Loading...
7.2 Plat Grand Prairie Addition CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 ITEM NO. Page 1 DEVELOPMENT SERVICES PLANNING BY: BY: Dean Andrew ITEM: Application #P08-2A Consider the acceptance of offered utility, drainage and pedestrian easement, street and cart path right-of-way and restricted access dedications from Cornerstone Development Group and the dedication of off-site utility, drainage and emergency access easements across Municipal Golf Course property to serve the Grand Prairie Addition, a proposed 70 lot residential subdivision adjacent to the Salina Municipal Golf Course. The subject property is a 37.14 acre tract located on the north side of Cedar Ridge Drive east of the Mariposa Addition. BACKGROUND: In 1963, the Graves family acquired the Southwest Quarter of Section 20 in Saline County. This quarter section is bounded on the south by Cloud Street and the west by Marymount Road and contains 160 acres. Shortly after their purchase, the Schilling Air Force Base closed perm itting the Salina Municipal Airport to relocate to the former air base. In 1967, a plan was put forward to construct a municipal golf course at the former site of the municipal airport. Because of the north-south runway alignment the airport land was flat and narrow and was configured in a manner that would have required all the long holes on the course to run on a north-south axis. The City approached the four Graves brothers (Bill, Dwight, John and Lowell) about the possibility of contributing some of their land for use in the design and layout of the golf course so as to provide some rolling terrain and allow for a layout that was not strictly north-south. Following some careful planning, 25 acres of Graves family land was given to the City for inclusion in the golf course layout. One result of this land donation is that there are now peninsulas of Graves Trust owned land between holes 7 and 12 and between holes 13 and 14. In 1988, a master plan for the remaining Graves Trust land, known as the Mariposa Master Plan, was approved in concept by the City of Salina and Saline County. The plan called for the closure of Cloud Street adjacent to the Elks Club and construction of a new, realigned collector street connecting Marymount Road and Markley Road with residential development occurring north and south of the new street. Phase I, the Mariposa Addition, Blocks 1-6, were platted in 1989. Phase II, the Flor De Sol Townhome and Briargate areas close to Markley Road, were platted and developed in 2000. Phase III, the Cedar Ridge Addition, was platted in 2004 and Cloud Street was eliminated and Cedar Ridge Drive was constructed as part of development of that subdivision. The Cornerstone Development Group has purchased a portion of the Graves Trust property between Cedar Ridge Drive and the Municipal Golf Course with plans to develop a residential subdivision. They retained the services of a land surveyor and civil engineer to develop potential subdivision layouts for the area. Their layouts led them to have some preliminary discussions with the golf course staff about potential land swaps and boundary adjustments between their subdivision and the golf course property. They identified areas where the addition of the golf course land could square off the subdivision boundary to provide better lot configurations and areas they would be willing to transfer to the golf course to widen areas adjacent to the ih hole fairway. Because all parties whose land is included in a subdivision plat must consent to participate in the plat CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 2 BY: Dean Andrew application, the Cornerstone Development Group made a formal written request that the governing body authorize the City of Salina to be a co-applicant in the platting of the property to allow portions of the golf course property to be included within the subdivision boundary. In terms of net land area, the proposed land swaps would result in more golf course land being added to the subdivision than Cornerstone land being added to the golf course, however, the developers are also proposing to grant trail easements or rights-of-way to the City to allow golf course personnel to travel through the subdivision to get between holes 7 and 12 and 6 and 12 to perform golf course maintenance functions. These trail corridors for City use contain approximately 6,840 sq. ft. Other requested areas of City participation and cooperation were the dedication of utility easements to allow utility extensions under golf course property, the granting of an emergency access easement over to Markley Road and the possible construction of a stormwater detention/retention pond on golf course property between the 13th and 14th fairways. In addition to the cart trail corridors, other potential benefits to the Municipal Golf Course operation from participating in this plat would be establishing a surveyed, monumented boundary along the south side of the golf course, and the potential for connecting an existing golf course restrooms to the public sewer system in the Grand Prairie Addition. The City Commission considered Cornerstone's request for City participation at their January 28, 2008 meeting and approved a resolution (4-0) authorizing the inclusion of Municipal Golf Course land in Cornerstone's subdivision plat and rezoning applications. The resolution essentially authorized the City of Salina to be a co-applicant on the plat as a landowner and authorized the Parks and Recreation Director to sign the rezoning and plat applications on behalf of the City but preserved the City Commission's authority to approve or disapprove the amount of City owned land included in the final layout. A preliminary plat application was filed on February 15, 2008. The Salina City Planning Commission met on March 18, 2008 and considered Cornerstone's proposed preliminary plat of the Grand Prairie Addition. Following presentation of the staff report, comments from the Parks and Recreation Director, comments from the design engineer and comments and questions by Commissioners, the Commission voted 8-0 to approve Cornerstone's proposed preliminary plat of the property. The Planning Commission's approval was made subject to the following conditions: 1. The applicant shall obtain a letter from the Mariposa Homeowner's Association authorizing excavation within the Mariposa Common Area and connection to the sanitary sewer system located within the common area prior to Planning Commission consideration of a final plat. Modified by Planning Commission December 2, 2008. 2. An emergency entrance and all weather access road from Markley Road over to the public street in the north peninsula shall be constructed as part of the development of the north peninsula area. The Fire Chief shall approve plans and specifications for the proposed fire access road prior to consideration of a final plat by the Planning Commission. Construction CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 3 BY: Dean Andrew shall be completed prior to issuance of any certificate of occupancy in the subdivision. Conceptually approved by Fire Marshal. 3. The applicant shall obtain a letter from the Director of Parks and Recreation approving the proposed boundary adjustments to the Municipal Golf Course boundary, the proposed location and design of the detention/retention pond located between holes #13 and #14, proposed easement locations and the emergency access road design prior to Planning Commission consideration of the final plat. The Director of Parks and Recreation and the golf course staff did not approve of the proposed location and design of the golf course pond and the pond has been relocated to Cornerstone property. The other easement locations were acceptable but the golf course staff did not want any excavation work on the golf course to occur between April and November. 4. The City Engineer shall approve preliminary plans and specifications for the internal public streets, on-site and off-site water and sanitary sewer line extensions and storm water collection and detention facilities needed to serve this subdivision prior to Planning Commission consideration of a final plat. Needed utility and drainage easements shall be provided on the final plat. Draft descriptions of proposed off-site easements shall also be included with the final plat. Approval letter attached. 5. The applicant's engineer shall provide the City Engineer with confirmation that the turning radii on the proposed cul-de-sacs within the subdivision are adequate to accommodate fire trucks and trash trucks prior to Planning Commission consideration of the final plat. Reviewed and confirmed by City Engineer. 6. A maintenance plan for the drainage ways adjacent to the golf cart trail corridors shall be agreed upon prior to Planning Commission consideration of the final plat. Golf course staff will maintain cart trail corridors. Developers are proposing to pay a fee and have the City take over ownership and maintenance of their detention pond. 7. Proposed street names shall be provided on the final plat. Shown on plat. 8. Section corner ties, subdivision and block corners and a curve data table shall be provided on the final plat. Shown on plat. Nature of Current Request The Cornerstone Development Group is requesting final plat approval to allow the residential development of a 37.14 acre tract bordered by the Mariposa Addition on the west, the Salina Municipal Golf Course on the north and east, unplatted agricultural land on the southeast and Cedar Ridge Drive on the south. As proposed, this 37.14 acre tract would be subdivided into 70 residential building lots for single-fam ily homes. The entire 37.14 acre tract now being proposed for residential development is vacant pasture land. The property directly to the west was platted, rezoned and CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 4 BY: Dean Andrew annexed into the city as part (Block 5) of the Mariposa Addition in 1989 but no development has ever occurred on this property. A separate request to rezone this property from A-1 to R-1 was filed with the preliminary plat application. Chanqes from Preliminarv Plat Following approval of the preliminary plat, the proposed location of the golf course detention pond between holes #13 and 14 was staked out in the field. After reviewing the staked out location in relation to fairway landing areas on the two holes, both golfers and golf course staff expressed dissatisfaction with its proposed location and configuration. Therefore on the proposed final plat the primary detention basin has been relocated to Cornerstone property between holes #6 and #12 on the golf course and is no longer on golf course property. This decision eliminated the potential for Cornerstone to construct a water feature on the golf course which could also serve as a supplemental source of irrigation water. Consequently, all proposed detention is on Cornerstone property. Street Access and Desiqn It appears that the applicant has designed a street network that generally conforms with the existing topography on this site. The applicant's plat layout shows a single public street connection to Cedar Ridge Drive. Ideally, major entrances to subdivisions on opposite sides of a collector or arterial street should line up with one another. In this case the street connection was dictated by the location which had the best sight lines east and west on Cedar Ridge Drive. A second connection to Cedar Ridge Drive was not proposed because no other location offered safe sight distances. All internal residential streets would all be public streets with 60 ft. of right-of-way, curb and gutter and 33 ft. of paving, except for Bentgrass Drive at the subdivision entrance. The South 800 ft. of Bentgrass Drive would have 86 ft. of right-of-way to accommodate a boulevard or parkway design with a large center median. These proposed right-of-way and paving widths meet city standards. The paving width of the original section of Mariposa Drive is 41 ft. but the width of the remaining Cedar Ridge Drive section is 29 ft. Forty-five (45) of the 70 lots proposed would have driveway access on Bentgrass Drive, the main entrance road. Although several lots abut or back up to Cedar Ridge Drive, there would be no individual driveways onto that street. Proposed Street Names Bentgrass Drive Larkspur Lane Cobiren Circle (short cul-de-sac) These proposed street names do not appear to conflict with any existing street names in the city or CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 5 BY: Dean Andrew county. The Planning Commission has the authority to approve or not approve proposed street names and accepted the three (3) proposed names. Variance Requests The applicant is requesting two (2) variances from the city's Subdivision Regulations. 1) A variance to the maximum length of a dead end (cul-de-sac) street; and 2) A variance to the requirement for a 150 ft. tangent between all street curves. The length of the proposed dead end street in the peninsula is over 2,300 ft. and is 2,650 ft. from the entrance to the subdivision if the length of the parkway is included. Section 36-10 of the Salina Code states that if the Planning Commission finds that particular hardships or practical difficulties may result from strict compliance with the subdivision regulation, it may approve variations of exceptions to the regulations so that substantial justice may be done and the public interest served. This section also states that the Planning Commission shall not approve variations unless it shall make findings based upon the evidence presented to it in each specific case that: 1) The granting of the variation will not be detrimental to the public safety, health or welfare or injurious to other property or improvements in the neighborhood in which the property is located; 2) The conditions upon which the request for a variation are based are unique to the property for which the variation is sought, and are not applicable generally to other property; 3) Because of the particular physical surroundings, shape or topographical conditions of the specific property involved, an extraordinary hardship to the owner would result, as distinguished from a mere inconvenience, if the strict letter of this chapter is carried out; 4) The variation will not in any manner vary the provisions of the zoning regulations, ordinance, comprehensive plan, official street classification plan and/or major street plan or official map of the city. Staff Analvsis The two conditions that make this property unique are its relatively landlocked location and the shape and topography of the site. The property is bordered on the west by a platted lot and on the north and east by the Salina Municipal Golf Course. That leaves only the Cedar Ridge Drive frontage as potential street access to the site and the choice of access points is limited by the hills and curves on that street which affect sight lines. CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 6 BY: Dean Andrew With the total length of this property (2,600 ft. from north to south), the golf course to the north and east and the natural slopes and dropoffs, the developer is very limited as to how they can layout lots and streets within the developable portions of this 37 acre tract. To mitigate concerns about having a second way into the development for emergency vehicles if the Cedar Ridge entrance is blocked, the applicant is proposing to work with the golf course to construct a secondary emergency access road from Markley Road to the northern cul-de-sac. This emergency access road would be located on golf course property crossing the 3rd and ih holes of the course. This plan has been reviewed and conceptually approved by the Fire Marshal and golf course staff. As to sidewalks, the developer is proposing an extensive network of rear yard pedestrian trails which will be owned and maintained by the abutting owners. This trail network would provide residents with off-street walking paths within the subdivision but in staff's opinion would not substitute for an on street sidewalk system. The Planning Commission has the authority to require sidewalks as a condition of granting any street length variance. Lot Desiqn All lots and blocks have been numbered on the plat drawing. Staff recommended that this subdivision be divided up into separate blocks at natural dividing points and a total of 74 numbered lots divided into two blocks are shown on the final plat. Not all 74 of the lots on the plat are buildable. Staff recommended that open space areas (Lot 2 and Lot 37, Block 2) and drainage easements (Lot 30, Block 1 and Lot 6, Block 2) be labeled as separate lots which would put the number of buildable lots at 70. All lots shown would have adequate frontage on and access to a public street. It appears that the width, depth and area dimensions of all lots shown on the plat would meet or exceed the minimum standards of the R-1 district. It does not appear that there would be any foreseeable difficulties, for reasons of topography or other conditions, in obtaining building permits to build on any of the proposed building lots lots, except for proposed Lots 3, 4, 5 and 6, Block 1 which have substantial slopes from east to west. Creative site planning or substantial regrading will be required on these lots. Public Utilities and Services 1. Water Supply and Fire Protection - This area is fed primarily by an 8" water line running west from Markley Road along the alignment of Cedar Ridge Drive. There is an existing 8" line in Marymount Road that runs from Crawford south to the Elks Club. The Fire Code would require that the water distribution system serving this subdivision be capable of providing 1,000 g.p.m. for fire protection. The Utilities Director has determined that adequate volume and pressure exists in the existing water distribution system to serve this 37 acre site. However without a second connection, this subdivision would have a long dead end system. A looped system with two sources of flow CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 7 BY: Dean Andrew would be created by extending a water line from the north end of Bentgrass Drive across the golf course over to a 20" water line in Markley Road. Internal water lines could be financed over 15 years through creation of a benefit district with the developer putting up 20% of the cost in cash or a letter of credit equal to 35% of the estimated cost. 2. Sanitary sewer - Preliminary plans show that this subdivision can be served by a gravity system. The nearest point of connection is a manhole adjacent to the Mariposa detention pond and Lot 12, Block 1 of the Mariposa Addition. This would require the construction of an off-site sewer line across golf course property to reach this manhole. There are two routes or options for connecting to this manhole. Option B would cross the Mariposa pond and would require Homeowner's Association approval. Option A would be to utilize an existing utility easement north of Lot 12, Block 1. Staff and the developers prefer Option B but it is dependent on the Mariposa Homeowners Association granting a sewer line easement. A network of 8" sewer lines located in the street right-of-way is proposed to serve individual building lots. The details of the sanitary sewer system and the design and layout of internal sewer lines will be resolved during the Engineering Department's review of actual design plans. Internal lateral lines and the off-site sewer connection could be financed through creation of a benefit district with the developer putting up 20% of the cost in cash or a letter of credit equal to 35% of the estimated cost. 3. Natural Gas - Kansas Gas Service has an existing gas line that extends south from Crawford along Marymount Road. They have extended another gas line west from Markley Road along vacated Cloud Street to provide a second gas feed into the RiverRun area. The Cedar Ridge Addition on the south side of Cedar Ridge Drive has a gas distribution system and this could be extended north into Grand Prairie. 4. Electricity - Westar Energy has electrical lines serving the golf course and the nearby Mariposa and Cedar Ridge Additions which could be extended to serve the Grand Prairie Addition. All electrical lines serving this subdivision must be placed underground. This would not include high voltage distribution lines crossing the property or pre-existing overhead lines. 5. Storm Drainage - The City's stormwater management regulations require the developer to design a stormwater drainage system to either accommodate or detain the additional runoff caused by development of the site (the difference between existing and developed conditions), The applicant's stormwater drainage plan has been approved in concept by the City Enginner and the proposed detention basins located within the subdivision have been sized mostly to accommodate off-site runoff coming from the south. It will really function more as a pass through basin than a storage pond. Final design and construction plans for any proposed surface flumes or ditches, storm sewers and detention facilities must be approved by the City CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 8 BY: Dean Andrew Engineer prior to issuance of any building permits in this subdivision. The applicant will need to obtain off-site drainage easements from the Municipal Golf Course (the City) in 3 locations to allow storm water discharge to enter and flow across golf course property. 6. Fire Protection - Fire response from Station #4, located at Marymount and Crawford, is about 5 minutes to the entrance of the subdivision. An emergency access drive connection from Markley Road across the golf course to Bentgrass Drive would provide a second means of emergency access should there be any type of blockage at the Cedar Ridge Drive entrance. This access drive would follow a path that is already in use. 7. Police Protection - Provided by the Salina Police Department once internal streets are built and opened to traffic. 8. Schools - Students in this proposed development would attend the following schools: Meadowlark School - Grades K-5; Lakewood Middle School - Grades 7-8; Salina Central High School - Grades 9-12. U.S.D. #305 has not indicated to City staff that this development will create any crowding problems at the above mentioned schools. 9. Parks - This property is shown as being located in Neighborhood Park Service Area #8 in the City's Neighborhood Park Plan. There are no Neighborhood Parks within this area. Under the City's Park Land Ordinance, developers of residential subdivisions have the option of dedicating land within their subdivision for public park purposes or paying a fee in lieu of dedication. The fee is set at $200 / dwelling for single-family dwellings. This fee may be reduced by 50% when the developer provides private recreation and open space for subdivision residents such as what was proposed in RiverRun. 10. Streets & Traffic - The applicant's engineer has not submitted an analysis of projected traffic from this development. A traffic study was not requested because Cedar Ridge Drive is a newly constructed collector street that was designed to accommodate the ultimate build out in this area. Based on a trip generation rate of 10 vehicle trips per day per household, staff estimates that a total of 700 vehicle trips per day would be generated if the entire platted area were fully developed with homes. This is less than the projected 1,088 vehicle trips per day that would be generated by RiverRun, all entering or leaving that subdivision through one access point (RiverRun Parkway). Easements and Dedications - The applicant is proposing to dedicate all street right-of-way and improvements shown on the plat to the public for City maintenance. All utility and drainage easements shown on the plat would be dedicated public easements. Platted restricted access is proposed along all of Cedar Ridge Drive except for the street opening for Bentgrass Drive. There is already 60 ft. of existing dedicated right-of-way for Cedar Ridge Drive adjacent to this property. The right-of-way for Cedar Ridge Drive was dedicated jointly by Haworth Construction and the Graves Trust. CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 9 BY: Dean Andrew All needed on-site utility and drainage easements are provided on the plat but the applicant is also responsible for obtaining utility, drainage and access easements from the City of Salina and Mariposa HOA to allow utility lines and stormwater runoff to flow across the golf course property. These easements will need to be described and dedicated by separate instrument and will need to be finalized and executed prior to City Commission consideration of the final plat. Required Public Improvements The developer of Grand Prairie Addition would be responsible for the following public improvements: 1. Streets - Approximately 4,200 ft. of asphalt or concrete paving, 2 lanes, 33 ft. wide with curb and gutter for internal streets, except for the wider parkway section on Bentgrass Drive. 2. Sidewalks - 4' sidewalks along both sides of (Bentgrass Drive and Larkspur Lane) unless an exemption is requested and granted. Cul-de-sacs less than 600 ft. in length are exempt from the sidewalk requirement. 3. Drainage - Construction of the primary and secondary detention basins and street inlets and pipes or flumes needed to carry runoff to the collection and discharge points shown on the drainage plan. 4. Utilities - Design and construction of internal public sewer lines and water mains needed to serve individual building lots as well as off-site utility extensions / connections. The City of Salina would be responsible for the following public improvements: 1. If special assessment financing is used, oversight over the contractor installing all on-site and off- site public improvements. 2. Design and construction of any repairs or modifications that need to be made to the concrete drainage flumes carrying water from the Municipal Golf Course into the Mariposa Pond. 3. Design and construction of the cart trails running through the subdivision. 4. Design and construction of any sewer lines serving golf course restrooms. Special Assessments /Impact Fees Portions of this property received assessments in 1999 for the 8" water line connection from Marymount Road to the Markley Water Tower and the sewer pump station constructed at the intersection of Marymount Road and Mariposa Drive. These assessments were initially deferred in 1999 because this property was outside the city limits. CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 ITEM NO. Page 10 DEVELOPMENT SERVICES PLANNING BY: BY: Dean Andrew Property owners outside of this proposed subdivision should not be impacted by assessments for internal streets or public utilities that serve only this development. The Graves Trust property received a substantial assessment (39% of the cost) for Cedar Ridge Drive in 2004. All costs for on-site improvements will be borne by the owner/developer of Grand Prairie or passed on to lot buyers as a special assessment. Phasinq of Public Improvements The developers have indicated that they plan to install all public improvements upfront in the first phase of development but they would have the option of phasing in some public improvements. Covenants The developers have submitted a draft set of Restrictive Covenants for the subdivision for staff's review. Covenants and an architectural control committee will be used to establish private housing design requirements and other building restrictions. Conformance with Comprehensive Plan 1. Land Use Map - The City's Land Use Plan shows this area as being appropriate for low-density residential development and in a Primary Service Area for the extension of city utilities and services. The proposed residential density of this subdivision (70 units on 37.14 acres) computes to 1.88 units per acre which is substantially less than the low density residential classification of 4.0 units per acre. Salina Comprehensive Plan Residential Development Policies for New Subdivisions R4 Future residential growth should embrace the traditional "neighborhood unit" concept, updated to reflect current needs and desires. Neighborhoods should be self-contained areas designed primarily for residential use. Through-traffic should be rerouted around the neighborhood, with a limited number of collector streets penetrating it. Neighborhoods should have access to a small convenience shopping area, accessible by foot or bicycle. Each neighborhood should be adequately served by an elementary school. Safe pedestrian walkway systems should connect homes with schools and other neighborhood facilities. Where possible, multi-family housing should be located on the edge of residential neighborhoods and near other major traffic generators. R5 New housing areas should be served by a safe and convenient circulation system with streets and roadways relating to and connecting with existing streets in adjacent areas. However, CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 11 BY: Dean Andrew residential traffic should be separated from non-residential traffic whenever possible. New residential street should generally follow the contour of the land and seek to highlight the natural features of the area. Access to residential properties should be limited to local streets wherever possible. R7 Any significant new residential development should include a small new park site to serve new residents R8 Major new residential developments should be developed as planned unit developments (PUD) or as planned development district (PDD). PUDs or PDDs give the City maximum control over residential area design and development, and also gives the potential developers flexibility and incentives for creative and high-quality projects. R14 No new residential development should be permitted until adequate water and sanitary sewer service are provided. Every effort should be made to discourage growth in locations where provision of these services are not available or planned as part of the City's future urban service growth areas. R15 Natural environmental features within residential areas should be preserved and protected. Natural vegetation, developed wooded areas, and large mature trees in residential areas add greatly to the ambiance of the City as a whole and should be maintained. Changes to the natural topography should be minimal. Planninq Commission Action The Salina City Planning Commission met on November 4, 2008, December 2, 2008 and again on December 16, 2008 to review and consider Cornerstone Development's application for approval of a final plat of the Grand Prairie Addition. Following presentation of the staff report, comments from Mr. Umphrey and comments and questions by Commissioners, the Commission voted 7-0 to approve the proposed final plat of the property at the December 16th meeting. The Planning Commission's approval was made subject to the following conditions: 1. The developer shall be responsible for installation of all public improvements shown on the approved preliminary plat and infrastructure plan drawings through private financing or by petitioning for the creation of a benefit district. 2. The subdivision plat shall be divided into separate blocks at natural dividing points. The intended use of Lot 2, Block 2 shall be clearly labeled on the plat. 3. Golf course trail corridor easements and drainage easement detention pond areas shall be separated out from each other and clearly labeled on the plat. 4. Mapped A Zone (Floodway Fringe) areas and the Base Flood Elevation shall be identified on the CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION NO: ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: 7 ITEM NO. Page 12 plat drawing. DEVELOPMENT SERVICES PLANNING BY: BY: Dean Andrew 5. All utilities in the subdivision shall be placed underground. 6. Sidewalks shall be installed on both sides on all public streets except for Cobiren Circle. 7. Final engineering design plans, including the final sanitary sewer alignment and plans for the emergency access road, must be approved by the City Engineer prior to beginning construction of any public improvements on the property. 8. A lot grading / drainage plan shall be reviewed and approved by the City Engineer prior to beginning construction of any public improvements on the property. 9. The covenants, conditions and restrictions for this subdivision shall prohibit the splitting of lots. 10. A Certificate of Completion for all public improvements shall be issued by the City Engineer and payment of the pond maintenance fee must be received prior to issuance of any building permits in this subdivision. A revised / corrected final plat containing all required corrections to the plat drawing and plat certificates must be received and all off-site easements across Municipal Golf Course property must be executed and in place prior to City Commission consideration of the plat. COMMISSION ACTION: If the City Commission concurs with the action of the Planning Commission, a motion should be made to authorize the Mayor to sign the plat and accept the offered easement, street right-of-way and restricted access dedications on behalf of the City. The two detention pond areas are shown as drainage easements on the final plat. The deed the pond acres over to the City upon completion of the ponds and payment of the maintenance fee. There are size (6) public utility and drainage easements outside the boundaries of the plat that would be dedicated by the City in support of this project. If the Commission is in agreement with making these dedications, a motion should be made to authorize dedication of these off-site easements as well. Enclosure: Application Vicinity Map Utility Layout Drainage Plans Final Plat Excerpt of PC Minutes 11/4108, 12/2108, and 12/16/08 CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE 4/27/2009 TIME 4:00 P.M. AGENDA SECTION ORIGINATING DEPARTMENT: APPROVED FOR NO: 7 AGENDA: DEVELOPMENT SERVICES ITEM PLANNING NO. BY: Page 13 BY: Dean Andrew cc: Cornerstone Development Group Mariposa HOA Larry Smith Jason Johnson, Landmark Surveying and Mapping 1. Subdivision Name Grand Prairie Addition 2. Subdivision Location North side of Cedar Ridge, east of Mariposa Addition 3. Land Area (sq.ft. and / or acres) 37 acres +/- 4. Number of Lots Proposed 70 5. Present Zoning A-1 Present Use Pasture land 6. Pending Zoning (if applicable) R-1 Proposed Use Residential land Cltyof ~ Salina Plannina &' Communit'l Develooment . Date Filed ,."'1\ Septemberf2, 2008 Application No. P 08-2A Preliminary Plat Receipt No. Approval Date March 21, 2008 102785 Site Plans Landmark Accepted By DA APPLICATION FOR FINAL PLAT APPROVAL 7. Please explain any provisions of conditional preliminary plat approval and your compliance with those provisions (attach additional sheets if necessary): See attached conditions. Off-site easements have been prepared for review. 8. If any changes have occurred between the approved preliminary and this final plat, other than those required by the Planning Commission, please explain the nature of these changes: Detention pond relocated from golf course to inside the subdivision. 9. Explain any waivers of the subdivision regulations granted with the preliminary plat or requested with this application: 1. Waiver of maximum cul-de-sac length of 600 ft. to allow 2300 ft. dead end street. 2. Variance to minimum street curve radius. 10. Applicant Name: Bill Sheppard Applicant Address: P.O. BOX 401, Salina, KS 67401 Phone Number: 11. Property Owner: Add ress: Phone Number: 785-822-7282 E-Mail: Cornerstone Development Group, LLC Same as above Same as above E-Mail: 12. Engineer/Surveyor: Landmark Surveying / Campbell & Johnson Engineers Address: P.O. Box 97, Abilene, KS 67410/113 W. ih, Concordia, KS 66901 Phone Number: 13. Authorized Representative Address: Phone Number: 785-263-2625 / 785-243-1755 E-Mail: Bill Sheppard Same as above Same as above E-Mail: I hereby agree to comply with the Subdivision Regulations of the City of Salina, Kansas, and all other pertinent ordinances of the City of Salina and statutes of the State of Kansas. In addition, it is agreed that all costs of recording the plat and supplemental documents thereto with the Register of Deeds :,)~be ~ssume~ and paid ~ the owner or applicant. AppHcant(s) S;gnature // f/ A~ I'J... ~ Date Se,tember '2, 2008 PLF-058, 1-08 RESOLUTION NUMBER 08-6483 A RESOLUTION AUTHORIZING THE INCLUSION OF MUNICIPAL GOLF COURSE PROPERTY IN THE PLAT OF A RESIDENTIAL SUBDIVISION AND AUTHORIZING THE PARKS AND RECREATION DIRECTOR TO SIGN THE NECESSARY PLAT AND ZONING APPLICAIONS. WHEREAS, K.S.A. 12-752(a) authorizes the owners ofland to subdivide that land into lots and blocks; and WHEREAS, K.S.A. 12-757(a) authorizes the owners ofland and the Governing body to initiate changes to the boundaries of zoning districts within the city; and WHEREAS, the Cornerstone Development Group has purchased the property directly south of the Salina Municipal Golf Course and plans to plat and develop the property for residential homesites; and WHEREAS, the Cornerstone Development Group is proposing to include a portion of Municipal Golf Course property within the boundaries of their subdivision plat and rezoning request area to square off the boundaries of the subdivision and more clearly define the boundary between the golf course and residential subdivision; and WHEREAS, there are other potential benefits to the City from participating in the plat including access to public sewer lines for existing golf course restrooms and maintenance vehicle trails across Cornerstone property. SO, NOW THEREFORE, BE IT RESOLVED by the Governing Body ofthe City of Salina, Kansas: Section 1. That the City of Salina as landowner of the Salina Municipal Golf Course hereby agrees to participate in the platting of a residential subdivision that includes a portion of Municipal Golf Course property. Section 2. That the Parks and Recreation Director is hereby authorized to sign preliminary plat and.final plat applications allowing a portion of Municipal Golf Course property to be included within the boundary of the plat. Section 3. That the Parks and Recreation Director is authorized to co-sign a zoning application to allow a portion of Municipal Golf Course property to be included in the proposed residential subdivision and be rezoned accordingly. Section 4. That this resolution shall be in full force and effect from and after its adoption. Adopted by the Board of Commissioners and signed by the Mayor this 28th day ofJanuary, 2008. A TrEST: {SEAL } Alan E. Jilka, Mayor Lieu Ann Elsey, City Clerk MARIPOSA MASTER PLAN lONG TERM DEVELOPMENT PLAN (subject to Amendment) EB ;, I " \; i. 1 i I : February 5. 1990 Summary of Property Line Adjustments City of Salina and Cornerstone Development Salina Municipal Golf Course ~ Cornerstone Development 59,470 sq. ft. along the south side of Municipal Golf Course between holes #13 and #14 to deepen and square off nine (9) residential lots on Larkspur Lane. This equates to 1.36 acres. Cornerstone Development ~ City of Salina A 3,589 sq. ft. strip of land south of the hole #15 tee box added to the golf course. Cornerstone Development ~ City of Salina A 7,951 sq. ft. strip of land along the west side of the ih hole fairway added to the golf course. City of Salina ~ Cornerstone Development A 5,541 sq. ft. strip of land along the west side of the ih hole fairway to square off three (3) residential lots on Bentgrass Drive. Cornerstone Development ~ City of Salina Four (4) 12 ft. wide cart trail corridors to be owned and maintained by the golf course that would provide interconnections between hole #7 and hole #12 and hole #12 and hole #6. These corridors contain a total of 6,840 sq. ft. City of Salina ~ Cornerstone Development 65,010 sq. ft. (1.49 acres) 18,673 sq. ft. (.43 acres) Cornerstone Development ~ City of Salina In addition, the City of Salina is being asked to dedicate three (3) drainage easements, three (3) utility easements and one (1) emergency access easement that extend into or cross golf-course property. The proposed drainage easements for secondary detention areas occupy about 24,000 sq. ft. of golf course property but do not extend into any playing areas. Maintenance Issues Grand Prairie Addition Street islands / subdivision entrance signs - Grand Prairie Homeowner's Association Rear yard pedestrian paths - Homeowners Association or Lot owners On-site detention ponds - Homeowners Association or the City* * Developers have expressed a desire to pay the City a maintenance fee and deed the pond areas over to the City. Golf course detention areas - Golf course staff Cart trail paths - Golf course staff Emergency access road - Golf course staff after it is accepted by the City of Salina Utility lines crossing golf course - City of Salina after they're accepted by the City R-2 Application #Z08-3 Filed by Cornerstone Development Group A-1 A-1 Request Area A-1 Q 0:: >- LU ....J ..., ~ ,. ~ :::E ~ A-1 - A-1 1 Inch = 400 Feet '" ~. g it I i I " ~ '- @ ;; ~ ~ D Prelim. Infrastructure !1:I.CAMPBELL 4& JOHNSON, PA _. ~. Wf1J 8I1RV1f1IJ1/8 J~ _.........-r. -. __. ,......11. ~ I Grand Prairie Addition City of Salina, KS .. ........lD.........1IdraIIMtln ...... (l-ls-am) ,. ~.......Iat.. ~~"'IIll"'''1II -;-:. "':' ~ 11 I I it ~ a ~ a ]1l1l1l It ! ! ! i' i ~ f - .~ o ~ """I; (/) '"' .. w ~ ~ ~ ~ :r '" ~ '" :;" '" [ Plan rrnm r=J N I) ~ riiiI ~ ~ -= :;II ;g -'II :g CI.l iiiII = '<t ~ V ~~:;:a .0 .e- -= .1:: ~ IlIIltJ = ~ Q) '"' 6~~ .;! I) ~ ~ "[ :~ ~, = Q'!:l. I...., == N C! ~ fl. ~ ;l.t: 1:1'" ~c~ ri: liiiI ~:g;S ~ -"1 :;~~ .::::\\Woo.=-= ~ i!,'l ......... .... .. o. "Cl ... I >,Q)C I n ."f::- ~ 'tl II U Y ~ ~.s~ tJl .s ~ ill .s.!S IHI '8 IJ ~ ~1 ~ e ~ !.~ ~U ~~; ~ii ~~! Application #P08-5A Grand Prairie Addition Final Plat ". t! ~t~ J , ., I , , , , , J ~II! ~I~ ~t~ Jr.........') . "I ~~! ~i. ~j<3 Gt- ! 5 . !::E~ ~i~ ~ ! :~ K ~ J ~ ~ ~ri~ ~id J.3~ ll~ .! ~ !Jw I]E- Sl..... 'r-v lI00ul-W I&DJHPPv,Ipn(~'JIil:> :l\IOJ,uaav ..l.N3:)Vrov d Prairie Addition Gran Grading Plan z -/ ~ tZl ~ DEPARTMENT OF PUBLIC WORKS Michael Fraser, Director of Public Works Daniel Stack, P.E., City Engineer Jim Teutsch, Operations Manager ~of !l Salina TELEPHONE. (785) 309-5725 FAX. (785) 309-5713 TDD . (785) 309-5747 E-MAIL: mikeJrasercmsalina.orQ dan.stackcmsalina.orQ jim. teutschcmsalina.orQ WEBSITE . www.salina-ks.aov 300 West Ash . P.O. Box 736 Salina, Kansas 67402-0736 DATE: December 15, 2008 TO: Salina Planning Commission RE: Grand Prairie Addition (City Project No. 08-2729) FROM: Daniel R. Stack, P.E., City Engineer ~~~ Per Section 36-75 of the Salina Subdivision Regulations, the City Engineer's office has reviewed the storm drainage report prepared by Campbell & Johnson, P.A. for the above referenced subdivision. The report outlines the following: . The property consists of approximately 37.6 acres which drains north and west . Detention calculations were based on the required 25-year, 24-hour storm event . The excess volume of runoff generated by the development will be detained in two ponds holding 6,043 yd3 of storm water - more than the required 5,627 yd3 . 22.2 acres of off-site runoff is being detained to replace the portion of the development runoff not able to be detained due to the location of the two ponds as required by the Municipal Golf Course . Peak runoff from the development and upstream off-site property will be reduced by 13% from 65.8 cfs to 57.2 cfs . Adequate erosion and velocity dissipation measures have been addressed at both the 16 and M1 outlets which discharge onto Municipal Golf Course property The analysis of the Campbell & Johnson report is based on good engineering practices and meets the City of Salina Design Criteria. Per Section 36-74.1 of the Salina Subdivision Regulations, we have reviewed the proposed street segments, cul-de-sacs, and median islands and determined that the design provides adequate turning radii for trash and fire trucks. Enqineering 4> Strf:et:.; ~ 'T";-~:{ftic (~\.)ntro; .t F'loocl C;ont(~-)! ~ C:en"tcal (Jaraqe ? SanitatIon -~~ L;:Jndfl1! Our Mission is to Build and Maintain a Clean, Safe Community ~ 0 .~ ......... 0 ~ ~ ~ - . 0 i ~~ Area B(north)/C 11.4 Acres A B ~~ ?p" ~ \ 0<) \~ 0')\ ",c,f' I . , : ) ". i / , , ------r-~ {# I '" ! 'I '\ / c ;' ! ~ ~~ I L g~! ; '(;'. (?t8! ~ ~ .::J q),' \\\ \ i.r "\ '"", l " , I """ '-..... - ! _'__'__'__'_-'--._-,--,~-----1_ ___ , '\ Area A(east)/B(south) = 12.6 Acres 0'>:- ~ ",0> -<;,S o Drainage Areas Grand Prairie Addition Cit of Salina, Kansas rrrrm llliill {g~~o.~ ..._--~. --.--. ......... Grand Prairie Addition Pond Location and Design 'li I ~'~l:.~~-::::::< ~ it ' 'I ~~ of ~~ -=- ....;:"'~ " ;.B~= ::: ,..:-...:::""\ ",~~ ""'~ __ ~I/__,'n ,,-.,., ~.i: ~~ ~ '\ ~"\ , '~-::.~,~Y~~~>-~r ~:r~ -. li ~ ~~- .... ...."~~~22L~~\~. ,",,,,..~;. ~.~. .'. ~.~_. t'':i'.'''' 1,11' ",1"''';''',.111 . '/cl4... .. ," ' . ..-, I \ ''-\~:J-'':hJ I . ..\.\!!).:k~ ~ lfj;~~ . ~P~~. ~\." ,,';n. ' .,,""";~~;;'- I. ~~ ~ flf11,J '~ . . ,,"-".) /"l_ _ -j / -.J/L 'I) \ '~\~~1i~ \ . "J '/ '- :Ie :J r ~ ~ .... -=----- ~ ,.::' ~ ~~L ~\ I \\\~~~~',~('~'" ~ :t~ /V~~ I ~~ ...::.ftfffJ... ~t-..-:~ J \~ \\.," ;Z~ I~~~ - ~':L .~~ ,'-. .'::..--... ~ >< :\\\, J~i \X~v~' ~:;~ ( 1/\ rl-/7 ~ ~ --a{....y ~ - ,I ~~\,;f fl~' .'. ., '~:'~~~x' z;:i I . . v '1/7 ' (j 'j "j ---:~ 11 '-_---IF-~rc. _~ "'~~ ~~'l):'~ U~~ i \ I ~ ~ / / I ~ . ..J C- ~u-;:::::. -----....', ,~, ~~ -J~ \ ~ ~ fl II,H / I 7/~-"""":' ~ / i' f F~",'::"":~" ~1 VI,' .I \( II 11.( // / mr---.:..~~ I_~ti~~ fflt~~~t~~:~ )l.\~,~ !l \)ll,~ifif((p{W~~ -VA\:" ~- ~ " .,\~~~,w l~ '. .. "II 1.'1111 ( 'I,/,':- ~ /1.. /'.-?s A1?" -...t., - ,~~ \ II I '(1\ 'I ~ 'l~~/(/M ~ -..~ '\ ~\\~'\\~ I \ \ V\I~W ~~\ ~:;.(.~ ~I''/// / '\ ~~ ~ ~\"\\\\'l~ ,~\ \~ ~ \\ ~ ( ! / ~ "\\~\\~\\ \ M\\\f\\\\ \\ ~ "\\~\il }I ) ) ~ '\ \~\ \) ) . ! II _ I ~.. ( \ ~~\\\~ \ \ \ \ \ \) \ ) fl' ')~ \ \ ( I:,r\\li' 'I m \\[~\\~\~,',' \\,1 ~4 :~~/ / }I~ ' (\\\1\ \ 5U ~~ \\\\\ l\ /J ~(//:1- / .\ ~\'\"\ ~ ) 'II I( / / _\1 ~ I 11 I ~ ((,\\t~\\ II 11/~, /( I \ ~,\~ \\, \ \ q (!I '(~- 1 m\: rrr ~ '~II !,~ - \ ~ ~ 1/})l11 \ _ ~~-#<~# / 'Fl ~ ~1" 'i (r!JfJli/Mff, 1 \ \ ,I ~~'i:!{ (< ]I L (~ \ ) ~ \)d~~\J JJ,1 -.-- -" ......-=>. ~ I- '7 L ~....; .. S ..J .<: u .. " x 7/. .". / ..... /.'IfI'" ~I I.. /'IP" No I I (I ' 1<\ \ \ t I {[ / \\~l\ \ \ ~ J /1 ~ ,~~ \\ \ \ I '\:-- ~, ,-.-/./: bf5 ..L. o~ 1Rt dt ~ .1! b ;;:=i ~ .3:!t":Lg l~!~~ L.!t...w U..H h !I..$,.. ~ W r~;> fr'~ ua.k~S eG. ~~ ~1 ~J el~I~t< f u:., lie;' ttE~~~ _.,t~~gUl E:'t;~Rt:t;~ ~. r~~ \..\~ ~~~~','~t- ~~~~~t ,~:, ~........ ",', ",'-- ,~I":,,-- ~~ ~':: ~ ~ " I ~ . . _ _ _ C5-- S '~ '" 20 20 (varies) I I I I I 20' Easement r WA Tr:l ~~~ (varies) o 0 :3 Q) >- C ........ Q) 0 '- .0 ...c Q) o Cl.. Cl.. U Q) e Q) 0.... l- I o 0 u .C ........ en U o Q) o w OJ 0) d lJ'l ~ -P C C OJ 0 E:jJ(,I) OJ~~ lJ'l""O ... d <[ d W . C OJ~ ""0 -- d ~~(,I) d-CS >-~<+- 10..0 ~ d t5 >. OJc-P ~dU ~ ""OL.:1 OJ lJ'l o 0. o .~ 0.. 10 20 o 10 EaseMent Between Lots Clots 47-56, Blk D I ,I I I 20 Easement 5' Trail o 00 0 Q) U C .- Q) 0 ~ .0 ...c en U o CL 0 Q) u ~ 0 w Q) I- o '- 0.... 10 10 20 o EaseMent on exterior lots SEWER ALIGNMENT OPTIONS 1illJ]] sx '1Iurres JO All::> aonwpv 3l-1f1l.Id pall.I~ suondo lUamu~rrv - .Ia.M.as .uR'HUeS _c...-l .___ .____t ~ tIJ{r1 . ~ . $:lIZDII!JNZ J::!J Yc/ "NOSNHOr 'S' T1SSc/l'lY:J I,C; .. i I I I I I I - ~ It~i - ~ \ 1- \ \ \ \ \ - -- \ .. 1 :~(~ ." ~ "--G.-I ~ ----< '''')=Q~,f~ ~vi ( ><"~Y:" ~ >- .;:, (-Ill C ., .... M "A ''--', 'V" ...................... (("~_~"1 .J.l1 ~ "'~~~ ~-~~ ~:--..::--... ,-I",......... _ ::-.... J ,!I" .../ ,-f \..- -7--[~J-- ~~ .. ~\J~~ ., ~ '0 i Y' >--' . )-.!II '-.....I "~ " ~ ~ ~ ~%l "O;~~ i '--. ;' 1 ~ ...9' :\f ~ ...<J.'o op<" <I: <: o :;:; a. o v IfIVl .~ ~ .,...... 0 ... .. :I .. ( ~'I) '- .. "' .. .. ,.. '- " .. c " .. I r;- I k>1 . I r l': hlj ~ ~ ~ .~ ~1Il ~<: o :;:; a. o - .~ ....,.- ! ;; _'-JII-:. P<l ~~ "- / '.. ()q ~ s~..tJ. ...,,0 <1>"" t>4" / / ~/ <;; ~ ::r.~ .....,... tGal..do..l;., --I .~ ~ / rXF " 'l / - ~ 8 / j~t' Y ~< .. ~ [>q ~~ '1-' ~. 1>" P<l .' '" <:Jl# ~ '.. [>q [>q ij> ;! !l ~ ~ .., c 0 IlL C 0 ., :5 ~ ~ 1 ~;!l i. .! - ~.. .12 ~ - ~ lie; -.' J J d II ,- '62 r i f 2'" ""'Z. d fu 1I .. ! ~ ! ~ --, I ~ ~: ; - u \ _ J \ J.! - F\ I ... -'~ . ...~ pi _ _" 3~_.,. .I ; "... ~-' -' . - - .-' ".' ,-j-. . D I I 'is i!i i! ii fi* ,.. ~ ; ,:. - il1 ii -,;; .. ~ =: ..- ii ; ~ Ii 1St .- - ~f -5 '2 Ii I\~ ..4 - Ii ..!.. .. ~~ .!. Ii I; -me _ -Ii Ii -. . -A~ ..- Ii ~__ . 1....., _.' .;: - / ~ -, - '6! .- .,' .c'- Ii ". ' .. II I '-. _ Ii; ,.1 .', "., ---' - ......~.. ill ---'- " .---::.. e- ill . ." -..c. Ii ., ,- .... -." ---i - "'c-.. L _, --. . I. _--' '_ ~ I r- ';';'-. .. , _" L,,-,- I __, ,,' ,I_" ','c ~~, , co, .. .' '\ ", ,.-- -"~Of ~:- ..~ .:.- '-_._\ .~ .. V---'" L \ . \ --- ..-- . \ ._- --.' '.:...-- - \"-- .; -...... \- ~L I I ~ .i& ill .. - Vi 1 -. ~j 'iii -=- ..d . i~ 'iii ~~ 'iii ~I ~ -. ":!. Ii !; -'- l!! IS '!! -. ~I i: ~i fi. Ii 6,~ 1 1-' ~ ~ .-< '- .-< ~. ,12 -- . I~ ~ ' ~! .'" ~~ h I I I ~ I 1 I 1 I ., "'" I. .' -. .., "i; "._ " .. .1. If :~ . l' . .' ". ':';" ;;i. " I,! .:: . ..' .,. ":. ,. '" :.:, -' '. ""C"" Il :';1 :ii. :,": '\ .. '.1; "! ". \ .Ii: ,.,-; '''1': :..... ii;' .. ;;: J\ ~ ':::':~ :;:;... ',f "" :,~ ; '; :( "' ~~!~ ." ,,;';1:; ;'~ !i~ ;y ~:~i ;: 1~i !~~ .::: :!! iHI 11 HI;:~ ,'. I!!! II;" jt Hi! i~ ,; H ;];1 ilL I! H;! i~ . " 'j jl! ", L....:- ")] Si iU' Ii n~j l~ -JI~ :W: "[:: i~ ., ::;j ;i;i i d !lli l~ .~:: 1 i) ;] :~q i~ 'j ::H l;i; i;:: p~ 'I; , ,.J idl i I ~;11 i[: jJt ! HH!~ ~ iiH \~~~ )i. iil! i 1 Uil:~ '. ;~ .. ; ~hi i ! ~nl j~ ~ !' ; IHi! ! !tp ;~ -'l in! lilt: 1 on dn -io.;-;.~""'.' 1,. ,,,", ! ii I lili 11' ~ -,,- _ N;, !Ill "" I "Hl!I\H :l!P,~ T, ,:i ;;!~ i!'; ni;;~ .<1 !:;: n' I Hli l~ ; ~; I fi: Ii ;, I ! tn . ,:: :1:1 ~i: " u~: ;~, '. "I ';:I!. '. ";;:1 .:.1 ., J..l..ili' "II B .~ , . .. , , , '.. 1 1 ~ 522,68 :5 UNPLA ITED ~ 10' Vj[ 522.68 COMMON 482.6 ....... .....jfO:1iO.... .... I ~. ~, 749' / @ ADomON i /' I 721 / 399' I... r' ~.. r' I" I" I t.. I \- i r r" r" I~ I!'>> r r fU r' r I'" .. ..IO'~..U<.~~..~ 171.76 .. ]o.oa ~ N (J) n o if 143.08 ...& . II ...& o q c ~ ;:;: '< /'T1 Q CO ~ CD ::J - :;0 CD CO - ., n - ~ > o o CD CO CO ~~~~ Cij 0 ~ "' ::: = . ~ _ 0 · 10 ::J =i' - o 0 ." (')::S ::s g 30 '1J o CD ~ 5. '1J o (It - ~ r rTl G) rTl Z o '" ' i€ .oas 00' L;i '--N89 7T7"w 186,93 N89' 07' 38' 1,/ 17o.olL '1J- :r C/) CD - N ."C/) o CD c: - ::J a. ~ ~ 5" o o ::J r t.l !Xl o o w ~ ~ ~ ~ ~-t ~ :;0 ZOZ .......&. fT1 . ct Z "~...& ~ fT1::sge.2 ....... . -::s (J)~ o It' 0.- fT1 ~ot It' :;00 z . "C m (I)" Q.~ ~ 0:t0l::S. (J) IO-- IQ U)" ct ~ ;;0 ca (J) "Tl !I~ca.,& 3 0 .0 0 N_ :::u o oZ"-'" om. ~o ?2."~o. ::s _~. N m . "Tl0 0 ~~"Tlf)2 . caO :I . "'O~ "Tl . ::sIO p.'&.>"'O . <i- "'0 o G Ul o N ~ ~ -...I , fT1 153.86 N87"48 37 W ~ U1 '-.J o o (XI ...& ...&...& C1I c..o...&OlI c....P':::'" . o. C1I ~c..~~ I~~~ ~/TIfT1 03: 0> 3:::;0 3::- 0'1J zO C/) >> :;O'1J ITI> >:::0 " 205.00 L 10'U.E. 648,55 S89' 45' SO' E \D o b o C: 0 3: {D ... o I~ ~ t'A IHWA ---1.29. 'is.- ~ ~ \D o o o 129,99 '" o o _ W WW <Xl !Xl "':I~ ;~oo R W (') I~ ::; r g rTl 0 to t.l P o ... o p o o ~ o I ICD .fo- I~ ,01 129.99 129.99 .fo- o N IS ~ ... .... p n; w 1I3:S'6 - z o o ON WU1 000 ';0 WO . fT1 I 01- r~ ~ I I I- e I <ii>.".'. CNI -... <0 (Ii !:: 5 6 -.... 7 8 '0 9 -0 10 .... 0 -I/'> 0 ,., r<> I/'> CD ji\ ,., po.; . 361.47' FAIRWAY 2d U/E t~~~;_lseWE East of MH ESTATES '<t to R: ,-' 8LK. I LOT I I' i 20' U/E -f-----, _ _____.J " -r--o !'V 0 '."''''> o <I)' 0 ~I 116.70' ADDITION 1 I I I 2 I roo I;:: I'" IN 1 1 , L_l~,Q~- I I I I I t lei r r I I _ _ ~QP_O:" _ _ _1~OE2'.-l 3 '0 Q o o '" -0 CXl (\j If) If) o r<> ,., 6 4 5 BLOCK 3 139,64' 140,00' _______ ____0__- 286-:65' g:; .. - ~ g z 207:51' Tract 6 '0 !!? 224' ---- -~~'- -- --- P.O. D. Tract 7 I I 1 I. I ) I t~-- LOT 7 21:'M'l~' to!3;06 By Drlvee~o 6" I I 0' 01 cii ~I 1 I l-.=l44~~-:::'::': -=-=- -26Cl'- ;----- Tract 5 4 o &rl N III lH~ .... 1"}6l: ~ 11'1 I 0 r::O-l C> ()J () ()l - - (}oJ -- (}oJ n ~w~ob c :E , ~(/JO 0 ::0 ~'~. 0 I < - -- - [\) 0 0 rr1 -..J o -c, - c~ z b 1O 0 0 [\.\ N Ooo-OOIE 220.001 220.00 r - - - - - - - - r ::0 -I C> I 0 () I N [\) N (Ji (j) n ()J (9 rv --J ('1 6 0 C N I N ~ O~ ol\Ji.O' .0 ;:0 !' ~ UJ~ I' , 0 I < I O' OO~OO rr1 0\, en ~. C/J~ --0 I z I 0 0 (jJ I ! o o N CD~ <.D 0 I 00. I I ()J ()l :E UJ 179,38' 294.38 ~ N - 135,::10 _ 162.50 102.48 --, I i\J , , ........ (J) r""1 N N .f> o o m - ---.I 150,00' -..J ...., pl CD o - '... ~ \ '.. ~ \ ,', \', C0 " , - ' .. \ .. ~ ':~, \ :~,\ CD" - .' ,~ - ' , ' ~ .~'.. ','.. f\) rv CD :j; ..",I ..', t I I f'-' U'. C "'. rT1 '- (8 ~ 'So .....S/ '- <.0 fV ~ o - --J rv lJ1 0, lD '- '- '- '- 194.\5' 195.00' Salina Planning Commission December 16,2008 Page 3 of 5 #4. Application #A08-2, filed by Landmark Development Co., requesting annexation of a 36.15 acre tract of land located at the northeast corner of Crawford Street and Holmes Road in Saline County, Kansas. MOTION: Mr. Mikesell stated I move that we postpone consideration of Applications #P08-9 and #A08-2 to allow possible areas of cooperation between Todd Welsh, the First Christian Church and Landmark Development to be explored. SECOND: Mr. Meier VOTE: Motion carried 7-0. I #5. Application #P08-2A, filed by Cornerstone Development Group, requesting approval of a final plat of a proposed 70 lot residential subdivision to be known as the Grand Prairie Addition to the City of Salina. The subject property is a 37.14 acre tract located on the north side of Cedar Ridge Drive east of the Mariposa Addition and includes portions of the Salina Municipal Golf Course property. Continued from December 2, 2008 meeting. Mr. Andrew presented the staff report with visual graphics which are contained in the case file. He summarized how each of the conditions of preliminary plat approval had been met. William (Cork) Umphrey, representative of Cornerstone Development Group, stated that Cornerstone was fine with the 11 conditions of approval recommended by staff. He said they would be filing covenants and there would be a Homeowner's Association. Mrs. Soderberg asked whether the case number for this application was #P08-2A or #P08-5A as printed on the agenda page. Mr. Andrew confirmed that it is #P08-2A. MOTION: Mr. Ritter stated I move that we approve final plat Application #P08-2A with the 11 conditions recommended by staff. SECOND: Mr. Householter. VOTE: Motion carried 7-0. #6. Application #P08-10/10A, filed by Kaw Valley Engineering on behalf of D.L. Rogers Corp., requesting approval of a replat of Lots 173 and 175 on Santa Fe and Lots 174 and 176 on Seventh Street in the Original Town of Salina to create Salina Planning Commission December 2, 2008 Page 3 of 5 SECOND: Mr. Schneider. VOTE: Motion carried 5-0. #4. Application #P08-2A, filed by Cornerstone Development Group, requesting approval of a final plat of a proposed 70 lot residential subdivision to be known as the Grand Prairie Addition to the City of Salina. The subject property is a 37.14 acre tract located on the north side of Cedar Ridge Drive east of the Mariposa Addition and includes portions of the Salina Municipal Golf Course property. Mr. Andrew presented the staff report with visual graphics which are contained in the case file. Mr. Andrew explained that Planning staff was still missing two documents needed for the Grand Prairie final plat. One of these documents is a letter from the City Engineer approving the overall subdivision drainage plan and the other is a letter from the Mariposa Homeowner's Association giving permission for a sewer pipeline to serve the Grand Prairie Addition to cross the Mariposa detention pond area to connect to a public line serving the Mariposa Addition. Mr. Stack explained that the Engineering Department received revised drainage plans for the Grand Prairie Addition at 2:41 PM that day and simply did not have enough time to review and approve them. Paul Carpenter, 2143 Columbine Court, President of the Mariposa Homeowner's Association, explained that his group was fine with the sewer pipeline going under their pond, but would not agree to that unless they were given some help with the maintenance of the pond. He suggested that the City of Salina take over maintenance of the pond due to its proximity to the golf course. William (Cork) Umphrey representing Cornerstone Development Group stated that although it would be less expensive and easier to run the sewer under the Mariposa pond, they would not be blackmailed just to accomplish that. He explained that due to Mariposa's non-cooperation, the sewer would have to be routed to the north. This option would be more disruptive to current landscaping on private property and would require dangerous 17 ft. deep trenches. Mr. Andrew explained that when the preliminary plat of the Grand Prairie Addition was approved in March it was believed that there was only one feasible route for providing gravity sewer service to the Grand Salina Planning Commission December 2, 2008 Page 4 of 5 Prairie Addition and that was through the Mariposa Common Area. Mariposa's covenants state that no sewer lines or other utilities may be placed in the Common Area without the Homeowners Association's approval. Therefore, the Planning Commission required that the Mariposa Homeowners Association indicate their approval in writing prior to Planning Commission consideration of the final plat so that everyone was assured that a sewer solution was in fact available. Since that time, Cornerstone's engineers have demonstrated that there is an Option B available (the north route) that is technically and legally possible and that does not require Mariposa Homeowner's Association approval. The question is whether the Planning Commission is willing to modify Condition #1 to take into account there is now an alternative to going through the pond. If so, that would allow the final plat to be considered without requiring the pond route. Steve Snyder, Parks & Recreation Director, has reviewed the two routes and does not believe that one route would have any more impact on the golf course than the other. MOTION: Mr. Ritter stated I move that Condition #1 of our preliminary plat approval be amended to allow either sewer option. SECOND: Mr. Schneider. VOTE: The motion carried 5-0. -io Approval of this motion eliminated the requirement that written approval be obtained from the Mariposa Homeowners Association but does not preclude the sewer going through the pond if some agreement is reached. #5. Application #P08-8A, filed by James Hall on behalf of Great Plains Manufacturing and multiple owners, requesting approval of a replat of portions of the White Acres Subdivision, Idlewilde Gardens Addition and Brown and Brown Addition to create the Great Plains Campus Addition. The subject property consists of 54.37 acres located on the north side of North Street east of Ohio Street in the City of Salina, Saline County, Kansas. Mr. Andrew presented the staff report with visual graphics which are contained in the case file. James Hall, Great Plains Manufacturing, 1525 E. North Street, explained that this replat was an effort to clean up an outdated and confusing system. The replat would radically simplify the description of lots in this area. Salina Planning Commission November 4, 2008 Page 3 of 5 MOTION: Mr. Householter stated I move that we approve Preliminary Plat Application #P08-6 with the 7 recommendations made by staff, with the cul-de-sac on Virginia Court being addressed in the final plat. SECOND: Mrs. Soderberg. VOTE: Motion carried 7-0. #4. Application #A08-1, filed by Magnolia Development Partners, LLC, Premier Properties and Com. Co. of Kansas, Inc. requesting the annexation of a 9.3 acre tract of land to allow it to be added to the proposed Magnolia Commons Addition. Mr. Andrew presented the staff report with visual graphics which is contained in the case file. MOTION: Mrs. Soderberg stated I move we recommend approval of Application #A08-1 requesting that 9 additional acres be annexed into the city. SECOND: Mr. Mikesell. VOTE: Motion carried 7-0. 1 #5. Consider proposed changes to the storm drainage / stormwater detention plan for the Grand Prairie Addition residential subdivision located on the north side of . Cedar Ridge Drive east of the Mariposa Addition. Mr. Andrew presented the staff report with visual graphics as contained in the case file. Greg Adams of Campbell & Johnson Engineers, PO Box 1332, Junction City, KS spoke regarding the plan for on-site and off-site drainage and stormwater detention as a representative of Cornerstone Development Group. He explained that this site was very difficult as water flows in many directions. The preliminary plat showed a plan to include a detention pond on the golf course between holes #13 and #14 as a permanent water hazard. However, in order to accomplish this, a number of mature trees would have been cut down. To avoid this, the pond was then moved north, but it was then determined that it could potentially cause flooding of the fairway if there was a greater than 25 year rainfall event. Mr. Adams explained that he was able to design a system that would hold back the volume of water corning from the south in order to offset the water that the Cornerstone Development would generate. He designed a channel that spreads out the water and would slow it to 2 ft. per second. He explained that after this design was implemented, there would actually be less water going into the Mariposa pond than before. There was some thought about adding a second Salina Planning Commission November 4, 2008 Page 4 of 5 small detention pond but it would only hold a small event, a 5 or 10 year rain. Since this would cause water to cross the golf course as well, he didn't see the merit in a secondary pond on the golf course property. Steve Snyder provided his perspective on the reasons for abandoning the golf course pond idea. Wayne Nelson noted that a secondary pond would be a dry bottom pond. He stated that City staff met with Mr. Adams earlier this afternoon and looked at several options. One was another pond between Lots 59 and 60 in Block 1 and another idea was to add an energy dissipation device in the form of a rock garden where a drainage flume discharges runoff from Larkspur Lane on to the golf course. Darald Hough, 2144 Columbine Ct., and Paul Carpenter, 2143 Columbine Ct. spoke as representatives for the Mariposa Homeowner's Association, owners of the pond where runoff will end up. A video taken by Mr. Hough was shown to illustrate the amount of water the Mariposa pond receives from the golf course. Mr. Carpenter explained that the Homeowner's Association spends a considerable amount of money on maintenance of their detention pond/drainage system and also on erosion repairs needed due to flooding. The pond dam collapsed in 1993 and had to be replaced at a cost of $25,000. The Mariposa Homeowner's Association is concerned that runoff from the Grand Prairie Addition and golf course could potentially cause an additional burden on their detention pond/drainage system and end up costing them more money. Mrs. Soderberg suggested that the Mariposa Homeowner's Association voice their concerns to the City Commission and show them the flooding video. The Planning Commission took no formal action but asked staff to address the drainage concerns in their staff report when the final plat of Grand Prairie Addition comes before the Commission. #6. Other Matters. Mr. Andrew stated that their could be follow up action on Magnolia Commons and the Grand Prairie Addition as early as your next meeting on the 18th. We also have some plats that are currently scheduled to be considered on December 2nd. The meeting adjourned at 6:09 P.M.