Loading...
7.1a Maj St Improv Annex Policy SALINA CITY PLANNING COMMISSION Policy No. 88-1 Subject: Improvement of Major streets Abutting Proposed Developments In cases where a proposed subdivision or planned development abuts an existing collector or arterial street that does not contain a paved surface conforming to minimum city standards, then the following requirements shall apply: 1. If the street surface consists of pavement having a minimum width of 24 feet and a minimum thickness of 8 inches of asphalt or 6 inches of concrete, the applicant is not required to make any further improvements to the abutting street. 2. If the abutting street does not comply with the above minimum standards, the applicant shall assist in completing needed street improvements in one of two ways: a) The applicant may submit legal assurances to the city agreeing to improve the abutting street during the process of completing adjacent public street and utility improvements within the development. Such improvement shall be sufficient to obtain an equivalent of 8 inches of asphalt pavement of 24 feet in width. Plans and specifications for said pavement shall be approved by the City Engineer. b) The applicant may submit legal assurances to the city consenting to the establishment of a special assessment . district and. obligating the abutting land within the proposed development for one-half of the total cost to reconstruct the street to city standards. Said assurances shall be valid for a 5 year period and legally binding on existing and future owners of land within the development. 3. Upon satisfactory compliance with the above standards, the city will consider approval of the final plat and annex and maintain the abutting street. 4. If the approved and recorded final plat of the development provides for total restricted access along the abutting street, the subdivider shall.be exempt from the above requirements. Attest: ~- /Secretary