Report on validity and submittal of engineering feasibility report for Petition No. 4233 filed on
August 1, 2002 by Mr. Darvin Dent requesting certain street and drainage improvements in
Woodland Hills Estates Addition, Phase 4.
BACKGROUND:
It is prescribed by Kansas state statutes that the City Commission consider a petition for
street, drainage or utility improvements and establish sufficiency on the basis that anyone
of the following three conditions are met:
1. The petition is signed by a majority of the resident owners of record of property
liable for assessment under the proposal.
The petition is signed by the resident owners of record of more than half of the
area liable for assessment under the proposal.
The petition is signed by the owners of record, whether resident or not, of more
than one half of the area liable to be assessed under the proposal.
2.
3.
In this case, the petition signatures represent 100% of the owners of record of the area liable
for assessments. Therefore, the petition clearly meets the statute requirements for
sufficiency. The Saline County Treasurer has indicated there are no delinquent taxes or
special assessments on any property within the benefit district owned by the petitioners.
Woodland Hills Estates Addition is a single family residential subdivision located in the
northeast part of Salina. The project represents the fourth phase of the subdivision. There
are essentially four parts to this project: 1) paving of Brookwood Lane, 2) paving of Estates
Drive, 3) sewer and water systems and 4) Brookwood Lane drainage crossing. The paving
of Estates Drive and the sewer and water systems are being contracted and funded privately
in conjunction with these petitioned improvements. Therefore, the only items that the
developer is requesting public financing for are the paving of Brookwood Lane and the
Brookwood Lane drainage crossing.
The City of Salina has a program where any owner may petition the city-at-Iarge to pay 50%
for any public improvement that serves a significant quantity of off-site public drainage. The
Brookwood Lane drainage crossing does serve a large basin that extends south to include
part of the Salina Municipal Golf Course, and therefore qualifies for the 50% funding by the
city-at-Iarge.
CITY OF SALINA
REQUEST FOR CITY COMMISSION ACTION
DATE
8/5/02
TIME
4:00 P.M.
AGENDA SECTION:
NO.
ORIGINATING DEPARTMENT:
APPROVED FOR
AGENDA:
Engineering & General Services
ITEM
NO.
BY: Shawn O'Leary
BY:
Page 2
Purposely excluded from the benefit district is a portion of Salina Presbyterian Manor that is
adjacent to Brookwood Lane. This property is bisected by a public drainage easement, and
therefore is not of sufficient lot depth for a buildable lot. Therefore, this property does not
receive a benefit from these improvements and was omitted from the benefit district. This
property was omitted from the benefit district with the understanding that the equivalent
residential lot cost for this property would be paid by the city-at-Iarge.
The engineering feasibility report for these public improvements is attached for your review.
The property owners within the benefit district shall be assessed for approximately 80.5% of
the Brookwood Lane project costs and 40.2% of the Brookwood Lane drainage crossing,
which are estimated to cost $39,189.36 and $14,088.20 respectively for a total of
$53,277.56. Each lot within the benefit district will pay their share of the costs based upon
an equal assessment per lot. The City's estimated share of the project is $30,448.54
The benefit district's portion of project costs will be financed over a 15 year period with the
special assessment system. The petitioner has the option of submitting a letter of credit for
35% of the project costs and assessing 100% of the project costs to the property owners, or
pay 20% of the project costs in cash in advance ond then assess the remaining 80% to the
benefit district.
RECOMMENDATION:
It is recommended that the City Commission approve the engineering feasibility report for
street and drainage improvements in Woodland Hills Estates Addition, Phase 4, and adopt
the resolution determining advisability for the project.
Cc:
Darvin Dent
Peter Earles
Encl. Engineering Feasibility Report
Petition
Resolutiòn No. 02-5854
FILE NO. 02-1
PRELIMINARY ENGINEERING ESTIMATE
AND
FEASffilLITY REPORT
PETITION NO.
PROPOSED
STREET AND DRAINAGE IMPROVEMENTS
WOODLAND HILLS ESTATES ADDITION
PHASE IV
JULY - 2002
SHAWN 0 'LEARY, DIRECTOR OF ENGINEERING
~
The curbing, guttering, paving, grading and drainage of Brookwood Lane ftom the east
property line of Lot 1, Block 2, Woodland Hills Estates Addition tQ. 40 foot east of the
east property line of Lot 1, Block 3 to serve Lots 22-28, Block 2 and'Lots 1-7, Block 3,
Woodland Hills Estates Addition to the City of Salina, Kansas.
The installation of a drainage channel crossing under Brookwood Lane at the east line of
Lot 1, Block 3, Woodland Hills Estates Addition to serve Lots 22-28, Block 2 and Lots 1-
7, Block 3, Woodland Hills Estates Addition to the City of Salina, Kansas.
BENEFIT DISTRICT
Lots 22-28, Block 2; Lots 1-7, Block 3, Woodland Hills Estates Addition to the City of
Salina, Kansas.
ADOPTION OF A SESSMENT
The assessment with accrued interest to be levied as a special assessment tax upon the
property included within the benefit district concurrent with the general property tax and
shall be payable in fifteen(15) equal annual installm.ents.
The method of assessment is that 100% of the total cost assessed against the property
shall be basèd upon equal assessments for each equivalent residential lot in the benefit
district relative to the type of improvement and the sub-area affected by each
improvement.
\
2
APPORTIONMENT OF COST
COST CHARGEABLE TO PRIVATE PROPERTY:
1.
Approximately 80.5% of the total cost of street and drainage improvements,
including grading, pavement, curbs and gutters, storm inlets and any incidentals
thereto to complete the residential street standard and drainage systems or 100%
less (-) the amount (19.5%) that would be attributable to the tract on the south
side ofBrookwood Lane had this tract been included in the benefit district. **
2. 50% of the total cost of the drainage channel crossing under Brookwood Lane
including culverts, earthwork, erosion control, and grading; less (-) the amount
that would be assessed to the tract on the south side ofBrookwood Lane (9.77%)
for atotal of 40.23%. **
COST CHARGEABLE TO CITY:
1. 50% of the total cost of the drainage channel crossing under Brookwood Lane
including culverts, earthwork, erosion control and grading; plus (+) the amount
that would be assessed to the tract on the south side ofBrookwood Lane (9.77%)
for a total of 59.77%.**
2.
Approximately 19.5% of the total cost of street and drainage improvements
including grading, pavement, curbs and gutters, storm inlets and any incidentals
thereto to complete the residential street standard and drainage systems or the
amount that would be attributable to the tract on the south side ofBrookwood
Lane had this tract been included in the benefit district. * *
**Due to findings by the City of Salina that the tract on the south side of
Brookwood Lane is bisected by a major drainage channel and easement that serves
off-site properties, this tract is deemed undevelopable. As a result, this property
receives no benefit fÌ'om these improvements, and was therefore excluded fÌ'om the
benefit district. The city-at-Iarge will pay the appropriate equivalent lot costs for
this tract for the Brookwood Lane drainage crossing and the Brookwood Lane street
construction.
\
3
DISTRIBUTION OF COSTS
WOODLAND IDLLS ESTATES ADDmON, PHASE IV
TO THE CITY OF SALINA, KANSAS
PETmONNO.
COSTS COST
CHARGEABLE
TO BENEFIT COST PER CHARGEABLE TOTAL
DISTRICT LOT TO CITY COST
STREETS AND $ 39,189.36 $ 2,799.24 $ 9,517.41 $ 48,706.77
DRAINAGE
BROOKWOOD
DRAINAGE $ 14,088.20 $ 1,006.30 $ 20,931.13 $ 35,019.33
CROSSING
TOTALS
$ 53,277.56
$ 30,448.54
$ 83,726.10
4
PETITION NO.
WOODLAND HILLS ESTATES ADDmON, PHASE IV
PRELIMINARY ESTIMATE OF
TOTAL PROJECT COSTS
(Including Streets and Drainage)
1. Common Excavation 341 CoY. @ $ 6.00 $ 2,046.00
2. BoITOW Material 450 CoY. @ $ 10.00 $ 4,500.00
3. Concrete Curb & Gutter 588 L.F. @ $ 15.00 $ 8,820.00
4. Concrete Pavement, 7Y2" 90 S.Y. @ $ 35.00 $ 3,150.00
5. Asphalt Pavement, 8" 1099 S.Y. @ $ 17.00 $ 18,683.00
6. Sidewalk Ramps 1 EA @ $ 650.00 $ 650.00
7. Special Trench Compaction 228 L.F. @ $ 7.00 $ 1,596.00
8. Concrete Flume 2 EA. @ $ 1,000.00 $ 2,000.00
9. Erosion Control Matting 25 S.Y. @ $ 15.00 $ 375.00
10. 10.2 Sq. Ft. (42") RCPHE 228 L.F. @ $ 100.00 $ 22,800.00
11. Erosion Control (D-50 6"-12;') 48 S.Y. @ $ 25.00 $ 1,200.00
12. Water 1 L.S. @ $ 250.00 $ 250~00
13. Regrade Water Valve 1 EA @ $ 500.00 $ 500.00
14. Construction Staking 1 L.S. @ $ 1,500.00 $ 1.500.00
SUBTOTAL:
ENGINEERING & CONTINGENCY:
TEMPORARY NOTE INTEREST, BONDING, ISSUING:
TOTAL:
$ 68,070.00
$ 10,210.50
$ 5.445.60
$ 83,726.10
"
\.\.
5
PETITION NO.
WOODLAND HILLS ESTATES ADDITION, PHASE N
PRELIMINARY ESTIMATE OF
PROJECT COSTS
(Brookwood Drainage Crossing Only)
7. Special Trench Compaction
8. Concrete Flume
9. Erosion Control Matting
10. 10.2 Sq. Ft. (42") RCPHE
11. Erosion Control (D-50 6"-12")
14. Construction Staking
SUBTOTAL:
ENGINEERING & CONTINGENCY:
TEMPORARY NOTE INTEREST, BONDING, ISSUING:
TOTAL:
228
2
25
228
48
1
L.F. @
EA. @
S.Y. @
L.F. @
S.Y. @
L.S. @
"
\\
6
$ 7.00
$ 1,000.00
$ 15.00
$ 100.00
$ 25.00
$ 500.00
$ 1,596:00
$ 2,000.00
$ 375.00
$ 22,800.00
$ 1,200.00
$ 500.00
$ 28,471.00
$ 4,270.65
$ 2~277.68
$ 35,019.33
PETITION NO.
WOODLAND HILLS ESTATES ADDITION, PHASE N
PRELIMINARY ESTIMATE OF
PROJECT COSTS
(Street Improvements Only)
1. Common Excavation
2. Borrow Material
3. Concrete Curb & Gutter
4. Concrete Pavement, 7~"
5 . Asphalt Pavement, 8 "
6. Sidewalk Ramps
12. Water
13. Regrade Water Valve
14. Construction Staking
341
450
588
90
1099
1
1
1
1
C.Y. @
C.Y. @
LF. @
S.Y. @
S.Y. @
EA. @
LS. @
EA. @
L.S. @
SUBTOTAL:
ENGINEERING & CONTINGENCY:
TEMPORARY NOTE INTEREST, BONDING, ISSUING:
TOTAL:
"
"
7
$ 6.00
$ 10.00
$ 15.00
$ 35.00
$ 17.00
$ 650.00
$ 250.00
$ 500.00
$ 1,000.00
,.,
$ 2,046.00
$ 4,500.00
$ 8,820.00
$ 3,150.00
$ 18,683.00
$ 650.00
$ 250.00
$ 500.00
$ 1.000.00
$ 39,599.00
$ 5,939.85
$ 3.167.92
$ 48,706.77
PETmON NO.
WOODLAND Hll.LS ESTATES ADDITION, PHASE IV
PROPERTY OWNERSHIP
Property Description
Property Owner
Woodland Hills Estates Addition, Block 2
Lot 22
Lot 23
Lot 24
Lot 25
Lot 26
Lot 27
Lot 28
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Woodland Hills Estates Addition, Block 3
Lot 1
Lot 2
Lot 3
Lot 4
LotS
Lot 6
Lot 7
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
Landmark Development Co.
"
Cc
8
..r
BROOKWOOD PAVING -
PROPERTY DESCRIPTION PER EACH DRAINAGE BROOKWOOD LANE TOTAL
Woodland Hills Estates Addition, Block 2
Lot 22 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 23 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 24 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 25 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 26 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 27 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 28 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Woodland HIUs Estates Addition, Block 3
Lot 1 1.00 $ 1 ,006.30 $ 2,799.24 $ 3,805.54
Lot 2 1.00 $ 1 ,006.30 $ 2,799.24 $ 3,805.54
Lot 3 1.00 $ 1 ,006.30 $ 2,799.24 $ 3,805.54
Lot 4 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 5 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 6 1.00 $ 1,006.30 $ 2,799.24 $ 3,805.54
Lot 7 1.00 $ 1 ,006.30 $ 2,799.24 $ 3,805.54
** **
CIty of Sallnll (a) 3.40 $ 3,421.48 $ 9,617.41 $ 12.938.81
City of Salina (b) $ 11,609.81 $ 11,609.61
TOTALS 17.40 $ 35,019.33 $ 48,706.77 $ 83,726.10
"
CIty of Salina (a) Due to the findings by the City of Salina that the tract on the south side of Brookwood Lane receives no benefits from this project, the city-at-iarge
will pay the appropriate equivalent lot coets (See ** below) for this tract for the Brookwood Lane drainage crossing and the BrookwoocI Lane street construction.
CIty of SalIna (b) The City of Salina has a program where any owner may petition the city-at-large to pay 50% for any public drainage Improvement that serves a significant .
quantity of off-slte property drainage. .
** An equivalent residential lot for this subdivision Is 90' by 12(1. Since the portion of Brookwood Lane that Is being built Is approximately 300', there would be
approximately 3.4 lots that would be aseessed assuming they were Included In the benefit district
oodla d
ha
- -
22 7
.:) 23 6
~>
~
"tJ .." 24 5
- m
- ~
Z tn
m ~
;!! ..J 25 .... 4
c :c m
Ci) tn
m 26 c 3
c ;:a
;:a
27 2
28 1
B-1 u I....'m u-li. I ..-
N 'l
- w-<?-'
s
Feet
0 50 100 200 300 400
, ,"
Benefit District
-
Boundary
DO NOT WRITE IN THIS SPACE
--, \~
PETITION NUMBER
?lo! J 3
'02 AUG 1 AH10:40
TO: THE GOVERNING BODY
City of Salina, Kansas
(A) We, the undersigned, being owners of record of property liable for assessment for the following improvements:
The curbing, guttering, paving, grading and drainage of Brookwood Lane from the east property line of Lot 1, Block 2, Woodland Hills Estates
Addition to 40 foot east of the east property line of Lot 1, Block 3 to serve Lots 22-28, Block 2 and Lots 1-7, Block 3, Woodland Hills Estates
Addition to the City of Salina, Kansas.
The installation of a drainage channel crossing under Brookwood Lane at the east line of Lot 1, Block 3, Woodland Hills Estates Addition to
serve Lots 22-28, Block 2 and Lots 1-7, Block 3, Woodland Hills Estates Addition to the City of Salina, Kansas.
Hereby propose that such improvement be made in the manner provided by Article 6a, Chapter 12 ofthe Kansas Statutes Annotated, as
amended.
(B) The estimate or probable cost of such Improvement is:
Eighty Three Thousand Seven Hundred Twenty Six and 10/100 Dollars
($83,726.10)
(C) The extent of the proposed improvement district to be assessed as indicated on the attached plat and is described as follows:
Lots 22-28, Block 2; Lots 1-7, Block 3, Woodland Hills Estates Addition to the City of Salina, Kansas.
(D) The proposed method of assessment is:
Shall be based upon equal assessments for each equivalent residential lot in the benefit district relative to the type of improvement and the
sub-area affected by each improvement.
(E) The proposed apportionment of costs between the improvement district and the improvement district and the City-at-Iarge is:
percent L-%) to be assessed against the improvement district and
percent L-%) to be assessed against the City-at-Iarge.
"See attached "Apportionment of Cost"
(F) We further propose that such improvement be made without notice and hearing as required by KS.A. 12-6aO4(1) as amended.
...............................................................................................
.
No name may be withdrawn from this petition after the Governing Body commences consideration of the petition or later than seven (7)
days after this petition has been filed with the City Clerk (KSA 12-6aO4).
...............................................................................................
Respectfully submitted by:
Darvin Dent for Landmark Development
Telephone Number
785-283-4430
Sianature
~~.~r
ßy." , .
Residence
Date & Time
of Sianina
Property owned within the
proDosed Improvement District
9Jø tU //~ £I
¡J¡«pÆ" I '/4 )::'.,/
7-Jc7 -&" 2...
/1// /11 dlad¿J hI~
APPORTIONMENT OF COST
COST CHARGEABLE TO PRIVATE PROPERTY:
1.
Approximately 80.5% of the total cost of street and drainage improvements,
including grading, pavement, curbs and gutters, stonn inlets and any incidentals
thereto to complete the residential street standard and drainage systems or 100%
less (-) the amount (19.5%) that would be attributable to the tract on the south
side ofBrookwood Lane had this tract been included in the benefit district. **
2. 50% of the total cost of the drainage channel crossing under Brookwood Lane
including culverts, earthwork, erosion control, and grading; less (-) the amount
that would be assessed to the tract on the south side ofBrookwood Lane (9.77%)
for a total of 40.23%. **
COST CHARGEABLE TO CITY:
1. 50% of the total cost of the drainage channel crossing under Brookwood Lane
including culverts, earthwork, erosion control and grading; plus (+) the amount
that would be assessed to the tract on the south side ofBrookwood Lane (9.77%)
for a total of 59.77%. * *
2.
Approximately 19.5% of the total cost of street and drainage improvements
including grading, pavement, curbs and gutters, storm inlets and any incidentals
thereto to complete the residential street standard and drainage systems or the
amount that would be attributable to the tract on the south side ofBrookwood
Lane had this tract been included in the benefit district. * *
**Due to findings by the City of Salina that the tract on the south side of
Brookwood Lane is bisected by a major drainage channel and easement that serves
off-site properties, this tract is deemed undevelopable. As a result, this property
receives no benefit fÌ'om these improvements, and was therefore excluded fÌ'om the
benefit district. The city-at-large will pay the appropriate equivalent lot costs for
this tract for the Brookwood Lane drainage crossing and the Brookwood Lane street
construction.