police Station HOLDING CELL 1500 1
Police Station INTERROGATION ROOM 1000 1
Police Station lAB 1000 4
Police Station LOBBY 3000 2
Police Station LOCKER ROOM-MEN 6000 1.
Police Station MECHANICAL 1000 2
Police Station MEETING ROOM 7000 1
Police Station OFFICE 7000 1
Police Station OFFICE 6000 3
Police Station OFFICE 3000 7
Police Station OFFICE 2500 25
Police Station OFFICE 1500 14
Police Station OFFICE 1000 1
Police Station OFFICE 300 1
Police Station RESTROOM 750 4
Page 5 of6
.
.
.
CITY OF SALINA, KANSAS
Lighting Usa.ge Houl'$ Summary
Qty of Area
Building Name Area Tvoe Annual Hrs Type
Police Station RESTROOM-MEN 7000 3
Police Station RESTROOM-MEN 3000 1
Police Station RESTROOM-WMN 7000 2
Police Station RESTROOM-WMN 3000 1
Police Station RESTROOM-WMN 1500 2
Police Station SERVER ROOM 1000 1
Police Station SHOWER-MEN 3000 1
Police Station SHOWER-WMN 1500 1
Police Station STAIRS 7000 4
Police Station STORAGE 2000 8
Police Station STORAGE 1500 3
Police Station STORAGE 1000 1
Police Station STORAGE 750 2
Police Station STORAGE 500 6
Police Station STORAGE 300 5
Police Station WEIGHT ROOM 2000 2
Smoky Hill Museum EXHIBITION HALL 3000 8
Smoky Hill Museum FOYER 3000 1
Smoky Hill Museum GIFT SHOP 1500 3
Smoky Hill Museum HALLWAY 3000 6
Smoky Hill Museum HALLWAY 2500 7
Smoky Hill Museum HALLWAY 2300 7
Smoky Hill Museum KITCHEN 2500 1
Smoky Hill Museum LOADING DOCK 2500 1
Smoky Hill Museum MECHANICAL 1000 2
Smoky Hill Museum MECHANICAL 500 2
Smoky Hill Museum OFFICE 2300 15
Smoky Hill Museum OFFICE 2000 7
Smoky Hill Museum OFFICE 1500 6
Smoky Hill Museum qFFICE 1000 2
Smoky Hill Museum PAINT ROOM 500 1
Smoky Hill Museum RESTROOM 500 2
Smoky Hill Museum RESTROOM 300 1
Smoky Hill Museum RESTROOM-MEN 2500 1
Smoky Hill Museum RESTROOM-MEN 2300 2
Smoky Hill Museum RESTROOM-WMN 2500 1
Smoky Hill Museum RESTROOM-WMN 2300 1
Smoky Hill Museum SHOP 1000 1
Smoky Hill Museum STAIRS 3000 5
Smoky Hill Museum STORAGE 2000 5
Smoky Hill Museum STORAGE 1500 3
Smoky Hill Museum STORAGE 1000 5
Smoky Hill Museum STORAGE 750 1
Smoky Hill Museum STORAGE 500 2
Smoky Hill Museum STORAGE 300 12
Page 6 of6
Appendix E
Utility Tariffs
.
.
.
Media contact:
Karla Olsen,
director, corporate
communications
Phone: 888.613.0003
FAX: 316.261.6769
karJa.olsen@WestarEnergy.com
Investor contact:
Bruce Bums,
director, investor I'elations
Phone: 785.575.8227
bruce.bums@WestarEnergy.com
WESTAR ENERGY REQUESTS INCREASE IN ELECTRIC RATES
Reauest includes Dlant investments needed to meet Ilfowinl customer usalle of electricity
and ice storm costs
TOPEKA, Kan., May 28,2008 - Westar Energy, Inc. (NYSE:WR) today fIled with the
Kansas Corporation Commission (KCC) a request to increase its rates to recover the cost of
providing electric service to its customers.
Westar is seeking an increase in rates of about 15 percent for both its north and south
regions. The increase in the northern region is $90.0 million and in the southern region it is $87.6
million. The combined increase is $177.6 million, and for each region reflects an increase of just
under 15 percent. The average residential customer would see a per month increase of $9.62 in
Westar's northern region and $10.34 in Westar's southern region, based on usage of 900
kilowatt-hours (kWh) of electricity. The national average retail rate is 9.2 cents per kWh. With
the requested rate increase, Westar said its average rates will be 6.9 cents per kWh.
"On a combined basis, our average rates today are lower than they were 20 years ago,"
said Bill Moore, Westar's president and chief executive officer. ''This is even more dramatic in
our southern area, where our average rates are significantly lower than they were in 1988-
something in stark contrast to other energy costs."
- MORE-
Page 1 of4
.
.
.
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY, INC.
(Name ofIswing Utility)
Index
SCHEDULE
8GS
NORTH RATE AREA
Replacing Schedule-..- ~~
Sheet
(Territory to which schedWe is applicable)
l'Jo AUPP!MJeI\t or ~e Imd<<stalldiBI
SbalI mOOlry Ule tariff as sho_ hereon.
which was filed MatCh ~~ 2000
Sheet 1 of 5 Sheets
SMALL GEN~RA~ SERVICE
AVAILABLE
Electric service is available under this schedule at points on Company's existing distribution
facilities.
APPLICABLE
To any customer using electric service supplied at one pOint of delivery for which no specific
schedule is provided. This schedule is not applicable to backup, breakdown, standby,
supplemental, short term, resale or shared electric service.
STANDARD SERVICE
NET MONTHLY BILL
CUSTOMER CHARGE
CAPACITY CHARGE
$12.00
Winter Period - Demand set in the billing months of October through May.
$ 2.83 per kW of Billing Capacity, over 5 kW
Summer Period - Demand set in the billing months of June through September.
$ 6.25 per kW of Billing Capacity, over 5 kW
ENERGY CHARGE
For all the first 1,200 kWh
For all remaining kWh
4.2503~ per kWh
2.2923~ per kWh
Plus all applicable adjustments and surcharges.
~
Issued
AUG 29.2001
Month Day Year
AUG 2 9 2001
OS-lj~:tE-'j81-RTS
Appn)',Jed
K.~isas CorForatia~1 Con~ission
JlJl':J 31. 2007
ISl SIJs.an K. Oljlf'~
Effective
.By
!)~ ~e.,
Michael Lennen. Vice President
.
.
.
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY, INe.
(Nllmil oflssuing Utility)
Index
SCHEDUlE
SG~
NORTH RATE AREA
Replacing Schedule-- S(;~
Sbeet 1.
(Territory to whicb schedule is applicable)
~1I'='fYLor~W=;~~l
whicb was filed March 2. 2006
Sbeet 2 of 5 Sheets
SMALL GEN'RAL SERVICE
RECREATIONAL UGHTlN~ qERVICg
Recreational Ughting Service is supplied to separately metered, outdoor recreational lighting
installations, including athletic fields, lighting for public parks and other public recreational
facilities. Such use may include small amounts of energy for other purposes incidental to the
recreational lighting function. All other uses under this rate schedule shall be Standard
Service.
NET MONTHLY BILL
CUSTOMER CHARGE
ENERGY CHARGE
$12.00
5.03~ per kWh
The rates hereunder are subject to all applicable adjustments and surcharges.
UNMETERED SERVICr;
Unmetered service refers to electric service which is not measured by a watt-hour meter. This
type of service may apply, at Company's option, to delivery points for which it is impractical or
difficult to install and read meters. In addition, it may apply, at Company's option, to delivery
points with minimal linear loads. The usage and demand are calculated by using typical hours
of use and rated equipment loads.
NET MONTHLY BILL
The per kWh rates for Standard Service shall apply to calculated hours of use and rated
equipment loads.
CUSTOMER CHARGE
$12.00
Plus applicable adjustments and surcharges.
v
Issued
AVO 2 9 2001
Day
0-5-I-dSEE-9:31-RTS
A~ro'.Jed
K~sas Corporation C'~iis5ion
.Ju!':/ 31, 2007
/SI SIJsat1 K. Duffy
Month
Year
Effective
AIlo 2 9 2001
By
~o~o L:=
M chael Lennen. Vice President
IOOex
.
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY, INC,
(Nam: of Issuing Utility)
. SCHEDULE
SGS
NORTH RATE AREA
Replacing Schedule SQ~ Sheet :3
(Territory to which schedule is applicable)
~u~n:-~~~=,1It
which was filed March 2, ~006
Sheet 31 of 5 Sheets
SMALL GENERAL SERVICE
MINIMUM MONTHLY BI~L
A minimum monthly biD is applicable to Standard Service, Recreational Ughting Service, and
Un metered Service. The minimum monthly bill shall be calculated as:
The greater of the Customer Charge plus:
A.
B.
C.
. D.
The minimum contract capacity specified in the Electric Service Agreement times the
capacity charge, or
The minimum bill amount specified in the Electric Service Agreement, or
The above rate for zero consumption plus $0.75 for each kW over 5 kW of the highest
Billing Capacity established during the twelve months ending currently, plus.
When a special transformer installation is necessary for the benefit of the customer or
to protect the quality of service to other customers, such minimum shall be not less
than $0.75 per kilovolt-ampere (kVA) of required transformer capacity;
E. plus applicable adjustments and surcharges.
BILLING CAPACITY
Customer's average kilowatt load during the fifteen-minute period of maximum use during the
month.
y
Issued
AUG 2 9 2001
Month
Day
AUG 2 9 2001
Year
i.
.By
f):U; t~eM
Michael Lennen, Vice President
05-I.dSEE-'3BI-RTS
APF"ro'~~j
K.~isas Corporati.)n CQo.lis$ion
Ju ly 31. 2007
/SI SIJSan K. (il.~ffo~
Effective
Index
.
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY, INC..
(Name of Issuing Utility)
SCHEDULE
sas
NORTH RATE AREA
Replacing Schedule ~GS Sheet .d
(Territory to which schedule is applicable)
~l?~IIPPle.mellt or seurale ondcrstandin~
....... fuOdify the tanlf as shown hereon.
which was filed March 2. 2006
Sheet 4. of 5 Sheets
SMALL GENiRA~ SI:RVICI
ADJUSTMENTS AND SURCHARGES
BiIlino Caoaqitv
If the customer's meter has not been modified to read the kilowatt load during the fifteen-
minute period of maximum use during the billing month the billing capacity shall be multiplied
by the following correction factor 1.0589.
Power Factor Adiustment
The Company may determine, by permanent measurement or by test of not less than 30
minutes duration under conditions which the Company determines to be normal, the power
factor of a customer. If the power factor for the month is less than 0.90 at the point of delivery,
the Billing Capacity will be increased by multiplying by 0.90 and dividing by the power factor.
. Other Adjustments
The rates hereunder are subject to adjustment as provided in the following schedules:
1. Fuel Adjustment Clause
2. Property Tax Surcharge
3. Transmission Service Charge
4. Environmental Cost Recovery Rider
5. Tax Adjustment
~
Month
AUG 2 9 2007
Day
Year
OS-ljSEE-'j:31-RTS
HPP"rO'.,led
Kansas Corporation C'~missio~
.Jul':1 31, 2007
/SI Susan K. Duffy
Issued
Effective
AUG 2 9 2001
.
.By
li:nt. oJ::. . YOM
ichael Lennen. Vice President -
Index
.
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY. INC.
(Nam:ofIssuiDg Utility)
SGS
. SCHEDULE
NOR.TH R.A TE AREA
Replacing Schedule- SQ~ Sheet S
(Territory to which schedule is applicable)
No liupp1emenr or s,lWate undel'JWldinJr
shall modiry the tantf IS shown hereOn.
which was filed March 2. 2006
Sheet 5 of 5 Sheets
$MALl GENERAL SERVICE
DEFINITIONS AND CONDITIONS
3.
. 4.
5.
1. Alternating current. at approximately 60 hertz, at the standard phase and voltage
available shall be supplied to a single location at points on the Company's existing
distribution facilities having sufficient capacity. ."
2. The initial term of service under this rate schedule shall be one year. Company
reserves the right to require the customer to execute an Electric Service Agreement
with an additional charge, or special minimum and/or a longer initial term when
additional facilities are required to serve such customer.
Individual motor units rated at more than five horse power shall be three phase (when
three phase service is supplied), unless otherwise agreed upon prior to installation.
Individual motor units rated at ten horsepower or more shall have starting equipment
satisfactory to the Company.
Service hereunder is subject to the Company's General Terms and Conditions as
approved by the State Corporation Commission of Kansas ~md any modifications
subsequently approved.
6. All provisions of this rate schedule are subject to changes made by order of the
regulatory authority having jurisdiction.
~
Issued
AUG 2 9 2007
Month Day
Year
Effective
.
. By
Aua 2 9 2001
t)~ ~y=
Michael Lennen, Vice President
OS-lt3EE -'3:31-lnS
ApF-roved
K.~isas Corporatic~ Commis$ion
Jub/ 31, 2007
ISI $IJ:san K. OUT1-""
.
.
.
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY, INC.
(N~ oflssuing Utility)
Index
SCHEDULE
MGS
NORTH RATE AREA
Replacing Schedule.- NOS Sheet
(Territory to which schedule is applicable)
No ~P1>lfn\CI\t or setlJVate undmtandinjt
shall moou)' me tariff IS shown hereon.
which was filed ]~h 2, 2006
Sheet Ii of 4 Sheets
MEDIUM GENERAL SERVICt;
A VA1LAB~E
Electric service is available under this rate schedule at points on Company's existing
distribution facilities.
APPUCABlE
To any customer using electric service supplied at one point of delivery and with an average
Billing Capacity greater than 200 kW. This rate schedule is not applicable to backup,
breakdown, standby, supplemental, short term, resale or shared electric service.
NET MONTHLY BILL
CUSTOMER CHARGE
CAPACITY CHARGE
$100.00
for all Billing Capacity
$6.83 per kW
ENERGY CHARGE
Winter Period - Energy used during the billings months of October through May.
For all kWh 1.211 O~ per kWh
Summer Period - Energy used during the billings months of June through September.
For all kWh 1.6367~ per kWh
Plus applicable adjustments and surcharges.
v
Issued
AUG 2 9 2001
Month Day Year
05-l.jSEE-'j:31-RTS
APHC'!.}ed
K~nsas Cor?orati'Jn C~IT~is~ic~
Jul':, 31, 2007
/~;/ Sus-3n K. r)I.~ffy
Effective
AlIG 2,9 2001
I):WL-:
Michael Lennen, Vice President
. By
Index.
.
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY,INC,
(NlIl11e oflssJiag Utility)
SCHEDULE
~G~
Replacing Schedule-- NOS Sheet 1.
NORm RATE AREA
(Territory to which schedule is applicable)
No supplmlent or seoanteunderslandina
shall modity the tariff as shown beRon.
which was filed ----b:Iarch 2, 2006
Sheet 2 of 4 Sheets
M~OIUM GENERAL SERVICE
MINIMUM BILL
The greater of the Customer Charge plus the Capacity Charge for 200 kW of Billing Capacity,
or the minimum specified in the electric Service Agreement, plus all applicable adjustments
and surcharges.
Bmino CaD~tv
i).
ii).
. iii).
Billing Capacity shall be the greatest of:
200 kW, or
The average kW load supplied during the 15 minute period of maximum use
during the month, adjusted for excessive lagging power factor, as described
below, or
50 percent of the highest billing capacity as adjusted for power factor
established during the previous billing months of ..June, July, August or
September, within the most recent 11 months, or
iv). The minimum capacity specified in the Electric ServicEl Agreement.
~
Issued
AUG 2 9 2001
Month Day Year
o.S-l.dSEE-'j:31-RTS
API" rOIJed
K~1sas COfPorati"1 COITooission
JIJ 1':i 31, 2007
ISI Susan K. ~Jffy
Effective
AUG 2 9 2007
't)~~
.
. By
Michael Lennen, Vice President
.
.
.
Index
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY, INC.
(Nameoflssuiog Utility)
SCHEDULE
MGS
Replacing Schedule-- Mf1~ ~1leet .,
NORTH RATE AREA
(Territory to which schedule is applicable)
Nosupple.Jl1Of\t or ~ und~
shallliJOdiry tile tariff 18 shown hereon.
which was filed March 2. 2006
Sheet 3 of 4 Sheets
MEDIUM G~NERAL SERVICE
ADJUSTMENTS AND SURCHARGES
BILLING CAPACITY
If the customer's meter has not been modified to read the kilowatt h:>ad during the fifteen-
minute period of maximum use during the billing month the Billing Capacity shall be multiplied
by the following correction factor 1.0157.
Power Factor Amustmem
The Company may determine, by permanent measurement or by test of not less than
30 minutes duration under conditions which the Company determines to be normal, the
power factor .of a customer. If the power factor for the month is less than 0.90 at the
point of delivery, the Billing Capacity will be increased by multiplying by 0.90 and
dividing by the power factor.
The rates hereunder are subject to adjustment as provided in the following schedules:
1. Fuel Adjustment Clause
2. Property Tax Surcharge
3. Transmission Service Charge
4. Environmental Cost Recovery Rider
5. Tax Adjustment
or-
Issued
AUG 2 9 2001
Month Day Year
05-\jSEE-'381-RTS
APF'rol.Jed
Kansas CorForatic~~n Con~issior
JuI':f 31, 2001
./SI SIJsan K. Duff':I
Effective
AUG 2 9 1001
J]:W; L-:
Michael Lennen, Vice President
By
.
.
.
Index
THE STATE CORPORATION COMMISSION OF KANSAS
WESTAR ENERGY, INC.
(Name oflssuing Utility)
SCHEDULE
MgS
Replacing Schedule- . .NOS Sheet A
NORTH RATE AREA
(Territory to which schedule is applicable)
li'?.lIuppl'.lJlellt or seoJlflltehunderstandillll
5.....11 modIry tile tariff ItS sl own hereon.
which was filed ---1~arch 2, 2006
Sheet 4 of 4 Sheets
MEDIUM GeNERAL SERVICE
DEFINITIONS AND CONDITIONS
1. Alternating current, at approximately 60 hertz, at the standard phase and voltage
available shall be supplied to a single location at points on Company's existing
distribution facilities having sufficient capacity.
2. Service shall normally be measured at delivery voltage; however, Company reserves
the right to measure service at other than delivery voltage and adjust such
measurements accordingly.
3. The initial term of service under this rate schedule shall be one year. Company
reserves. the right to require the customer., to. execute an Electric Service Agreement
with an additional charge, or special minimum and/or a longer initial term when
additional facilities are required to serve the customer.
Service under this rate schedule is subject to Company's. General Terms and
Conditions presently on file with the State Corporation Commission of Kansas and any
modifications subsequently approved.
5. All provisions of this rate schedule are subject to changes made by order of the
regulatory authority having jurisdiction.
4.
or-
Issued
AUG 2 9 2007
Day
Year
Month
Effective
AUG 2 9 2007
1j:W ~
05-1i::1"'EE-9:31-RTS
AF'P rov8d
K.~1sas CQrporati'~1 C'~~lisliGn
.Jub 31, 2007
/S/ Susan K. D;J H':!
. By
Michael Lennen, Vice President
.
.
.
THE STATE CORPORATION COMMISSION OF KANSAS
KANSAS GAS SERVICE
A DIVISION OF ONEOK, INC.
(Name of Issuing Utility)
INDEX NO 21.1
SCHEDULE GS
All Rate Areas
(Territory to which schedule is applicable)
Replacing Schedule GS Sheet 1
which was filed June 7 2005
Sheet-1-of-1-Sheets
No supplement or separate understanding
shall modify the tariff as shown hereon.
GENERAL SALES SERVICE
AVAILABiliTY
Available in and around the communities specified in the Index to non-residential customers at
single locations. Not available for service to separately metered generators with a capacity
less than 20 kilowatts. Service is subject to the DEFINITIONS AND CONDITIONS section
below.
NET MONTHLY Bill
. $23.35 Service Charge
plus
Delivery Charge
$ 1.9746 per Mcf for all gas delivered
plus
Applicable adjustments and charges provided in Company's Cost of Gas Rider,
Weather Normalization Adjustment Rider and Ad Valorem Tax Surcharge
Rider.
The Net Monthly Bill shall be no less than the Service Charge plus any minimum charges set
forth in a customer's Service Agreement.
DEFINITIONS AND CONDITIONS
1. Sales service is provided for the charge specified in the NET MONTHLY BILL section when
supplied from Company's existing facilities. When additional facilities are needed to serve a
customer, an additional charge may be required.
2. Multiple meter installations, installed at a single location for a customer's convenience, shall
be billed additional Service Charges for each additional meter installation.
3. Sales service under this rate schedule is subject to the provisions and applicable charges
contained in Company's General Terms and Conditions for Gas Service, or successor
documents, approved by the Commission.
4. All provisions of this rate schedule are subject to changes made by order of the Commission.
Issued November 16
2006
06-KGSG- ~ 209-RTS
Approved
Kansas Corporation Commission
November 16, 2006
/S/ Susan K. Duffy
Month Day
Effective January 1
Year
2007
Month
Day
Year
By /S/
LARRY G. WILLER, DIRECTOR
.
.
.
THE STATE CORPORATION COMMISSION OF KANSAS
KANSAS GAS SERVICE
A DIVISION OF ONEOK, INC.
(Name of Issuing Utility)
INDEX NO 29.1
SCHEDULE STt /
Rate Area "t"
(Territory to which schedule is applicable)
Replacing Schedule ST Sheet 1
which was filed Aoril14. 2005
Sheet-Lof-'-.Sheets
No supplement or separate understanding
~hall modify the !anff as shown hereon.
SMALL TRANSPORTATION SERVICE
AVAILABILITY
Available in and around the communities specified in the rhdex to commercial and industrial
customers. Service is subject to the DEFINITIONS AND CONDITIONS section below.
NET MONTHLY BILL
$ 23.35 Service Charge
plus
Delivery Charge
$ 1.8802 per Met for all gas delivered
plus
Applicable adjustments and charges provided in Company's Ad Valorem Tax
Surcharge Rider.
The Net Monthly Bill shall be no less than the Service Charge plus any minimum charges set
forth in a customer's Service Agreement.
DEFINITIONS AND CONDITIONS
1. Annual deliveries of at least 1,500 Mcf at a single location during the last 1:2 billing periods
shall qualify a customer for service under this schedule. A customer, once qualified, shall
remain eligible for service under this schedule.
2. A customer shall meet all conditions of the following tariffs to maintain service under this rate
schedule:
a. Electronic Flow Measurement Rider
b. Company's General Terms and Conditions for Gas Service (GTC), Section 10
Reauirements for Transportation Service.
3. Company may base a bill on a customer's normal meter reading cycle, but may issue that bill
at the beginning of the next billing month. Although the bill may indicate a different period, it
shall reflect actual information obtained from the regular-cycle meter reading. A customer
served under this rate schedule and who desires a calendar month-based bill must install
electronic flow measurement equipment and will not be eligible for RDQ balancing.
Issued November 16 2006
Effective
Month
January
Month
06-KGSG-1209-RTS
Approved
Kansas Corporation Commission
November 16. 2006
/5/ Susan K. Duffy
Day
1
Year
2007
Day
Year
By
ISI
LARRY G. WILLER, DIRECTOR
.
.
.
THE STATE CORPORATION COMMISSION OF KANSAS
INDEX NO 29.2
KANSAS GAS SERVICE
A DIVISION OF ONEOK, INC.
(Name of Issuing Utility)
SCHEDULE STt
Rate Area "t"
(T erritOfY to which schedule is applicable)
Replacing Schedule ST Sheet 2
which was filed Aoril14 2005
Sheet-Lof~Sheets
No supplement or separate understandlng
Ishan modify the tariff as shown hereon.
SMALL TRANSPORTATION SERVICE (Cont.)
4. Service under this rate schedule shall be terminated upon notification by the customer, but not
before the next regular-cycle meter reading date.
5. Transportation service is provided for the charge specified in the NET MONTHLY BILL section
when supplied from Company's existing facilities. When additional facilities are needed to
serve a customer, an additional charge may be required.
6. Multiple meter installations, installed at a single location for a customer's convenience, shall
be billed additional Service Charges for each additional meter installation. Usage recorded on
these multiple meters shall be aggregated for purposes of qualifying for this rate schedule.
7. Transportation service under this rate schedule is subject to the provisions and applicable
charges contained in Company's GTC, or successor documents, approved by the
Commission.
8. All provisions of this rate schedule are subject to changes made by order of the Commission.
Issued November 16
2006
06-KGSG-1209-RTS
Approved
Kansas Corporation Commission
November 16, 2006
ISI Susan K. Duffy
Month Day
Effective January 1
Year
2007
Month
Day
Year
By /5/
LARRY G. WILLER, DIRECTOR
.
.
.
RESOLUTION NUMBER 08-6523
A RESOLUTION ESTABLISHING WATER AND WASTEWATER RATES IN THE
COMPREHENSIVE FEE SCHEDULE OF THE CITY OF SALINA, KANSAS.
and
WHEREAS, the City of Salina provides many specific services for the Citizens of Salina;
WHEREAS, specific individuals benefit from said services; and
WHEREAS, it is appropriate public policy to require specific individuals benefiting from
specific services to pay all or a portion of the cost of such services; and
WHEREAS, Salina Code Section 2-2 provides that the Board of Commissioners shall
determine, by resolution, all license fees, permit fees a.nd other user related fees or chargers
established by ordinances of the City; SO NOW, THEREFORE
BE IT RESOLVED by the Governing Body of the City of Salina, Kansas:
Section 1. That the following Utilities fees of Article XI of the City of Salina
Comprehensive Fee Schedule are hereby amended to read ~.follows:
Effective Julv 1. 2008
WASTEWATER
Inside City Limits
Customer Charge (0 C.F.)
Consumption Charge per 100 C.F.
Per Month
$3.51
$2.63
WATER
Inside City Limits
Customer Charge (0 C.F.)
5/8" Meter
%" Metter
1" Meter
1 W' Meter
2" Meter
3" Meter
4" Meter
6" Meter
8" Meter & Above
$3.75
$5.97
$8.10
$12.57
$20.31
$53.31
$76.34
$141.67
$298.11
Consumption Charge per 100 C.F.
First 2,000 C.F.
Next 8,000 C.F.
All over 10,000 C.F.
$2.54
$2.31
$2.07
Excess Use Charge
Metered Consumption Above
Excess Use Baseline
$4.68
Metered Consumption All
. Irrigation Meters $4.68
Apartment Rate: When three or more units are placed on a master meter, usage is charged at the
first 2,000 cubic feet rate for all consumption.
RATE OUTSIDE CITY:
Customer Charge Double Inside Rate
Consumption Charge 125% Inside Rate
Effective November 1.2008
WASTEWATER
Year 2009 Year 2010 Year 2011 Year 2012 Year 2013
Effective Effective Effective Effective Effective
Inside City Limits 11-1-2008 11-1-2009 11-1-2010 11-1-2011 11-1-2012
Customer Charge (0 C.F.) $6.31 $6.42 $6.57 $6.73 $6.89
Consumption Charge per 100 C.F. $2.88 $3.08 $3.35 $3.64 $3.90
WATER
Inside City Limits
Customer Charge (0 C.P.)
5/8" Meter $4.44 $4.51 $4.60 $4.70 $4.80
%" Meter $7.07 $7.18 $7.33 $7.48 $7.65
1" Meter $9.60 $9.74 $9.94 $10.16 $10.38
. 1 W' Meter $14.89 $15.11 $15.43 $15.76 $16.10
2" Meter $24.06 $24.41 $24.93 $25.46 $26.02
3" Meter $63.15 $64.07 $65.43 $66.84 $68.30
4" Meter $90.43 $91.75 $93.70 $95.71 $97.80
6" Meter $167.82 $170.27 $173.88 $177.62 $181.50
8" Meter and above $353.14 $358.30 $365.88 $373.75 $381.93
Consumption Charge per 100 C.F.
Unit Block Rate
Metered Consumption
Through Excess Use
Baseline $2.34 $2.55 $2.82 $3.12 $3.49
Excess Use Charge
Metered ConsUmption Above
Excess Use Baseline $4.68 $5.10 $5.64 $6.24 $6.98
Metered Consumption All
Irrigation Meters $4.68 $5.10 $5.64 $6.24 $6.98
RATE OUTSIDE CITY:
Customer Charge Double Inside Rate
. Consumption Charge 125% Inside Rate
.
.
.
Winter Quarter Average (WQA) shall be defined by adding the metered water consumption on bills
rendered during the months o/January, February and March and then dividing this sum by the
number of billings (three). Each customer's WQA shall be recalculated in April of each year. This
WQA shall be utilized for the following months of May through April.
Minimum Winter Quarter Average (MWQA) shall be defined as 800 cubic feet.
In those instances where no water consumption data exists for the calculation of a WQA for a
customer, the Director of Utilities or designated representative shall determine the most appropriate
method of establishing the WQA.
. Excess Use Baseline shall equal the greater of 120% of the WQA or 120% of the MWQA.
Excess Use Charge shall apply to: (1) all irrigation meters (2) any use in excess of the excess use
baseline.
A customer with metered water consumption greater than three million cubic feet (3,000,000 cf) per
year shall be charged at the Tier 1 rate for all consumption. This customer must have a Water
Conservation Plan and the plan must be approved by the Director of Utilities.
Section 2. That this Resolution shall be in full force and in effect after its adoption.
Adopted by the Board of Commissioners and signed by the Mayor this 9th day of June, 2008.
[SEAL]
ATTEST:
John K. Vanier II Mayor
Lieu Ann Elsey, CMC, City Clerk