Investment Grade Audit Report - Revised Chevron . === Investment Grade Audit City of Salina Salina, Kansas . Prepared by Chevron Energy Solutions Company A Division of Chevron U.S.A. Inc. October 2008 (Revised) DWCES 30614 . Energy Solutions . Investment Grade Audit of City of Salina Salina, KS . by: Chevron Energy Solutions Company Chevron October 2008 . Executive Summary Energy Conservation Measures Historical Energy Consumption Operation & Maintenance Data on Present Facilities Measurement and Verification Environmental Impact Appendices A. Standards of Control B. HV AC Equipment Tables C. Gas Price Comparison D. Lighting Usage Hours E. Utility Tariffs . . . Section 1 Executive~ Summary Introduction A performance contract is an agreement between an energy services company (ESCO) and a facility owner, under which the ESCO designs, engineers and implements needed facility improvements and upgrades. The ESCO guarantees the owner that savings from those upgrades will occur over the course of the performance contract. The guaranteed savings from reduced utility bills and material savings are then used to pay back the initial capital investment in equipment and installation. Thus, the owner merely redirects existing budgeted dollars, which are currently being paid to their utility companies, back into their facilities in the form of capital improvements. Afterwards, the facility owner retains 100% of the savings to use at its discretion. In the State of Kansas, the Kansas Energy Office allows public entities to utilize the state's Facility Conservation Improvement Program (FCIP) to implement these projects. By utilizing this program, energy experts from the State have been involved in all project development and oversight and have performed a thorough review of the engineering and energy savings calculations to ensure that the City of Salina is receiving the best possible project. The Kansas Energy Office will maintain it's involvement in this project throughout construction and for the life of the project. From the onset of this Investment Grade Audit, it has been the intention of Chevron Energy Solutions to align this energy conservation and capital improvement project with the stated goals of the City's 2008 Shared Vision Statement and Strategic Plan. In that plan, the City calls for a well maintained city with the highest possible quality municipal services, the start of efforts to be an environmentally friendly "green" community, and making practical efforts to preserve natural resources. This Performance Contract with Chevron Energy Solutions contributes. directly to all ofthese issues. This program directly conserves energy and water resources in City facilities to not only save energy dollars that can be reinvested, but to also having a positive environmental impact on the City's carbon footprint. In fact, the energy savings as a result of the recommended program equate to removing 74 cars from the road or planting 93 acres of trees each year. Knowing that water is increasingly becoming a scarce resource, this program also goes to great lengths to conserve water wherever possible. In addition to the energy and water reductions, this program provides capital improvements at the Police Station and the Health Department, to give City employees and citizens a better working and living environment, and provides an opportunity to make these improvements now instead of little by little over time on an emergency basis. The process of implementing a performance based guaranteed energy program, as practiced by Chevron Energy Solutions through the Facility Conservation Improvement Program includes the following four phases: Chevron ~ Energy Solutions 1-1 . . . Section 1 Executive: Summary Phase I II III IV Description Feasibility Energy Analysis Investment Grade Audit (IGA) Implementation Measurement and Verification This report documents Phase II of our process, the Investment Grade Audit. In developing this report, Chevron ES has worked on-site with the City of Salina personnel to address the concerns of the facilities and uncover areas for energy conservation opportunities. Beginning the first week in June 2008, Chevron ES staff visited the nine (9) City facilities included in the scope of the project to collect information. We examined every component and system that uses energy, including lighting, mechanical systems, building envelope systems, internal electrical systems, and miscellaneous "plug load" equipment. On following visits, a detailed survey of each lighting fixture and water fixture in the nine buildings was performed by specialized teams. Our data was collected by direct observation of equipment, site drawings, operating schedules and other relevant data. We also conducted interviews with City personnel to gain a better understanding of operational issues and their objectives for this program. After several months of analysis and subsequent site visits, Chevron Energy Solutions has been able to design a program that will maximize savings in order to address deferred maintenance issues while improving comfort and operational controL In addition to the physical surveys, Chevron Energy Solutions and the Kansas Energy Office held several meetings with City Administration to determine which capital improvement issues were most pressing and could be addressed through this program. Through these discussions, the much needed improvements at the Health Building and the Police Station were brought to light. Both of these buildings require significant facility improvements that the City has not been able to budget necessary funds for a comprehensive solution. This Performance Contracting program will allow the City to make the necessary changes and improvements to these buildings now to improve comfort, control and operational maintenance, instead of waiting for available funds from the City's capital budget. Through this team effort, Chevron Energy Solutions was able to identify savings opportunities that will improve the City's facilities and provide a reduction in maintenance costs. Through implementing an energy savings performance contract, the City of Salina will be able to pro actively solve facility needs through a proven mechanism ensuring a guaranteed fixed price and no additional taxpayer burden. This program solves problems now through money that was previously going to your utility companies and has a tremendous positive impact on the environment. Our program focused around the six general categories: . Lighting Conservation Measures . Mechanical Improvement Measures . Building Envelope Improvement Measures Chevron ~ Energy Solutions 1-2 . . . Section 1 Executive Summary . Equipment Control Conservation Measures . Water Conservation Measures . Utility Sourcing Alternatives Chevron Energy Solutions is pleased to present a customized energy savings improvement program for the City of Salina. Our meetings with Mr. Jason Gage, Mr. Steve Snyder, Mr. Byron Erickson and the rest of the City personnel outlined their goal to maximize potential energy savings and leverage excess savings. We would like to express our thanks to all of the staff members that provided assistance during our visits and telephone calls: Jason Gage, City Manager Steve Snyder, Director - Parks and Recreation Byron Erickson, Facilities Superintendent Jim Meyer, Bicentennial Center John Highkin, Smoky Hill Museum Michael Spicer, Salina Community Theatre Jack Rolfs, Director, IT Department Margaret Kay, Accounting Cindy Beneke, City of Salina Water Department Loralee Tibbetts, Health Department Additionally, we would like to recognize the Chevron Energy Solutions Team: John O'Herron, Business Development Manager Ron LaCombe, Senior Project Manager Randy Jameson, Project Manager Jacquelynn Morris, Lead Project Engineer Brandon Well, Energy Analyst Jason Patterson, Engineering Intern Steve Schulte, M&V Specialist Our objective is to provide a comprehensive list of energy conservation measures (ECMs) and energy related capital improvement measures (CIPs) to assist the City of Salina in tailoring a program that addresses immediate facility and operational needs as well as long-term infrastructure needs. Below is an outline of this Investment Grade Audit report: Section 1 Executive Summary includes a financial proforma of a comprehensive project scope, as well as a general overview of the recommended projects. Section 2 Energy Conservation Measures includes a narrative describing each ECM and CIP and a line-by-line list of potential costs and savings for each ECM. Chevron ~ Energy Solutions 1-3 . . . Section 1 Executive Summary Section 3 Historical Energy Consumption includes a summary of electric, natural gas, water and sewer consumption and cost history. Section 4 Operations and Maintenance includes details ofthe operations and maintenance savings and capital avoidance savings associated with implementation of the ECMs and CIPs, as well as some general O&M guidelines. Section 5 Data on Present Facilities summarizes the current types of mechanical, lighting, heating, ventilation and air-conditioning (HV AC), and control systems in the buildings. Section 6 Measurement and Verification, describes the recommended methods of savings verification employed by Chevron ES to assure that actual savings meet or exceed projected savings. Section 7 Environmental Impact, discusses the environmental benefits of the project, including reduction in emissions and removal/disposal of PCB ballasts. Appendices include various supporting documentation as listed in the Table of Contents. Recommendations The recommended program includes comprehensive water and lighting conservation programs at all nine buildings, and controls projects, a building improvement project, and alternative sourcing of natural gas at selected buildings. At Fire Stations No. 1 and No.2, the golf clubhouse, the Health Department building, and the Salina Community Theatre the program includes installation of network programmable thermostats. Controls at the Smoky Hill Museum will receive some modification to reduce energy consumption at this building. The mechanical projects include replacement of five aging HV AC units at the Health Department. To address some significant comfort needs at the Police Department building, the feature project in the program is the replacement of the HV AC air handling units and control system. The program also includes replacement of a leaking skylight in the Health Department building and replacement with an insulated roof and ceiling. Utility cost savings will be realized with consolidation of gas meters at the golf clubhouse and bulk purchasing natural gas for the Bicentennial building, the Memorial Hall, and the Police building. Table 1-1 provides a summary of the projects in the recommended program. Detailed descriptions of each proposed measure, as well as the other measures that were evaluated, are provided in Section 2 - Energy Conservation Measures. This section also includes several projects initially considered but not recommended due to length of payback or other reasons. Chevron ES will work with the City to tailor a program that best meets the City objectives. Chevron _ Energy Solutions ... 1-4 . . . Section 1 Executive Summary Table 1-1 Summary of Energy Conservation Measures for City of Salina Annual Eleetric Electric Gas Gas water' Wateri Total Oller. & Project Demand Energy Dollar Energy Dollar Sewer Sewer Utility Maint. Total Simple Cost Savings Savings Savings Savings Savings Savings Savings Savings Savings Savings Payback Enlilrov CO!lS!If1/ation U...""es 1$1 IlkW-mo IkWhI 1$1 Imcfl ISI Icetl ISI ($) ($) 1$1 IYearsl Investment Grade Audit $12,012 L - Lichtinc Uoorades 11 \ $230,886 1,131 241,504 $18,568 0.0 $0 0 $0 $18,568 $4,413 $22,981 10.0 W - Domestic Water Uoorades (2) $149,785 0 -1,965 -$103 26.3 $298 1,224 $7,688 $7,883 $819 $8,702 17.2 C1 - Networked Proorammable Thermostats $74,628 0 80,059 $4,212 468.5 $5,079 0 $0 $9,291 -$2,945 $6,346 11.8 C2 - Controis Uocrades $4,141 6 16,173 $872 0.0 $0 0 $0 $872 $0 $872 4.7 CIP4 - Renlace Snlit-S""tem Units $172,421 30 3,410 $381 4.6 $44 0 $0 $425 $0 $425 405.7 CIP5 - HVAC Imnrovements I Controls Unarad $643,304 -152 29,474 $611 118.8 $1,380 0 $0 $1,991 $3,500 $5,491 117.2 CIP6 - Remove Sk iicht $61,605 4 2,252 $149 . 38.3 $366 0 $0 $515 $750 $1,265 48.7 U1 - Contract Natural Gas 131 $4,511 0 0 $0 0.0 $12,545 0 $0 $12,545 $0 $12,545 0.4 U2 - Consolidate Gas Meters $4,894 0 0 $0 0.0 $0 0 $0 $0 $294 $294 16.6 Total $1,358,187 1,020 370,$07 $24,690 656.5 $19,712 1.223.8 $7;688 $52,090 $6,831 $58,921 23.1 NOTES: (1) Lighting ECM pricing is based on fixed costs distributed over the projects at each building. Pricing may change if some buildings excluded in final program. (2) Water ECM pricing is based on fixed costs distributed over the projects at each building. Pricing may change if some buildings excluded from in program. (3) ECM U1 procurement assistance services pricing is based on a fixed cost distributed among all three buildings. Pricing may change if some buildings excluded from program. Financials The financial aspects of the project are presented in the following Table 1-2. Working in conjunction with the Rod Franz, the City Finance Director, a net present value of comparative scenarios is presented. A 3.0% annual inflation rate was used for electric and natural gas energy savings, a 9.0% inflation rate was used for water and sewer savings as determined from the future rates that have already been established, and 2.5% annual inflation rate was used to project materials savings. Materials savings only were shown for all operations and maintenance savings. No in-house City labor costs are included in the materials savings, although a reduction in labor expended will be recognized with the implementation ofthese ECMs. All projects in this report are comprehensive including engineering, construction, installation labor, and materials. The total implementation costs were determined in accordance with paragraph 5.1 of the Investment Grade Audit Agreement. A breakdown ofthese costs into the State Master Agreement categories follows in Table 1-3. Chevron ~ Energy Solutions 1-5 . Section 1 Executive Summary Table 1-2 Financial Aspects of Performance Based Energy Program for City of Salina Salina, Kansas Program includes ECMs L 1-L6, C1, C2, W1-W5, U1, U2, CIP4, CIP5, CIP6 Implementation Cost CEA Fee Totall!SCO Project Fee $1,346,175 $12,012 $1,358,181 FCIP fe~ (payable to the Kansas Energy Office) Total Cost of Project $29,582 $1,381,769 1 2 I 3 I 4 5 I 6 7 I 8 I 9 10 City of Salina Budaet Plans L2, CIP4, CIP5} ImDlementation of Recommended Program Operational Net Present Operational Present Total and Program Value of Net Total and Net Program Value of Net Capital Energy Maintenance Costs Program Energy Maintenance Costs Program Year Budget Savinas Savinas {Savinas} Costs Savinas Savinas {Savin as} Costs 0 $0 $0 $4,000 $4,000 $4,000 ($26,045) ($2,616) $1,329,526 $1,329,526 1 $32,000 ($285) $3,967 $35,682 $34,475 ($54,114) ($3,331 ) ($57,445) ($55,502) 2 $442,263 ($1,312) $3,685 $444,636 $415,073 ($56,240) ($3,414) ($59,654) ($55,688) 3 $10,200 ($2,552) ($1,037) $6,611 $5,962 ($58,4 75) ($3,500) ($61,975) ($55,898) 4 $6,000 ($3,415) ($1,304) $1,281 $1,117 ($60,827) ($3,587) ($64,414) ($56,133) 5 $0 ($3,517) ($1 ,335) ($4,852) ($4,085) ($63,303) ($3,677) ($66,980) ($56,395) 6 $0 ($3,623) ($1,362) ($4,985) ($4,055) ($65,912) ($3,769) ($69,681 ) ($56,686) 7 $0 ($3,732) ($1,376) ($5,108) ($4,015) ($68,663) ($3,863) ($72,526) ($57,005) 8 $0 ($3,844) ($1,365) ($5,209) ($3,956) ($71,566) ($3,960) ($75,526) ($57,355) 9 $0 ($3,959) ($1,332) ($5,291 ) ($3,882) ($74,632) ($4,059) ($78,691 ) ($57,738) 10 $0 ($4,078) ($1,280) ($5,358) ($3,798) ($77,873) ($4,160) ($82,033) ($58,155) 11 $0 ($4,200) ($1 ,217) ($5,417) ($3,710) ($81 ,301 ) ($4,264) ($85,565) ($58,607) 12 $0 ($4,326) ($1,157) ($5,483) ($3,629) ($84,930) ($4,371 ) ($89,301 ) ($59,098) 13 $0 ($4,456) ($1,123) ($5,579) ($3,567) ($88,776) ($4,480) ($93,256) ($59,628) 14 $0 ($4,590) ($1,123) ($5,713) ($3,530) ($92,853) ($4,592) ($97,445) ($60,200) 15 $0 ($4,728) ($1,146) ($5,874) ($3,506) ($97,180) ($4,707) ($101,887) ($60,815) 16 $0 ($4,870) ($1,174) ($6,044) ($3,486) ($101,776) ($4,824) ($106,600) ($61,477) 17 $0 ($5,016) ($1,204) ($6,220) ($3,466) ($106,661 ) ($4,945) ($111,606) ($62,187) 18 $0 ($5,166) ($1,234) ($6,400 ) ($3,445) ($111,857) ($5,069) ($116,926) ($62,948) 19 $0 ($5,341 {$1,4651 ($6,586 ($3,4261 ($117,388' i$5,195 ($124,583 ($63,764 Iota resent valUe cost {Savlnasl: !l:40s 072 $214248 . (1 ) (2) (3) (4) (5) (6) (7) (8) (9) . (10) Notes By Column: Years after implementing retrofit changes. City budgeting requirement estimates to address planned or required projects. Projects include L2 (in four buildings) and partial of CIP4 and CIP5. Electric and natural gas energy savings are escalated by 3.0% to account for inflation. Operational and Maintenance Savings estimates are escalated at 2.5% to account for inflation. Operational and Maintenance Savings for existing Police HVAC replacement cease after year 2. Net Program Costs (Savings) = (2) - (3) - (4). Net Present Value based on an annual discount rate of 3.5% Electric and natural gas energy savings are escalated by 3.0% to account for inflation. Water I sewer savings are escalated by 9.0% calculated from Resolution 08-6523. 50% of savings recognized for construction year. Operational and Maintenance Savings are stipulated and escalated at 2.5% to account for inflation. 50% of lighting and water savings recognized for last portion of Construction Period. Net Program Costs (Savings) = - (3) - (4). Year 0 includes Total Esco Project Fee of +$1,358,187. Net Present Value based on an annual discount rate of 3.5% Chevron ~ Energy Solutions 1-6 . . . Section 1 Executive Summary The Recommended Program in Table 1-2 above will save $54,115 in utility costs and $7,164 in material and operational costs after the first year. City budget impact of implementation has a Present Value cost of $405,072 over 19 years. The Recommended Program with additional energy and utility cost savings measures has a Present Value cost of $214,248, leaving a residual net present savings of$190,824 with the implementation of the $1,358,187 Recommended Program of improvements. Table 1-3 Required Kansas Energy Office Pricing Summary per State Master Agreement 1m Diem entation Costs ESCO Construction Construction Bonds & Subtotal Engineering Construction Period Overhead Total ECM No. ECM Descnotion Costs. Insurance Cost Desion Manaoement Interest CQmmissionino M&V & Profit Price IGA Investment Grade Audit $12,012 $12,012 L Ughting Upgrades $161,685 $3,234 $164,918 $10,720 $9,071 $4,948 $6,597 $6,597 $28,036 $230,886 W Domestic Water Upgrades $104,892 $2,098 $106,989 $6,954 $5,884 $3,210 $4,280 $4,280 $18,188 $149,785 C1 Networked Programmable Thermostats $52,261 $1,045 $53,306 $3,465 $2,932 $1,599 $2,132 $2,132 $9,062 $74,629 C2 Controls Upgrades $2,900 $58 $2,958 $192 $163 $89 $118 $118 $503 $4,141 CIP4 Replace Split-5ystem Units $120,743 $2,415 $123,158 $8,005 $6,774 $3,695 $4,926 $4,926 $20,937 $172,421 CIP5 HV AC Improvements I Controls Upgrad< $450,493 $9,010 $459,503 $29,868 $25,273 $13,785 $18,380 $18,380 $78,116 $643,304 CIP6 Remove Skylight $43,141 $863 $44,004 $2,860 $2,420 $1,320 $1,760 $1,760 $7,481 $61,605 U1 Contract Natural Gas $3,780 $76 $3,856 $0 $0 $0 $0 $0 $656 $4,511 U2 Consolidate Gas Meters $3,427 $69 $3,496 $227 $192 $105 $140 $140 $594 $4,894 . Construction Costs are vaiid for 90 days from October 1, 2008. Ener2V Savin2s Performance Contract Benefits to the City of Salina: The City of Salina will derive many benefits from the implementation of a comprehensive energy performance contract. Just a few of the benefits are listed below. . Improved Working Environment: New and improved HV AC systems and temperature controls will provide a more comfortable working environment for the City of Salina staff and visitors. Additionally, lighting will be upgraded throughout all facilities. New lighting systems are designed to meet the llluminating Engineers Society (IES) standards. . Cost Control: Performance contracting provides a means to divert monies to facility improvements that would otherwise be spent on paying utility bills. Many of the items planned for replacement are well beyond their useful, functional life. Therefore, these are items that the City will need to replace in the near future. Through this performance contract, the City of Salina is able to pro actively make these improvements at one time, utilizing energy saVIngs and very favorable Interest rates to help fund the replacements and also lesson the burden on taxpayers. This program has a guaranteed fixed cost which also eliminates change orders from the construction. Chevron V Energy Solutions 1-7 . . . Section 1 Executive Summary . Energy Savings and Environmental Impact: The proposed energy conservation measures will reduce energy consumption and costs. The reduced energy consumption will result in less power plant consumption from the electric utility and much less natural gas usage as well. Other examples of positive environmental actions with some of the ECMs include removal of hazardous light ballasts. Implementation of the project will make a strong statement about the City's commitment to energy efficiency and environmental responsibility. . Reduced Maintenance: Several ofthe ECMs will significantly reduce maintenance costs and hours. No financial savings have been claimed for the City of Salina Facilities Department in-house labor savings. However, several of the projects will result in significant labor savings, freeing up the maintenance staff to address other items. Conclusion Chevron Energy Solutions recommends that the City of Salina move forward with a guaranteed energy savings performance contract. The evaluation shows that the resulting energy and materials savings will significantly reduce the cost of funding a wide range of projects that will benefit the City for years to come. The preparation of this report would not have been possible without the cooperation of City of Salina personnel. Chevron ES found the entire staff at the City of Salina extremely cooperative and supportive throughout the duration of the Investment Grade Audit. The spirit of cooperation exhibited by the City of Salina staff was instrumental in the successful completion of this Investment Grade Audit and will no doubt contribute to the successful implementation of the projects. Chevron _ Energy Solutions - 1-8 .. . . Section 2 Energy Conservation lMeasures Various energy conservation measures (ECMs) and energy related capital improvement measures (CIPs) were evaluated at the City of Salina. The measures considered covered the categories of building envelope, lighting, water conservation, heating, ventilation, and air conditioning (HV AC), and energy management systems (EMS). Table 2-1 on the following page presents a summary by project type. Table 2-2 presents a summary of costs, consumption savings, dollar savings, and simple payback for each measure. Following Table 2-2 are descriptions for each ECM and CIP with an explanation ofthe existing system operations, and an explanation of how these systems can be modified or replaced to provide more efficient and reliable operation. The primary method utilized for calculating energy and water savings was modeling of the individual ECMs through detailed analysis in spreadsheets utilizing bin weather data, annual load variation, equipment energy use, and schedule parameters. The savings were calculated as the difference between existing equipment definition (efficiencies, full load energy use and capacities, part-load profiles, and operating schedule) and proposed equipment modification or replacement. The type of calculation described above is very accurate for well-defined ECMs. For instance, water consumption savings for domestic water retrofits were determined by individually subtracting the rated water flow ofthe retrofit from the existing fixture water flow. Sample field measurements of existing lighting fixture electric usage were taken to calibrate the manufacturer's data. Chevron ~ 2-1 Energy Solutions . . . Section 2 Energy Conservation Measures City of Salina Energy Conservation Measures Lighting Included in Recommended Pro ram L 1 De-lamp and Install Specular Reflectors L2 T12 to T8 Fluorescent Conversion L3 32 Watt to 28 Watt Fluorescent Conversion L4 Incandescent to Compact Fluorescent L5 LED Exit Signs L6 Metal Halide to New Fluorescent Fixtures Mechanical and Building Envelope CIP4 Replace SplikSystem Units CIP5 HVAClmprovements I Controls Upgrade CIP6 Remove Skylight Controls Water Utilities C1 Networked Programmable Thermostats C2 Controls Upgrades W1 Replace Faucet Moderators W2 Replace Toilets W3 Retrofrt and Replace Urinal Flush Valves W4 . Replace Faucet and Spray Valves W5 Replace Water-Cooled Ice Machines U1 Contract Natural Gas U2 Consolidate Gas Meters Not in Recommended Pro ram CIP1 Replace Unit Heaters with Infrared Radiant Heat CIP2 Replace Boiler CIP3 Replace Condlmsing Unites) CIP7 Ceiling Modification I Insulation NRControls Upgrade NR Install Trash Compactor NR Replace Condensing Units NR Replace Steam Boiler and Rezone Piping NR Replace Window AC with Centralized Cooling NR Install ArenaGeiling and HVAC NR Downsize Water Meter Table 2-1 .... Q) c: Q) U tli "2 c: 2 c: Q) t.l iii E ::l Q) Ul ::l ::! J: ~ o E en N ~ x x x x x x x x x x x x x x x x x x x x x x Chevron U Energy Solutions 2-2 . = l"I'J ~ ~ ~ = Q .- ... ~ I> ;.. ~ l"I'J = Q U ~ ell ;.. ~ = ~ . M = Q .,] N I N Q) :c t'lS I- ... .E II) Q) ... ~ II) t'lS Q) :E c o ; t'lS t'lS C ~a; 1I)fJ) C.... o 0 (,) ~ ~- ~(,) Q) C W .... o ~ t'lS E E ~ fJ) .!l~Ui Q. III ... l: ,g III .= >0 >CD 0:'~ III ili m '0 ,5 ti "'" ~;;;; o olI~ ~ .i 8'~ III ~,-:o '> !! III o ->0 .m~ Q..... "'"5 III m .5 Ii ~ ... o III ~,-:o '> !! III o III 1 ~ ~ ~ -;3:.-u 3t~~.g o i:'- S; III CD 3t0 ... III III III = C) 0 e III ~,-:o '> !! III o >0111 1Ile'~'i ~~">_Ii W~- u ... i:4! b 0 me III ~,-:o '> !! III o ~~~:c u ... c: ::.. CD ~ '> ~ iijw ~;:;: ili "CI III 0 ::I Ii ~ e ~ e; '~ ~ 0:::: - gUiIi of' 8 ;;:; a. l:II CII "CI "CI ii 8 o Ncqr--O......'<I" r--N r--co '<I" CO or-:........t<riccir-:.or-:<ri<riocci ~T"'"T"" ('t)(V)('l')OT""~('l') or- '<1"...... 10 T""C\lCCNC\llt)CJ)U').,,-lt)C\I CO O'<l"r--......o)'<I"NO) CO 10 O)r--MCO'<l"'<I"CO'<l"'<I"N...... NCOcDfh~~~fh.o~w N~~ ~~~ ~~ ~ 10'<1" '<1"0) ION N~ ...... ~ MO)IOOOOOOOOOO'<l" T""T"'""=:tER-OOtR-t:.9-01OfhfhO') '<I"COo) co...... lOr-- N ..t~N ~M M~ ~ fh fi( f;f3- 6'7 CX)('I)T"'"NNLOCDlt)T"'"LOC\l CO CO O)r--......o)'<I"NO)...... 10 IOCONCOCOMCO'<l"O)IO...... COr--:o)tI7fhT"'"T"'"th~fhut o ~ ~ EIT EIT EIT 100 '<I" EIT 10 N ...... EIT 000000000000 ~CO~ElTElTEIT~EITEITEITEIT co r-:- ~ 00 EIT EIT 0'<1"00000000000 N N_ ...... OCOO)OOIOO'<l"OCOO) ElTO)r--ElTO)O)~'<I"COCOM NO .......("1') E/7('t)("t').,,- fhL6 foA-r-"' ~f;f3-(h ~ EIT EIT 100 '<I" EIT 10 N ...... EIT OMIOOOOOCOCOMOOO o cci<rio<riOO..t<ri<riN 00 C\lCO CON T"'"('l')T"'" '<I" ...... ...... co ('t)NC\lNOO)T'""T"'"o)M 00 CCOT"'"......C\Ifh'VCX)T""~T"'"fhl;h LOT"'"NCOER- CX)('l')COT"'"fh ct5~..t~ ":EIT~EIT ...... EIT EIT EIT '<I"IOO)MM OCOIOr--N ~CDOT"'"'o::t ~ ~g~ N OOO'<l"Nr-- (O"C""'"I"---LO....... O)'<I"'<I"N...... ..tMai'N N N 00 c;;oocooo~g~-.;:tT"'"OO ...... ...... . C\ICOIOOO-c-O.......LOT""":::I"I.C)(W')T""v ~~ ~~~~~~~~n~~ ~~_ NOai'..t..tMNai'NM":":'<I"'<I" ......M'<I"r--ElTIOCOCOr--'<I"COCOEITEIT ER-NT""W fl7T"""fhT"'"COtR-fh EIT EIT EIT ~ EIT 1-- ...J ...J J:_ ~~~U)...... N_ ...... D.,. D.,.J:_J: a. J: a.:2 t!) Nt!) ai 0) -0 ltl ~ :J III l!! ::I III III CD :i c: o i ~ CD III c: o o ~ CD C W l!! '" 2 a; m 1;) J: CiJ o "0 ~ E ~~~.~ IN CD ~ ~ ..... ..... I';;;~ E .~'~,~ ~ 0)(1) :i: c:J:::: ~~ ~~ en ~EJ9 ::~~ -gE 2 a2~ c(/)JB ~ :s :3" Eltl ",!l! ,,!(! E - 2 ,~ ~ -0'" (1)- '-'~m'" -s,ltl"-''''' ::I 0) <D ::'-oJ: <Dc 2l..!,. g1~.._2"jii "'ltl <(-O_"'o'ltl~ 0""'- ~~~a:~5S~&gg'g~t!) l!!.Q-o~:J(I)(J)(J)(I)E>(J):2z2 ...J'-_ 0000- ~ ltl t!) ~cn-c.!!lltlltlltlltlOOc'O:!:! - c' (I) 0 O2 g. g. c. <( E = I!! (5 5i"" E~~O)(J)(J)(J)>(J)'(j)c'" E-s, 0(1) 00:: 0::0:: 0:: J:O:: 0 05 __-~'Ozc..> I I I I I I I ()() ~ -7.:- I I a:~~~~~~ I I ~:i~o~ooooooo;S E e! Ol o 0- E ,g -c (J) -c ::I E~ Ol Ql ~ tJl ~~ 0..=0 .5 S E~ .g E o '" E e! Ol e a. Cij r: <;:: .5 -c Ql -c-c ::I (J) ~~-; QlOOl ~ ~ ~ c: CI) 'fi :Q~>- ~~~ ~ E g g ~ :2 -go: & ~ ui r: Ql Ol Ol Ol r: -5 ffi ~ ~ -5 ~ E ~ :g ~E.c :2 g>;; a: '0 m ~ Ol cD a.. 5 ~ g> ~ ~~~ -5.E~ cu ..c "C ~~~ Ol (J) -c J!!1\it5 ~ J!! 8 'oo.=- .~ ~ o x ~ a~ i:55 E; CD -g ~ ~ rJ ~~~ ::> .- ]!:g~ "'C t5 "0 j!! =0 .~ ~ .21 (f) o '" (J) ~ 8'~ ~~~ 5 q::: CD "'C c: g IDO]! '" -c tJl ca Q) "00 .c '" tJl .~ ~ m orne c: .- CD :2 g> E 0.."0 ~ :2 ':5. 5 u:2e wuo. .~~ ::; ~*:2 :::is:&:: =-~fi cij W I- o Z l""l . N i:f (J) o :S Cij 0) J: J: Qi" '" ::I o '- :E-m .2 (J) ~~ 8~ . ::I t!)E ._ E '- 0 20 c . t5"'" ]j E c ::I c (J) ~ ~ ~~ i'i'i:f ~~ o ~~ o . ~0 o ;:;0. S CD me ~ Q) u:: .2 .'0 N'7 ';':n.. ~~ cJ: 2:ii S <5 ~~ .!:: ::i u., ::i \/I c: o ";:; ::J '0 VI >. 01 .... QJ c: W u; (J) -0 o o m c B '5 ell il) . . . Section 2 Energy Conservation Measures ECM Number: Ll ECM Title: De-lamp and Install Specular Reflectors ECM Description: All nine (9) City of Salina facilities surveyed under the scope of this study utilize light fixtures that operate three or four linear lamps. These fluorescent luminaires are candidates for retrofit with a specular reflector. This ECM considers de-lamping the three or four lamp fixtures down to two 28 watt T8 lamps. This can be achieved without sacrificing light quality by retrofitting the fixtures with enhanced aluminum specular reflectors, and new electronic ballasts. This ECM also considers retrofitting fixtures from two U-tube lamps to two 17 watt T8lamps, reflectors, and new electronic ballasts. There are 866 retrofits included in this ECM. Most of these fixtures have a poor reflective cavity design, resulting in light being trapped in the luminaires and never emerging as "usable" light. This energy is converted to heat within the luminaire, which shortens lamp and ballast life and contributes to additional cooling load. The lighting industry has seen continued advances in the field oflight reflection, which has resulted in the introduction of specular reflectors. With the specular reflector system, up to half of the lamps and ballasts can be removed without reducing the light level at the work surface. Each reflector is custom designed using sophisticated optical engineering and computer-aided design. The reflector is bent at optimum angles for each fixture type. The enhanced aluminum material optimizes reflectivity and overall performance. The reflector produces uniform lighting that is comfortable and aesthetically pleasing without changing the appearance of existing fixtures. Use ofthis reflector causes almost all ofthe light energy within a fixture to be transmitted as usable light. Resulting light levels are less diverse because of the reflector's geometric design. This induces even distribution of light and reduces glare. This ECM will reduce the number of ballasts required to operate the same number oflamps because the older magnetic ballast can operate a maximum of only two lamps, while electronic ballasts can control up to four lamps. With new electronic ballasts, areas that have luminaires mounted end-to-end can be tandem ballasted. Tandem ballasted fixtures house the ballast in one luminaire, while operating lamps in one, or more ofthe nearby luminaires. Due to the significant reduction in the amount of lamps and ballasts to maintain, this lighting ECM will generate considerable maintenance savings. The new lamps and electronic ballasts have average life ratings of approximately 24,000 and 50,000 hours respectively and are guaranteed by the manufacturer for 3 years (lamps) and 5 years (ballasts). Chevron ~ Energy Solutions 2-4 . . . Section 2 Energy Conservation Measures ECM Number: L2 ECM Title: Tl2 to T8 Fluorescent Conversion ECM Description: Eight (8) of the City of Salina facilities surveyed currently utilize fluorescent fixtures that operate Tl2lamps. Standard magnetic core and coil ballasts are used to operate these lamps. This ECM considers retrofitting the existing fluorescent fixtures with T8 lamps and new electronic ballasts. There are 870 retrofits included in this ECM. The combination ofT8lamps and electronic ballasts is one of the most technologically advanced fluorescent lighting systems available. It is proven to be more energy efficient than the conventional Tl2lamps and magnetic ballasts. The electronic ballasts operate at high frequencies to reduce the power requirements, while maintaining the appropriate light level. Electronic ballasts reduce the tendency of fluorescent lamps to flicker or ballasts to hum. T8 lamps use rare earth phosphor minerals, which provide superior color rendition similar to the familiar energy saver or warm white lamps. The combination ofT8lamps and electronic ballasts also operate approximately 30 degrees cooler than comparable Tl2lighting systems, offering the potential for summer cooling savings and longer lamp and ballast life. In addition to energy savings, this lighting ECM creates maintenance savings as well. Magnetic ballasts can control a maximum of two lamps, while electronic ballasts can control up to four lamps, therefore, reducing the number of ballasts to maintain. Some areas that have luminaires mounted end-to-end can be tandem ballasted. Tandem ballasted fixtures house the ballast in one luminaire, while operating lamps in one, or more of the nearby luminaires. Additional maintenance savings will also be achieved by replacing the existing, older lamps and ballasts which may be nearing the end of their useful life ratings. The new lamps and electronic ballasts have expected life ratings of approximately 24,000 and 50,000 hours respectively and are guaranteed by the manufacturer for 3 years (lamps) and 5 years (ballasts). Chevron ~ Energy Solutions 2-5 . . . Section 2 Energy Conservation Measures ECM Number: L3 ECM Title: 32 Watt to 28 Watt Fluorescent Conversion ECM Description: Seven (7) City of Salina facilities utilize fluorescent fixtures containing 32 watt T8 lamps and standard electronic ballasts. A reflector retrofit is not feasible with these fixtures and most contain only one or two lamps. Some of the T8 lamps in these fixtures have burned out or are nearing the end of their lamp life. This ECM considers replacing all the existing 32 watt lamps in one or two lamp fixtures with new 28 watt T8 lamps. The existing electronic ballasts will be re-used wherever possible. There are 507 retrofits included in this ECM. Once a lamp bums out after years of usage, the illuminance that was originally designed for the area is no longer achieved. Light levels lower than the original design can adversely affect workplace efficiency, safety, and productivity. In addition, lamps nearing the end of their life expectancy experience a decrease in efficacy (lumens per watt) which is commonly referred to as lumen depreciation. Depreciated or burned out lamps consume the same amount of energy as a new lamp of the same wattage but produce less light than what was designed. Group re-Iamping ensures the most foot-candles per energy dollar. Group re-Iamping maximizes labor efficiency and reduces the number of workplace interruptions. This ECM ensures lamp continuity throughout the facilities, which will result in all fluorescent fixtures having uniform lumen output, and color temperature. The proposed 28 watt T8 lamps will fit in the existing standard T8 bi-pin sockets without luminaire modification. The new lamps have expected lives of approximately 24,000 hours, and they are 100% guaranteed by the manufacturer for 3 years. Chevron ~ Energy Solutions 2-6 . . . Section 2 Energy Conservation Measures ECM Number: ECM Title: ECM Description: L4 Incandescent to Compact Fluorescent The City of Salina utilizes incandescent light fixtures in many of its facilities. This ECM considers replacing these lamps with new screw-in compact fluorescent lamps. There are 601 retrofits included in this ECM. Incandescent sources provide such desirable qualities as instant light, good color rendition, low replacement cost, and ease of control in dimming situations. However, they are the least efficient type of light source currently available. Of the total input power, only 10% emerges as visible light, 90% is converted into heat energy, which contributes to additional cooling load. The typical efficacy of an incandescent source is 20 lumens per watt and the typical life of an incandescent bulb ranges between 750 and 1,000 hours. Compact fluorescent lamps are a much more efficient light source with the typical efficacy of 50 to 70 lumens per watt, and having an average rated lamp life of 10,000 hours. Long lamp life results in reduced maintenance costs associated with lamp replacements. The higher efficiency, lower wattage compact fluorescent lamps can provide light levels iOf the same intensity as an incandescent lamp up to 150 watts without sacrificing light quality. Chevron ES studied the replacement ofthe 300 watt PAR 56 spotlights currently used at the Salina Community Theater and the Bicentennial Center. A one for one replacement of those particular fixtures with compact fluorescent fixtures is feasible but would sacrifice lumen output and dimming capability. A dimmable compact fluorescent PAR lamp with the equivalent lumen output of a 300 watt halogen lamp is not yet available. This measure does not include or recommend the replacement of those particular fixtures due to their specialized application. Chevron ~ Energy Solutions 2-7 . . . Section 2 Energy Conservation Measures ECM Number: L5 ECM Title: LED Exit Signs ECM Description: A combination of incandescent and compact fluorescent exit signs was found at seven (7) of the City of Salina facilities surveyed. This ECM recommends replacing or retrofitting the incandescent and compact fluorescent exit signs with new light emitting diode (LED) exit fixtures including battery backups. There are 67 retrofits included in this ECM. The typical life of an incandescent exit light bulb ranges from 2,000 to 3,000 hours with an efficacy light source rating of 20 lumens per watt. Of the total input power, only 10% emerges as visible light in an incandescent lamp. Exit signs generally operate 8,760 hours per year; therefore, on average, incandescent exit signs must be re-Iamped as often as 3 times a year, and up to once every 1 to 1 ~ years for fluorescent. Chevron ES recommends replacing these fixtures with a LED exit fixture. LED fixtures meet or exceed standards for exit lighting levels, while using only 2 watts of energy. These LED exit fixtures have a five-year warranty and a twenty-five year projected life. This will reduce nearly all maintenance labor and material costs associated with replacing bulbs. Chevron ~ Energy Solutions 2-8 . . . Section 2 Energy Conservation Measures ECM Number: L6 ECM Title: Metal Halide to New Fluorescent Fixtures ECM Description: Metal halide lamps are currently being used at Memorial Hall in the Arena and Access TV Studio. This ECM recommends removing the 12 existing metal halide fixtures in the Arena and installing 12 new 2'x4' high intensity fluorescent T8 fixtures. This ECM also includes replacing the metal halide fixture in the Access TV Studio with 3 new T8 fluorescent fixtures. There are 15 retrofits included in this ECM. A standard metal halide (MH) lamp provides desirable qualities such as 100 lumens per watt and a lamp life of 15,000-20,000 hours. However, the MH fixture generates a significant amount of heat which adds to the facilities' cooling load. MH lamps also degrade rapidly between 12,000 and 15,000 hours. A typical metal halide lamp has a lumen output depreciation of approximately 40% over its average life rating and are-strike (re-start) time period of approximately 15 minutes. The new fluorescent fixtures use significantly less energy and can generate nearly the same light output as the MH fixtures due to the addition of reflectors. The reflectors in the 2'x4' fluorescent fixtures distribute the light more evenly which minimizes shadows, reduces glare and creates a more balanced brightness. The new fluorescent lamps have a greater average life expectancy of 24,000 hours. In addition, the fluorescent fixtures are instant start (on/oft), and generate substantially less heat than the MH lamps. Fluorescent lamps also produce a constant and more uniform lumen output during an average life cycle in the areas they are used. Chevron Energy Solutions recommends retrofitting the selected metal halide lamps with new fluorescent fixtures with T8 lamps, and electronic ballasts. Due to the quicker re-strike period, constant lumen output, and elimination of heat produced by metal halide lamps, this retrofit is recommended for Memorial Hall. Chevron ~ Energy Solutions 2-9 . . . Section 2 Energy Conservation Measures ECM Number: C1 ECM Title: Networked Programmable Thermostats ECM Description: The Golf Clubhouse, Fire Station No.1, and Fire Station No.2 are equipped with primarily standard, non-programmable thermostats that control their split systems and rooftop HV AC units. The Health Department has a mix of non-programmable and programmable thermostats controlling the split systems. At the Health Department, only one ofthe programmable thermostats was found to have an active set back schedule programmed. This thermostat's clock was set 12 hours in advance, causing the set back temperature to control during the building's occupied hours instead of the unoccupied hours. Other programmable thermostats at the Health Department were programmed with a time schedule, but were set with a constant temperature at every time. If there is a temperature complaint at one of these building, maintenance personnel must physically visit the site to assess the complaint. With a centralized system, much of this time could be used more productively. This measure proposes installing a wireless mesh networked solution from Millennial Net, an industry leader in wireless mesh networking. The wireless system will allow an easy installation, without having to run network cable through the buildings. Each building will have a Wi-Site controller connected to the internet that will communicate with the networked programmable thermostats and the web-based server. The web-based server receives data from each building's Wi-Site; there is no communication initiated from the web-based server to the Wi..Site. There is a monthly fee for hosting the web-based server maintenance of$30/month per site, which is included as a cost (negative savings) in the O&M savings of Table 2-2. This hosting fee includes all programming, scheduling, system monitoring and server maintenance. The proposed networked programmable thermostat system will provide supervisory control of the HV AC equipment at the Salina Community Theater, Golf Clubhouse, Fire Station No.1, Fire Station No.2, and the Health Department. The system will enable the equipment during occupied hours, and the existing local controls will control the equipment to maintain the space temperature set point per the Standards of Control (see Appendix A). The system will allow the equipment to operate during unoccupied hours to maintain a setback temperature. This system will also allow all equipment controlled in these buildings to be monitored via the Internet. Chevron ES has discussed connecting to the Internet with the City's IT Department and found that due to security concerns, the system cannot use the City's existing intranet for access. Since the system is not allowed to connect to the Internet at Fire Stations No.1, No.2, or the Golf Clubhouse via the City of Salina's interface, it is proposed that a cellular Internet connection be used at each of these sites. The estimated monthly cost per site for the cellular connection is approximately $40, which has been included as a cost (negative savings) in the O&M savings column of Table 2-2 for these three buildings. The City may choose from several Chevron U Energy Solutions 2-10 . . . Section 2 Energy Conservation Measures options for the Internet connection, from a standard phone line or dedicated DSL line, or the cellular connection mentioned above. At the Salina Community Theatre and the Health Department, pricing is based on using a direct gateway connection to the existing building's network for Internet access. In addition to the networked programmable thermostats at the Salina Community Theatre, this ECM includes minor ductwork modifications to provide improved control for the tandem air handling unit. This unit serves rooms on all three floors of the building, including the rehearsal room in the basement and offices on the main floor. Thermostatically controlled dampers and a bypass duct with a local pressure-controlled damper actuator will be installed to better manage airflow to these spaces based on occupancy. The fire stations are occupied 24 hours a day, 7 days a week, but opportunity exists for savings when the building is empty while the staff is out on an emergency call or when some areas are unoccupied for extended periods oftime. At Fire Station No.1 and Fire Station No.2, occupancy sensors will be installed for each thermostat to signal the rooftop air handling units to go into unoccupied temperature mode when no occupancy is detected for a period of time. The HV AC equipment will be scheduled according to the occupancy schedule of the spaces, as listed in Appendix A - Standards of Control. It is imperative that maintenance personnel verify the equipment schedules with the occupied schedules at least once a year to maintain the proposed savings. Failing to maintain these schedules will prevent a large portion of the energy savings from materializing. All of the schedules will be adjustable from the central location. The scheduled "ON/OFF" time for most HV AC equipment will coincide with the occupancy schedule for the area served by each piece of equipment. In addition, the City of Salina will need to inform the occupants that the new temperature controls are to be installed; and a procedure for permanent schedule changes and adjusting temperature set points will need to be established. The installation contractor will provide a complete I-year material and labor warranty for all EMS components. Chevron ES will perform a point-by-point commissioning during the installation to ensure that the EMS works properly. The City of Salina will be responsible for the followin2 items: 1. Maintaining temperatures and operating schedules as detailed in Appendix A - Standards of Control of this CEA Report. 2. Maintaining and repairing the thermostats after the I-year material and labor warranty expIres. Chevron _ Energy Solutions ... 2-11 . . . Section 2 Energy Conservation Measures 3. Installing (if extra lines are currently not available) and maintaining a dedicated Ethernet line in each building for the system to have remote monitoring and control capability for the Health Department and the Salina Community Theater. 4. Providing and maintaining dedicated Internet systems for Fire Station No.1, Fire Station No. 2, and Golf Clubhouse. 5. Ongoing monthly fees for remote web-server system. All electrical installations will comply with the National Electric Code, the equipment shall be UL or ETL (or other approved insurance organization) listed, and the overall installation will conform to all Uniform Building Codes. Savings are based on utilizing temperature bin data, and the corresponding occupied and unoccupied hours. The reduction in energy usage was calculated based on shutting offHV AC equipment during unoccupied hours and maintaining a temperature set back/set up. The hours of operation for the existing, and for the proposed changes is located in the Standards of Controls Table, located in Appendix A. Chevron ~ Energy Solutions 2-12 . . . Section 2 Energy Conservation Measures ECM Number: C2 ECM Title: Controls Upgrades ECM Description: The Smoky Hill Museum has an existing energy management system that is working well for the building. The existing energy management system operates the building to maintain the space temperature set point 24 hours a day, regardless of building occupancy to ensure that the exhibits are maintained within desired parameters. During the audit survey, it was noted that several office areas could be set back in unoccupied hours without causing any changes to the temperature and humidity control of the exhibit areas or storage areas. This measure includes programming time for the Invensys representatives to modify the programs to initiate set back during unoccupied hours for the office areas. There are eight (8) variable volume (V A V) reheat boxes serving these dedicated office areas. Implementing a setback program would eliminate excessive heating or cooling of these spaces when unoccupied. Savings are based on utilizing temperature bin data, and the corresponding occupi1ed and unoccupied hours. The reduction in energy usage was calculated based on setting the office area V A V boxes to their minimum position during unoccupied hours and eliminating or reducing the electric reheat coil use. The hours of operation for the existing, and for the proposed changes is located in the Standards of Controls Table, located in Appendix A. Chevron ~ Energy Solutions 2-13 . . . Section 2 Energy Conservation Measures ECM Number: CIPl (not in recommended program) ECM Title: Replace Unit Heaters with Infrared Heaters ECM Description: Five hot water unit heaters provide space heating for the garage/apparatus bay at Fire Station No. 1. One unit heater has been disconnected, but may be used if needed. The unit heaters have a constant flow heating coil, and the fan cycles on and off to maintain the space thermostat's set point temperature. The apparatus bay previously had an ice-melt system for the bay and the adjacent driveway. The ice-melt system has been decommissioned and not used for several years. The hot water boilers serving the building were sized for the loads of the unit heaters and the ice-melt system. With the ice-melt system no longer in use, the boilers are oversized for their current load -- the four working unit heaters. Existing Unit Heater This measure proposes abandoning the existing two hot water boilers in place, removing the unit heaters, demolishing the existing hot water piping in the apparatus bay and equipment room, and installing five new gas-fired infrared unit heaters to serve those spaces. New gas lines, gas exhaust pipes and electrical power will be provided for each new infrared heater. Coring or drilling through the walls and/or roof for the new exhaust pipe and gas pipe as required is included in the budget. Included is replacement of the electrical disconnects and breakers based on using the existing electric panels and available capacity. No new electrical panels or circuit breaker panels are included in the price. Proposed Infrared Heater In the heating season, opening the garage doors allows a substantial amount of cold outside air into the building. End-switches will be provided for the infrared units located near garage doors to prevent their use when the garage doors are open. With an infrared system, the floor and occupants are warmed by the radiant heat instead of the air. Ceiling space is at a premium in the apparatus bay at Fire Station No.1. Chevron ES recommends installing two of the heaters in the rear ofthe apparatus bay and one in the equipment room (small garage). The finaI arrangement will be determined during engineering design. Savings for this measure were calculated based on improved combustion efficiency of the radiant heaters at full and part loads over those of the existing atmospheric boiler; elimination of distribution losses with the hot water piping; and shutting offunits at times of wasted heating such as when garage doors are opened. The calculated savings were compared for reasonableness to the existing heating load as established from the most recent 12 months of natural gas usage data. Chevron ~ Energy Solutions 2-14 Section 2 Energy Conservation Measures . ECM Number: CIP2 (not in recommended program) ECM Title: Replace Boiler ECM Description: The boiler at the Police Administration Building is near the end of its rated useful life, and is oversized for its current load. The boiler was originally designed to provide hot water for heating to the air handling units, as well as floor radiant heat to the former jail/holding area. The floor radiant heat was eliminated several years ago when the space was converted to more evidence storage. At Fire Station No.2, the boiler is over 50 years old, and is at the end of its rated useful life. This cast iron boiler has an atmospheric burner, which has a standing pilot liight that burns whether the boiler is firing or not. This boiler was also originally designed to provide floor radiant heat to the first floor, as well as to hot water radiators throughout the building. When the building was remodeled (around 2006), the floor radiant heat was disconnected along with the radiators on the upper floor. Only the hot water unit heaters in the apparatus bay and three hot water radiators on the ground floor remain in service. . Police Administration Building Boiler This measure includes replacing the existing boiler at the Police Administration Building with a more efficient boiler with similar capacity, to ensure adequate capacity is available if measure M5 is selected. If the City of Salina chooses to implement measure M5, the additional outside air required to ventilate the building would likely result in increased heating consumption. This measure also includes replacing the existing boiler at Fire Station No.2 with a slightly smaller higher efficiency boiler. For both buildings, new PVC fresh air intake and exhaust will be routed from the basement to the outside wall. A new concrete curb will be added, the existing hot water pumps and valves will be reused. One new boiler control valve is included for each boiler. The new boilers will need power for the combustion fan and burner controls. Included in the pricing are new breakers based on using the existing electric panels and available capacity. No new electrical panels or circuit breaker panels . Chevron ~ Energy Solutions Fire Station #2 Boiler 2-15 . . . Section 2 Energy Conservation Measures are included in the price. A new boiler kill switch will also be installed for each boiler. At both facilities, the existing air separator and expansion tanks will be reused. Savings for this measure were calculated based on applying the efficiency of the new boilers to the existing building heating load for each building, which was based on the most recent 12 months of natural gas usage data at each building. Chevron V Energy Solutions 2-16 . . . Section 2 Energy Conservation Measures ECM Number: CIP3 (not in recommended program) ECM Title: Replace Condensing Unit(s) ECM Description: The Golf Clubhouse has a General Electric brand condensing unit that is at the end of its rated useful life. This condensing unit provides cooling for the south portion of the building. At the Health Department, the six (6) existing Lennox condensing units serving the north side ofthe building are all 14 to 15 years old, and are rated at 10 SEER or below. This measure includes replacing these existing condensing units with new, more efficient condensing umts. The new condensing units will be rated at a minimum of 14 SEER. Existing refrigerant lines will be reused as much as possible. New connections to the new condensing units are included in the price. Insulation on the exterior portions of the new refrigerant line connections will be installed. Existing coil drains and routing will be reused. Included is replacement of the electrical disconnects and breakers based on using the existing electric panels and available capacity. No new electrical panels or circuit breaker panels are included in the price. New air hoods on the proposed Golf Clubhouse units are not included. Modifications to the existing CU enclosure at the Golf Clubhouse are not included. The new condensing units will utilize refrigerant R22 to match the existing air conditioning coil on the inside unit. The inside furnaces and air conditioning coils on the existing units at both the Health Department and the Golf Clubhouse are all 14-15 years old, but are in very good condition, and all units at the Health Department have high efficiency heaters. Savings for this measure were calculated using cooling load variation with each annual temperature bin. Existing and proposed condensing unit efficiencies were applied to the existing load; the energy savings is the difference between the existing and proposed energy usage. The new unit efficiencies were based on 14 SEER for the condensing units at the direction of the City of Salina. Golf Clubhouse Condensing Unit Heat pumps were considered for this measure but are not recommended due to the increased cost of the heat pump installation as compared to the cost of a high efficiency condensing unit, coupled with the fact that the heat pumps are slightly less efficient than the proposed condensing units. Chevron ~ Energy Solutions 2-17 . . . Section 2 Energy Conservation Measures ECM Number: CIP4 ECM Title: Replace Split-System Units ECM Description: The south portion of the Health Department building is conditioned with five olde:r split systems, each consisting of a furnace with cooling coil in the attic and a condensing unit mounted on the roof. These five (5) split systems are near the end of their rated useful life, and are not operating efficiently. The existing furnaces have standing pilot lights which use gas year round, regardless of need. Due to their age and use, the condensing units for cooling are operating at lower efficiencies than current design condensing units. These five split systems do not provide fresh outside ventilation air for the occupants of the building as typically required by current building codes. This measure proposes removing the existing five split systems and replacing with five new, more efficient units. The new split systems will have outside air ducted to them to provide ventilation, new spark- ignition furnaces, and high efficiency condensing units. Adding the code-required ventilation will cause an increase in energy required to heat and cool the air, and this increased usage is included in the energy use shown on the ECM Summary Table. Each outside air damper will be mechanically interlocked with its corresponding supply fan to open when the fan is operating and close when the fan is off. A labor premium for attic: work was included in the price for this measure, and a new access ladder similar to the ladders installed for the south end attic mechanical rooms will be installed. Furnace #1 at Health Department The existing condensing units utilize R22, and the proposed condensing units will use R41Oa. Changing the condensing unit's refrigerant type would typically require changing the inside coil and possibly refrigerant lines to match the pressure rating of the new refrigerant. Replacing the R22 condensing unit to an R410a condensing unit is not usually cost effective as a stand alone measure when the inside coil must be replaced also. Replacing the entire five split systems affords the City of Salina on opportunity to switch refrigerants to the future refrigerant replacement for R22 now. New balancing dampers will be provided in main branch lines to enable balancing air flow. The existing ductwork and diffusers will be reused. Outside air or ventilation ductwork will be routed from proposed new outside air louvers (to be located in the attic space) to each new split system. New refrigerant lines will be run from the new condensing units to the inside furnaces. Existing coil drains and routing will be re-used. Included is replacement of the electrical disconnects and breakers based on using the existing electric panels and available capacity. No new electric panels or circuit breaker panels were included in the price. Chevron _ Energy Solutions ... 2-18 . . . Section 2 Energy Conservation Measures Savings for this measure were calculated based on temperature bin data to determine the existing load and the proposed load of the new units with the addition of the outside air. Existing split system heating efficiencies and condensing unit efficiencies were applied to the existing load; proposed heating efficiencies and condensing unit efficiencies were applied to the proposed load. The new unit efficiencies were based on a minimum 14 SEER for the condensing units, and 90% for the new gas furnaces. Heat pumps were considered for this measure but are not recommended due to the increased cost of the heat pumps compared to the cost of a high efficiency condensing unit coupled with the fact that the heat pumps are slightly less efficient than the proposed condensing units. Chevron V Energy Solutions 2-19 . . . Section 2 Energy Conservation Measures ECM Number: CIP5 ECM Title: HV AC Improvements/Controls Upgrade ECM Description: The air handling units (AHUs) serving the Police Administration building are the original equipment installed when the building opened in 1969. These existing air handling units are multi-zone units, which mix a stream afhot air and cold air ta deliver the required temperature air to each zone. The zone mixing dampers are nat accessible far maintenance and, as such, may not be working effectively. The hat and chilled water cails in these units have canstant flow and no contral valve to vary the flow as laad changes. Instead, each zone damper modulates to blend the amaunt of hat and cold air required for its zane. The use af various spaces in the building has changed over the years, and the current air distributian system is not as effective as it shauld be. In the winter, some exteriar rooms do nat get enaugh heat and in the summer, some interior spaces are toa warm. This building has been a problem far the city maintenance staff for years. Chevran ES recommends replacing the 3 existing air handling units with variable air volume air handling units and electric zone reheat cails ta provide the best cantrol and comfort far the occupants. The existing air handling units will be remaved from the building, and replacement air handling units will be installed. The new air handling units will each be equipped with a supply fan and assaciated VFD, hat water preheat and heating cails, and a chilled water coil. The: new AHUs will alsa have full economizer capability, but will not have a dedicated return fan. Temporary heating and caaling units will be used to serve the spaces during construction, as required. Same ductwork may need ta be replaced, but the majority af the existing ductwark will be reused; the engineering design phase will determine to what extent the ductwork needs to be madified or replaced. A new stand-alone energy management system far HV AC contral will be installed as part afthis project and is included in the cost estimate. Canverting from a constant volume air handling unit to a variable valume air handling unit typically generates significant energy savings. Currently, at the Police building, the outside air dampers are closed in the winter and summer in arder to meet space temperature requirements. With the new air handling unit installation, more outside air will be introduced into the building in order to meet building code ventilation requirements. Caaling and heating this additiana1 autside air has a negative impact of the energy savings, but will provide improved occupant comfort. The addition of terminal reheat cails will alsa increase the energy usage, but these provide the mast cast-effective way to solve the comfart and cantra1 problems in this building. Chevron U 2-20 Energy Solutions . . . Section 2 Energy Conservation Measures The building load model will be refined during the engineering phase of the projec:t to accurately determine load and airflow requirements for the building. In order to complete the computer model, additional data and site work to determine how effectively the conditioned air is being delivered to the spaces now may be required before the detailed scope can be finalized. For instance, more ductwork modifications, or increased duct sizes may be required pe:nding the analysis. Material and labor costs for these potential changes have been incorporated into the budget pricing for this ECM. In order to install the electric zone reheat, an electrical service upgrade will likely be required. A budget for the electrical upgrade has been included in the cost estimate. The need for the electrical upgrade and a firm quantity for the work will be determined during the engineering phase of the project. The City of Salina has indicated that their asbestos testing shows no asbestos in the corridor ceilings where the majority of the ductwork is located. Any asbestos testing or abatement required is not included in this scope of work. Chevron ~ 2-21 Energy Solutions . . . Section 2 ECM Number: CIP6 Energy Conservation Measures ECM Title: Remove Skylight ECM Description: The Health Department building has a large skylight in the lobby area. The City of Salina indicated to Chevron ES that the skylight has developed leaks over the past several years, and would like the skylight removed. The City allocates funds to their budget on a yearly basis to caulk and seal around the skylight. The Health Department provides and replaces a sun screen every 2-3 years. Existing Sunscreen This measure recommends removing the existing skylight and installing a new roof structure and TPO roof to match the existing roof material. Rigid roof deck insulation will be installed and a new drop ceiling will be added, with batt insulation above the ceiling tiles. The existing cove lighting and air diffusers are located below the proposed drop ceiling height, and may be suitable for reuse. For safety reasons, this work will need to happen when the building is unoccupied, and a labor premium for evening or weekend work has been included in the budget. Savings for this measure result from the reduction in solar load with removal of the skylight, and from the increased thermal resistance of the new roof and ceiling structure. Temperature bin data was used to account for annual load variations. Chevron U Energy Solutions Existing LoveLighting and Skvlieht 2-22 Section 2 . Energy Conservation Measures ECM Number: CIP7 (not in recommended program) ECM Title: Ceiling Modification/Insulation The Police Administration Building has a large office on the top floor with skylights and clerestory windows around the perimeter. This area was the old courtroom, and is now the Chief of Police's office, secretary's office, and conference area. Due to the high ceilings, low airflow, and insufficient roof insulation, this space is difficult to keep comfortable year-round. The City of Salina has indicated that their asbestos testing shows positive results for asbestos in the ceiling of this room and provided a contractor estimate to abate the area of work. The cost of this abatement is not in Chevron ES' scope of work, but is included in the financial analysis of the project for direct contracting by the City of Salina. This scope of work is dependent upon having the asbestos removed. ECM Description: . Clerestory Windows in Chief of Police Office This measure recommends installing a new drop ceiling with additional insulation above the new ceiling tiles. To keep some of the natural sunlight, 4 Solatubes or equivalent brand will be installed in the existing skylight wells and routed to the new drop ceiling. The remaining skylight glazing not replaced with Solatubes will be removed and weatherproofed. The existing air diffusers are located below the proposed drop ceiling height which is just below the clerestory windows level with the ledge shown in the picture, and the existing diffusers will be blanked off. The ductwork will be Solatube routed to the new drop ceiling and new diffusers will be installed. New recessed troffer lighting fixtures will need to be installed in the drop ceiling to replace the existing lighting fixtures on a one-to-one basis. Savings for this measure were calculated based on using temperature bin data and the reduction in load due to the increased resistance of the new roof and ceiling structure. . Chevron ~ Energy Solutions 2-23 Section 2 Energy Conservation Measures . Water ECMs WI through W5 The City of Salina uses few low consumption water devices in the facilities surveyed under the scope of this study. The facilities use more water than necessary due to the inefficient manner in which the existing devices distribute water. In many areas of the country, the use of water has become more of a concern in recent years due to depletion of natural raw water sources, deterioration of water infrastructure, and environmental concerns, all resulting in e:scalating cost of water and sewer rates. Utility charges for potable water and sewage is now increasing at a rate greater than other utilities such as electricity and natural gas. Chevron ES proposes a comprehensive program of water conservation that includes all areas of consumption in the buildings. The proposed changes fall directly in line with the City's Strategic Plan for 2008, specifically goal #7: "The City will recognize the importance of its natural resources and make practical efforts to preserve them." Action item #1 of goal #7 states that the City is planning a comprehensive approach to water use and conservation, which our project provides for the buildings included in our scope. On the following pages are details of the proposed Energy Conservation Measures (ECM) for all . facilities surveyed. . Chevron U Energy Solutions 2-24 . . . Section 2 Energy Conservation Measures ECM Number: WI ECM Title: Replace Faucet Moderators ECM Description: All City of Salina facilities surveyed contain kitchen and lavatory faucets that are designed to mix hot and cold water to the desired temperature. All faucets surveyed deliver water through moderators with internal parts that have deteriorated over time. These moderators allow a higher than necessary flow rate for their particular application. On average, these fixtures flow rates are approximately 3 to 4 gallons per minute. There are 143 retrofits included in this ECM. This ECM recommends replacing worn or damaged moderators with new pressure compensating moderators that utilize an o-ring to deliver the proper water flow rate for the task for which the faucet was designed. For lavatory faucets, existing moderators shall be replaced with 0.5 gallon per minute moderators. Kitchen faucet moderators shall be replaced with 1.5 gallon per minute moderators. This ECM also recommends replacing the o-rings, washers, and packing for faucets that are leaking. These upgrades will decrease water consumption, sewer, and maintenance costs. Since a portion of the water saved will have been heated, thermal energy will also be saved. Automatic sensors for faucets were considered, but are not included in this project due to the increased maintenance cost to replace batteries and adjust the sensors. Hard-wired sensors were not considered due to the substantial cost of running power to each fixture. Chevron !IIII!!!!! Energy Solutions - 2-25 . . . Section 2 Energy Conservation Measures ECM Number: W2 ECM Title: Replace Toilets ECM Description: All facilities surveyed contain toilets and flush valves that are not rated for low water consumption. These flush valves will occasionally hang up, using an excessive amount of water. In most cases, the diaphragms and vacuum breaker's rubber internal part will start to deteriorate after five years which can cause leaks that are not easily detected. These flush valves use between 3 to 5 gallons per flush, depending upon type. Recent technology has helped manufacturers develop toilets and flush valves that eliminate waste more efficiently. There are 146 retrofits included in this ECM. The Federal government established the Energy Poliey Act of 1992 (EPAct), a national policy that required by 1997 that all new water closets use no more than 1.6 gallons of water per flush. Since that time, water closet manufacturers have redesigned their china to effectively complete the flush process with 1.6 gallons or less. This ECM recommends replacing the inefficient toilets at all facilities surveyed with new, low water consumption toilets that exceed the EP A requirements. Since the existing toilets are not designed for low water consumption, they must be replaced along with their flush valves. Retrofit kits for flush valves shall be used where low flow toilet china already exists. These retrofit kits convert the existing 3 to 5 gallon per flush valves to 1.28 gallons per flush. Toilets with tanks that usually use 3.5 gallons per flush will be replaced with new tank toilets rated at 1.0 gallon per flush. All ADA compliant toilets will be replaced with new ADA compliant toilets. At the Bicentennial Center, the pricing includes installation of an access door to the pipe chase. The access door is required for the modifications to the flush valves. Automatic sensors for flushometers were considered, but are not included in this project due to the increased maintenance cost to replace batteries and adjust the sensors. Hard-wired sensors were not considered due to the substantial cost of running power to each fixture. Chevron ~ Energy Solutions 2-26 . . . Section 2 Energy Conservation Measures ECM Number: W3 ECM Title: Retrofit and Replace Urinal Flush Valves ECM Description: The existing urinal flush valves located at all City of Salina facilities are from five to fifteen years old. Due to the age and condition ofthe flush valves' internal parts, these valves use approximately 2 to 3 gallons per flush. These flush valves will occasionally hang up, using more water than required. The flush valve diaphragms and vacuum breaker's rubber internal part will start to deteriorate after five years which can cause leaks that are not easily detected. There are 55 retrofits included in this ECM. The Federal government established the Energy Policy Act of 1992. (EP Act), a national policy that required by 1997 that all new urinals use no more than 1.0 gallon per flush. Since that time, urinal flush valve manufacturers have designed 1.0 gallon per flush retrofit kits for urinal flush valves. This ECM recommends the installation of retrofit kits to the existing flush valves. These retrofit kits which include spuds, handle kits, vacuum breakers, water saving diaphragms and o-rings will reduce the 2 to 3 gallons per flush valves to 1.0 gallon per flush and eliminate wasteful leaks. This upgrade will result in a reduction of water consumption and sewer costs. The standardization of all flush valves and newer internal parts will lower maintenance costs. Chevron ~ Energy Solutions 2-27 . . . Section 2 ECM Number: W4 ECM Title: ECM Description: Energy Conservation Measures Replace Faucet and Spray Valves This ECM includes replacement of an older lavatory faucet at Smoky Hill Museum with a new, more efficient push-button faucet. This ECM also includes replacement of the dishwashing spray valves at the Bicentennial Center. There are 4 retrofits included in this ECM. These upgrades will decrease water consumption, thermal energy, and will reduce maintenance cost. Applicable sewer costs will also decrease in proportion to the decrease in water usage. Chevron ~ Energy Solutions 2-28 . . . Section 2 Energy Conservation Measures ECM Number: W5 ECM Title: Replace Water-Cooled Ice Machines ECM Description: This ECM considers replacing the existing ice machines located at Fire Station No. 1 and the Golf Clubhouse with newer ice machines that utilize air cooled condensers. The existing ice machines currently utilize water cooled condensers. The existing water cooled condensers consume more than ten times the amount of water required for actual ice production. There are two retrofits included in this ECM. The main benefit for replacing the existing ice machines is water savings, but maintenance savings can also be realized since water cooled condensers generally require more maintenance than air cooled condensers. Savings for this measure result from the elimination of water use to cool the ice compressors. The electrical penalty for switching to air- cooled vs. water cooled was calculated based on manufacturer's data and data loggers for run-time from a previous job. Chevron ~ Energy Solutions 2-29 . . . Section 2 Energy Conservation Measures ECM Number: VI ECM Title: Contract Natural Gas ECM Description: Kansas Gas Service (KGS) furnishes natural gas for all buildings in the scope of the project, except for the Health Department and Smoky Hill Museum. The Health Department obtains natural gas under a contract that Saline County has with Seminole Energy Services. With contracted natural gas, the Health Department has realized a lower natural gas rate than paid for use at the City buildings. Refer to Section 3, Historical Energy Consumption for comparison of rates. The ECM proposes contracting natural gas for the Bicentennial Center, the Memorial Hall, and the Police Department. With contracted natural gas, a third party would supply the commodity and Kansas Gas Service distribution would provide delivery services within the City. The reason that only these three buildings are recommended is because ofthe restrictions of Kansas Gas Service for delivery ofthe natural gas. To qualify for delivery of natural gas from a third party, a minimum annual usage of 1,500 mcf per building or contiguous properties is required. (See KGS's Small Transport Service tariff in Appendix D) The annual usage at the Bicentennial Center and at the Memorial Hall each exceeds the 1,500 minimum. In discussions with KGS, the Police Department building is considered to be contiguous to the Memorial Hall. Chevron ES explored allowing Fire Station No. I to be considered contiguous to these buildings also, but KGS commented that since other properties separate Fire Station No. I from Memorial Hall or the Police Department Building, that it would not qualify. Contracting third party natural gas supply does not guarantee a lower rate each month, but over time this approach has been shown to reduce annual natural gas expenses. Different approaches can be taken to contracting the gas by locking in annual rates for a fixed amount or by buying each month at the "first of month" price. When a price is set, typically an amount of usage is also defined. When more or less than the contract amount is used, the excess or overage will be charged at a different rate. Chevron ES will work with the City's procurement department to assist in evaluating historical usage and purchasing options. To estimate savings, Chevron ES was furnished the historical rates from Seminole Energy Services for the last two years. These rates were compared to the commodity portion ofthe historical natural gas bills from KGS, shown in Table CI of Appendix C. In addition to the commodity, KGS Small Transportation Service tariff for delivery has a small discount over the delivery rate in the General Sales Service tariff now used with KGS supply. These comparisons, shown in Table C2 of Appendix C, show the result of an average savings of $2. 792/mcf for the period from September, 2006 through May, 2008. This is based on all usage of the buildings being charged at the "first of month" rate over by Seminole Energy Services. It is rather optimistic to assume that each month's usage can be predicted accurately, so there will be some Chevron ~ Energy Solutions 2-30 . . . Section 2 Energy Conservation Measures influence of excess or under usage, which can change this savings rate. To check this, Chevron ES compared the historical Seminole Energy Services blended rates to the commodity portion paid by the Health Department. This comparison is shown in Table C3 in Appendix C, indicating a historical savings over use of KGS gas of $2.1 08/mef for the same September, 2006 through May, 2008 period. This equates to 74% ofthe analysis using only the "fIrst of month" rates. Chevron ES proposes that forecasted natural gas cost savings be based on a natural gas savings rate of $2.1 O/mcf. This amount is then multiplied by baseline natural gas usage at the buildings less any natural gas savings from implementation of ECMs. The baseline usages are shown in Section 3 - Historical Energy Consumption. Chevron ~ Energy Solutions 2-31 . . . Section 2 Energy Conservation Measures ECM Number: U2 ECM Title: Consolidate Gas Meters ECM Description: The Golf Clubhouse has two natural gas meters -- one serving the usage of the furnaces and domestic hot water on the south portion of the building, and the other serving the lightly used north "First Tee" area furnaces. As the north meter only serves the heating needs of the north furnaces, it typically has zero use at least five months per year. Evenso, the City incurs a service charge and fee on this meter of$23.52/month with no usage. This ECM proposes consolidating all natural gas use of the Clubhouse onto the south gas meter. This includes the addition of natural gas piping from the south furnace room to the north furnace room. This piping will be routed above the drop ceiling across the rooms between the two furnace rooms. Kansas Gas Service will remove the unused meter back to the gas main. NOTE: The gas utility information furnished by the City included data for two additional meters at the Golf Course, but not serving the Clubhouse. These meters showed as much or more use as the Clubhouse gas use, including use throughout the summer. One of these meters was identified as serving the North Maintenance building. As other buildings at the Golf Course were not in the contract scope, the source of the natural gas use at these other Golf facilities was not investigated. Chevron ~ Energy Solutions 2-32 . . . Section 2 Energy Conservation Measures Energy Conservation Measures Not Recommended This section provides a brief description of energy conservation measure projects that were evaluated or considered, but later found not to be economically viable. While these projects may offer some energy savings, they typically would have to be funded through an additional capital outlay and/or through excess savings from other projects. Title: Controls Upgrade Description: The Bicentennial Center has a supervisory local control system for some of its HVAC equipment. Every air handling unit cycles to maintain the space temperature set point when operating. Due to the sporadic occupancy at the building, the maintenance staff have been manually duty cycling or alternating run times for the arena area of the building -- only half of the units run when the building is not hosting an event. Some of the local controls: that Chevron ES personnel observed during our survey did not appear to be operational or could not be confirmed due to inaccessible outside air dampers or bypass dampers. From the temperature readings observed, it is likely that the majority of the outside air dampers were closed. This measure is not recommended due to the high cost to install a new controls system and the negative payback resulting from increasing the outside air usage when the building operation is conformed to building codes. Title: Install Trash Compactor Description: The Smoky Hill Museum has six roll-off trash carts that are serviced weekly. The building has sporadic use, and does not always use all six containers each week. The City is charged for picking up all six containers whether they are all used or not. Chevron ES investigated installing a trash compactor as well replacing the trash carts with a single trash dumpster. The trash dumpster offered a potential savings of $30 per month over the use ofthe six carts. Chevron ES found that the savings available with the large dumpster were offset by the cost of the required concrete slab and enclosure fence. Title: Replace Condensing Units Description: The Salina Community Theatre has some older condensing units that provide cooling for the ground floor restrooms and the green room. Chevron ES discovered that due to the small size and intermittent loads in these spaces, replacing these units with modem high efficiency units was not cost-effective and is not recommended. Chevron ~ Energy Solutions 2-33 . . . Section 2 Energy Conservation Measures Title: Replace Stearn Boiler and Re-Zone Piping Description: The Memorial Hall has a small stearn boiler that installed in 1993-1994, with a new condensate return system installed in February of2008. The boiler is rated at 15 psi operating stearn pressure, but currently operates at 3 psi to maintain the space temperature set point of the single controlling thermostat in the lobby. The boiler stearn serves several original stearn radiators throughout the building. Some of the radiators are equipped with occupant controlled thermostatic regulating valves, which help control the temperature in that space. Although the boiler was installed after many of the building's original stearn radiators were taken out of service, it is still oversized for the current load, and operates inefficiently to maintain such a low stearn pressure. Chevron ES considered replacing the stearn boiler with a smaller, more efficient stearn boiler, and re-zoning the existing stearn piping to enable better control of the building heat and temperature setback when the building or portions of the building are unoccupied. This measure is not recommended due to the long payback of replacing the boiler and modifying the piping. Savings for this measure would be negatively impacted by the pending planned renovations in the ACCESS TV studio area, wHich would reduce the building stearn load. Chevron ES recommends a planned removal of the stearn systems in the building, and replacing with either a hot water system or packaged heat pumps similar to the planned renovations of the ACCESS TV studio. Title: Replace Window Air Conditioning with Centralized Cooling Description: The USD 350 offices on the south end ofthe Memorial Hall building use window air conditioners to provide cooling, while stearn radiators supply heat. Chevron ES considered replacing the window air conditioners with packaged AC units and installing duct\;vork to better distribute airflow to the spaces. With the change to a packaged unit, more space in the affected rooms would be cooled than are currently being cooled with the window air conditioners, which would offset any savings with the more efficient AC system. Architectural modifications to the space would be required to allow for installation of the ductwork to maintain an aesthetically pleasant work environment. Due to the limited occupancy of the areas using window air conditioners, their intermittent use, and the resulting long payback, this measure is not recommended. Chevron ~ Energy Solutions 2-34 . . . Section 2 Energy Conservation Measures Title: Install Arena Ceiling and HV AC Description: The arena at Memorial Hall currently houses a local youth gymnastics program. The gymnastics program holds several meets and public events throughout the year with a full audience in attendance. The arena currently has no cooling, and limited heating capability. These events would be more comfortable for the gymnasts and their audience if the space were air conditioned. The City of Salina asked Chevron ES to investigate installing a drop ceiling over the arena area, and installing heating and cooling to serve the space. Further discussions with the City indicated that the work at the Police Department building (ECM M5) was of higher priority than upgrading Memorial Hall. As this project would increase energy use and ECM M5 was a priority, focus was place on development ofECM M5 for use of excess savings generated from the other City projects in the program. The City confirmed that there would be no increased revenue generated by making the proposed changes and agreed that the measure should not be included in the project due to the increased operating cost and lack of any additional economic benefit. Title: Downsize Water Meter Description: The Memorial Hall has the largest water meter of the nine buildings in scope, yet it has an annual usage equivalent to buildings with only a 1" to 2" meter. The Memorial Hall's peak monthly water usage is less than that of the Golf Clubhouse, which has a 1" water meter. \Vith the upcoming water rate changes, the 3" meter will incur a service charge of $63. 15/month. A 1 W' meter's service charge is to be $14.89/month. With a change to a more appropriately sized water meter, the Memorial Hall could realize an annual reduction of up to $579. Chevron ES has discussed this matter with the City Municipal Utilities Department and they are investigating the feasibility of a meter changeout to reduce costs at the Memorial Hall. But, as of the issuance of this report Chevron ES was unable to get a conclusive answer to this request. As such, this ECM has been left under "Not Recommended". Chevron ~ Energy Solutions 2-35 '. . . Section 3 Historical Energy Consumption Historical Energy Consumption The consumption and costs of electricity, natural gas, water and sewer historical usages for the nine City of Salina facilities affected by the scope are provided in this section. The purposes of presenting historical energy consumption and costs are to calibrate energy savings calculations, to determine a basis for which energy savings can be evaluated, and to establish baselines for future savings reference. The following pages include electric, natural gas, and water consumption histories. The electric, natural gas, and water rate tariffs are provided in Appendix. D. Approx.imated overall energy use of the nine City buildings are given in the below chart: Energy Load Summary III Lights - 9% . Cooling - 26% o HV AC motors - 13% o Plug Loads - 15% . Heating & DHW 35% III other Misc. - 2% Electri~ A comprehensive list of electric meters and accounts serving the nine buildings are identified in Table 3-1. Only meter usages and accounts serving areas affected by projects in this report were analyzed. Table 3-1 Electric Meters Building Address Account No. Meter No. Rate Bicentennial Center Kenwood Park 7630776810 04963871 Medium General Service Fire Station No. 1 222 W. Elm 3293260986 05832488 Small General Service Fire Station NO.2 1110 S. Santa Fe 9273875307 85513046 Small General Service Golf Clubhouse, Cart Shed, Maint. Shop 2500 E Crawford 5848604405 04712388 Small General Service Health Deoartment 125 W. Elm 9103587961 8888733 Small General Service Memorial Hall 410 W. Ash 3688865628 01109857 Small General Service Police Department 253 N. 10th 6657383578 03443179 Small General Service Salina Community Theater 303 E. Iron 1596344723 04351468 Small General Service Smokv Hill Museum 211 W. Iron 0938010970 01956018 Small General Service Chevron ~ 3-1 Energy Solutions . . . Section 3 Historical Energy Consumption All buildings, except the Bicentennial Center, have electrical usage charged under Westar Energy's Small General Service (North Area) tariff. Under the Small General Service (SGS) rate, the first 1,200 kWh on monthly consumption is charged at a higher rate than all remaining consumption for a month. The SGS rate structure also has a demand charge for the maximum demand usage over 5 kW in each month. While the consumption charge is constant throughout the year, the demand charge changes seasonally with a summer (June through September) rate that is more than twice the non-summer demand rate charge. In addition to the energy rate and demand charges, there is a fixed $12 customer charge, several riders that are a function of consumption, and a 5% franchise fee that varies with the total charge of each month's bill. The Bicentennial Center electrical usage is charged under Westar Energy's Medium General Service (MGS) tariff. This tariff is available for facilities with demand use over 200 kW. The MSG tariff offers lower consumption rates than the SGS tariff, but a constant yearly demand rate. The summer (June through September) consumption rates are slightly higher than the non- summer consumption rates. The MGS tariff also has a monthly fixed charge of $1 00, several riders that are a function of consumption, and a 5% franchise fee on the total charge of each month's bill. The electrical rates used in the savings calculations are based on the most recent tariff rates. As the amount of the riders can vary each month, the actual total charge per kWh varies from month to month, primarily due to Fuel Charge Surcharge, which has been trending higher over the past six months of available data. All buildings use substantially in excess of the 1,200 kWh tier of the SGS tariff, so the lower tier energy charge is used in the determination of the impact of energy savings measures at the buildings. For the rates to be representative ofthe charges at the time of implementation, the impact of the Westar Energy rate increase application is included. (See Appendix D.) Table 3-2 Electrical Consumption Rate Determination Base Tariff Surcharges Franchise Expected Total Rate E1ffective Rate ($/kWh) ($/kWh) Fee Increase ($/kWh) SGS - all months $0.022923 $0.02060 5% 15% $0.0526 MGS - June-Sept $0.016367 $0.02122 5% 15% $0.0454 MGS - Oct-May $0.01211 $0.0402 Surcharges are based on sum ofthe average ofthe Fuel Charge, Property Tax Surcharge, Transmission Service Charge, and Environmental Cost Recovery Rider over the last twelve billing cycles. The effective electric demand rates are not impacted by any surcharges or riders. Chevron ~ Energy Solutions 3-2 . . . Section 3 Historical Energy Consumption Table 3-3 Electrical Demand Rate Determination Base Tariff Rate Franchise Expected Total Effective ($/kW) Fee Increase Rate ($/kW) SGS - June-SeDt $6.25 5% 15% $7.547 SGS - Oct-May $2.83 $3.417 MGS - all months $6.83 5% 15% $8.247 Generally, electric usage increases slightly from year to year. This was not always the case for all buildings at the City of Salina but, with a few exceptions, there was reasonable agreement on electric consumption from year to year. To represent recent electric growth and to smooth out minor anomalies, the average of the most recent two years of data was used to establish the historical baseline for each building. One exception to this is in the data for Fire Station No.2, which shows a significant drop in electric usage for most of 2006. This was identified as the time that the fire station was being renovated. Also, note that the electric use data for the Golf Clubhouse includes the maintenance shop and the cart shed electrical usage, and these three buildings are metered together. A summary of the historical usage and most recent year charges are given in Table 3-4 through Table 3-12 along with the most recent two year baseline usage. Chevron ~ Energy Solutions 3-3 . . . Section 3 Historical Energy Consumption Chevron ~ Facility: Account: Rate Code: Meter: Bicentennial Center 7630776810 Medium General Service 04963871 Table 3-4a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Month 200$ 200. 2007 2008 2 Year Avg Year Costs Jan 242,800 212,400 280,800 261,600 271 ,200 $12,185 Feb 206,000 219,200 247,600 195,600 221,600 $1'1,149 Mar 175,200 216,800 171,600 180,800 176,200 $11,524 Apr 180,400 174,000 182,000 152,400 167,200 $8,935 May 190,000 212,400 174,000 186,000 180,000 $13,332 Jun 205,600 231,200 195,600 213,400 $1:3,084 Jul 194,800 222,000 170,800 196,400 $1'1,248 Aug 200,000 190,800 188,000 189,400 $1'1,139 Sep 192,800 176,800 188,000 182,400 $9,377 Oct 164,000 194,400 149,200 171,800 $7,694 Nov 239,600 220,000 224,800 222,400 $11,159 Dec 236,800 235,200 271,200 253,200 $12,724 Total 2,428,000 2,505,200 2,443,600 2,445,200 $133,550 Note: Costs have the monthly fixed Service Charge removed, Table 3-4b Electric Demand History and Baseline Electric Demand (kW) Recent Month 2005 2006 2007 2008 2 Year Ava Jan 739 663 709 632 671 Feb 706 738 661 609 635 Mar 706 715 538 510 524 Apr 706 704 601 362 482 May 706 591 528 554 541 Jun 663 620 561 591 Jul 597 536 590 563 Aug 650 632 578 605 Sep 698 702 537 620 Oct 547 554 501 528 Nov 484 623 601 612 Dec 865 604 629 617 M~im!Jm 865 738 709 671 Historical Electric Consumption 300,000 -+-2005J __ 2006 -+- 2007 __ 2008 -Baseline 250,000 200,000 :i' 3: 150,000 ~ 100,000 50,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Energy Solutions 3-4 . . . Section 3 Historical Energy Con.sumption Facility: Account: Rate Code: Meter: Fire Station No.1 3293260986 Small General Service 05832488 Table 3-5a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Month ~05 ~006 2007 2008 2 Year Ava Year C.osts Jan 11 ,207 9,905 10,457 11,596 11,027 $568 Feb 10,327 10,334 10,514 10,154 10,334 $562 Mar 9,409 10,542 10,096 10,537 10,317 $665 Apr 11,890 12,639 10,764 9,985 10,375 $630 May 13,378 14,970 13,392 13,018 13,205 $893 Jun 16,462 16,932 16,313 16,623 $1,117 Jul 20,447 21,741 19,315 20,528 $1,179 Aug 17,189 18,319 20,942 19,631 $1,237 Sep 15,802 12,532 16,240 14,386 $854 Oct 10,290 11,935 11,828 11,882 $586 Nov 10,658 10,742 12,403 11,573 $622 Dec 11,882 11,161 13,007 12,084 $658 Total 158,941 161,752 165,271 161,962 $9,573 Note: Costs have the monthly fIXed Service Charge removed. Table 3-5b Electric Demand History and Baseline Electric Demand (kW) Recent Month 2005 2006 2067 2008 2 Year Ava Jan 26 26 29 30 30 Feb 28 30 33 33 33 Mar 28 30 34 29 32 Apr 35 38 37 31 34 May 39 45 42 39 41 Jun 43 42 42 42 Jul 43 49 47 48 Aug 43 51 41 46 Sep 42 37 39 38 Oct 36 42 26 34 Nov 24 34 34 34 Dec 27 31 36 34 Maximum 43 51 47 48 Historical Electric Consumption 25,000 20,000 15,000 :c ~ 10,000 5,000 -+- 2005 ___ 2006 -..- 2007 __ 2008 -Baseline o ~ ~ ~ ~ - ~ ~ ~ - ~ ~ ~ Chevron ~ Energy Solutions 3-5 . . . Section 3 Historical Energy Consumption Chevron ~ Facility: Account: Rate Code: Meter: Fire Station No.2 9273875307 Small General Service 85513046 Table 3-6a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Month 2005 2006 20Q7 2008 2 Year Ava Year Costs Jan 5,040 5,080 8,839 8,812 8,826 $432 Feb 4,600 4,520 7,807 7,625 7,716 $410 Mar 4,400 2,720 7,077 6,678 6,878 $427 Apr 6,400 2,520 8,374 7,630 8,002 $479 May 7,520 2,000 9,597 12,027 10,812 $864 Jun 9,840 2,640 12,470 12,470 $837 Jul 9,320 3,526 14,752 14,752 $Im Aug 7,720 3,558 13,219 13,219 $775 Sep 5,680 3,259 1 0,465 10,465 $520 Oct 4,520 5,234 7,078 7,078 $353 Nov 4,960 7,039 9,212 8,126 $455 Dec 5,680 9,217 8,932 9,075 $447 Total 75,680 51,313 117,822 117,417 $6,870 Note: Costs have the monthly fixed Service Charge removed. Table 3-6b Electric Demand History and Baseline Electric Demand (kW) Recent Month 2005 2006 2007 2008 2 Year Ava Jan 16 16 19 22 21 Feb 15 17 19 20 20 Mar 15 8 20 19 20 Apr 20 8 27 22 25 May 20 8 27 30 29 Jun 24 9 30 30 Jul 20 12 32 32 Aug 19 14 33 33 Sep 16 14 28 28 Oct 16 15 24 24 Nov 16 19 22 21 Dee 15 19 22 21 M;lXimum 24 19 33 33 Note: Data dunng 2006 renovation up to Oct., 2006 not Included In averages. 15,000 :c ! Energy Solutions Historical Electric Consumption 25,000 20,000 10,000 --200J'" -- 2006 __ 2007 -- 2008 -Baseline 5,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 3-6 . . . Section 3 Historical Energy Consumption Facility: Account: Rate Code: Meter: Golf Clubhouse, Maint shop, Cart shed 5848604405 Small General Service 04712388 Table 3-7a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Month 2005 2006 2007 2008 2 Yellr Avg Year Costs Jan 10,560 12,000 10,240 9,600 9,920 $478 Feb 14,720 13,280 12,960 11,840 12,400 $649 Mar 15,040 14,080 13,120 14,080 13,600 $896 Apr 17,120 16,480 19,040 13,760 16,400 $933 May 15,520 26,720 20,000 20,960 20,480 $1,588 Jun 18,880 27,840 21,280 24,560 $1,660 Jul 18,240 31,040 28,320 29,680 $1,813 Aug 17,600 24,640 23,680 24,160 $1,499 Sep 12,000 15,840 18,080 16,960 $1,050 Oct 13,440 13,600 13,520 13,560 $733 Nov 12,480 15,680 11,840 13,760 $665 Dec 12,320 11,840 11,680 11,760 $618 Total 177,920 223,040 203,760 207,240 $12,582 Note: Costs have the monthly fixed Service Charge removed. Oct. 2007 consumption and cost was estimated. Table 3-7b Electric Demand History and Baseline Electric Demand (kW) Recent Month 2005 2006 2007 2008 2 Year Ava Jan 35 29 29 27 28 Feb 50 51 44 37 41 Mar 53 53 53 42 48 Apr 58 64 71 66 69 May 51 83 68 73 71 Jun 50 81 83 82 Jul 58 97 80 89 Aug 58 90 75 83 Sep 45 58 76 67 Oct 43 47 - 24 Nov 29 51 56 54 Dec 34 36 41 39 Maximum 58 91 83 89 Historical Electric Consumption 35,000 30,000 -+- 2005 __ 2006 ---.- 2007 -*- 2008 -Baseline 25,000 :c 20,000 3: :!f.. 15,000 10,000 5,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Chevron !III!!!!!! Energy Solutions - 3-7 . . . Section 3 Historical Energy Consumption Chevron ~ Facility: Account: Rate Code: Meter: Health Dept. 9103587961 Small General Service 8888733 Table 3-8a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Month 2005 2006 2007 2008 2 Year Ava Year Costs Jan 10,800 11,440 12,080 13,040 12,560 $680 Feb 10,480 11,520 11,920 12,160 12,040 $703 Mar 9,840 11,760 11,120 12,800 11,960 $847 Apr 11,840 11,280 11,680 10,720 11,200 $722 May 16,320 14,400 14,320 14,320 14,320 $1,082 Jun 20,240 17,760 19,600 16,080 18,680 $1,497 Jul 23,360 24,480 21 ,440 22,960 $1,550 Aug 21,360 21,040 24,080 22,560 $1,620 Sep 19,120 15,200 17,040 16,120 $1,085 Oct 12,400 12,480 13,680 13,080 $773 Nov 12,640 12,240 13,200 12,720 $694 Dec 12,800 12,800 12,560 12,680 $691 Total 181,200 176,400 182,720 180,880 $11,945 Note: Costs have the monthly fixed Service Charge removed. Table 3-8b Electric Demand History and Baseline Electric Demand (kW) Recent Month 2005 2006 20117 2008 2 Year Ava Jan 50 46 51 48 50 Feb 50 19 47 50 49 Mar 46 47 50 49 50 Apr 69 55 58 49 54 May 71 74 68 68 68 Jun 79 75 70 73 Jul 81 90 86 88 Aug 85 90 91 91 Sep 78 66 74 70 Oct 70 75 80 78 Nov 54 49 47 48 Dee 52 49 53 51 Maximum 85 90 91 91 Historical Electric Consumption 25,000 __200f'] __ 2006 --2007' --*- 2008 -Baseline 20,000 :c ! 15,000 10,000 5,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nav Dec Energy Solutions 3-8 . . . Section 3 Historical Energy Con.sumption Chevron ~ Facility: Account: Rate Code: Meter: Police Dept 6657383578 Small General Service 03443179 Table 3-9a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Mont'" 2005 2006 2007 2008 2 Year Ava Year Costs Jan 31,200 38,000 41,200 35,600 38,400 $1,658 Feb 33,840 35,840 38,320 33,360 35,840 $1,701 Mar 33,280 41,760 46,240 37,840 42,040 $2,331 Apr 38,720 48,560 40,560 42,560 41,560 $2,551 May 46,560 53,280 49,600 50,960 50,280 $3,356 Jun 43,040 55,040 59,200 51,040 57,120 $3,990 Jul 62,800 64,000 58,800 61,400 $3,476 Aug 57,280 57,600 58,880 58,240 $3,329 Sep 56,240 50,640 55,520 53,080 $2,725 Oct 43,120 45,840 42,880 44,360 $1,958 Nov 38,080 40,960 41,120 41,040 $1,988 Dee 37,280 44,000 36,400 40,200 $1,728 Total 521,440 575,520 568,720 563,560 $30,790 Note: Costs have the monthly fIXed Service Charge removed. Table 3-9b Electric Demand History and Baseline Electric Demand (kW) Recent Mont'" 2005 2006 2007 2008 2 YltCIr Ava Jan 65 94 100 70 85 Feb 73 107 90 67 79 Mar 70 103 114 93 104 Apr 106 114 111 98 105 May 101 133 108 103 106 Jun 121 123 119 121 Jul 119 132 124 128 Aug 125 125 124 125 Sep 116 113 106 110 Oct 119 111 101 106 Nov 94 97 95 96 Dee 69 99 68 84 Maximum 125 133 124 128 Historical Electric Consumption 70,000 60,000 50,000 :E' 40,000 s: ; 30,000 -- 2005 __ 2006 --2007 -*- 2008 -Baseline 20,000 10,000 o Jan Feb Mar Apr May Jun JuJ Aug Sep Oct Nov Dec Energy Solutions 3-9 . . . Section 3 Chevron ~ Historical Energy Consumption Facility: Account: Rate Code: Meter: Salina Community Theater 1596344723 Small General Service 04351468 Table 3-10a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Month 2085 2008 2007 2088 2 Year Avo Year (:osts Jan 16,160 14,240 14,320 10,960 12,640 $572 Feb 16,960 16,400 15,360 16,080 15,720 $928 Mar 17,360 15,200 14,640 14,880 14,760 $986 Apr 16,960 19,840 17,520 12,000 14,760 $825 May 20,960 18,800 22,720 17,200 19,960 $1,280 Jun 27,120 30,080 26,880 28,480 $2,030 Jul 31,280 30,880 30,000 30,440 $2,015 Aug 23,920 27,520 27,840 27,680 $1,808 Sep 20,960 24,400 23,440 23,920 $1,396 Oct 13,840 17,040 14, 000 15,520 $785 Nov 13,600 13,680 13,680 13,680 $690 Dee 17,280 12,320 13,680 13,000 $713 Total 236,400 240,400 234,080 230,560 $14,030 Note: Costs have the monthly fixed Service Charge removed. Table 3-10b Electric Demand History and Baseline Electric Demand (kW) Recent MOllth 2005 2006 2007 2008 2 Year Ava Jan 42 44 47 67 57 Feb 59 60 49 67 58 Mar 50 56 60 58 59 Apr 66 75 73 74 74 May 80 69 95 74 85 Jun 94 94 95 95 Jul 88 90 95 93 Aug 95 95 95 95 Sep 98 90 87 89 Oct 58 73 80 77 Nov 53 43 39 41 Dee 44 43 45 44 Maximum 98 95 95 9S Historical Electric Consumption 35,000 30,000 -- 2005 -- 2006 .....2007 ~ 2008 -Baseline 25,000 ::c 20,000 3: ; 15,000 10,000 5,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Energy Solutions 3-10 . . . Section 3 Historical Energy Consumption Chevron ~ Facility: Account: Rate Code: Meter: Smoky Hill Museum 938010970 Small General Service 01956018 & K1956018 Table 3-11a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Montl1 21111~ 2006 2007 2008 2 V,aT Ava Veal' CO$ts Jan 64,800 70,500 85,500 80,400 82,950 $3,788 Feb 44,400 68,400 72,300 86,700 79,500 $4,441 Mar 34,200 56,100 60,000 71,100 65,550 $4,298 Apr 31,500 49,500 52,800 58,200 55,500 $3,568 May 48,900 51,000 54,115 56,400 55,258 $3,827 Jun 49,800 55,200 61,200 58,200 $4,030 Jul 49,200 62,700 51,900 57,300 $3,198 Aug 59,100 56,100 53,700 54,900 $3,166 Sep 50,400 50,400 49,500 49,950 $2,573 Oct 44,700 58,200 50,700 54,450 $2,315 Nov 73,500 54,600 69,000 61,800 $3,337 Dec 88,500 93,000 90,900 91,950 $4,277 Total 639,000 725,700 751,615 767,308 $42,818 Note: Costs have the monthly fixed Service Charge removed. Table 3-11b Electric Demand History and Baseline Electric Demand (kW) Recent Month 200$ 2006 2007 20118 2 Year Ava Jan 165 147 181 177 179 Feb 135 168 184 186 185 Mar 96 140 137 150 144 Apr 111 127 143 162 153 May 106 133 133 126 130 Jun 132 130 130 130 Jul 138 127 128 128 Aug 126 130 133 132 Sep 126 137 129 133 Oct 117 149 120 135 Nov 198 184 162 173 Dec 183 172 - 86 Maximum 19B 184 184 185 100,000 90,000 80,000 70,000 60,000 I 50,000 40,000 30,000 20,000 10,000 o Energy Solutions Historical Electric Consumption __ 2005 __ 20015 __ 2007 __ 20015 -Baseline Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee 3-11 . . . Section 3 Historical Energy Consumption Chevron ~ Facility: Account: Rate Code: Meter: Memorial Hall 3688865628 Small General Service 01109857 Table 3-12a Electric Consumption History and Baseline Electric Consumption (kWh) Recent Most Recent Month 2005 2006 2007 200$ 2 Year Ava Year Costs Jan 22,960 22,720 22,320 24,800 23,560 $'1,171 Feb 23,360 22,480 23,360 22,720 23,040 $'1,190 Mar 22,240 24,160 22,400 22,480 22,440 $'1,385 Apr 25,360 23,760 21,840 22,960 22,400 $'1,384 May 24,480 25,680 24,640 25,040 24,840 $'1,688 Jun 24,880 28,480 27,200 27,840 $'1,898 Jul 23,840 29,360 27,200 28,280 $'1,706 Aug 27,120 31,040 36,880 33,960 $2,176 Sep 27,840 25,040 30,080 27,560 $'1,600 Oct 23,040 23,440 24,720 24,080 $'1,141 Nov 25,440 24,640 26,400 25,520 $'1,256 Dee 24,080 25,360 23,600 24,480 $'1,168 Total 294,640 306,160 310,640 308,000 $11,762 Note: Costs have the monthly fixed Service Charge removed. Table 3-12b Electric Demand History and Baseline Electric Demand (kW) Recent Month 2005 2006 2007 2008 2 Year Ava Jan 49 51 52 53 53 Feb 54 54 52 55 54 Mar 53 54 58 54 56 Apr 55 60 60 54 57 May 59 63 73 61 67 Jun 66 68 78 73 Jul 50 77 72 75 Aug 71 86 92 89 Sep 71 64 73 69 Oct 58 64 61 63 Nov 48 57 53 55 Dee 49 54 59 57 Maximum 71 86 92 89 Historical Electric Consumption 40,000 35,000 30,000 25,000 --200J ___ 2006 ......2007 __ 2008 -Baseline :c :!: 20,000 :::!. 15,000 10,000 5,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Energy Solutions 3-12 . . . Section 3 Historical Energy Consumption Natural Gas A listing of the natural gas meters and accounts serving the buildings in scope are identified in Table 3-13. Only usages ofthose meters and accounts serving areas affected by projects in this report were analyzed. Seven of the buildings have natural gas furnished and delivered by Kansas Gas Service (KGS) under the General Sales Service rate. The Health department purchases its natural gas from Seminole Energy Services and delivery from Kansas Gas Service.. The remaining building, Smoky Hill Museum is an all electric building and does not use natural gas. Table 3-13 Natural Gas Meters Buildin(J Address Account No. Meter No. Rate Utilitv Bicentennial Center Kenwood Park 510346073154747045 1209426433 General Service Kansas Gas Service Fire Station No. 1 222 W. Elm 510038084154747564 1209321450 General Service Kansas Gas Service Fire Station No.2 1110 S. Santa Fe 510395322154747345 0406873044 General Service Kansas Gas Service Golf Clubhouse 2500 E Crawford 510172027154748500 0403264013 General Service Kansas Gas Service 510213303154748264 1005252310 General Service Kansas Gas Service Health Deoartment 125 W. Elm 102658 2202139 contract Seminole Enerov Services Small TranSDortation Service Kansas Gas Service Memorial Hall 410 W. Ash 510222211162148900 1208590037 General Service Kansas Gas Service Police Deoartment 253 N. 10th 510553773154747900 1209321453 General Service Kansas Gas Service Salina Community Theater 303 E. Iron 510249755154748682 0406873417 General Service Kansas Gas Service Smokv Hill Museum 211 W.lron no Qas - all electric The KGS General Sales Service tariff consists of a fixed monthly service charge; a delivery charge, gas hedge, and other surcharges based on usage; a rate for the cost of gas that varies each month; and a 5% franchise fee on the total charge of each month's bilL To arrive at the effective natural gas rate used in the savings calculations, the monthly bill was determined after removal of the $23.35fmonth service charge with the 5% franchise fee. The Golf Clubhouse has two natural gas meters, so the bills for these two monthly bills were aggregated for the analysis. The average natural gas rate for each of the months from June, 2007 through May, 2008 was determined and averaged. Because of the upward trend in natural gas costs, the most recent data is the closest to representing where gas rates may be today. The averages from the seven buildings were quite similar, varying only because of the billing periods that kept the monthly bills from using the same surcharges and gas costs. A rate of $11.617 fmcf was used as the basis for the savings calculations for the seven buildings using a twelve-month average. Chevron ~ Energy Solutions 3-13 . . . Section 3 Historical Energy Consumption Table 3-14 Most Recent Year Natural Gas Rates ($/mcf) Bicentennial Fire Station Fire Station Golf Memorial Police Community Center NO.1 NO.2 Clubhouse Hall Dept. Theater Jun 2007 $11.7692 $11.7680 $11.7693 $11.7699 $11.7792 $11.7695 $11.7719 Jul2007 $11.6637 $11.7699 $11.6635 $11.6629 $11.7690 no bill $11.6645 Auq 2007 $10.9350 $11.6629 $10.9347 $10.4709 $11.6662 $11.71593 $10.9393 Sep 2007 $10.4715 $10.4709 $10.4705 $10.4706 $10.4675 $11.6625 $10.4713 Oct 2007 $10.1089 $10.4706 $10.1091 $10.7205 $10.4719 $10.4693 $10.1092 Nov 2007 $10.7207 $10.7205 $10.7207 $10.7207 $10.1088 $10.1088 $10.7208 Dee 2007 $10.8304 $10.7207 $10.8304 $10.8305 $10.7207 $10.7:208 $10.8305 Jan 2008 $10.7698 $10.8304 $10.7698 $10.7699 $10.8304 $10.8304 $10.7699 Feb 2008 $11.6143 $10.7699 $11.6141 $11.6142 $10.7698 $10.7700 $11.6142 Mar 2008 $13.2042 $11.6143 $13.2041 $13.2053 $11.6143 $11.6143 $13.2041 Apr2008 $13.4328 $13.2044 $13.4327 $13.4340 $13.4327 $13.4328 $13.4334 May 2008 $14.6420 $14.6405 $14.6418 $14.6425 $14.6413 $13.4331 $14.6443 Averages $11.6802 $11.5536 $11.6801 $11.6927 $11.5227 $11.5073 $11.6811 The Health Department uses natural gas contracted from Seminole Energy Services. In addition to the commodity, transportation is purchased from Kansas Gas Service. The KGS charge has the same fixed service charge component and franchise fee as at the other buildings. Once the monthly fixed charge is removed, all remaining charges vary directly with natural gas use. The average natural gas cost at the Health Building for the last twelve months is given in Table 3-15 showing the average of $9. 566/mcf. Table 3-15 Most Recent Year Natural Gas Rates - Health Department ($/mcf) Jun 2007 Jul2007 Au 2007 Se 2007 Oct 2007 Nov 2007 Dec 2007 Jan 2008 Feb 2008 Mar 2008 A r 2008 Ma 2008 Avera e Most Recent Year $9.8356 $8.8994 $8.2516 $7.6328 $8.1771 $8.8643 $8.9248 $9.2861 $10.2820 $10.7483 $11.5183 $12.3746 $9.5662 A summary of the historical natural gas usages are given in Table 3-16 through Table 3-23 along with the most recent year baseline usage. Chevron . Energy Solutions 3-14 . . . Section 3 Chevron ~ Historical Energy Consumption Table 3-16 Gas Consumption History Facility: Account: Rate Code: Meter: Bicentennial Center 510346073154747045 General Service 403264013 Natural Gas Consumption (mct) Recent Month 2005 2006 2007 2008 Year AVA Jan 580 373 623 1,106 1,106 Feb 370 372 400 641 641 Mar 243 213 133 351 351 Apr 101 65 96 290 290 May 35 31 13 71 71 Jun 16 8 7 7 Jul 6 6 6 6 Aug 6 11 13 13 Sep 34 37 33 33 Oct 132 215 132 132 Nav 514 420 392 392 Dec 585 Not available 610 610 Annual Use 2,622 2,460 3,652 1,200 1,000 800 LL. U 600 :i 400 200 Historical Gas Consumption E+- 2005 __ 2006 -.- 2007 -*- 2008 Jan March May July Sept Nav Energy Solutions 3-15 . . . Section 3 Historical Energy Consumption Chevron ~ Table 3-17 Gas Consumption History Facility: Account: Rate Code: Meter: Fire Station No.1 510038084154747564 General Service 403264013 Natural Gas Consumption (mct) Recent Month 2005 2006 2007 2008 Year Avg Jan 198 106 157 179 179 Feb 132 146 171 133 133 Mar 86 101 78 103 103 Apr 83 70 87 65 65 May 63 61 30 13 13 Jun 12 11 12 12 Jul 12 12 11 11 Aug 12 11 11 11 Sep 14 12 12 12 Oct 16 63 12 12 Nov 79 99 109 109 Dee 190 152 186 186 Annual Use 897 843 874 845 Historical Gas Consumption 200 E-.- 2005 -1_ 2006 ......- 2007 -)Eo- 2008 160 120 u.. (.) ::i 80 40 o Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nov Dee Energy Solutions 3-16 . . . Section 3 Historical Energy Consumption Chevron W Table 3-18 Gas Consumption History Facility: Account: Rate Code: Meter: Fire Station No.2 510395322154747345 General Service 403264013 Natural Gas Consumption (mcf) Recent Month 2005 2006 2007 2008 V.ar Avg Jan 56 55 105 101 101 Feb 40 45 60 71 71 Mar 38 30 37 44 44 Apr 38 5 17 40 40 May 19 6 15 40 40 Jun 14 7 12 12 Jul 16 5 11 11 Aug 10 14 12 12 Sep 12 9 13 13 Oct 17 31 21 21 Nov 66 66 66 66 Dee 59 103 114 114 Annual Use 383 375 484 546 Historical Gas Consumption 150 -+- 2005 -_ 2006 -.- 2007 -*- 2008 125 100 LI. (.) 75 :::i 50 25 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nav Dee Energy Solutions 3-17 . . . Section 3 Historical Energy Consumption Chevron ~ u. (,J 75 ::lE Table 3-19 Gas Consumption History Facility: Account: Rate Code: Meter: Golf Clubhouse 510172027154748500and 510213303154748264 General Service 0403264013 and 1005252310 Natural Gas Consumption (mct) Recent Month 2005 2006 2007 2008 Year Avg Jan 59 42 81 80 80 Feb 37 51 36 51 51 Mar 10 24 13 12 12 Apr 3 1 6 5 5 May 1 1 1 1 1 Jun 1 1 1 1 Jul 1 1 1 1 Aug 1 1 1 1 Sep 1 1 1 1 Oct 4 9 4 4 Nov 59 49 49 49 Dee 55 61 81 81 Annual Use 231 242 273 285 Note: Data is sum of usage of both gas meters. Historical Gas Consumption 150 [ ~ -~ -..- ~ --*"'" ~ 125 100 50 25 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Energy Solutions 3-18 . . . Section 3 Historical Energy Consumption Chevron ~ Table 3-20 Gas Consumption History Facility: Account: Rate Code: Meter: Memorial Hall 510222211162148900 General Service 403264013 Natural Gas Consumption (mef) Recent Month 2005 2006 2007 2008 Year AVQ Jan 471 285 409 463 463 Feb 326 362 398 394 394 Mar 234 285 81 248 248 Apr 39 26 91 163 163 May 1 2 2 15 15 Jun 1 2 2 2 Jul 1 2 3 3 Aug 1 2 2 2 Sep 1 2 3 3 Oct 32 100 45 45 Nov 234 353 271 271 Dee 489 412 451 451 Annual Use 1,832 1,832 1,757 2,059 Historical Gas Consumption 600 ~-..... 2 005 --1_ 2006 -.- 2007 -X'- 2008 500 400 LL (,) 300 :IE 200 100 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Energy Solutions 3-19 . . . Section 3 Historical Energy Consumption Chevron ~ Table 3-21 Gas Consumption History Facility: Account: Rate Code: Meter: Police Department 510553773154747900 General Service 403264013 Natural Gas Consumption (mef) Recent Month 2005 2006 2007 2008 Year Avg Jan 96 71 143 86 86 Feb 80 88 75 77 77 Mar 51 61 78 76 76 Apr 5 60 29 81 81 May 4 40 6 39 39 Jun 5 4 3 5 3 Jul 4 4 3 3 Aug 4 3 5 5 Sep 3 5 5 5 Oct 4 4 5 5 Nov 29 17 22 22 Dee 90 93 84 84 Annual Use 375 450 455 485 Historical Gas Consumption 150 -+- 2005 -_ 2006 -.- 2007 -*- 2008 125 100 u.. U 75 :i 50 25 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Energy Solutions 3-20 . . . Section 3 Historical Energy Consumption Chevron ~ Table 3-22 Gas Consumption History Facility: Account: Rate Code: Meter: Salina Community Theater 510249755154748682 General Service 403264013 Natural Gas Consumption (met) Recent Month 2005 2006 2007 2008 Year Ava Jan 134 62 84 127 127 Feb 75 134 137 106 106 Mar 43 45 88 47 47 Apr 6 5 22 23 23 May 9 3 25 5 5 Jun 6 2 3 3 Jul 2 3 2 2 Aug 4 3 2 2 Sep 3 3 2 2 Oct 20 13 3 3 Nov 52 53 10 10 Dee 63 84 68 68 Annual Use 417 410 446 398 Historical Gas Consumption 150 ~+- 20 05 -......... 2006 -+- 2007 -*- 2008 125 100 u. U 75 ::& 50 25 o Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nav Dee Energy Solutions 3-21 . . . Section 3 Historical Energy Consumption Chevron U Table 3-23 Gas Consumption History Facility: Account: Rate Code: Meter: Health Dept 102658 General Service 2202139 Natural Gas Consumption (mcf) Recent Month 2005 2006 2007 2008 Year Ava Jan 95 52 99 103 103 Feb 58 59 87 82 82 Mar 46 33 31 58 58 Apr 16 9 30 26 26 May 6 4 5 6 6 Jun 4 3 4 4 Jul 4 3 4 4 Aug 4 4 4 4 Sep 4 4 4 4 Oct 13 15 10 10 Nav 38 37 47 47 Dee 86 72 83 83 Annual Use 374 295 408 431 Historical Gas Consumption 150 --+- 2005 _2006 -..- 2007 -*- 2008 125 100 LI. u 75 :2 50 25 Jan March May Sept July Nav Energy Solutions 3-22 . . . Section 3 Historical Energy Consumption Water Water and sewer service for the City of Salina buildings is furnished by the Municipal Utilities Department of the City. A listing of the water meters and accounts serving the buildings in scope are identified in Table 3-24. Only meter usages and accounts serving areas affected by projects in this report were analyzed. Table 3-24 Water and Sewer Accounts Address Account No. Meter Size Utility Bicentennial Center 19199-12562 2" City of Salina 19195-12556 5/8" City of Salina Fire Station No.1 15505-9806 1 %" City of Salina Fire Station No.2 7437-4388 2" City of Salina Golf Clubhouse 35481-24182 1" City of Salina Health Department 15593-39666 1 %" City of Salina Memorial Hall 15333-9678 3" City of Salina Police Department 215-162 2" City of Salina Salina Community Theater 16211-10512 2" City of Salina Smoky Hill Museum 1691-1008 2" City of Salina To encourage water conservation, the City has recently changed the water and sewer rate structure to incorporate an "excess use charge" to apply when a meter's monthly use exceeds 120% of the "Winter Quarter Average" use. The new water rate structure along with new water rates increases in sewer rates, and increases in meter charges go into effect November 1, 2008. Resolution 08-6523 also sets the water, sewer and meter rates for five years. These rates are shown in Table 3-25. The water and sewer savings rates used in the savings calculations are based on the 2009 rates. The average escalation of total rate per ccf over the next five years is 9.0%. Table 3-25 Water and Sewer Rates per Resolution 08-6523 2009 2010 2011 2012 2013 Average annual rate of increase Water base rate ($/ccf) $2.34 $2.55 $2.82 $3.12 $3.49 10.5% Water excess rate ($/ccf) $4.68 $5.10 $5.64 $6.24 $6.98 10.5% Sewer ($/ccf) $2.88 $3.08 $3.35 $3.64 $3.90 7.9% For each building, monthly baseline water use was established using the averages from 2005 through 2007, using all available data furnished by the City. To determine effective combined water and sewer rate for each building, a forecast was developed for post-retrofit water use. It is assumed that, on average, each month's future usage is at this post-retrofit value. Knowing the post-retrofit usages, the months exceeding 120% of the "Winter Quarter Average" can be Chevron . Energy Solutions 3-23 . . . Section 3 Historical Energy Consumption determined. The water savings in these months is based on the "excess use" rate and the water savings in other months is based on the base rate. Each month's rate is weighted by the monthly forecasted quantity of water savings in ccf to arrive at an equivalent annual average water rate. All usages also have a $0.032/kgal ($0.023936/ccf) charge for the state water fee and for sewer usage for the types ofECMs considered; For 2009, the minimum base savings rate is: $2.34/ccf(water) + $2.88/ccf(sewer) + $0.02394/ccf(state fee) = $5.244/ccf The maximum savings rate for any month occurs when usage exceeds 120% of the "Winter Quarter Average": $4.68/ccf(water) + $2.88/ccf(sewer) + $0.02394/ccf(state fee) = $7.584/ccf The savings rates fall in between these values for all buildings as shown in the ECM Summary table of Section 2. Note that the savings rates at the Golf Clubhouse and at Smoky Hill Museum are at the minimum rate of $5.244/ccf as each month's post-retrofit usage is expected to be below 120% of the defined minimum "Winter Quarterly Average" of 800 ccf. Another interesting observation is that the Police Department savings rate is near the maximum rate year-round. This is because of the shape of the annual water use curve which shows that the three minimum use months are coincident with when the "Winter Quarter Average" use is established. A summary of the historical water usages are given in Table 3-26 through Table 3..34 along with the three year historical average usage. Chevron ~ Energy Solutions 3-24 . . . Section 3 Historical Energy Consumption Table 3-26 Water Usage History and Baseline Facility: Bicentennial Center Account: 19199-12562 Meter Size: 2" Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 10,800 9,300 10,000 10,030 Feb 16,700 23,900 17,800 19,470 Mar 20,100 18,400 17 ,200 18,570 Apr 31,400 26,500 31,000 29,630 May 26,200 16,800 23,900 22,300 Jun 14,800 20,600 19,300 18,230 Jul 15,000 8,700 13,200 12,300 Aug 6,100 6,700 2,200 5,000 Sep 8,000 8,800 3,000 6,600 Oct 17,800 10,500 2,600 10,300 Nov 13,800 11 ,800 3,300 9,630 Dee 7,700 9,200 2,300 6,400 Total 188,400 171,200 145,800 168,460 Historical Water Consumption 35,000 30,000 25,000 - Gl Gl 20,000 u.. Co) :s 15,000 :l 0 10,000 5,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Month Chevron ~ Energy Solutions -+- 2005 ___ 2006 -.- 2007 _Average 3-25 . . . Section 3 Historical Energy Consumption Table 3-27 Water Usage History and Baseline Facility: Fire Station No. 1 Account: 15505-9806 Meter Size: 1 W' Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 2,800 5,100 3,600 3,830 Feb 3,100 4,700 3,100 3,630 Mar 3,300 4,800 3,100 3,730 Apr 4,900 3,300 4,200 4,130 May 3,400 4,600 3,800 3,930 Jun 4,300 6,400 4,800 5,170 Jul 5,500 6,800 6,300 6,200 Aug 7,800 7,200 6,700 7,230 Sep 8,100 7,100 8,500 7,900 Oct 6,600 4,300 3,900 4,930 Nov 4,900 4,100 3,800 4,270 Dee 4,200 4,200 3,900 4,100 Total 58,900 62,600 55,700 59,050 Historical Water Consumption 9,000 8,000 7,000 Q) 6,000 t!. 5,000 u :0 4,000 :II o 3,000 2,000 1,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Month Chevron . Energy Solutions -+- 2005 ___ 2006 --.- 2007 _Average 3-26 . . . Section 3 Historical Energy Consumption Table 3-28 Water Usage History and Baseline Facility: Fire Station No.2 Account: 7437-4388 Meter Size: 2" Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 1,600 1,600 1,300 1,500 Feb 1,700 1,600 1,500 1,600 Mar 1,600 1,800 1,100 1,500 Apr 1,900 1,100 1 ,400 1,470 May 1,600 700 1,200 1,170 Jun 220 600 1,600 810 Jul 330 900 1,300 840 Aug 3,500 700 2,200 2,130 Sep 2,700 600 1 ,400 1,570 Oct 1,700 1,200 1,500 1,470 Nov 2,100 500 1,600 1 ,400 Dee 1,900 1,200 1 ,400 1,500 Total 20,850 12,500 17,500 16,960 Historical Water Consumption 5,000 4,000 1) 3,000 Q) I.L. U :a 2,000 ::I U 1,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee: Month Chevron ~ Energy Solutions -+- _2006 -..- 2007 -et-Average 3-27 . . . Section 3 Historical Energy Consumption 6,000 5,000 - 4,000 G) G) u. u 3,000 :s ;:, 0 2,000 1,000 0 Table 3-29 Water Usage History and Baseline Facility: Municipal Golf course clubhouse Account: 35481-24182 Meter Size: 1" Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 400 1,900 1,100 1,130 Feb 300 500 800 530 Mar 800 600 900 770 Apr 1,700 1,000 1 ,400 1,370 May 1,500 2,100 1,900 1,830 Jun 1,600 3,100 2,500 2,400 Jul 2,100 2,800 3,500 2,800 Aug 2,000 2,600 3,700 2,770 Sep 4,000 1,900 5,700 2,950 Oct 1,000 900 2,100 1,330 Nov 600 700 1,100 800 Dee 300 600 600 500 Total 16,300 18,700 25,300 19,180 Note: Data of Sept, 2007 not Included in Pre-Retrofit average. High value due to leaks" Historical Water Consumption Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Month -.- 2005 ___ 2006 -.- 2007 -&-Average Chevron ~ Energy Solutions 3-28 . . . Section 3 Historical Energy Consumption Table 3-30 Water Usage History and Baseline Facility: Health Department Account: 15593-39666 Meter Size: 1 W Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 1,100 1,000 900 1,000 Feb 1,200 1,300 1,100 1,200 Mar 1,200 1 ,400 1,000 1,200 Apr 1,500 1,300 1,100 1,300 May 1,200 1,000 1,100 1,100 Jun 1,100 1,100 2,200 1,470 Jul 1,700 1,500 1,100 1 ,430 Aug 1 ,400 1,500 1,900 1,600 Sep 1,700 1,500 2,200 1,800 Oet 2,400 1,100 1,000 1,500 Nov 1 ,400 1,000 1,600 1,330 Dee 1,100 1,000 1,100 1,070 Total 17,000 14,700 16,300 16,000 Historical Water Consumption 5,000 4,000 - II) 3,000 II) II.. U :s 2,000 :::l 0 1,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nov Dee Month Chevron I!IIIII!!!I Energy Solutions - --+- 2005 _ 2006 -.- 2007 -B-Average 3-29 . . . Section 3 Historical Energy Consumption Table 3-31 Water Usage History and Baseline Facility: Memorial Hall Account: 15333-9678 Meter Size: 3" Water Consumption (cu ft) 3 Year Month Z005 2006 2007 2008 Averaae Jan 900 1,000 900 930 Feb 1,800 2,000 1,700 1,830 Mar 2,200 1,200 1,500 1,630 Apr 1,700 1,700 1 ,400 1,600 May 1,500 3,700 1,000 2,070 Jun 1 ,400 1,200 1,100 1,230 Jul 1,300 1,000 700 1,000 Aug 1,500 1,500 2,900 1,970 Sep 1,300 1,600 1,000 1,300 Oet 1 ,400 1,700 1,700 1,600 Nov 1 ,400 1 ,400 1,500 1 ,430 Dee 3,300 4,200 3,200 3,570 Total 19,700 22,200 18,600 20,160 Historical Water Consumption 5,000 4,000 - : 3,000 u. u :0 2,000 :::I (J 1,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oet Nov Dee Month Chevron ~ Energy Solutions -.- 2005 _2006 -.- 2007 ~Average 3-30 . . . Section 3 Historical Energy Consumption Table 3-32 Water Usage History and Baseline Facility: Police Department Account: 215-162 Meter Size: 2" Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 1,800 1,800 1,700 1,770 Feb 1,900 1,900 2,100 1,970 Mar 1,700 1,900 1,700 1,770 Apr 3,200 2,200 2,100 2,500 May 2,100 4,400 1,900 2,800 Jun 3,900 4,600 2,100 3,530 Jul 6,500 4,100 3,500 4,700 Aug 5,200 3,900 6,600 5,230 Sep 5,800 5,800 6,200 5,930 Oct 6,100 5,500 5,900 5,830 Nov 4,100 6,000 6,300 5,470 Dee 2,900 4,800 3,800 3,830 Total 45,200 46,900 43,900 45,330 Historical Water Consumption 7,000 6,000 5,000 1 IL 4,000 u :s 3,000 ~ (J 2,000 1,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Month Chevron ~ Energy Solutions -+- 2005 _2006 .....- 2007 _Average 3-31 . . . Section 3 Historical Energy Consumption Table 3-33 Water Usage History and Baseline Facility: Salina Community Theater Account: 16211-10512 Meter Size: 2" Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 1,600 700 1,000 1,100 Feb 3,300 1,700 400 1,800 Mar 1,500 1,100 1,600 1 ,400 Apr 1,700 900 500 1,030 May 2,000 1,900 1,000 1,630 Jun 2,600 1,700 900 1,730 Jul 4,100 4,400 3,300 3,930 Aug 4,200 2,400 3,200 3,270 Sep 2,100 2,000 2,800 2,300 Oct 3,400 3,300 3,900 3,530 Nov 1,600 1,700 1,100 1,470 Dee 1,900 2,300 800 1,670 Total 30,000 24,100 20,500 24,860 Historical Water Consumption 5,000 4,000 - I 3,000 I&. U :c 2,000 :J U 1,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Month Chevron ~ Energy Solutions -+- 2005 _ 2006 -+- 2007 _Average 3-32 . . . Section 3 Historical Energy Consumption Table 3-34 Water Usage History and Baseline Facility: Smoky Hill Museum Account: 1691-1008 Meter Size: 2" Water Consumption (cu ft) 3 Year Month 2005 2006 2007 2008 Averaae Jan 1,300 1,100 700 1,030 Feb 1,300 1,200 1,100 1,200 Mar 1,100 1,200 900 1,070 Apr 1,200 1,100 800 1,030 May 1 ,400 900 500 930 Jun 110 1,600 700 800 Jul 800 900 600 770 Aug 600 700 1,100 800 Sep 110 700 1,000 600 Oct 900 900 800 870 Nov 800 1,700 700 1,070 Dee 1,100 500 3,000 1,530 Total 10,720 12,500 11,900 11,700 Historical Water Consumption 5,000 4,000 1) .f 3,000 u :s = 2,000 o 1,000 o Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dee Month Chevron ~ Energy Solutions --+- 2005 _ 2006 -..- 2007 _Average 3-33 . . . Section 4 Operation & Maintenance A. OPERATIONAL AND MAINTENANCE (O&M) SAVINGS As mechanical and lighting systems age, they require more maintenance, which can strain a facility's physical and capital resources. The proposed project will significantly reduce maintenance by replacing old, maintenance intensive mechanical, plumbing, and lighting equipment. Maintenance cost savings associated with individual energy conservation measures are documented in this section. The projects included in this report involve new equipment with a full service life ahead of them at the beginning of the program. As such, future expenditures for certain equipment replacements are avoided or greatly reduced. Future funds that would be used for replacement of equipment covered in this program can be diverted to other facility needs. These avoided replacement costs are not included in the financial aspects of the program. However, specific reductions in replacement parts are included in the financial aspects of the project and are quantified in this section. Some median estimates of service life are provided by ASHRAE for some of the types of equipment covered in this program. Hot Water Boilers Pumps (base mounted) Air-cooled Condensers Rooftop Air Conditioners Gas-Fired Furnaces Hot Water Unit Heaters 24 - 30 years 20 years 20 years 15 years 18 years 20 years ECMs LI-L6: Lighting ECMs The maintenance savings related to lighting retrofits includes the benefits of replacing existing lamps that have part of their expected life used with new lamps having a full life expectancy, and of the use of new lamps and ballasts with longer lives than existing lamps. The replacement costs for the retrofit assumes that lamps will have to be replaced every five years and that the ballasts will last for twenty years. The tables on the following pages provide the basis for determination of the lighting maintenance savings. Table 4-1 provides the existing maintenance costs, while Table 4-2 provides the expected maintenance costs after the lighting retrofit has been completed. Table 4-3 shows the savings over a term of20 years. No lighting maintenance costs are shown during the first three years after the retrofit as all of the components will be new and will be under warranty. The annual average lighting maintenance savings of $4,413 is prorated by building and presented in Section 2 - Energy Conservation Measures, Table 2-2. Chevron ~ 4-1 Energy Solutions . . . Section 4 Operation & Maintenance Table 4-1 Existing Lighting Maintenance Costs Average LAMPS BALLASTS TOTAL Annual Rated Annual Lamp Rated Annual Burn Lamp Quantity Average Material Replacement Ballast Quantity Average Material Ballast Annual Hours Type Cost Type Cost Replacement Material Cost Life Hours Cost Life Hours Cost 2,500 T-12 4,457 20,000 $ 1.00 $ 557.13 Magnetic 2,474 40,000 $ 12.00 $ 1,855.50 $ 2,412.63 2,500 T-8 1,649 24,000 $ 1.50 $ 257.66 Electronic 664 50,000 $ 10.00 $ 332.00 $ 589.66 2,500 HID 69 10,000 $ 5.00 $ 86.25 HID 69 40,000 $ 50.00 $ 215.63 $ 301.88 2,500 CFL 187 10,000 $ 2.00 $ 93.50 CFL 0 10,000 $ 12.00 $ - $ 93.50 2,500 Incand. 992 1,200 $ 0.50 $ 1,033.33 - - - $ - $ - $ 1,033.33 8,760 Exit-Incan. 136 1,200 $ 1.00 $ 992.80 - - - $ - $ - $ 992.80 8,760 Exit-CFL 5 10,000 $ 2.00 $ 8.76 CFL 0 10,000 $ 12.00 $ - $ 8.76 8,760 Exit-LED 28 90,000 $ 10.00 $ 27.25 - - - $ - $ - $ - $ 5,432.55 Table 4-2 Upgraded Lighting Maintenance Costs Average LAMPS BALLASTS TOTAL Annual Rated Annual Lamp Rated Annual Bum Lamp Quantity Average Material Replacement Ballast Quantity Average Material Ballast Annual Hours Type Cost Type Cost Replacement Material Cost Life Hours Cost Life Hours Cost 2,500 T-12 0 20,000 $ 1.00 $ - Magnetic 11 40,000 $ 12.00 $ 4.13 $ 4.13 2,500 T-8 4,898 24,000 $ 2.00 $ 510.21 Electronic 2,159 50,000 $ 12.00 $ 647.70 $ 1,157.91 2,500 HID 56 10,000 $ 5.00 $ 35.00 HID 56 40,000 $ 50.00 $ 87.50 $ 122.50 2,500 CFL 806 10,000 $ 2.00 $ 201.50 CFL 0 10,000 $ 12.00 $ - $ 201.50 2,500 Incand. 373 1,200 $ 0.50 $ 194.27 - - - $ - $ - $ 194.27 8,760 Exit-Incan. 0 1,200 $ 1.00 $ - - - - $ - $ - $ - 8,760 Exit-CFL 0 10,000 $ 2.00 $ - CFL 0 10,000 $ 12.00 $ - $ - 8,760 Exit-LED 99 90,000 $ 10.00 $ 48.18 - - - $ - $ - $ - $ 1,680.30 Chevron ~ 4-2 Energy Solutions . . . Section 4 Operation & Maintenance Chevron ~ Table 4-3 Lighting Maintenance Cost Comparison Existing Upgraded Maintenance Maintenance Maintenance YEAR Cost Cost Savings 1 $5,433 $0 $5,433 2 $5,433 $0 $5,433 3 $5,433 $0 $5,433 4 $5,433 $17 $5,416 5 $5,433 $34 $5,399 6 $5,433 $168 $5,265 7 $5,433 $420 $5,012 8 $5,433 $672 $4,760 9 $5,433 $1,008 $4,424 10 $5,433 $1,344 $4,088 11 $5,433 $1,596 $3,836 12 $5,433 $1,680 $3,752 13 $5,433 $1,680 $3,752 14 $5,433 $1,680 $3,752 15 $5,433 $1,680 $3,752 16 $5,433 $1,680 $3,752 17 $5,433 $1,680 $3,752 18 $5,433 $1,680 $3,752 19 $5,433 $1,680 $3,752 20 $5,433 $1,680 $3,752 Total $108,651 $20,382 $88,269 Average Annual Maintenance Savings $4,413 Energy Solutions 4-3 . . . Section 4 Operation & Maintenance CIP 1: Replace Unit Beater with Infrared Radiant Beat (not in recommended program) With the installation on the direct-fired infrared heaters, the existing boilers will be decommissioned and no longer need to be maintained. Chevron ES was furnished an estimate of $600/year that the City of Salina will save in a reduction of ongoing maintenance costs associated with the boiler at Fire Station No.1. CIP 2: Replace Boiler at Fire Station No.2 (not in recommended program) The replacement ofthe 50 year old boiler at Fire Station No.2 with a modern high efficiency boiler will lead to a reduction in maintenance costs associated with the aging boiler. Chevron ES was furnished an estimate of $800/year that the City of Salina spends annually on maintenance parts and costs associated with the existing boiler at Fire Station No.2. It is assumed that maintenance costs on the new boiler will be half this amount. CIP 2: Replace Boiler at the Police Department (not in recommended program) The replacement of the aging boiler at the Police Department with a modern high efficiency boiler will lead to a reduction in maintenance costs associated with the boiler. Chevron ES was furnished an estimate of $3,200/year that the City of Salina spends annually on maintenance parts and costs associated with the aging boiler at the Police Department. With an allowance for annual maintenance costs of the new high efficiency boiler, an annual O&M savings of $2,700 is estimated to be realized with the boiler replacement. CIP 5: BV AC Improvements / Controls Upgrade The upgrade of the 40 year old HV AC system including air handling units and controls will lead to a reduction in the annual maintenance, parts, and subcontracted repair expenditures by the City for maintaining the air handling units, dampers, ductwork, and fans. Chevron ES was furnished an estimate of $4,000/year for the amount of these annual expenditures. With a small allowance for annual costs to keep the new system in optimal operating condition, an annual O&M savings of$3,500 is estimated to be realized with the HV AC replacement. This annual O&M savings is used in the financial analysis until the year of capital cost avoidance with equipment replacement. CIP 6: Remove Skylight Removal of the skylight at the Health Department building will not only provide energy savings in conditioning the space, but also provide a reduction in annual maintenance costs associated with the skylight. Chevron ES was provided an estimate of $200 that the City spends annually to caulk and seal the skylight to prevent leakage. The City also spends $1,650 every three years to replace the skylight screen installed to reduce the radiation into the lobby space. Overall, the removal of the skylight and replacement with conventional roofing and an insulated ceiling will lead to an O&M savings of$750/year. Chevron ~ 4-4 Energy Solutions . . . Section 4 Operation & Maintenance ECM Cl: Networked Programmable Thermostats Chevron ES was provided an estimate of $300/year for maintenance and replacement of thermostats affected by this ECM. This O&M savings was distributed over the buildings affected by this ECM roughly by the number of thermostats at each building. At Fire Station No. 1, Fire Station No.2, and the Golf Clubhouse an annual O&M savings of$45 is used. At the Health Department building and the Salina Community Theatre an O&M savings of $80/year is used. Section 2 - Energy Conservation Measures describes that for ECM C1, these annual maintenance savings will be more than offset with the $30 web server maintenance fee and with the approximate $40/month ISP service required at the two fire stations and the Golf Clubhouse. ECM Wl-W5: Domestic Water Retrofits O&M savings assume reduced parts and maintenance costs will result after new plumbing systems have been installed. Replacing/retrofitting existing toilet and urinal flush valves with new flush valves as described in Section 2 - Energy Conservation Measures, will not only reduce the water usage per flush but will also result in maintenance savings from fewer repairs to existing flush valves. The annual baseline assumption is that on average, 20% of the flush valves, tank toilets, and sink aerators will need to be rebuilt / replaced each year. Using a cost differential of $20 for each flush valve and tank toilet and $0.50 for each sink, an annual avoided maintenance cost is obtained: (29 tank toilets + 172 flush valves) x 0.20 x $20.00 + 144 sinks x 0.20 x $0.50 = $819 This is based on the assumption that parts have, on average, a five-year life. Chevron ~ Energy Solutions 4-5 . . . Section 4 Operation & Mai.ntenance B. CAPITAL COST AVOIDANCE Much of the major equipment proposed in the ECMs and CIPs replaces existing equipment that is near or beyond its useful live. This existing equipment will need to be replaced within the term of the financing period if the measures are not implemented. Implementation of these projects now will save the City the expense of replacing equipment over the coming years when the end oftheir useful lives is reached. To conservatively estimate the replacement year ofthe major pieces of equipment, the ASHRAE median service life plus 35% was used. Ifthe replacement year has already past, indicating that the equipment is beyond its typical useful life, 2009 was used as the replacement year. Generally, the current subcontracted cost estimate was escalated at 2.5% per year, for inflation, to arrive at the cost of replacement at the end of the equipment's life. These estimates include equipment, supplies, labor, bonds, and contractor overhead and profit. An exception to this is the cost of the split-system replacements at the Health Department building. These are discussed below. Table 4-4 summarizes the basis ofthe capital cost avoidance estimates. These resulting one time cost savings are grouped by year and shown at the appropriate year in the cash flow Proforma in the Section 1 - Executive Summary. Table 4-4 Capital Cost Avoidance Estimates A5ttRAE 2009 Median Estimated Cost Estimate Cost at Installed Service Replacement for Time of Building ECM I CIP Equipment Year Life Year Replacement Replacement Included in Recommended Program I Health Department I CIP4 2 South Split System Units (1) 1984 18 2008 $29,000 $29,000 CIP4 3 South Split System Units (2) 1984 18 2010 $43,500 $45,702 Police Administration I CIP5 Air HandlinQ Units 1967 30 2011 $370,599 $389,361 Not 1m;luded in Recommended Program I Fire Station #1 I CIP1 Hot Water Boiler 1991 24 2024 $40,562 $58,746 Fire Station #2 I CIP2 Hot Water Boiler 1956 24 2009 $40,562 $40,562 Golf Clubhouse I CIP3 Tandem Condensing Units 1980 20 2009 $15,944 $15,944 Health Department I CIP3 6 North Condensing Units 1993 20 2020 $31,920 $41,882 Police Admi1nistration CIP2 Boiler 1975 24 2009 $68,965 $68 965 Notes: (1) $29,000 budgeted In 2008 to replace two umts. (2) Remaining 3 south units prorated at 2008 budget to be replaced in two years. Chevron ~ Energy Solutions 4-6 Section 4 Operation & Maintenance . CIP 1: Replace Unit Heater with Infrared Radiant Heat (not in recommended program) The capital cost avoidance amount associated with this CIP is based on the direct subcontracted replacement cost of the hot water boiler at Fire Station No. I if it were to remain using the hot water unit heaters in lieu of changing to direct-fired infrared heaters. CIP 2: Replace Boiler (not in recommended program) The capital cost avoidance amount associated with this CIP is based the direct subl.::ontracted replacement costs of the 52 year old boiler at Fire Station No.2 and the 33 year old boiler at the Police Department building with high efficiency hot water boilers as described for CIP 2 in Section 2 - Energy Conservation Measures. CIP 3: Replace Condensing Unit(s) (not in recommended program) The capital cost avoidance amount associated with this CIP is based the direct subcontracted replacement costs of the 15 ton south condensing unit at the Golf Clubhouse, and the six (6) north roof-mounted condensing units at the Health Department building as described for CIP 3 in Section 2 - Energy Conservation Measures. . CIP 4: Replace Split System Units The capital cost avoidance amount for replacement ofthe split-systems at the Health Department building savings is based on the budgeted amount that the City had allocated in 2008 for replacement of two of the five units. The City planned to replace two split systems in 2008 for $29,000. Even though the other three south units are ofthe same age, the analysis assumes that they will be replaced in two years at the same current cost per unit increased for inflation: ($29,000/2) x 3 units = $43,500 [2008 cost] $43,500 x (1 + 2.5% inflationlyr) (2 years) = $45,702 [2010 cost] CIP 5: HV AC Improvements / Controls Upgrade The capital cost avoidance amount used for replacement of the HV AC systems and controls at the Police Department is based on the direct subcontracted replacement costs of the project, as described in Section 2 - Energy Conservation Measures, less the electrical upgrade amount in the CIP pricing. . Chevron ~ Energy Solutions 4-7 . . . Section 4 Operation & Maintenance ECMs LI-L2: Lighting ECMs The City of Salina Facilities Department has plans over the next several years to convert Tl2 fluorescent fixtures to T8 fluorescent fixtures at several of the buildings in scope. With implementation of ECMs LI and L2, all remaining Tl2lamps will get converted to T8lamps, making it unnecessary for the City to budget for this retrofit work. Based on discussions with Byron Erickson, City of Salina Facilities Superintendent, the following are the basis for the capital cost avoidance with implementation of the lighting ECMs. Table 4-5 Estimates for City T12 to T8 Conversions (Material Only) . Health Department Police Department Memorial Hall Community Theatre Total: 2008 $3,000 2009 2010 2011 Remarks $3,000 $3,000 % of fixtures I year $3,000 $3,000 $3,000 % of fixtures I year $1,200 $1,200 $3,000 $3,000 % fixtures I year $7,200 $10,200 $6,000 $3,000 C. OPERATION AND MAINTENANCE PRACTICES A good operation and maintenance program is vital in minimizing energy consumption and attendant costs. O&M work should be performed on a fixed schedule. O&M items may be added to reflect unique characteristics of a building as well as to accommodate future changes to a facility. An effective O&M program will result in minimum equipment problems and a smoother running facility. The remarks given herein are intended for consideration to augment the current O&M efforts. As Chevron Energy Solutions has found that the City of Salina Facilities Department generally follows good O&M practices, suggestions listed below may repeat some practices currently in effect. No energy savings are calculated for the following general O&M items. D. GENERAL OPERATION AND MAINTENANCE Administration Q Review importance of conserving energy with staff annually; indicate what they can do to reduce the waste of energy dollars. Q Name an Energy Manager and assign specific tasks to be handled by that person. Chevron ~ Energy Solutions 4-8 . . . Section 4 Operation & Maintenance 1:1 Where possible, schedule more maintenance and custodial work during daylight hours to overlap with normal occupied hours. 1:1 When custodial work is done after normal occupied hours, use an area cleaning schedule, which causes work to progress from one end of a floor or building to the other end. Turn off lights and reduce room temperatures as each zone is completed. 1:1 When practical, concentrate activities in one area ofbuilding(s) so remainder can be treated as an unoccupied area. Building Envelope 1:1 Replace cracked and broken windows as soon as they are found. 1:1 Paint interior spaces colors to improve effectiveness oflighting (usually light, flat colors). 1:1 Inspect roofs annually and perform preventive maintenance to avoid roofleaks. 1:1 Repair roof leaks as soon as they become evident. 1:1 Check door weather stripping and repair or replace as needed. 1:1 Seal cracks and openings. Primary Heating System 1:1 Inspect boilers each year; repair as needed. 1:1 Run combustion test annually and adjust to maximize operating efficiency. 1:1 Check water circulating piping for leaks prior to heating season start and correct all leaks found. 1:1 Check water valves for leakage annually and repair as needed. 1:1 Use a water treatment program to minimize corrosion and water hardness deposits on heat transfer surfaces. Chevron ~ Energy Solutions 4-9 . . . Section 4 Operation & Maintenance Heating. Ventilating. and Air Conditioning (HV AC) o Inspect filters on all HV AC equipment quarterly; clean or replace as needed. o Check calibration of thermostats and temperature sensors annually and repair as needed. o Install locking covers over thermostats and temperature sensors to prevent tampering. o Repair leaky valves as soon as they are discovered. o Clean heating and cooling coils annually. o Set temperatures (heating/cooling, occupied/unoccupied) per established guidelines. o Review EMS program seasonally and implement needed changes. o Set EMS alarms at a level to avoid printout of excessive alarms. Domestic Hot Water (DHW) System o Turn off DHW heater when hot water is not required for an extended time. Turn off domestic hot water pumps during unoccupied times. Lighting Systems o Turn off lights whenever a space is to be unoccupied for a period of more than five minutes. o Whenever burned out lamps (tubes and bulbs) are replaced, clean the light fixture and lens at the time of replacement. o Whenever fluorescent ballasts fail, replace with high efficiency ballasts. o Clean light fixtures annually using detergent and water. o Use group relamping in buildings when practical. o Replace yellowed lenses in fluorescent light fixtures. Chevron ~ Energy Solutions 4-10 . . . Section 4 Operation & Maintenance Electrical System Cl Turn off refrigerators and deep freezers when they are not needed for an extended period of time. Cl When electric motors fail, replace them with energy efficient units. Potable Water Cl Check water faucets and taps for leaks monthly and correct leaks as soon as they are found. Cl Check faucets and water closets for leaks monthly. Chevron ~ Energy Solutions 4-11 . . '. Section 5 Data on Present: Facilities Data important to energy use at the City of Salina is covered in this section of the report. The data was collected on a building-by-building basis including outside area lighting and thermal energy distribution systems. Each building was visited by a survey team to collect data and to identify potential opportunities for energy cost reduction. Areas of concern encompassed factors that impact the usage of thermal energy and electrical energy. The survey considered building envelopes, heating, ventilation, and air conditioning (HV AC) equipment, lighting, miscellaneous equipment, process equipment, etc. Information was collected on building use schedules as well as HV AC equipment usage and lighting schedules. Available plans and HV AC control drawings for each building were reviewed to augment data collected during the survey work. In addition, energy usage information was assembled from a tabulation of utility bills. Building characteristics, general HV AC equipment information, temperature control, and operating schedules used to develop computer models and energy savings are given in this report section. More detailed information on HV AC equipment is located in Appendix B ofthe report. Chevron V Energy Solutions 5-1 . . . Section 5 Data on Present Facilities Bicentennial Center I. General Description: A. Building Type: Convention Center, Concert and Sports Arena B. Gross Square Footage: 108,240 c. Year of Original Construction: approximately 1978 D. Building Schedules: The Center is typically occupied from 7:00 am to 5:30 pm Monday through Friday, and most every Saturday and Sunday from 7:00 am to 10:00 pm or later for events. II. Lighting: The facility uses majority of fluorescent troffer fixtures with T -12 lamps in the convention center, second floor training/meeting rooms, arena main concourse, dressing rooms, offices, restrooms, and storage areas. Many incandescent can fixtures are used to illuminate the main lobby and hallway. A number of metal halide fixtures provide light for the Sports and Concert arena floor. III. Water: The water fixtures in the Convention Center consist of floor mounted flushometer toilets, wall mounted flushometer urinals, lavatory faucets, utility faucets, and dishwashing pre- rinse sprayers. The water fixtures in the Sports and Concert arena are wall mounted flushometer toilets, wall mounted flushometer urinals, lavatory faucets, utility faucets, and dishwashing pre-rinse sprayers. None of the plumbing fixtures in the facility utilize low consumption valves or moderators. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow approximately 2 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: The majority of the Arena is conditioned by several large air handling units with DX cooling and electric heating. Some units have natural gas unit heaters, and some air handling units appear to have natural gas heating capability that is not used. Chevron ~ Energy Solutions 5-2 . . . Section 5 Data on Present: Facilities All units are controlled locally by their respective space temperature thennostat. A supervisory control system monitors and displays temperatures for the exhibition hall and main arena air handling units. This control system can only enable or disable the equipment. The exhibition hall main air handling units have a local mixed air controller that is not operational. The maintenance staff at the building currently duty-cycles the air handling units when the building is not hosting events. Only about half of the air handling units operate when the building is sparsely occupied, and air handling units are alternated to even out run time. The arena public restrooms are heated with electric strip radiant heaters and controlled by a wall mounted controller. The majority of the exhibition hall is conditioned with split system units, and packaged roof top units. V. Domestic Hot Water: Electric domestic water heaters provide hot water for the building. Chevron ~ Energy Solutions 5-3 . . . Section 5 Data on Present Facilities Fire Station #1 I. General Description: A. Building Type: Fire Station B. Gross Square Footage: 15,810 C. Year of Original Construction: Unknown D. Building Schedules: The building is occupied 24 hours per day 7 days per week year round. II. Lighting: The apparatus bay of the station uses eight foot fluorescent fixtures containing T -12 lamps. The remainder of the station is illuminated primarily by fluorescent troffer fixtures also with T -12 lamps. Several incandescent fixtures provide light in the restroom, and storage areas. A few compact fluorescent lamps are used in the basement. III. Water: The water fixtures in the facility consist of floor mounted flushometer toilets, wall mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers. The station also has an Ice-O-Matic ice machine with a water cooled condenser. Estimates indicate the ice machine uses on average approximately 384 gallons of water per day. No plumbing fixtures in the facility utilize low consumption valves or moderators. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow 2 to 3 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: The apparatus bay and equipment shop area of the building are heated with hot water unit heaters, each controlled by a wall mounted thermostat. The unit heater fans cycle to maintain the space temperature set point. The hot water coil in the unit heaters does not have a control valve to regulate hot water flow. Hot water is provided to the unit heaters by two boilers located in the basement mechanical room. The boilers are manually scheduled to run approximately October through late April or early May, depending on weather conditions. Chevron _ Energy Solutions - 5-4 . . . Section 5 Data on Present Facilities The office and living areas are conditioned by packaged rooftop units with direct- expansion (DX) cooling and direct-fired natural gas heating. V. Domestic Hot Water: A natural gas domestic water heater serves this building. Chevron . Energy Solutions 5-5 . . . Section 5 Data on Present Facilities A. Building Type: Fire Station Fire Station #2 I. General Description: B. Gross Square Footage: 10,150 C. Year of Original Construction: Unknown D. Building Schedules: The building is occupied 24 hours per day 7 days per week year round. II. Lighting: III. The station uses a majority of fluorescent fixtures with two T -8 lamps. The apparatus bay contains industrial fluorescent T -8 fixtures while the remainder of the facility uses troffer fluorescent T -8 fixtures. Several incandescent and compact fluorescent fixtures are used in the restrooms and storage areas. Water: The water fixtures in the facility consist of floor mounted flushometer toilets, wall mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers. No plumbing fixtures in the facility utilize low consumption valves or modera1tors. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow 2 to 3 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: The apparatus bay of the building is heated with hot water unit heaters, each controlled by a wall mounted thermostat. The south lobby area is heated with hot water perimeter radiation. Hot water is provided to the unit heaters and the perimeter radiation by a boiler located in the basement mechanical room. The office and living areas are conditioned by packaged rooftop units with direct- expansion (DX) cooling and direct-fired natural gas heating. V. Domestic Hot Water: Chevron U A natural gas fired domestic water heater serves this building. Energy Solutions 5-6 . . . Section 5 Data on Present Facilities A. Building Type: Golf Clubhouse and Pro Shop Golf Clubhouse I. General Description: II. III. B. Gross Square Footage: 8,109 C. Year of Original Construction: Unknown D. Building Schedules: During the summer months from May to September, the building is occupied 6:30 am to 9:30 pm, seven days per week. During the spring and fall months the building is occupied from 7:30 am to 7:00 pm also seven days per week. For the three winter months the facility is occupied from 8:00 am to 6:00 pm Monday through Saturday. Lighting: The majority of the building is illuminated by fluorescent troffer fixtures. Most of these fixtures use T -8 lamps but some use T -12 lamps. A few wraparound fluorescent fixtures with T -8 lamps are used in the hallway. The clubhouse also uses a few incandescent lights in the mechanical room and storage areas. Water: The water fixtures in the facility consist of floor mounted flushometer toilets, wall mounted flushometer urinals, lavatory faucets, kitchen faucets, and a shower. The facility also has a Manitowoc ice machine with a water cooled condenser. Estimates indicate the ice machine uses on average approximately 252 gallons of water per day. No plumbing fixtures in the facility utilize low consumption valves or moderators. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow 2 to 3 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: V. Chevron ~ The building is conditioned with several split systems equipped with natural gas fired heating and DX cooling. The split systems are controlled with standard space thermostats. Domestic Hot Water: A small electric domestic water heater serves the main lobby restrooms. A natural gas fired domestic water heater serves the north area restrooms. Energy Solutions 5-7 . . . Section 5 Data on Present Facilities A. Building Type: Health Maintenance Facility Health Department I. General Description: B. Gross Square Footage: 16,892 C. Year of Original Construction: Unknown D. Building Schedules: The building is typically occupied from 7:00 am to 5:30 pm Monday through Friday. II. Lighting: III. The facility uses a majority of fluorescent troffer fixtures with T -12 lamps. Many wraparound and strip fluorescent T -12 fixtures are also used in storage areas and restrooms. A few incandescent light fixtures are used in hallways. Water: The water fixtures in the facility consist of floor mounted flushometer toile:ts, wall mounted flushometer urinals, lavatory faucets, kitchen faucets, and a utility faucet. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow approximately 2 to 3 gallons per minute: on average. IV. Heating, Ventilation, and Air Conditioning: V. Chevron ~ The building is conditioned with several split system units equipped with natural gas heating and DX cooling. The south portion of the building has older natural gas furnaces with standing flame pilot lights located in the attic and aging condensing units located on the roof. The north portion of the building has higher efficiency furnaces, and both the furnaces and condensing units were replaced approximately 15 years ago. Several programmable thermostats are installed at the Health Department, but only one of them was observed to be programmed with a setback temperature. The clock was set incorrectly on this thermostat, causing the set back temperature to be in eftect during occupied hours. The other programmable thermostats had time programs scheduled, but with no change in the temperature set point. Domestic Hot Water: An electric and a natural gas fired domestic water heater serve this building. Energy Solutions 5-8 . . . Section 5 Data on Present Facilities A. Building Type: Multi-purpose arena/office. Memorial Hall I. General Description: II. III. B. Gross Square Footage: 47,435 C. Year of Original Construction: 1922 D. Building Schedules: The main portions ofthe building are occupied from 8:00 am to 5:00 pm Monday through Friday and frequently on Saturday and Sunday for Gymnastics practices/events. During the summer months classrooms on the second and third floor are occupied from 7:30 am to 7:30 pm Monday through Saturday for adult education classes. Lighting: The facility contains a majority of fluorescent fixtures most of which operate T-12 lamps, but a considerable number of fixtures with T -8 lamps are also used in office areas, arena seating, and in hallways. Incandescent lighting fixtures are used primarily in small storage areas. High-intensity discharge fixtures illuminate the arena, and compact fluorescent lamps light the main lobby, foyer, and some hallways. Water: The water fixtures in the facility consist of floor mounted flushometer toilets, floor and wall mounted flushometer urinals, and lavatory faucets. With the exception of one urinal, all plumbing fixtures in the facility do not utilize low consumption valves lOr moderators. Toilets use approximately 3 to 5 gallons per flush, urinals use approximate:ly 2 to 3 gallons per flush, and faucets flow approximately 2 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: The majority of the building is heated with steam radiators served by a Superior brand steam boiler located in the basement. The boiler is rated for 15 psi, but is operated to maintain approximately 3 psi, and is typically operated from November to early May. Most of the radiators are equipped with thermostatic control valves, and the boiler cycles to maintain the single space temperature sensor located in the main floor entrance area. Several of the USD 350 offices on the south end of the building are equipped with window air conditioners. Two split-system fan coil units are used on the third floor for cooling. A split-system also serves an office area in the basement. Chevron ~ Energy Solutions 5-9 . . . Section 5 Data on Present Facilities Packaged heat pump units condition server room 105 and the Access TV studios. Controls: The systems are controlled manually with thermostats. The majority of the equipment runs 24 hours a day, seven days a week and maintains the space: temperature at approximately 730P. V. Domestic Hot Water: A natural gas water heater serves the basement and main arena area and small circulating pump located in the basement boiler room. The three restrooms on the west side of the building are served by a 50 gallon natural gas water heater with a small circulating pump. The southeast side of the building is served by several small electric water heaters. Chevron ~ Energy Solutions 5-10 . . . Section 5 Data on Present Facilities A. Building Type: Museum Smoky Hill Museum I. General Description: II. III. B. Gross Square Footage: 39,857 C. Year of Original Construction: Unknown D. Building Schedules: The Museum is generally occupied from 8:00 am to 5:00 pm Tuesday through Saturday and 12:00 pm to 5:00 pm on Sunday. TIlle Museum is closed on Monday. Lighting: Much of the fluorescent lighting in the facility has been upgraded from T -12 to 32 watt T -8 light fixtures. Fluorescent lighting is used in the basement, first floor offices, and on the entire second floor. The facility uses a majority of incandescent spotlights and floodlights for museum exhibits, displays, and in some storage areas. Water: The water fixtures in the facility consist of floor mounted flushometer toilets, wall mounted flushometer urinals, lavatory faucets, and a kitchen faucet in the break room. No plumbing fixtures in the facility utilize low consumption valves or moderators. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow approximately 2 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: V. The building is conditioned by three air handling units with DX cooling. Two large condensing units for these air handling units are located on the roof; the other condensing unit is located at grade on the east side of the building. The air handling units are variable volume terminal reheat units with electric reheat coils and direct expansion (DX) cooling coils. The air handling units are also equipped with several humidifiers to maintain space humidity set points. These air handling units run continuously and are controlled by an Invensys energy management system to maintain both the exhibit and office area space temperature and humidity set points 24 hours a day. Domestic Hot Water: A small electric domestic water heater serves this building. Chevron ~ Energy Solutions 5-11 . . . Section 5 Data on Present Facilities A. Building Type: Performing Arts Theater Salina Community Theater I. General Description: II. III. B. Gross Square Footage: 15,225 C. Year of Original Construction: Unknown D. Building Schedules: The building is typically occupied from 8:00 am to 5:00 pm Monday through Friday. The building schedule varies for rehearsals, productions/performances but is generally occupied three nights a week from 5:00 pm to 8:00 pm, and on weekends from 12:00 pm to 8:00 pm. Lighting: Approximately half of the lighting in the building is from fluorescent T -12 fixtures and half of the lighting is from incandescent fixtures. Incandescent lights are used mainly in the theater, lobby, foyer, and studio. Fluorescents are used throughout the offices, storage areas, practice/rehearsal room, stage, dressing rooms, and restrooms. Water: The water fixtures in the facility consist of floor and wall mounted flushometer toilets, wall mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow approximately 2 to 3 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: The building is conditioned by packaged rooftop units (RTUs) and split-systems. The RTUs and split systems have natural gas heating and DX cooling. Standard space thermostats control the split systems and R TU s to maintain the space temperature set point 24 hours/day. V. Domestic Hot Water: Chevron ~ Three natural gas fired domestic water heaters serve this building. Energy Solutions 5-12 . . . Section 5 Data on Present Facilities Police Station I. General Description: A. Building Type: Police Department Facility B. Gross Square Footage: 29,440 C. Year of Original Construction: 1968 D. Building Schedules: The building is occupied 24 hours per day 7 days per week year round. II. Lighting: The facility uses a combination of T -8 and T -12 fluorescent light fixtures. Some of these fixtures are recessed troffer fixtures and some are surface mounted box fixtures. The facility also uses a number of eight foot strip fixtures. Some incandescent and compact fluorescent fixtures are used in hallways and storage areas. III. Water: The water fixtures in the facility consist of floor and wall mounted flushometer toilets, floor mounted flushometer urinals, lavatory faucets, kitchen faucets, and showers. Toilets use approximately 3 to 5 gallons per flush, urinals use approximately 2 to 3 gallons per flush, and faucets flow approximately 2 to 3 gallons per minute on average. IV. Heating, Ventilation, and Air Conditioning: The building is primarily conditioned by three multizone air handling units, equipped with hot water heating and chilled water cooling. Neither the hot water nor chilled water coils have control valves for flow control. The multizone zone dampers modulate to maintain their space temperature set point. A hot water boiler located in the basement mechanical room provides heating hot water for the three air handling units. The boiler is manually scheduled to run October through early May. Each air handling unit is equipped with a hot water coil pump. A hot water booster pump serving the former floor radiant heating system was operating at the time of our survey. A Trane air-cooled chiller provides chilled water for the three air handling units. Each air handling unit is equipped with a cooling coil pump. Chevron W 5-13 Energy Solutions . . . Section 5 Data on Present Facilities Two small cooling-only split systems provide air conditioning for the detention area on the main floor and an office area in the basement. V. Domestic Hot Water: A natural gas domestic water heater located in the basement mechanical room serves this building. Chevron ~ Energy Solutions 5-14 . . . Section 6 Measurement & Verification The heart of any performance contract is the guarantees with which it is associated. Not only the guaranteed price of the installation but the guaranteed savings generated from the installation of the energy conservation measures. While the installation guarantee is easy to track and verify, the savings guarantee is more complex, can be done in different ways, and can be left open to interpretation. However, when done correctly, not only can the savings be measured and verified, but the customer can achieve many additional benefits from the equipment installed, over and above the guaranteed savings. The following section introduces Chevron Energy Solutions' Energy Management Group, and outlines some of the services it can provide. Specifically, these topics will address: · Energy Management Group Overview - Including its staff, experience, and capabilities. · Measurement and Verification (M& V) of Savings - What are the options, when should they be applied, and what are the benefits of each. · Client Specific Recommendation - Based on the parameters of this analysis, these are our recommendations for a workable M&V plan that gives the greatest ongoing benefit, and ongoing Monitoring Services. These are included in the base Monitoring fee. · Monitoring Services - The scope of Standard Services included and Optional Extended Services from the Energy Management Group. Measurement & Verification of Savin2:s One key to successfully achieving the predicted savings of any project is the accuracy of measurement techniques employed, and the validity of the energy baselines. To assure confidence in these processes, Chevron Energy Solutions will follow the International Performance Measurement and Verification Protocol (IPMVP). This protocol is recognized by the National Association of Energy Service Companies (NAESCO) as the standard guideline of how savings resulting from energy conservation projects should be measured. The IPMVP defines four broad options for measurement and verification of energy savings. Each option is applicable to specific situations; and, oftentimes, more than one option is possible. Multiple options are often implemented on a single project. The broad categories of the IPMVP layout as follows: · Option A - Partially Measured Retrofit Isolation - End-use measurements, some stipulations. · Option B - Retrofit Isolation - Complete end-use measurements. · Option C - Whole Building - Energy use analysis on multiple systems. · Option D - Calibrated Simulation - Computer modeled building savings. Chevron ~ Energy Solutions 6-1 . . . Section 6 Measurement & Vt~rification Often overlooked is the necessity of identifying the M&V plan coincidently with the project development. In some cases, it is necessary to drop or ignore a portion of savings associated with a specific retrofit for the simple reason that that portion is unreasonably expensive to measure. Implementation of a verification plan for the diverse types ofECM's typically involved in a performance contract usually requires a combination of methods to successfully measure savings. Even for a given ECM, verification categories may be crossed by combining a stipulated and an end-use measurement component into the savings calculation. Factors that guide the selection of an M& V method for each ECM include: * Cost of measurement vs. savings * Timing of measure installation * Likelihood of future ECM's at the same facility * Likelihood of future construction at the facility * Degree of sub-metering within the facility * Complexity ofECM's to be installed * Level of interaction between ECM's * Dynamics of the facility's energy baselines * Likelihood of sustainable savings from the measures Due to the variables and dynamics that are unique to each performance contract, and often to each facility within a performance contract, an individual measurement and verification plan must be developed for each situation. While the specifics may vary, the general method employed will always follow one of the methods outlined in the IPMVP. The following paragraphs detail the M&V methods being recommended for the City of Salina: Option A - Partially Measured Retrofit Isolation This option allows for the energy savings to be calculated using a sampling of field measurements combined with stipulated parameters. The savings, once calculated, are usually stipulated to for the life of the project. Ongoing actual measurements mayor may not be used in this verification technique depending on whether the predicted savings and/or volatility of the measures implemented warrant the expenditure on additional field measurements. A possible application for using this option would be for lighting efficiency improvements whose performance may be relatively stable and not interdependent with other measures. The savings for the lighting upgrade would be quantified by measuring before and after power consumption for a representative sample oflighting circuits and by stipulating or agreeing to the hours of operation of each circuit. Entirely Stipulated Savings While not directly defined as an IPMVP option, the protocol recognizes that there are instances when measurement and verification of the savings is not warranted. In cases where the cost of measurement is too high as compared to the savings, where the parameters preclud1e accurate measurements, or where the confidence of the savings projections is high, the Client and Chevron ~ Energy Solutions 6-2 Section 6 Measurement & Verification . Chevron Energy Solutions may agree to stipulate to those projected savings for the term of the project without any additional measurement and verification of the savings. Recommended Measurement and Verification Pro2ram The table below represents a proposed M&V approach which balances M&V cost with the value of savings associated with each component. . % of Energy Savings $ of Savings M&V Recommended ECM(s) Building(s) Component Option Program * Bi-Centennial Center Community Theater Fire Station No. 1 Fire Station No.2 Electricity L1 thru L6 Golf Clubhouse A 47.5% Health Department (kWh) Memorial Hall Police Department Smoky Hill Museum Bi-Centennial Center Community Theater Fire Station No. 1 Fire Station No.2 Water & Sewer WI thru W4 Golf Clubhouse (cd) A 15.2% Health Department Memorial Hall Police Department Smoky Hill Museum W5 Fire Station No. 1 Water & Sewer Stipulated 4.4% (Ice Machines) Golf Clubhouse (cd) Bi-Centennial Center Community Theater Fire Station No. 1 Fire Station No.2 Electricity and All others Golf Clubhouse Natural Gas Stipulated 37.2% Health Department (kWh & mct) Memorial Hall Police Department Smoky Hill Museum . * Savings associated with ECM VI have no associated units of energy savings. These savings dollars are excluded from the calculation. Chevron _ Energy Solutions ... 6-3 . . . Section 7 Environmental Impact Purpose The City of Salina has retained Chevron ES to identify and evaluate energy conservation measures (ECMs) that could be implemented through a performance contract to produce improvements in energy utilization. Chevron ES has conducted thorough surveys of the heating, ventilation and air conditioning (HV AC) systems, lighting systems, building energy controls, water-use areas, and building envelopes of buildings at the City of Salina. The purpose of the survey was to locate and analyze mechanical, controls, lighting, water systems, and equipment to determine which ECMs could be implemented to provide the maximum reduction of energy usage at the minimum cost for the City of Salina. The recommended ECMs in this project address and achieve these goals. Greening Measures for the City of Salina The ECMs that were discussed in Section 2 will reduce the amount of energy used to heat and cool the buildings while simultaneously increasing occupant comfort: . HV AC Improvements and Controls . Replace Split - System Units . Replace Condensing Units . Replace Boilers . Replace Unit heaters with Inferred Radiant Heat However, there are additional benefits beyond energy savings that will be realized through the implementation of many the ECMs: Lighting and PCB Ballast Disposal: All PCB-contaminated materials will be incinerated pursuant to the U.S. Environmental Protection Agency Final Rules 40 CFR 761.70. All uncontaminated (less than 50 ppm PCB's) metal components of the ballast shall be recycled, recovered, or reclaimed. Chevron ES will insure that the ballast disposal company provides a manifest and certificate of destruction pursuant to 40 CFR Subpart K. Environmental Impact on Pollution Direct Emission Reductions: Every mcf of natural gas that is burned by the City of Salina to generate heat will produce NOx, SOx, and CO2 emissions. Reducing the amount of natural gas required to meet the building heating load results in a direct reduction in emissions. The existing annual emissions of NO x, SOx, and CO2 compared to the projected annual emissions for the Recommended Program presented in Section 1 is shown in Figures 7-1 through 7-3 below. These results are determined from the energy savings that would be generated by the proposed ECMs that reduce natural gas consumption. Chevron U Energy Solutions 7-1 . . . Section 7 Chevron ~ 2,000 III :5! 1,000 10 III :5! o 1,000 III C o I- o Energy Solutions Environmental Impact Figure 7-1 Annual NOx Generation 1,679 1,553 Baseline Recommended Program Figure 7-2 Annual 502 Generation 5.1 4.7 Baseline Recommended Program Figure 7-3 Annual CO2 Generation 512 473 Baseline Recommended Program 7-2 . . . Section 7 Environmental Impact Indirect Emission Reduction Indirect emissions are defined as the emissions associated with generating electricity at the utility's power plant, which is assumed to utilize fossil fuels to generate steam. Chevron ES has identified ECMs that would result in reduced electrical consumption, and if implemented, these ECMs would aid in the reduction of emissions such as NOx, S02, and C02 produced during electrical generation. Every annual 1 0,000 kWh reduction in electricity use equates to the carbon sequestering of 2.5 acres of pine or fir forest or equivalent to taking 2 average cars off the road each year. fit tit ~ The corresponding environmental impacts of implementing the Recommended Program presented in Section 1 is shown in Table 7-1 below, and is based on the projected electrical energy savmgs. Table 7..1 Actual Program with Annual Savings of 370,907 kWh Emission (Ib/vear) Types of Fuel Saved CO2 NOx S02 Coal not burned: 879,132 1,385 2,593 Gas not burned: 7,315 18 65 Total Fossil Fuels not burned: 886,447 1,403 2,658 The project equates to: 93 Acres of Pine or Fir Forest Planted per Year 74 Cars off the Road per Year Chevron ~ Energy Solutions ... 7-3 Appendix A Standards of Control . . . <C ~ o z W Q. Q. <C as c .- - as fJ) - o ~ (3 o ... - c o o - o UJ "0 ... as "tS c as - fJ) 1 III ell Q. ell a- D. "1:1 CD '5, " ". 8 e .~i i 0 o-::J" ~ 01:" f:! 0._ Ii !t! ~ i '5, " ". U e =lil" b i c:=! ~ os ::l CD b ~ 1 ~ ~ '5,~ ~ c3 CD "S "1:1"1:1 CD CD Ci,7.i ~1Il uo 00( > :r >. '" ~ '" o .c N ~ .e :t:: o lt '" '" Q. '" g '" o "1:1 CD rn '" al b ~ M ~ b l!! b ~ >. '" 32 [!! '" o .c N ~ .e :t:: o lt '" 1II Q. '" 8 o '" o "0 III 1II al o II) ~ M ~ b ~ o ~ "" CD CD ~ ~ "0 ~ o o o N o o co o ~ ~ M ~ :::. l!! b ~ "" CD CD ~ rn ~ "0 II) o o 00 ~ o o ~ o in \0 Ct, ~ ~~ <') <') <') ~ ~ ~ boo ~ 92t: o 00 ~ ~ ~ "" "" "" 8l 8l 8l ~ ~ ~ ~ ~I'l' 1II 1II1ils "0 "0"0 ~ ~ ~ 8" gl~ ~ ~:!2 , [!! o.c Ov 13N o o ~ o "1:1 CD '5, " ". 8 ! cnO:;J \o~\O\ofofo~:n\o:n 0 a:5 i .....,....,.... 1'-,........................... r-- !::: 8-1:-;-:-:-:-:-:-:-:-:- 0 ullE g~gRRg~gg:e g .~t! u u o 0) c:: ;:; III OJ( W "1:1 CD 'is. " ". U f .eg~~refe~fere ~ 123.:-:-00 :-:- - J:i e ~gggRg ~ 1~ u u o o <') ~ - M ~ b ~ - b ~ 'C c: "C c: "C c: "t: c: 'C C"t: C CD LL:;'U.::JU.:::JU.::::::ILL:JL1.:::J "S I en I rn I CI) I en I (I) I en 'C 515 51g 61g 5:; 5~ 6~ jl:iirn:iirn:iirn:iirn:iirn:iirn ~ iif~iif~iif~iif~iif~iifiif CJ~:!2:e:!2:e:!2~:e:e~~~ 0(> ....~ee?~e?....e?e?~~e? ._ ..c:..c:..c:..c:..c:..c:..c:..c-C.c..c:.c :r~~~~~~~~~~~~ "1:1 CD ~ CD rn os e 0( Q) '" :Q ":; al rn 1II l!! <( 2l == o "0 '" 1II Q) '" os: :.::; ci z '" ~ S rn l!! u: rn 1II l!! <( 2l == o "0 '" 1II Q) '" 'S: :.::; N ci z '" o ~ en l!! u: <( CD rn '" o J:: .c '" U "5 o rn CD (J == o "E CD E 1:: 1II a. CD Cl ~ Oi CD :c <( ~ 8 rn rn '" '" l!! .- 1II rn ~ 1II CD ~~ CD= ~<( o ~ $ 1II CD J:: I- &;0 'c '" E E o U 1II .S Oi rn E '" CD rn '" :ii :c ~ o E rn Appendix B BV AC Equipment Tables . f: <( N ~ :c <( -d ]! :S f! o '" ::J '0 '" ~ -d ]! :5 N "T ~ ~ ~~ -,!. EE :c ~ ~..... :i oE r---~ ~o i~ ~~ -gO 1j2! ~U) ~.~ :O~-5ii~ 'E- ~~tazd 'j~ ~6'!!!~'!-6.S1\i 'cNO<eO)".;]"Ci- :Jqj~~6.~~~ ~B~2~m-8'j .",oin"'><(E E (!!::2N"Ea..5UJO 0 2i-g "8 'l''jijD.':: e ~~..~~~5m ~ 'OOC")IC:::Z~O 8 ~~~~2Nm~ OJ .-oc:,;.:or-li)= .5 Se~~~~a.1ii ~ al '0 l'l . f! 2-d i!! "' ..':il::..ca is 6 aJ. Q) ~ &Woo~.~:8f! ~~c;.:8.!!Q) c..a.. ,g - c: - 15 E E~15Zt2~c:'" ~:Cu~-i:iQi:B"D <("C l!!-a 0'- ct:j offi5og,5~o ~ "0 c: '" C5 "0 c: '" <( o ~ s ~ s ~ xxx 000 ~ :c o ~ :c o "'~'" '" ~ ~ C::!~~ N<ON .... .... .... aj ~ 00 . o 0 <0 <0 a a '" '" N N o '" ~ <0 o N o .... ~ <0 o N Ul~lt) -ciT"'" '" '" .. c: o ~ :; ::!! .. c: o ~ :; ::!! o 000 000 ",0", >~> <00<0 ~o~ O(!)O mOm a:: I.!! a:: msm <0 N ~ .g.g .g 00'0 .. .. .. www eT!!~ .. .. .. c: c: c: .... .. (!)(!)(!) .. "' ::J o .<: OJ c: ~ ~ .. ., ::J o .<: OJ c: 1i ~ '" c: c: .. E III '" m 15 o ;:;: ~ u: . s ~ ~ :c o '" ~ oj o 0 '" '" ~ ~ o 0 N N '" .. c: o 'l' ~ ::!! ~ c: .. "' ::J o .. .<: c: ~ f! ii .- ~ 15 o ;:;: "0 c: N '" ~ :c <( N :c i ~ ~ ::!! b l>- '0 VJ '" c: C1. 0 rl 0 a~ C1. m ~ ~ '2 ::J ,.. '2 o OJ .5 o o o .! ~ (p =s ~ ~ 'E'E 'E ::J::J ::J .<:.c: .c: E E E ~ ~ ~ rn 'U Q) U) CD .~ .~~.~~ .9 .9;.3~ 6 (5 II) 6 Q) C1. C1.E C1.E ~ ~i=~i= .. c: o Z x o x X o 0 '" ~ ".; '" o .. c: ~ .. c;, c: en '" .. .<: .. a:: o m o .... U N .... ~ .. .. c c: ~ ~ E o o a:: ii: o o E o o a:: ,.. C1. o o ~ :c <( N :c N oj .... @) 15 <; ::!! u.. (/) c: o o ~ m m <( X o '" ~ 1ii .. .c: ~ '" .. .c: .. a:: .. c: f! I- 15 o ;:;: f! u: 15 o ;:;: "0 8 .. (/) N ~ :c <( '" ~ :c <( . . as ..... as C Q) ..... as - a. Q) E as z ~ Q) - .- o m . . . . . '" '" ~ J: "" <D < E <D .. 0 Z C e l!! D- " s::s:: < u u <D :> 2: .. .. 0; ., :> 0 <D <D <D '" l!! l! 01 .. C 2: .. C i!! .. .. ./: <D l!! .C '" '" ., :> " <D 9l <D .. ",-0 r-- :> :> C i'l i'l"" I tUti ., 0 lU~ "" > > '" IE C i'l C C :> :i 0 '" C ..eJ! ~ .c 0 0- .!!! """" "' "' l!! !~ :> '" '" :> C C C ~ 0 00 53 .. .. <D 00 :!! '" CJ) CJ)J!! !~ '" ., C ~ ~ :> '" '" <D <D '" :g i l!! l!! ;g. :!! ~ ....i: 0 2: E E <D E E :; ~ <D " 0 0:2 88 E CJ) CJ)Z ON - ............-.......... "'''' r-- ~ '" C'\It'-....r-- 0 ": N~,..;,..; 0 0 0 0 0 0", "' "' ~ '" '" "'0 "" "" N N NN "' N 0 N N N,,",," ~ N N N N N N IX: IX: IX: IX: '" "'''' . '" r-- "" ::: "$. ~ 0 0 0 0 ~ ~ "' '" "" N ~ 0 0 ~ 0 0 0 Ci '" ~ 0 12 0 IX: "' Iii r-- "' .g 1i C C " [ij ~ ~ i! lD lD <D C <D <:l ')I '" "f ~r;; J: :i: J: -lD < < < Ii. 0 ..J C D- .. '" 2:- 5i ::> CD ::> ~ u 0 0 . . as ..... as C S as - a. CD E as z ~ CD ..... as ~ . ..... o :E: o ;; fA CD E o c . . . . CIS '1ii c S CIS CI) E ClS Z rn CI) u CIS C ... ::s u.. e '~ 5l $ '2 ::J '" ~ ::J o E I~ '8 '0 ~ ~ 1-1- I- - <'l o? I- _ o <'l '" - - xx 00 .!!! e .!!! e .!!! e o '2 2 '0 .. iiJ o U .. iiJ o co o o ~~ e~ m .. e ., l! ,l!! t;:i .. 0 > e e .. ..J ., E e 15 1 g:9 i!2 .. E I- a; Ie e .. O.c ;:;:0 :c:t= :2~ x w '- - - .5 Qi om .c~ '::0 ..- I=;~ l:= e ., ,- .. :!;!CJ 00 o e ., '" ,- .. ".c ~ 8 - .. OlE :5::J ",u- ti ~ E ~ 5~ ~ g 'E o E <( ,5 ~~ "0 .. ,il! 5l IE ::J uig ~ '28 E E ~ 'is tDC ~ i ~ '0 ~ <( . lE 1~0C3:: Gi~~~ o e ::J .., ~~ ~~ - ;e;e U') dd ci ---c CD x-g 00 U } e e .. .. xxx-gx'" 00080 } g g g 00 0 ~~ m ~ ~ 00 0 '2'2 '2 e e e tl tl tl .... .. iiJ iiJ iiJ ~ .,., '" .... .. Cl Cl Cl ~ ::J 1i Z e~ ::J ::J 10m zz '- Iii co ~ m W co o :; ..J m ffi!J5 0; ::!ia:: 0 i1ii1i ~ 9i ~ if w '" ClCl m a::a:: <'l - o :a .. iiJ ~ CD e CD Cl - ~ o o u:: 'lil ~ ~ ~ e e ~~ ~ ~ a::a:: m m E5 -g g]lg> .. ~gl B ~8~~;g~ :ag~e:Ra:: :nii~ t c e u: u-.: 8a. .. l!! <( 8 == o - LL ~:g:: ~ ~ <'l ::!! ~~ ~ <( o o 0, r::. '" '" '" o o o ~ r::. o o o <Ii co o '2 2 tl " iiJ ., .. Cl ~ ~ Z 0; o '" ~ ~ U '" m '" '" a:: ::!! Z ::t. <( JC:.!! .!e.!! c: ui ~ en ~.. 95 'S'5:g;; en '5 !i lii:6~3 ~ ~ ~l ll~5i ,g., ",e e~e;:j c: .c: Q) cu c: ,9 'E :t=g. oo~ii "....:r2 ==.!.:Ii is c5 ~ ~ <( ~lI:: !3 e ' 0 ~ '0; l:':l~,~~~E':' m i!! E"'''''''''''~~ .~ '5~~~:e5~3ii ::J "'::J::J'2l:el:l:",,,, ,~ t~,~:!~-i~~~~ 9' e_9inO",0000 .....,;-........""E..EEEE "'8",,,,,,,:5~.Q~~~~ ~~~~~'j:E ~:E:E:E:E zi!!ZZZI-::!io::!i::!i::!!::!i ~~ ~~ e e .. " xx-gxxxxx-gxxxx 0080000080000 } } g gggg g o 0000 ~ ~ ~~~?J ~ 0000 0000 0000 ...-riai..- cnmcom g gggg g ggg8 ~ ~~~~ ~ ~~~~ Q) OOCOLO,..... ~ ~~I'-~ I I !! II a. :e- :::, e e e e e e e '0 '0 '0'0 CD G) CD CD iiJ iiJ iiJiiJ 1: ~ 1: 1:.S:l :3' ;3131;3 2 :Q :Q:q:9 1i ii: ii: ii:ii:iiJ t1J en en U) II) fh en UJ (I) (I) CIS \Vasnsm as ClSasllSta Cl Cl Cl Cl Cl Cl Cl Cl Cl Cl ~ !f!ee e! l'!1!1!1! ~ ~~~~ ~ ~~fi~ Z ZZZZ Z ZZZZ co mmm..- o NNW I (,0 "It'"V tv) 1.0 ill tn ill ffi li- e ggm8 ~ ooota 3 333~ m mmm ~~ ~ $ 88J;8 ~ ~~~~ '" <'l~O'" 16 1616~16 N N N(!)N Cl Cl Cl Cl (,) to) (.) U :a ii~~ Q) Q) Q) Q) iiJ iiJiiJ iiJ ~ " e .. Cl ~ ~ e e ~~;~ ~ e e e " " " ClClCl )( )( x >< 0000 c: c: c: c: c c: c: c: ~~~~ '" 10 co ,.:. ~ ~ ~ ci ~ ~ E ~ a:: ., E o e lfi e ,2 CiS 1i:N 1! 0:::00 tV -g.:; 55 tU~ Cl ~ ~ o ..J ~~ E ,,:r~8 NfD......l:l:: ~~~B ""-M...... c: ~;'!E~ Cf) E E ct: ~ E a:: a:: U a:: ;t ~ 11;t~ <( <( <(<(<(u- E ~ ~ ~ cn~Sl~W e.Qf!!~;g ~ ~~~.~ CD ::l= Cl ~ 's e .ll! .2: e o <(<(g: 00'6 000 eeU - e .ll! E .. co cO , '" -r- '- Ii; e .. " "G ~ '0; o '2 2 '0 " .. '" .. I -fi .. " I m ::!i '" ~ '2 ::J E " '" e .l9 - - - m~H~: o o o <i co I- o 0 o 0 o 0 uf uf o '" ~ I- -I- .. IICDI; ~~ 00 ~~~$l i:J: cncnrnE :2 13ffl a:: U uu - UU ~ <(<( a. a. ;;~~n :t:i:u...u.. <(<( 00 UU CD " iiJiiJ ~ a.a.u- ",,,,Z , ,0 ~100 U;>~~ com", i'iiiiiJ: UUI m ::J x X 00'" e e ::J e e ::J ~~o:: o :a " iiJ I- I- '- Kl Cl ~ ::J 1i Z I- 11i ..J :2 ii: I- "'., ., .. .. .. ClClCl ~~~ ::J::J ::J Qiii'tU ZZZ I- o '2 2 '0 " iiJ g'! ~ 10 o ::!i U m Z u- a:: ::!! ~ N~u'J ~O'" ~o~ U..!-J, :!~~ N'r"(O ~U~ ~I- E~~ tD22 :StVCD <(..J..J .. i!! .. '" 1:: .. -e CD E CD ., .. m -I- :5B Eg~ ~ ~a::-g e .. " a; ~~~ ~~ a:: 1-1- '" " .. .., ..!!! -0 Z IN~ ~"'I ",$..., :ttJ:~ -'- . . . C') C') C')C') 10 10 10 ..... 0) 0)0) -.: ......:-.: cO ~ ~~ ..... ..... ..... 0 00 CO V vv 0 ~ ~~ N CO CO CO 0 00 N NN 111 10 1010 0 00 10 10 10 10 N N NN ...... ...... ...... ...... ..... ..... ..... ..... 888 t\l t\l t\l I- I- I- ~ :c u ~ ~~ :c :c:c ~ u ~ ~~ 0. E E E :::J :::J:::J a.. a.. a.. . ~ ~ .. .c i:.-.; .. ~ ~i~ "::!i~ ~g ~.5 cn-u.. ... i'~~.~~ lIl~m~~< ~i!~~go "",UNOogO "IltO:::..-U.....Z M(I') _ (")..... ..: ""=""'= ...'" ~ "'''' NN ."" "'''' 00 00 "'''' "'''' "'~ '" '" '" ~ "'''' '" "'''' . ~ ~ ~ ~ !:: ~ ~;: "'''' "'''' 00 00 "'''' "'''' - - ~ ~ 0 ~~ ~ W ~ ~ .. .. .. Cl ClCl i! ee ~ 33 .. .. Z zz '" '" '" ~g 0 ~~ ... ... '" '" . >< >< >< Cl Cl Cl ~~ ~ ~~ ....1lg.. x ~ ~ ~.... ~X>ON ::> ::> :J :::> ~ ~ ~ ~ E .. ~ ~~~ .!!:8 ~~ tf o~.s <( ED ()..r;: . . , , I tI)::> => ~i:!~ ~t:: ."" '" Appendix C Gas Price Comparison . . .- :.... ~ c. e o u ~ CJ .- :.... ~ {of.) ~ (J . u ~ .- "'C = ~ . In CD OJ ... as .t: o :::... ~ '0 o E E o o In as C) Ci ... :::t - as Z Ci u ";: o - In i: CD u ":; ... CD en In as C) In as In C as ~ .... o CD :a as I- Q)2~::- cn~\j- '" c:: 0 U ~(/)E.€ >(,9E~ <(:.::8- c CI) E 1;: .~ CI) Q CI) .!:! '0 l1. "'~- 0-0;;:: ....ou (/)EE (,9E~ :.::8- .~ &C 13mE C.t::.- _ ~()~ <IlE;= en '" U '" -0 E (,9<1l~ J:'!? <('0 Z E :5:~ -~'5 ~ (,9 E ()o~ ii J: :! C5 E .. :!! "'~c: ~"813 (/)EE (,9E~ :.::8- .~ 2l,;;:: "50;~ C.c:~ ~()~ Q);;:: en '" U ~al.€ J:~ <(;;:: Z ~ :5:~ -~'fi ~ (,9 E ()o~ ~ ~ oil tJ ii 'E c: oil C oil (J iii m~ (5"00;:: .... 0 U (/)EE (,9Ei!! :.::8 .~ ~c .c: ~ U U '" E C.c:~ ~()~ GlE;= en '" U '" -0 E (,9Gl~ J:~ <(13 ZE :5:i!! --~13 ~ (,9 E uo~ OOMC\lCOtO(,Qf'-CX)MLOLO 1"--'0:::1"0('1")0> 0>1.0<0...... N(o 0') ('I')I"-O>C'\I,...............('I')OOO)('I")...... ~ocioo)aio)mai,....:,...:ai ......,.........,...Efl-W&'7(fl(flEA-ffl-Efl tfl (fl W !fl ac::nO'>C\lcococo""","como...q- CO.q-('l')MO>O'>O>l'-vMO)...... IOcnC\lC\l,...............OO>CO-q...... ~o,...:cimaiaioiaicocciai ........................f/7W(flWEf7f:17Efl-f:17 t1} W EF.t (fl I.ON"Ctcn""," "Ct-.::tMI"--............('l') d~ddd6d66d~d fhtflEA-EA-tfl-eA-EA-tfltflWEA-W OOcY')('f')('l') C"')('I') ('l')('l')OO 0 OOV'O::f'"'O:::t" "Ctv-v-.:;t'ooo gg~~~~~~~ggg 0000000 WeA-Efl- WEA-fR-W 000........-,...,...,...............,........ NNNCOCOCOCOCOCOrococo (")(f')('f')..q-.q-..q-'o:::t"-.::t"Ctq-...q-"Ct NNC\lNNNNNC"JNNN ciciciocicicidcicicici W(flEflffl-ER-ER-WEflEfiWEA-W COO'>MLONNN............r--OC") tOlO.......C\lLOI.OLONNO>MN O'lO'>O>NC") ('l'){f')NLOr-MM ,..........LO<oteCO<.OLOMmOlq- cicimcri"":"":-"":""':cci""':t.cicri ............Wffltflffl(fl(fl(:,C}EA-WEfl- Y> Y> omO)NCOCOtOI"--COcnO..q- COv('f')(")o>o>mt--vMO),... l.t)O)NN..................Ocnc.o'V,..- "":ci"":ciaiaiaiaiaicricOai .....,.............tflffl-tf.)-f:I7(flffl-f:hER- ER- ER- ER- ER- l()C\Iq-m'"d"-o:::t-q-(t)........T"""~C""l ddcid~dciddddd U7ER-ER-tflER-WER-EA-EA-ER-ER-ER- OOMMC""lC")MC"')MOOO OO"l::t"C:t..q-"l::t..q-...q--q-OOO gg~~~~~rq~ggg 0000000 EA- ER- W ER- ~ ER- W OOOT"""T"""T"""~__~______ NNC\lCOcx) co co CO CO CO co co C""l('l')M"l::t-vv-v-vv'V",,"-v "!,,,!NNNNNNNNNN oocicic:icicidcicicici WWER-ER-(:RoER-U7WWWWER- COmMl()NNN____f"-C""lM tOlt)........NIJ')l()IJ')NNO'>MN C>O)C>NC") (l")C")Nlt)........(I")C""l ........--LOtOCOtO(O\,()(I")Q)m""" c:icioicci""':""':""':""':cri""':1riai ----ER-U7ER-WER-WfflfhWffl Y> Y> O'>--NN<.OCO........CO........O"""LO -q-NMMO'>O)........-vIJ')O'>__LO ~~"!"'!~,.-OO'>lt)V,...M oooomoioiaioicrioioi ,...,...,...,...fflWfFJ-EA-EA-EA-U7ER- EA-ER-WER- Nmo,>o,>..q--vC""l........CO__C""llt) dciddddddd~dd EA-EA-ER-ER-ER-EA-ER-EA-ER-EA-ER-(:Ro OOMMMMMC""lC""lOOO OO......"l::t-vv-v-q--.;;tOOO gg~~~~~~~ggg 0000000 ER- U7 (;F) (;Roo U7 ER- EA- ",.c: c- ._ c == 0 CO:2: 00______,.-,...____,...,...,.- NNCOCOCOCOCOCOO::>cococo C'lC'l'<t"'<t"'<t"'<t"'<t"'<t"'<t"'<t"'<t"'<t" NNNNNNNNNNNN cicicicicicicicidooo ~U7ER-U7EA-E&fhb'7b'7U7U7ER- O'>Ml.Ol()NN,...__........C")(\")CO I.O,......NNLOlt)C'\INO)(\")N__ Q)mNNC""lC""lNlt)........(I")('l')CO __L()CO~IDCOl()Mo)o)......CO ci05a:icri""':""':""':cci.....:t.ria:ia:i --U7ER-U76CfEA-EA-U7EA-U7U7(;F) Y> corocoro(QCOCOCOCOCOIDCO 9 9 999",9 9 99 9 9 9 c:..c ffi a~ c:"'5 OlQ.ti > u J!l.f:2:<(~~""~Jjo~t3 CO('l')'V........COCOC""l,.-__O.............. OOMm("')MOO>-.:;tO>COq- 'V-vNmCOCOCON('I')........MCO a:iaidai05oioimcc:i"":a:icci ER-U7__EA-f;R-tflER-ER-ER-WEA-ER- Y> v-q---........COCOCOv,...o>OO MM........,...... ('l')('I')('l')M'o:;t....... 0'>0l -q-'oc:tN__COCOtOLOMO>LOIO aiaidcioioiaio:icri""':c:cic:ci EA-ER-____(;I)-fhEA-f:I7f:17U7U7fA. Y> Y> lOLOO>COtOCOCOLOOO::>T"""__ vvv'o:;tV'V"Ct"Ct..q-M..q-..q- dciciciociciciciocio ER-EA-Wf;;hW(;I)-EflER-f:I7(;F}f:I7f:17 OOCOCOCOCOCOCOCOOOO oO..q-",,"-v-q-oq-'Vvooo gg~~~~~~~ggg 0000000 ER- ER- U7 U7 EA- ER- ER- wro;X;U;U;L;;u;;;;u:;u:;u:;;n 'o:;tq-q-........,............................................................ NNN______T"""__T"""______ dcicicicicicicicicicici (fl(flWER-U7U7EflfA.U7WEI}OO ..q-q-MLOLOLOl()o>C"')COM('l') (OromNo>mmm..;::f-MtOCO MM..;::f-M__T""""-""CONOO ,..............cotO~T"""'T"""OCO..q-oo cricriccicciccicc:icciaicri""':aicci ER-ER-WER-EA-ER-fflfflWfflfA.EI) LO..q-................cococo..q-T"""NmO LOM........r-MM('l')('l')..q-T"""........O> ('l')'VT"""__cotOCOU")C"'l-q-cnLO oioiciciaiaioioicri""':""':cri ER-ER-__,...EflEflER-oo.fflEl}ffloo. Y> Y> L01.OCOCOCOCOCOLOOLOCO__ "'>tvv-q--v..;::f-<o::tv"'>tC"'lMoq- cicic:icicicicicicicicic:i f;flfflfflEflWfAfflEA-fflfflfflffl OOCOCOC:OC:OC:OCOCOOOO OO..;::f-"'>tvvV",,"'o:::tooo cici~~~~~~~cicici fflffl . . . . . . .U7fflW 0000000 ffl Efl ffl Efl ffl Efl ffl ;x;;x;;nLOU:;U;lOil)U;U;LOU; "'>t"'>tr--.-r--.r--.........................r--.-r--.-................ NNT""",...,.-T"""~T"""T""T""~T""" dciciciciciciciddcio EflEflfflEflfflffltl7Eflffl-Eflffl-Efl CO'o:::t1.OLO LOLOJ.t)O)cr')('I") (OM __CDNNmmmmvvMCD CDMM(\")T""~T""~C:OaJNO CO........COCO__,.-__OaJaJ-vO ccicciccicciccicciccicri&:O&:O""':cci fflEflfflfflEl}EI}fflfflfflfflfflffl ~~u;~~~~:g~~g~ vMN<OCOCOLOCOMmLO....... oioicioicnoiciaicri""':cricri Eflffl__fflER-oo.Eflfflfflfflfflffl Y> IOvmCOtDCOLONOCQT""N vvvvvv..q--q-..q-M-v-v c:ic:icicicidcicicicicici WfflfflEflWfflEflU7(flEA-ER-W oocococococococoooo OOv<o::tv..;::f-..q-vvOOO . .aJCOCOC:OCOaJCO . . . OOCOCOCOCOCOCOCOODO fflffl . . . . . . .fflWffl 0000000 (;R- ffl ffl Efl ffl U7 ffl rococoU:;U;U:;U;U;u:;u:;u:;LO V...q-..;::f-................r--.................r--.r--.-r--.r--.- NNN"""""""-__T"""T""T-T"" cicicic:icidc::icicidcici ffl-EflfflEflffl-EflfflfflEflEA-fi7ffl v(Y')LOLOI.()1.t)O>tOcr')(O('I")(Y') c.omNOlO>O>O>LO..;::f-MCOa M..q-MT""T""__"-NCONO<D r---tO<D,.-,.-<c-OMCO..q-O__ cricxicciccicx:icciair'tci.....:ccicxi EflEflEflfflEflER-U7U7Efl-EflER-ffl r--.-r--.r--.r--.r--........,......r--.I'-l"-r--.,...... 999999999999 CoO '- '- >'c:s Olo.- > u J!l.f~~~~""~Jj8~t3 NM(J)v'T""" M........NLOCO ........ (J)........ C") T""" a::iccio~N -Efl -Efl T""" T""" T- ffl Y> Y> NNO..;::f-'o:;t 1.0 (J)MLOLO ........ <0 1.t) M ("') cciccici~~ EflU7T""T"""'T""" Y> Y> Y> N~Ovv vvLOLOlO cieicicid fA Efl Efl fA. fA. oo__~,... 00........................ . . v v..q- OOmmOl fflER- . . . 000 ffl Y> Y> __ T"" T"" C"') M 1J".)1.t)lt)mm r---r---r--..NN T""" T""" T- 0 0 ciaocid ffl (fl fA fi7 ffl C")<DCO.....<o::t ONtO........ ........ c.oOO("')(I') <C-T"""mcoco ccicricrioici fA-. ffl E;f} ER- ffl NNO..q-..;::f- IOmMLOCO .......COl.t)(I')LO criccici~N ffl (fl __ T- __ ffl Y> Y> N--O"'l::tO -q-oq-LOIO(O ciddcici Efl (fl (fl fA- E:A- OO____T""" 00..................... cic:i~~~ fflffl . . . 000 Y> Y> Y> -C- -c- T"" C""l C""l LOL01.t)mo> r--.................NN 'T"""T"""T""OO cicicicid Efl fA- ffl EA- ffl (I') CD COvO> ONtD........CO COOOMCX) -C-'T"""o>com ccicrio:icrici ffl Efl ffl Efl __ Y> N<.O<.Ovv CD M N U") <.0 COLOT"""('l')Lt) cria)~~N ffl ffl __ 'T""" __ Y> Y> Y> T""lt)MvO <O::tVlt)lt)CO ciocicici fA. Efl ffl ffl EI} aOT""T"""'T""" 00.................... . . '<t" '<t" '<t" DOmmen fflffl . . . 000 Y> Y> Y> __ To- M ('l') (Y') lOLOo>o>cn ..............NNN -C-T"""OOD ciddcid ffl ffl ffl ffl EA- coco........vo> NCDm........co OO__MCO T"""cnc.ocom cricciaioici WfflEfl-Efl'T""" Y> coo::> CO coco 99999 ffi~ffio.~ ..., u.:2: <(:2: ...... U en Gl e> '" .c: U 1:- .~ Q; -0 (/) (,9 :.:: <Il -0 :J U .s 15 c o -0 en Gl ro c:: U\ C .S! +-- ::J -0 VI >- ~ CIl C W jl) . . '. Appendix C Gas Price Comparison Chevron ~ Table C2 Natural Gas Commodity Rate Comparison Average Seminole HistoriGal KGS Rate Historical Commodity Delivery Savings Billing Commodity Rates (1) Savings Savings (2) Potential Month ($/mcf) ($/mcf) ($/mcf) ($/mcf) ($/mcf) Sep-06 $9.818 $6.04 $3.517 $0.0991 $3.616 Oct-06 $7.923 $3.81 $2.680 $0.0991 $2.780 Nov-06 $7.365 $6.69 $2.424 $0.0991 $2.524 Dec-06 $9.195 $7.03 $2.325 $0.0991 $2.424 Jan-07 $9.408 $5.82 $3.614 $0.0991 $3.713 Feb-07 $9.403 $7.33 $2.012 $0.0991 $2.111 Mar-07 $10.234 $6.99 $3.264 $0.0991 $3.363 Apr-07 $9.997 $6.40 $3.238 $0.0991 $3.337 May-07 $9.638 $6.96 $2.678 $0.0991 $2.777 Jun-07 $9.638 $7.24 $2.398 $0.0991 $2.497 Jul-07 $9.603 $6.43 $3.104 $0.0991 $3.2103 Aug-07 $9.291 $5.54 $3.265 $0.0991 $3.3164 Sep-07 $8.341 $5.07 $3.271 $0.0991 $3.370 Oct-07 $7.790 $5.66 $2.319 $0.0991 $2.418 Nov-D7 $8.387 $6.55 $2.040 $0.0991 $2.140 Dec-07 $8.644 $6.50 $2.252 $0.0991 $2.3.51 Jan-08 $8.732 $6.52 $2.172 $0.0991 $2.271 Feb-08 $8.973 $7.66 $1.876 $0.0991 $1.975 Mar-08 $10.729 $8.37 $2.756 $0.0991 $2.855 Apr-08 $11.354 $8.59 $2.764 $0.0991 $2.864 May-D8 $12.161 $9.99 $2.574 $0.0991 $2.6'73 Average Historical Savings (Sept, 2006 thru May, 2008): $2.792 (1) Total Commodity Rates furnished by Seminole Energy. (2) Based on current differences between KGS General Service and Small Transportation Service delivery rates. ($1.9746 - $1.8802)*1.05 = $0.0991 Energy Solutions C-2 Appendix C Gas Price COlnparison . . . Chevron U Table C3 Health Department Natural Gas Commodity Savings Seminole Average Health Dept KGS Rate Commodity Historical Billing Commodity Rate Savings Month ($/mcf) ($/mcf) ($/mcf) Jan-06 $11.370 $11.189 $0.181 Feb-06 $10.740 $8.940 $1.799 Mar -06 $10.903 $9.790 $1.113 Apr-06 $10.232 $6.827 $3.405 May-06 $9.196 $6.510 $2.686 Jun-06 $9.196 $5.263 $3.933 Jul-06 $9.156 $5.620 $3.536 Aug-06 $9.367 $6.644 $2.723 Sep-06 $9.818 $7.408 $2.410 Oct-06 $7.923 $6.576 $1.347 Nov-06 $7.365 $7.864 ($0.499) Dec-06 $9.195 $8.290 $0.905 Jan-07 $9.408 $7.140 $2.267 Feb-07 $9.403 $7.673 $1.731 Mar-07 $10.234 $8.474 $1.760 Apr-07 $9.997 $6.399 $3.598 May-07 $9.638 $7.000 $2.638 Jun-07 $9.638 $7.280 $2.358 Jul-07 $9.603 $6.344 $3.260 Aug-07 $9.291 $5.696 $3.595 Sep-07 $8.341 $5.077 $3.264 Oet-07 $7.790 $5.622 $2.168 Nov-07 $8.387 $6.4 73 $1.914 Dee-07 $8.644 $6.493 $2.151 Jan-08 $8.732 $7.004 $1.728 Feb-08 $8.973 $7.948 $1.025 Mar-08 $10.729 $8.451 $2.278 Apr -08 $11.354 $9.188 $2.166 May-08 $12.161 $9.951 $2.210 Avg. Savings (Sept, 2006 - May, 2008): $2.108 Avg. Savings (Jan, 2006 - May, 2008): $2.195 Energy Solutions C-3 Appendix D Lighting Usage Hours . . "'C UJ c <C CD UJ CD z~ ~ f ~ :s <C 0 zJ: ~Ii u.::::) o CD >- .S: !::~ o CD ::i . ]iUj' -CO~ SI-O) (/) - 0) "~~ 3: 33co .....CI.O <(- li- -"(/) ~~ -0) ~ 3: CN ~~ ~ ::J o I ~ CO (/) ::J g :;;:; ..c: :g .:oJ ~ "m Cl ]i o I- .2:: ~ 0) ~ ii; -C 0 C N ::J en ii; "E 0 .a N CO en ii; -C 0 ";:: N U. ii; -c ~ ::J ..c: I- 10 -C (/) 0) C -C ~ 1ii' -C (/) 0) ::J I- 10 -C C o ::iE o o o "'" o o (t) "'" o v ..... o N o N o N o N o o o <0 "'" 1.0 N <0 o N ..... N ..... co ..... co ..... co ..... co ..... co ..... co ..... o o o 1.0 v ..... N 1.0 o o ..... co N ..... <0 ..... <0 ..... <0 ..... <0 ..... <0 ..... o o 1.0 V (t) 0) <0 V o 0) co N ..... v ..... v ..... v ..... v ..... v ..... o o o v ..... "'" ..... v o CO co N ..... N ..... N ..... N ..... N ..... N ..... o o 1.0 (t) o 1.0 <0 (t) o "'" v co . ..... ..... ..... ..... N ..... N ..... N ..... o o o (t) 0) N ..... (t) o <0 o 1.0 ..... ..... ..... ..... ..... ..... ..... ..... ..... ..... o o 1.0 N "'" o ~ o 1.0 o N co o ..... o ..... o ..... o ..... o o (t) N 0) 0) (t) N <0 V o N co 0) 0) 0) 0) o o o N <0 CO o N o v o o co co co co co o o 1.0 ..... V <0 1.0 ..... o (t) o o <0 <0 <0 <0 <0 o o o ..... (t) v o ..... o N o o v v v v v o 1.0 "'" N CO "'" 1.0 ..... o o ("') (t) (t) (t) (t) o o 1.0 ..... N 1.0 o ..... o o N N N N N o o (t) o c, .... (t) ..... (t) oo;t 0 o <0 ~. ~ <0 co N <0 ..... o o ~ ..... u') V N N o <0 - o ..... ..... I.n v o N 0) Ol CO a. ..... ~n v c:i N ..... ~n ("! v o N ..... ~ v (~ N ..... 10 C'o! v (~ N roo>...... N (t) V 1.0 <0 "'" co 0) 0..... N (t) V 1.0 c:o "'" Q)Q.O -c-~-r-~~~'r-~ ~~z . CITY OF SALINA, KANSAS Lighting Usage Hours SummarY Qty ot Area Buildina Name Area Type Annual Hrs Type Bi-Centennial Ctr ARENA 1000 1 Bi-Centennial Ctr ARENA 750 1 Bi-Centennial Ctr ARENA 300 1 Bi-Centennial Ctr BREAK ROOM 1500 1 Bi-Centennial Ctr CONCESSION 500 2 Bi-Centennial Ctr CONCOURSE 500 15 Bi-Centennial Ctr DRESSING 300 3 Bi-Centennial Ctr DRESSING ROOM 300 7 Bi-Centennial Ctr EXHIBITION HALL 1500 4 Bi-Centennial Ctr GREEN ROOM 300 2 Bi-Centennial Ctr HALLWAY 2300 11 Bi-Centennial Ctr KITCHEN 2300 4 Bi-Centennial Ctr LAUNDRY ROOM 1000 1 Bi-Centennial Ctr LOBBY 2500 6 Bi-Centennial Ctr LOUNGE 2000 1 Bi-Centennial Ctr MECHANICAL 300 5 Bi-Centennial Ctr MEETING ROOM 750 9 Bi-Centennial Ctr OFFICE 2000 13 Bi-Centennial Ctr RESTROOM 1000 25 Bi-Centennial Ctr RESTROOM-MEN 2300 5 . Bi-Centennial Ctr RESTROOM-MEN 750 4 Bi-Centennial Ctr RESTROOM-WMN 2300 5 Bi-Centennial Ctr RESTROOM-WMN 750 4 Bi-Centennial Ctr STAIRS 2000 7 Bi-Centennial Ctr STORAGE 1000 16 Bi-Centennial Ctr STORAGE 300 15 Bi-Centennial Ctr STORAGE/SHOP 2000 3 Bi-Centennial Ctr VESTIBULE 2500 2 Bi-Centennial Ctr VESTIBULE 2000 1 Community Theater BREAK ROOM 2000 1 Communi y Theater DRESSING ROOM 1500 2 Communi v Theater HALLWAY 2300 7 Communi v Theater LOBBY 3000 2 Communi y Theater LOBBY 2300 1 Communi v Theater LOUNGE 2000 3 Community Theater MEZZANINE 750 4 Community Theater OFFICE 2000 6 Communi w Theater PAINT STORAGE 300 2 Communi W Theater PRACTICE ROOM 1500 1 Communi y Theater RECEPTION 2000 1 Communi W Theater RESTROOM 1500 2 Communi V Theater RESTROOM-MEN 2000 3 Communi v Theater RESTROOM-WMN 2000 3 Community Theater RESTROOM-WMN 300 1 Community Theater STAGE 500 3 . Community Theater STAIRS 2300 3 Community Theater STAIRS 2000 4 Page 2 ot6 . . . CITY OF SALINA. KANSAS Lighting Usage Hours Summary Qty of Area Buildina Name Area Tvpe Annual Hrs Type Community Theater STORAGE 2000 3 Community Theater STORAGE 1500 2 Communi y Theater STORAGE 1000 2 Communi v Theater STORAGE 500 2 Communi v Theater STORAGE 300 4 Communi v Theater STORAGE 100 1 Communi w Theater STUDIO 1500 2 Communi IN Theater STUDIO-BALCONY 1000 1 Communi w Theater THEATER 750 3 Communi ry Theater UNDER BALCONY 750 1 Fire Station NO.1 APPARATUS ROOM 6000 3 Fire Station No. 1 BEDROOM 6000 2 Fire Station No. 1 CONFERENCE ROOM 2000 3 Fire Station No. 1 DINING ROOM 2500 1 Fire Station No. 1 HALLWAY 6000 2 Fire Station NO.1 HALLWAY 4000 1 Fire Station No. 1 HALLWAY 3000 3 Fire Station No. 1 KITCHEN 3000 1 Fire Station No. 1 LAUNDRY ROOM 1500 1 Fire Station No. 1 --c- OFFICE . 2000 14 Fire Station No. 1 POLE ROOM 1500 1 Fire Station No. 1 RECREATION ROOM 2000 2 Fire Station No. 1 RESTROOM 1000 2 Fire Station No. 1 RESTROOM-MEN 7000 2 Fire Station No. 1 RESTROOM-WMN 3000 2 Fire Station No. 1 SHOP 6000 2 Fire Station No. 1 SHOP 3000 1 Fire Station No. 1 SHOWER ROOM-MEN 500 1 Fire Station No. 1 SHOWER ROOM-WMN 300 1 Fire Station No. 1 STAIRS 6000 1 Fire Station No. 1 STORAGE 300 11 Fire Station No. 1 WEIGHT ROOM 1500 1 Fire Station No. 2 APPARATUS BAY 6000 2 Fire Station No. 2 BEDROOM 5000 1 Fire Station No. 2 CONFERENCE ROOM 1500 2 Fire Station No. 2 DINING ROOM 2000 1 Fire Station No. 2 DRESSING ROOM 3000 1 Fire Station No. 2 HALLWAY 3000 3 Fire Station No. 2 KITCHEN 2000 1 Fire Station No. 2 LIVING ROOM 2500 3 Fire Station NO.2 LOBBY 2000 2 Fire Station No. 2 MECHANICAL 500 2 Fire Station No.2 OFFICE 2300 2 Fire Station NO.2 POLE ROOM 750 2 Fire Station No. 2 RESTROOM 1000 1 Fire Station NO.2 RESTROOM-MEN 7000 4 Fire Station No. 2 RESTROOM-MEN 3000 1 Page 3 of6 . . . CITY OF SALINA, KANSAS Lighting Usage Hours Summary Qty of Area BuildinQ Name Area Type Annual Hrs Type Fire Station No. 2 RESTROOM-WMN 3000 2 Fire Station No. 2 SHOWER ROOM 1000 1 Fire Station NO.2 SHOWER ROOM 300 1 Fire Station NO.2 STAIRS 4000 2 Fire Station NO.2 STORAGE 300 3 Fire Station No.2 WEIGHT ROOM 1000 1 Golf Clubhouse CONFERENCE ROOM 1500 4 Golf Clubhouse HALLWAY 1000 1 Golf Clubhouse LOBBY 3500 3 Golf Clubhouse MECHANICAL 300 2 Golf Clubhouse OFFICE 1000 2 Golf Clubhouse PRO SHOP 3500 5 Golf Clubhouse RESTROOM 750 3 Golf Clubhouse RESTROOM-MEN 2500 2 Golf Clubhouse RESTROOM-WMN 2500 2 Golf Clubhouse STORAGE 3500 1 Golf Clubhouse STORAGE 750 1 Golf Clubhouse STORAGE 300 4 Health Department BREAK ROOM 2000 2 Health Department CONFERENCE ROOM 1500 5 Health Department EXAM ROOM 2500 8 I-tealth Department HALLWAY 3000 19 Health Department LAB 2300 2 Health Department M & I ROOM 2300 1 Health Department MAIL ROOM. 2500 1 Health Department MECHANICAL 1000 2 Health Department NURSES STATION 2500 1 Health Department OFFICE 2300 29 Health Department RECEPTION 3000 2 Health Department RESTROOM 1000 1 Health Department RESTROOM-MEN 2000 1 Health Department RESTROOM-MEN 1500 2 Health Department RESTROOM-WMN 2000 1 Health Department RESTROOM-WMN 1500 2 Health Department STORAGE 2300 3 Health Department STORAGE 500 1 Health Department STORAGE 2000 2 Health Department STORAGE 500 1 Health Department STORAGE 1000 1 Health Department STORAGE .500 1 Health Department VESTIBULE 3000 2 Health Department VESTIBULE . 500 1 Health Department WAITING ROOM 3000 1 Memorial Hall ARENA 3000 1 Memorial Hall ARENA SEATING 2500 4 Memorial Hall ELEVATOR 3000 1 Memorial Hall FOYER 3000 1 Page 4 of6 . . . CITY OF SAUNA, KANSAS lighting Usaae Hours Summary Qty of Area Buildina Name Area Tvpe Annual Hrs Type Memorial Hall . HALLWAY 3000 24 Memorial Hall LOBBY 3000 2 Memorial Hall OFFICE 2500 6 Memorial Hall OFFICE 1000 9 Memorial Hall PRACTICE ROOM 1000 1 Memorial Hall RECEPTIONIST 2500 1 Memorial Hall RESTROOM 1000 1 Memorial Hall RESTROOM 300 3 Memorial Hall RESTROOM-MEN 1000 2 Memorial Hall RESTROOM-MEN 500 1 Memorial Hall RESTROOM-WMN 1000 1 Memorial Hall RESTROOM-WMN 500 4 Memorial Hall STAIRS 2500 1 Memorial Hall STAIRS 1000 8 Memorial Hall STAIRS 750 2 Memorial Hall STAIRS 500 1 Memorial Hall STORAGE 1500 1 Memorial Hall STORAGE 1000 3 Memorial Hall STORAGE 750 2 Memorial Hall STORAGE 500 11 Memorial Hall STORAGE 300 13 Memorial Hall STORAGE 100 5 Memorial Hall STUDIO 750 3 Memorial Hall TICKETS 750 1 Police Station BREAK ROOM 7000 1 Police Station CONFERENCE ROOM 750 2 Police Station DARK ROOM 1000 1 Police Station EVIDENCE ROOM 6000 1 Police Station . GARAGE 6000 2 Police Station HALLWAY 7000 12 Police Station HALLWAY 6000 7 Police Station HALLWAY 3000 9 Police Station HOLDING CELL 1500 1 Police Station INTERROGATION ROOM 1000 1 Police Station lAB 1000 4 Police Station LOBBY 3000 2 Police Station LOCKER ROOM-MEN 6000 1. Police Station MECHANICAL 1000 2 Police Station MEETING ROOM 7000 1 Police Station OFFICE 7000 1 Police Station OFFICE 6000 3 Police Station OFFICE 3000 7 Police Station OFFICE 2500 25 Police Station OFFICE 1500 14 Police Station OFFICE 1000 1 Police Station OFFICE 300 1 Police Station RESTROOM 750 4 Page 5 of6 . . . CITY OF SALINA, KANSAS Lighting Usa.ge Houl'$ Summary Qty of Area Building Name Area Tvoe Annual Hrs Type Police Station RESTROOM-MEN 7000 3 Police Station RESTROOM-MEN 3000 1 Police Station RESTROOM-WMN 7000 2 Police Station RESTROOM-WMN 3000 1 Police Station RESTROOM-WMN 1500 2 Police Station SERVER ROOM 1000 1 Police Station SHOWER-MEN 3000 1 Police Station SHOWER-WMN 1500 1 Police Station STAIRS 7000 4 Police Station STORAGE 2000 8 Police Station STORAGE 1500 3 Police Station STORAGE 1000 1 Police Station STORAGE 750 2 Police Station STORAGE 500 6 Police Station STORAGE 300 5 Police Station WEIGHT ROOM 2000 2 Smoky Hill Museum EXHIBITION HALL 3000 8 Smoky Hill Museum FOYER 3000 1 Smoky Hill Museum GIFT SHOP 1500 3 Smoky Hill Museum HALLWAY 3000 6 Smoky Hill Museum HALLWAY 2500 7 Smoky Hill Museum HALLWAY 2300 7 Smoky Hill Museum KITCHEN 2500 1 Smoky Hill Museum LOADING DOCK 2500 1 Smoky Hill Museum MECHANICAL 1000 2 Smoky Hill Museum MECHANICAL 500 2 Smoky Hill Museum OFFICE 2300 15 Smoky Hill Museum OFFICE 2000 7 Smoky Hill Museum OFFICE 1500 6 Smoky Hill Museum qFFICE 1000 2 Smoky Hill Museum PAINT ROOM 500 1 Smoky Hill Museum RESTROOM 500 2 Smoky Hill Museum RESTROOM 300 1 Smoky Hill Museum RESTROOM-MEN 2500 1 Smoky Hill Museum RESTROOM-MEN 2300 2 Smoky Hill Museum RESTROOM-WMN 2500 1 Smoky Hill Museum RESTROOM-WMN 2300 1 Smoky Hill Museum SHOP 1000 1 Smoky Hill Museum STAIRS 3000 5 Smoky Hill Museum STORAGE 2000 5 Smoky Hill Museum STORAGE 1500 3 Smoky Hill Museum STORAGE 1000 5 Smoky Hill Museum STORAGE 750 1 Smoky Hill Museum STORAGE 500 2 Smoky Hill Museum STORAGE 300 12 Page 6 of6 Appendix E Utility Tariffs . . . Media contact: Karla Olsen, director, corporate communications Phone: 888.613.0003 FAX: 316.261.6769 karJa.olsen@WestarEnergy.com Investor contact: Bruce Bums, director, investor I'elations Phone: 785.575.8227 bruce.bums@WestarEnergy.com WESTAR ENERGY REQUESTS INCREASE IN ELECTRIC RATES Reauest includes Dlant investments needed to meet Ilfowinl customer usalle of electricity and ice storm costs TOPEKA, Kan., May 28,2008 - Westar Energy, Inc. (NYSE:WR) today fIled with the Kansas Corporation Commission (KCC) a request to increase its rates to recover the cost of providing electric service to its customers. Westar is seeking an increase in rates of about 15 percent for both its north and south regions. The increase in the northern region is $90.0 million and in the southern region it is $87.6 million. The combined increase is $177.6 million, and for each region reflects an increase of just under 15 percent. The average residential customer would see a per month increase of $9.62 in Westar's northern region and $10.34 in Westar's southern region, based on usage of 900 kilowatt-hours (kWh) of electricity. The national average retail rate is 9.2 cents per kWh. With the requested rate increase, Westar said its average rates will be 6.9 cents per kWh. "On a combined basis, our average rates today are lower than they were 20 years ago," said Bill Moore, Westar's president and chief executive officer. ''This is even more dramatic in our southern area, where our average rates are significantly lower than they were in 1988- something in stark contrast to other energy costs." - MORE- Page 1 of4 . . . THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY, INC. (Name ofIswing Utility) Index SCHEDULE 8GS NORTH RATE AREA Replacing Schedule-..- ~~ Sheet (Territory to which schedWe is applicable) l'Jo AUPP!MJeI\t or ~e Imd<<stalldiBI SbalI mOOlry Ule tariff as sho_ hereon. which was filed MatCh ~~ 2000 Sheet 1 of 5 Sheets SMALL GEN~RA~ SERVICE AVAILABLE Electric service is available under this schedule at points on Company's existing distribution facilities. APPLICABLE To any customer using electric service supplied at one pOint of delivery for which no specific schedule is provided. This schedule is not applicable to backup, breakdown, standby, supplemental, short term, resale or shared electric service. STANDARD SERVICE NET MONTHLY BILL CUSTOMER CHARGE CAPACITY CHARGE $12.00 Winter Period - Demand set in the billing months of October through May. $ 2.83 per kW of Billing Capacity, over 5 kW Summer Period - Demand set in the billing months of June through September. $ 6.25 per kW of Billing Capacity, over 5 kW ENERGY CHARGE For all the first 1,200 kWh For all remaining kWh 4.2503~ per kWh 2.2923~ per kWh Plus all applicable adjustments and surcharges. ~ Issued AUG 29.2001 Month Day Year AUG 2 9 2001 OS-lj~:tE-'j81-RTS Appn)',Jed K.~isas CorForatia~1 Con~ission JlJl':J 31. 2007 ISl SIJs.an K. Oljlf'~ Effective .By !)~ ~e., Michael Lennen. Vice President . . . THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY, INe. (Nllmil oflssuing Utility) Index SCHEDUlE SG~ NORTH RATE AREA Replacing Schedule-- S(;~ Sbeet 1. (Territory to whicb schedule is applicable) ~1I'='fYLor~W=;~~l whicb was filed March 2. 2006 Sbeet 2 of 5 Sheets SMALL GEN'RAL SERVICE RECREATIONAL UGHTlN~ qERVICg Recreational Ughting Service is supplied to separately metered, outdoor recreational lighting installations, including athletic fields, lighting for public parks and other public recreational facilities. Such use may include small amounts of energy for other purposes incidental to the recreational lighting function. All other uses under this rate schedule shall be Standard Service. NET MONTHLY BILL CUSTOMER CHARGE ENERGY CHARGE $12.00 5.03~ per kWh The rates hereunder are subject to all applicable adjustments and surcharges. UNMETERED SERVICr; Unmetered service refers to electric service which is not measured by a watt-hour meter. This type of service may apply, at Company's option, to delivery points for which it is impractical or difficult to install and read meters. In addition, it may apply, at Company's option, to delivery points with minimal linear loads. The usage and demand are calculated by using typical hours of use and rated equipment loads. NET MONTHLY BILL The per kWh rates for Standard Service shall apply to calculated hours of use and rated equipment loads. CUSTOMER CHARGE $12.00 Plus applicable adjustments and surcharges. v Issued AVO 2 9 2001 Day 0-5-I-dSEE-9:31-RTS A~ro'.Jed K~sas Corporation C'~iis5ion .Ju!':/ 31, 2007 /SI SIJsat1 K. Duffy Month Year Effective AIlo 2 9 2001 By ~o~o L:= M chael Lennen. Vice President IOOex . THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY, INC, (Nam: of Issuing Utility) . SCHEDULE SGS NORTH RATE AREA Replacing Schedule SQ~ Sheet :3 (Territory to which schedule is applicable) ~u~n:-~~~=,1It which was filed March 2, ~006 Sheet 31 of 5 Sheets SMALL GENERAL SERVICE MINIMUM MONTHLY BI~L A minimum monthly biD is applicable to Standard Service, Recreational Ughting Service, and Un metered Service. The minimum monthly bill shall be calculated as: The greater of the Customer Charge plus: A. B. C. . D. The minimum contract capacity specified in the Electric Service Agreement times the capacity charge, or The minimum bill amount specified in the Electric Service Agreement, or The above rate for zero consumption plus $0.75 for each kW over 5 kW of the highest Billing Capacity established during the twelve months ending currently, plus. When a special transformer installation is necessary for the benefit of the customer or to protect the quality of service to other customers, such minimum shall be not less than $0.75 per kilovolt-ampere (kVA) of required transformer capacity; E. plus applicable adjustments and surcharges. BILLING CAPACITY Customer's average kilowatt load during the fifteen-minute period of maximum use during the month. y Issued AUG 2 9 2001 Month Day AUG 2 9 2001 Year i. .By f):U; t~eM Michael Lennen, Vice President 05-I.dSEE-'3BI-RTS APF"ro'~~j K.~isas Corporati.)n CQo.lis$ion Ju ly 31. 2007 /SI SIJSan K. (il.~ffo~ Effective Index . THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY, INC.. (Name of Issuing Utility) SCHEDULE sas NORTH RATE AREA Replacing Schedule ~GS Sheet .d (Territory to which schedule is applicable) ~l?~IIPPle.mellt or seurale ondcrstandin~ ....... fuOdify the tanlf as shown hereon. which was filed March 2. 2006 Sheet 4. of 5 Sheets SMALL GENiRA~ SI:RVICI ADJUSTMENTS AND SURCHARGES BiIlino Caoaqitv If the customer's meter has not been modified to read the kilowatt load during the fifteen- minute period of maximum use during the billing month the billing capacity shall be multiplied by the following correction factor 1.0589. Power Factor Adiustment The Company may determine, by permanent measurement or by test of not less than 30 minutes duration under conditions which the Company determines to be normal, the power factor of a customer. If the power factor for the month is less than 0.90 at the point of delivery, the Billing Capacity will be increased by multiplying by 0.90 and dividing by the power factor. . Other Adjustments The rates hereunder are subject to adjustment as provided in the following schedules: 1. Fuel Adjustment Clause 2. Property Tax Surcharge 3. Transmission Service Charge 4. Environmental Cost Recovery Rider 5. Tax Adjustment ~ Month AUG 2 9 2007 Day Year OS-ljSEE-'j:31-RTS HPP"rO'.,led Kansas Corporation C'~missio~ .Jul':1 31, 2007 /SI Susan K. Duffy Issued Effective AUG 2 9 2001 . .By li:nt. oJ::. . YOM ichael Lennen. Vice President - Index . THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY. INC. (Nam:ofIssuiDg Utility) SGS . SCHEDULE NOR.TH R.A TE AREA Replacing Schedule- SQ~ Sheet S (Territory to which schedule is applicable) No liupp1emenr or s,lWate undel'JWldinJr shall modiry the tantf IS shown hereOn. which was filed March 2. 2006 Sheet 5 of 5 Sheets $MALl GENERAL SERVICE DEFINITIONS AND CONDITIONS 3. . 4. 5. 1. Alternating current. at approximately 60 hertz, at the standard phase and voltage available shall be supplied to a single location at points on the Company's existing distribution facilities having sufficient capacity. ." 2. The initial term of service under this rate schedule shall be one year. Company reserves the right to require the customer to execute an Electric Service Agreement with an additional charge, or special minimum and/or a longer initial term when additional facilities are required to serve such customer. Individual motor units rated at more than five horse power shall be three phase (when three phase service is supplied), unless otherwise agreed upon prior to installation. Individual motor units rated at ten horsepower or more shall have starting equipment satisfactory to the Company. Service hereunder is subject to the Company's General Terms and Conditions as approved by the State Corporation Commission of Kansas ~md any modifications subsequently approved. 6. All provisions of this rate schedule are subject to changes made by order of the regulatory authority having jurisdiction. ~ Issued AUG 2 9 2007 Month Day Year Effective . . By Aua 2 9 2001 t)~ ~y= Michael Lennen, Vice President OS-lt3EE -'3:31-lnS ApF-roved K.~isas Corporatic~ Commis$ion Jub/ 31, 2007 ISI $IJ:san K. OUT1-"" . . . THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY, INC. (N~ oflssuing Utility) Index SCHEDULE MGS NORTH RATE AREA Replacing Schedule.- NOS Sheet (Territory to which schedule is applicable) No ~P1>lfn\CI\t or setlJVate undmtandinjt shall moou)' me tariff IS shown hereon. which was filed ]~h 2, 2006 Sheet Ii of 4 Sheets MEDIUM GENERAL SERVICt; A VA1LAB~E Electric service is available under this rate schedule at points on Company's existing distribution facilities. APPUCABlE To any customer using electric service supplied at one point of delivery and with an average Billing Capacity greater than 200 kW. This rate schedule is not applicable to backup, breakdown, standby, supplemental, short term, resale or shared electric service. NET MONTHLY BILL CUSTOMER CHARGE CAPACITY CHARGE $100.00 for all Billing Capacity $6.83 per kW ENERGY CHARGE Winter Period - Energy used during the billings months of October through May. For all kWh 1.211 O~ per kWh Summer Period - Energy used during the billings months of June through September. For all kWh 1.6367~ per kWh Plus applicable adjustments and surcharges. v Issued AUG 2 9 2001 Month Day Year 05-l.jSEE-'j:31-RTS APHC'!.}ed K~nsas Cor?orati'Jn C~IT~is~ic~ Jul':, 31, 2007 /~;/ Sus-3n K. r)I.~ffy Effective AlIG 2,9 2001 I):WL-: Michael Lennen, Vice President . By Index. . THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY,INC, (NlIl11e oflssJiag Utility) SCHEDULE ~G~ Replacing Schedule-- NOS Sheet 1. NORm RATE AREA (Territory to which schedule is applicable) No supplmlent or seoanteunderslandina shall modity the tariff as shown beRon. which was filed ----b:Iarch 2, 2006 Sheet 2 of 4 Sheets M~OIUM GENERAL SERVICE MINIMUM BILL The greater of the Customer Charge plus the Capacity Charge for 200 kW of Billing Capacity, or the minimum specified in the electric Service Agreement, plus all applicable adjustments and surcharges. Bmino CaD~tv i). ii). . iii). Billing Capacity shall be the greatest of: 200 kW, or The average kW load supplied during the 15 minute period of maximum use during the month, adjusted for excessive lagging power factor, as described below, or 50 percent of the highest billing capacity as adjusted for power factor established during the previous billing months of ..June, July, August or September, within the most recent 11 months, or iv). The minimum capacity specified in the Electric ServicEl Agreement. ~ Issued AUG 2 9 2001 Month Day Year o.S-l.dSEE-'j:31-RTS API" rOIJed K~1sas COfPorati"1 COITooission JIJ 1':i 31, 2007 ISI Susan K. ~Jffy Effective AUG 2 9 2007 't)~~ . . By Michael Lennen, Vice President . . . Index THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY, INC. (Nameoflssuiog Utility) SCHEDULE MGS Replacing Schedule-- Mf1~ ~1leet ., NORTH RATE AREA (Territory to which schedule is applicable) Nosupple.Jl1Of\t or ~ und~ shallliJOdiry tile tariff 18 shown hereon. which was filed March 2. 2006 Sheet 3 of 4 Sheets MEDIUM G~NERAL SERVICE ADJUSTMENTS AND SURCHARGES BILLING CAPACITY If the customer's meter has not been modified to read the kilowatt h:>ad during the fifteen- minute period of maximum use during the billing month the Billing Capacity shall be multiplied by the following correction factor 1.0157. Power Factor Amustmem The Company may determine, by permanent measurement or by test of not less than 30 minutes duration under conditions which the Company determines to be normal, the power factor .of a customer. If the power factor for the month is less than 0.90 at the point of delivery, the Billing Capacity will be increased by multiplying by 0.90 and dividing by the power factor. The rates hereunder are subject to adjustment as provided in the following schedules: 1. Fuel Adjustment Clause 2. Property Tax Surcharge 3. Transmission Service Charge 4. Environmental Cost Recovery Rider 5. Tax Adjustment or- Issued AUG 2 9 2001 Month Day Year 05-\jSEE-'381-RTS APF'rol.Jed Kansas CorForatic~~n Con~issior JuI':f 31, 2001 ./SI SIJsan K. Duff':I Effective AUG 2 9 1001 J]:W; L-: Michael Lennen, Vice President By . . . Index THE STATE CORPORATION COMMISSION OF KANSAS WESTAR ENERGY, INC. (Name oflssuing Utility) SCHEDULE MgS Replacing Schedule- . .NOS Sheet A NORTH RATE AREA (Territory to which schedule is applicable) li'?.lIuppl'.lJlellt or seoJlflltehunderstandillll 5.....11 modIry tile tariff ItS sl own hereon. which was filed ---1~arch 2, 2006 Sheet 4 of 4 Sheets MEDIUM GeNERAL SERVICE DEFINITIONS AND CONDITIONS 1. Alternating current, at approximately 60 hertz, at the standard phase and voltage available shall be supplied to a single location at points on Company's existing distribution facilities having sufficient capacity. 2. Service shall normally be measured at delivery voltage; however, Company reserves the right to measure service at other than delivery voltage and adjust such measurements accordingly. 3. The initial term of service under this rate schedule shall be one year. Company reserves. the right to require the customer., to. execute an Electric Service Agreement with an additional charge, or special minimum and/or a longer initial term when additional facilities are required to serve the customer. Service under this rate schedule is subject to Company's. General Terms and Conditions presently on file with the State Corporation Commission of Kansas and any modifications subsequently approved. 5. All provisions of this rate schedule are subject to changes made by order of the regulatory authority having jurisdiction. 4. or- Issued AUG 2 9 2007 Day Year Month Effective AUG 2 9 2007 1j:W ~ 05-1i::1"'EE-9:31-RTS AF'P rov8d K.~1sas CQrporati'~1 C'~~lisliGn .Jub 31, 2007 /S/ Susan K. D;J H':! . By Michael Lennen, Vice President . . . THE STATE CORPORATION COMMISSION OF KANSAS KANSAS GAS SERVICE A DIVISION OF ONEOK, INC. (Name of Issuing Utility) INDEX NO 21.1 SCHEDULE GS All Rate Areas (Territory to which schedule is applicable) Replacing Schedule GS Sheet 1 which was filed June 7 2005 Sheet-1-of-1-Sheets No supplement or separate understanding shall modify the tariff as shown hereon. GENERAL SALES SERVICE AVAILABiliTY Available in and around the communities specified in the Index to non-residential customers at single locations. Not available for service to separately metered generators with a capacity less than 20 kilowatts. Service is subject to the DEFINITIONS AND CONDITIONS section below. NET MONTHLY Bill . $23.35 Service Charge plus Delivery Charge $ 1.9746 per Mcf for all gas delivered plus Applicable adjustments and charges provided in Company's Cost of Gas Rider, Weather Normalization Adjustment Rider and Ad Valorem Tax Surcharge Rider. The Net Monthly Bill shall be no less than the Service Charge plus any minimum charges set forth in a customer's Service Agreement. DEFINITIONS AND CONDITIONS 1. Sales service is provided for the charge specified in the NET MONTHLY BILL section when supplied from Company's existing facilities. When additional facilities are needed to serve a customer, an additional charge may be required. 2. Multiple meter installations, installed at a single location for a customer's convenience, shall be billed additional Service Charges for each additional meter installation. 3. Sales service under this rate schedule is subject to the provisions and applicable charges contained in Company's General Terms and Conditions for Gas Service, or successor documents, approved by the Commission. 4. All provisions of this rate schedule are subject to changes made by order of the Commission. Issued November 16 2006 06-KGSG- ~ 209-RTS Approved Kansas Corporation Commission November 16, 2006 /S/ Susan K. Duffy Month Day Effective January 1 Year 2007 Month Day Year By /S/ LARRY G. WILLER, DIRECTOR . . . THE STATE CORPORATION COMMISSION OF KANSAS KANSAS GAS SERVICE A DIVISION OF ONEOK, INC. (Name of Issuing Utility) INDEX NO 29.1 SCHEDULE STt / Rate Area "t" (Territory to which schedule is applicable) Replacing Schedule ST Sheet 1 which was filed Aoril14. 2005 Sheet-Lof-'-.Sheets No supplement or separate understanding ~hall modify the !anff as shown hereon. SMALL TRANSPORTATION SERVICE AVAILABILITY Available in and around the communities specified in the rhdex to commercial and industrial customers. Service is subject to the DEFINITIONS AND CONDITIONS section below. NET MONTHLY BILL $ 23.35 Service Charge plus Delivery Charge $ 1.8802 per Met for all gas delivered plus Applicable adjustments and charges provided in Company's Ad Valorem Tax Surcharge Rider. The Net Monthly Bill shall be no less than the Service Charge plus any minimum charges set forth in a customer's Service Agreement. DEFINITIONS AND CONDITIONS 1. Annual deliveries of at least 1,500 Mcf at a single location during the last 1:2 billing periods shall qualify a customer for service under this schedule. A customer, once qualified, shall remain eligible for service under this schedule. 2. A customer shall meet all conditions of the following tariffs to maintain service under this rate schedule: a. Electronic Flow Measurement Rider b. Company's General Terms and Conditions for Gas Service (GTC), Section 10 Reauirements for Transportation Service. 3. Company may base a bill on a customer's normal meter reading cycle, but may issue that bill at the beginning of the next billing month. Although the bill may indicate a different period, it shall reflect actual information obtained from the regular-cycle meter reading. A customer served under this rate schedule and who desires a calendar month-based bill must install electronic flow measurement equipment and will not be eligible for RDQ balancing. Issued November 16 2006 Effective Month January Month 06-KGSG-1209-RTS Approved Kansas Corporation Commission November 16. 2006 /5/ Susan K. Duffy Day 1 Year 2007 Day Year By ISI LARRY G. WILLER, DIRECTOR . . . THE STATE CORPORATION COMMISSION OF KANSAS INDEX NO 29.2 KANSAS GAS SERVICE A DIVISION OF ONEOK, INC. (Name of Issuing Utility) SCHEDULE STt Rate Area "t" (T erritOfY to which schedule is applicable) Replacing Schedule ST Sheet 2 which was filed Aoril14 2005 Sheet-Lof~Sheets No supplement or separate understandlng Ishan modify the tariff as shown hereon. SMALL TRANSPORTATION SERVICE (Cont.) 4. Service under this rate schedule shall be terminated upon notification by the customer, but not before the next regular-cycle meter reading date. 5. Transportation service is provided for the charge specified in the NET MONTHLY BILL section when supplied from Company's existing facilities. When additional facilities are needed to serve a customer, an additional charge may be required. 6. Multiple meter installations, installed at a single location for a customer's convenience, shall be billed additional Service Charges for each additional meter installation. Usage recorded on these multiple meters shall be aggregated for purposes of qualifying for this rate schedule. 7. Transportation service under this rate schedule is subject to the provisions and applicable charges contained in Company's GTC, or successor documents, approved by the Commission. 8. All provisions of this rate schedule are subject to changes made by order of the Commission. Issued November 16 2006 06-KGSG-1209-RTS Approved Kansas Corporation Commission November 16, 2006 ISI Susan K. Duffy Month Day Effective January 1 Year 2007 Month Day Year By /5/ LARRY G. WILLER, DIRECTOR . . . RESOLUTION NUMBER 08-6523 A RESOLUTION ESTABLISHING WATER AND WASTEWATER RATES IN THE COMPREHENSIVE FEE SCHEDULE OF THE CITY OF SALINA, KANSAS. and WHEREAS, the City of Salina provides many specific services for the Citizens of Salina; WHEREAS, specific individuals benefit from said services; and WHEREAS, it is appropriate public policy to require specific individuals benefiting from specific services to pay all or a portion of the cost of such services; and WHEREAS, Salina Code Section 2-2 provides that the Board of Commissioners shall determine, by resolution, all license fees, permit fees a.nd other user related fees or chargers established by ordinances of the City; SO NOW, THEREFORE BE IT RESOLVED by the Governing Body of the City of Salina, Kansas: Section 1. That the following Utilities fees of Article XI of the City of Salina Comprehensive Fee Schedule are hereby amended to read ~.follows: Effective Julv 1. 2008 WASTEWATER Inside City Limits Customer Charge (0 C.F.) Consumption Charge per 100 C.F. Per Month $3.51 $2.63 WATER Inside City Limits Customer Charge (0 C.F.) 5/8" Meter %" Metter 1" Meter 1 W' Meter 2" Meter 3" Meter 4" Meter 6" Meter 8" Meter & Above $3.75 $5.97 $8.10 $12.57 $20.31 $53.31 $76.34 $141.67 $298.11 Consumption Charge per 100 C.F. First 2,000 C.F. Next 8,000 C.F. All over 10,000 C.F. $2.54 $2.31 $2.07 Excess Use Charge Metered Consumption Above Excess Use Baseline $4.68 Metered Consumption All . Irrigation Meters $4.68 Apartment Rate: When three or more units are placed on a master meter, usage is charged at the first 2,000 cubic feet rate for all consumption. RATE OUTSIDE CITY: Customer Charge Double Inside Rate Consumption Charge 125% Inside Rate Effective November 1.2008 WASTEWATER Year 2009 Year 2010 Year 2011 Year 2012 Year 2013 Effective Effective Effective Effective Effective Inside City Limits 11-1-2008 11-1-2009 11-1-2010 11-1-2011 11-1-2012 Customer Charge (0 C.F.) $6.31 $6.42 $6.57 $6.73 $6.89 Consumption Charge per 100 C.F. $2.88 $3.08 $3.35 $3.64 $3.90 WATER Inside City Limits Customer Charge (0 C.P.) 5/8" Meter $4.44 $4.51 $4.60 $4.70 $4.80 %" Meter $7.07 $7.18 $7.33 $7.48 $7.65 1" Meter $9.60 $9.74 $9.94 $10.16 $10.38 . 1 W' Meter $14.89 $15.11 $15.43 $15.76 $16.10 2" Meter $24.06 $24.41 $24.93 $25.46 $26.02 3" Meter $63.15 $64.07 $65.43 $66.84 $68.30 4" Meter $90.43 $91.75 $93.70 $95.71 $97.80 6" Meter $167.82 $170.27 $173.88 $177.62 $181.50 8" Meter and above $353.14 $358.30 $365.88 $373.75 $381.93 Consumption Charge per 100 C.F. Unit Block Rate Metered Consumption Through Excess Use Baseline $2.34 $2.55 $2.82 $3.12 $3.49 Excess Use Charge Metered ConsUmption Above Excess Use Baseline $4.68 $5.10 $5.64 $6.24 $6.98 Metered Consumption All Irrigation Meters $4.68 $5.10 $5.64 $6.24 $6.98 RATE OUTSIDE CITY: Customer Charge Double Inside Rate . Consumption Charge 125% Inside Rate . . . Winter Quarter Average (WQA) shall be defined by adding the metered water consumption on bills rendered during the months o/January, February and March and then dividing this sum by the number of billings (three). Each customer's WQA shall be recalculated in April of each year. This WQA shall be utilized for the following months of May through April. Minimum Winter Quarter Average (MWQA) shall be defined as 800 cubic feet. In those instances where no water consumption data exists for the calculation of a WQA for a customer, the Director of Utilities or designated representative shall determine the most appropriate method of establishing the WQA. . Excess Use Baseline shall equal the greater of 120% of the WQA or 120% of the MWQA. Excess Use Charge shall apply to: (1) all irrigation meters (2) any use in excess of the excess use baseline. A customer with metered water consumption greater than three million cubic feet (3,000,000 cf) per year shall be charged at the Tier 1 rate for all consumption. This customer must have a Water Conservation Plan and the plan must be approved by the Director of Utilities. Section 2. That this Resolution shall be in full force and in effect after its adoption. Adopted by the Board of Commissioners and signed by the Mayor this 9th day of June, 2008. [SEAL] ATTEST: John K. Vanier II Mayor Lieu Ann Elsey, CMC, City Clerk