8.6 Advis Wallerius Improvement CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE T I ME 5/18/1987 4:00 P.M. AGENDA SECTION: Administration ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: NO. 8 City Clerk ~ / NO. 6 BY: D. L. Harrison BY: Resolution Number 87-3892 - determining the advisability of curbing, guttering, paving, grading, water main and service improvements, estimating the cost thereof, defining the boundaries of the improvement district, method of assessment, and apportioning the cost between the improvement district and the City-at-large. [Improvements on Saturn and Hageman Avenues] This is the first step in the. special assessment process. Normally, the City receives a petition from the property owners which starts the process. In this case, utilizing special statutory authority, the City Commission is initiating the project without a petition. Kansas Statutes authorize city commissions to initiate paving projects to connect streets that are already paved. Enclosed is a memo'l prepared previously on this matter. We have notified the property owners and have had some response from them which you will note in the attached memorandum from Don Hoff. We plan to notify the property owners of Commission consideration at the June 1st meeting. This first step is procedural' in nature. The action at the June 1st meeting is the key step in the special assessment project because it authorizes the project. COMM I SS I ON ACT I ON MOTION BY SECOND BY TO: UNPAVED SECTION OF SATURN AVE ! NO. ~ I I I PROPERTIES, INC. 9 ON~ I · ., RECEIVED -MAY 5 1987 May 4, 19 8 7 CITY MANAGER'S OFFICE ~mo To: R.L. Nye, City Manager From: Don Hoff, Assistant Director of Engineering & Utilities Subject: Street Improvements on Hageman Avenue and on Saturn Avenue We have completed the preliminary design phases and the feasibility reports for the proposed improvement of Hageman Avenue from Saturn Avenue to Jupiter Avenue and for the proposed improvement of Saturn Avenue from Hageman Avenue to Tulane Avenue. Copies of the feasibility studies were mailed to all property owners within the benefit district. Only five (5) of the fourteen (14) property owners responded to our cover letter request to call our office to express their views concerning the proposed street improvements. However, 80% of the responses received were in favor of the improvement project. It is my understanding the City Commission is considering initiating this street improvement project in accordance with the provisions of K.S.A. 12-6a04 regarding "connecting streets." We are tentatively scheduled to have our next street improvement project letting date, involving several subdivisions, within 60 days. If the above described two blocks of street improvements (Saturn Avenue and Hageman Avenue) are "ordered to be improved" by the City Commission, this work could be combined with other planned subdivision work into a single ~onstruction project. If you need additional information concerning this subject at this time, please contact me. Attached are copies of the feasibility studies. ? PRELIMINARY ENGINEERING ESTIMATE AND FEASIBILITY REPORT PETITION NO. STREET IMPROVEMENTS FOR PART OF WALLERIUS ADDITION TO THE CITY OF SALINA, KANSAS FILE NO. 87-1 FEBRUARY - 1987 DEAN BOYER,'CITY ENGINEER SCOPE OF WORK The curbing, guttering, paving and grading of Hageman Avenue from the north line of Saturn Avenue to the south line of Jupiter Avenue. Also, the installation of'water services to Lots 1, 17 & 18, Block 8, Wallerius Addition. BENEFIT DISTRICT Part of Lots 7 and 18, and all of Lots 8 through 17, Block 12, Wallerius Addition, and all of Lots 1 through 4 and Lots 14 through 18, ~Block 8, Wallerius Addition. ADOPTION OF ASSESSMENT The assessment with accrued interest to be levied as a special assessment tax upon the property included within the benefit district concurrent with the general property tax and shall be in ten (10) equal annual installments. APPORTIONMENT OF COST COST CHARGEABLE TO PROPERTY 1. 100% of the total cost of curbing, guttering, paving, grading, water services and incidentals thereto to complete the street improvement. COST CHARGEABLE TO CITY None D.ISTRIpU~ION OF COST FRONT COST PER COST TO FOOTAGE FRONT FOOT PROPERTY Street Improvement 1537.9 $13.24 $20,355.00 PRELIMINARY CONSTRUCTION ESTIMATE STREET IMPROVEMENTS WALLERIUS ADDITION PETITION NO. 1. COMMON EXCAVATION: 750 C.Y. @ $ 4.00 = $ 3,000.00 2. ASPHALTIC PAVEMENT, 8": 700 S.Y. @ 16.00 = 11,200.00 3. CONCRETE CURB & GUTTER: 450 L.F. @ 7.00 : 3,150.00 4. WATER: 1L.S. @ 50.00 = 50.00 5. REGRADE WATER VALVE: 1 EA. @ 300.00 : 300.00 6. WATER SERVICE, l": 3 EA. ~ 300.00 : 900.00 SUB TOTAL: $18,600.00 15% ENGINEERING + CONTINGENCIES: $. 2~.790.00 TOTAL: $2-1,390.00 .. I. I .. ~ .o il! ,,. ~l F ,.. iii .. I .o. I .o. I .~-I ... IH ) '- AVF'. 4 IBBBBBB Benefit District N .' ,,. 2: 3 : 4 : 5, L ,8!!L--J---[-(]).'---I__L__Ji:, '~ bi I-- Pefifion No. L,, ,i,, .I ,.t 14 = 13:1 12 ® r ,.. Iff././. / / . -/ " / u. III MERCURY VACATED I "' ili"'l'l' "1"1" / '~ III '"/ ~ / .... / A~. . I : I I 13 ~ ~ ~. ~ II SATURN i AVE. ~k I I 6 m 4 ~" ~ ¥ - MOON DRIVE I " B~k 2 L__ _- --- -. PRELIMINARY ENGINEERING ESTIMATE AND FEASIBILITY REPORT PETITION NO. PROPOSED STREET AND UTILITY IMPROVEMENT PART OF WALLERIUS ADDITION, PART OF WALLERIUS ADDITION NO. 2, AND PART OF THE SOUTHEAST QUARTER (SE~) OF THE SOUTHEAST QUARTER (SE~) OF SECTION 26, TOWNSHIP 14 SOUTH, RANGE 3 WEST OF THE 6TH P.M. IN ~ALINE COUNTY KANSAS MARCH - 1987 FILE NO. 87-2 DEAN BOYER, CITY ENGINEER PETITION NO. SCOPE OF WORK The curbing, guttering, paving and grading Of saturn Avenue from the east line of Hageman Avenue to the west line of Tulane Avenue, and the installation of a 6" C.I. pipe watermain in Saturn Avenue from Hageman Avenue to Tulane Avenue. BENEFIT DISTRICT Part of Lots 9 and 18, and all of Lots l0 through 17, Block 8, Wallerius Addition, and Lots 1 through 7 and part of Lot 8, Block l, Wallerius Addition No. 2, and that part of an unplatted tract of land in the Southeast quarter of the Southeast quarter of Section 26, Township 14 South, Range 3 West of the 6th P.M. in Saline County described as follows: Beginning at the Northeast corner of Lot l, Block l, Wallerius Addition No. 2; thence East along the South line of Saturn Avenue a distance of 211.5 feet; thence South, parallel to the East lane of said Lot l, a distance of 200 feet; thence West, parallel to the South line of Saturn Avenue a distance of 211.5 feet; thence North along the East line of said Lot 1 to the point of begi nni ng. ADOPTION OF ASSESSMENT The assessment with accrued interest to be levied as a special assessment tax upon the property included within the benefit district concurrent with the general property tax and shall be in ten (10) equal annual installments. PETITION NO. APPORTIONMENT OF COST COST CHARGEABLE TO PROPERTY 1. 100% of the total cost of curbing, guttering, paving, grading and any incidentals thereto to complete the street improvement. 2. 100% of the watermain, fire hydrants, valves, fittings, service lines, trenching, backfill and any incidentals thereto to complete the water system. COST CHARGEABLE TO CITY None DISTRIBUTION OF COST FRONT COST PER COST TO STREET IMPROVEMENT FOOTAGE FRONT FOOT PROPERTY North side of Saturn 673.8 $40.236 $27,111.25 South side of Saturn 1065.2 25.452- 27,111.25 WATER SYSTEM 1151.0 14.612 16,818.75 $71,041.25 PRELIMINARY COST ESTIMATE PETITION NO. WALLERIUS ADDITION WALLERIUS ADDITION NO. 2 UNPI~ATTED TRACT (PT. S.E. 1/4 OF SEC. 26-14-3) 1. COMMON EXCAVATION: 450 C.Y. e $ 4.00 = $ 1,800.00 2. BITUMINOUS PAVEMENT, 8": 2,200 S.Y. @ 16.00 = 35,200.00 3. CONCRE'I'E CURB & GUTTER: 1,400 L.F. @ 7.00 = 9,800.00 4. C.I. PIPELINE, 6": 750 L.F. @ 12.00 : 9,000.00 5. C.I. FITFINGS: O.1 TON e 3,000.00 = 300.00 6. GATE VALVE, 6": 1 EA. ~ 600~00 = 600.00 7. FIRE HYDRANT: 1 EA. @ 1,400.00 = 1,400.00 8. WATER SERVICE~ l": ll EA. ~ 300.00 = 3,300.00 9. REGRADE MANHOLE: 1 EA. ~ 300.00 - 300.00 10. WATER: 1L.S. ~ 75.00 : 75.00 SUB TOTAL: $61,775.00 15% ENGINEERING + CONTINGENCIES: $ 9,266.25 ? TOTAL: $71,041.25 PETITION NO. PRELIMINARY CONSTRUCTION ESTIMATE STREET IMPROVEMENTS 1. COMMON EXCAVATION: 450 C.Y. g $ 4.00: $ 1,800.00 2. BITUMINOUS PAVEMENT, 8": 2,200 S.Y. ~ 16.00 : 35,200.00 3. CONCRETE CURB & GUli'ER: 1,400 L.F. @ 7.00 : 9,800.00 9. REGRADE MANHOLE: 1 EA. @ 300.00 = 300.00 lO. WATER: 1 L.S. @ 50.00 : 50.00 SUB TOTAL: $47,150.00 15% ENGINEERING + CONTINGENCIES: $ 7,072.50 TOTAL: $54,222.50 PETITION NO. STREET IMPROVEMENTS THE CURBING, GUTTERING, PAVING AND GRADING OF THE NORTH SIDE OF SATURN AVENUE FROM THE WEST SIDE OF LOT 17 TO THE EAST SIDE OF LOT lO, BLOCK 8, WALLERIUS ADDITION. 1. COMMON EXCAVATION: 225 C.Y. @ $ 4.00 : $ 900.00 2. BITUMINOUS PAVEMENT, 8": 1100 S.Y. @ 16.00 = 17,600.00 3. CONCRETE CURB & GUTTER: 700 L.F. @ 7.00 = 4,900.00 9. REGRADE MANHOLE: 0.5 EA. @ 300.00 : 150.00 10. WATER: 0.5 L.S. @ 50.00 = 25.00 SUB TOTAL: $23,575.00 15% ENGINEERING + CONTINGENCIES: $ 3~536.25 TOTAL: $27,111.25 PETITION NO. STREET IMPROVEMENTS THE CURBING, GUTTERING, PAVING AND GRADING OF THE SOUTH SIDE OF SATURN AVENUE FROM THE WEST SIDE'OF LOT 6 TO 211.5' EAST OF THE EAST SIDE OF LOT l, BLOCK l, WALLERIUS ADDITION NO. 2 1. COMMON EXCAVATION: 225 C.Y. @ $ 4.00: $ 900.00 2. BITUMINOUS PAVEMENT, 8": llO0 S.Y. @ 16.00 : 17,600.00 3. CONCRETE CURB & GUTTER: 700 L.F. @ 7.00 : 4,900.00 9. REGRADE MANHOLE: 0.5 EA. @ 300.00 : 150.00 10. WATER: 0.5 L.S. @ 50.00 : 25.00 SUB TOTAL: $23,575.00 15% ENGINEERING + CONTINGENCIES: $ 3~536.25 TOTAL: $27,111.25 PETITION NO. PRELIMINARY. CONSTRUCTION ESTIMATE WATER SYSTEM 4. C.I. PIPELINE, 6": 750 L.F. @ $ 12.00 -- Sg,o00.O0 5. C.I. FITTINGS: O.1 TON ~ 3,000.00 : 300.00 6. GATE VALVE, 6": 1 EA. g 600.00 : 600.00 7. FIRE HYDRANT: 1 EA. g 1,400.00 -- 1,400.00 8. WATER SERVICE, l": ll EA. g 300.00 -~ 3,300.00 10. WATER: 1 L.S. @ 25.00 -- 25.00 SUB TOTAL: $14,625.00 15% ENGINEERING + CONTINGENCIES: $ 2,193.75 TOTAL: $16,818.75 PETITION NO. STREET IMPROVEMENTS PROPERTY FRONT SATURN DESC. FOOTAG, E AVENUE WATER TOTAL Block 8 Pt. Lt. 9 31..6' 1271.47 $1271.47 Lot 10 80.0 3218.91 3218.91 Lot ll 75.0 3017.72 1095.92 4113.64 Lot 12 75.0 3017.72 1095.92 4113.64 Lot 13 75.0 3017o72 1095.92 4113.64 Lot 14 75.0 3017.72 1095.92 4113.64 Lot 15 75.0 3017.72 1095.92 4113.64 Lot 16 75.0 3017.72 1095.92 4!!3.64 Lot 17 80.0 3218.91 3218.91 Pt. Lt. 18 32.2 1295.61 1295.61 Block 1 Pt.of SE¼ of Sec.26-14-3 211.5 5383,07 3090.50 8473,57 Lot 1 84.3 2145.59 1231.82 3377.41 Lot 2 90.0 2290.66 1315.11 3605.77 Lot 3 75.2 1913.97 1098.84 3012.81 Lot 4 60.0 1527.11 876.74 2403.85 Lot 5 60.0 1527.11 876.74 2403.85 Lot 6 120.0 3054.22 1753.48 4807.70 Lot 7 320.0 8144.58 8144.58 Pt. Lt. 8 44.2 1124.97 1124.97 1065.2 54222.50 16818.75 71041.25 PETITION NO. i~,~~I BENEFIT DISTRICT