Loading...
8.13 2nd St Asphalt Improvement CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 08/07/89 4:00 AGENDA SECT I ON: Admi nis trati on OR I G I NAT I NG DEPARTMENT: APPROV ED FOR NO. 8 AGENDA: ........ CITY MANAGER NO. 13 Dennis Kissinger BY: BY: Consideration of options on Second Street Project issue As we discussed briefly at a previous meeting, staff has been preparing some options for Commission consideration involving possible changes in the scope of the Second Street Storm Drainage (Slough) Project. The attached memorandum gives background information and some advantages/disadvantages of each option. The issue involves what (if any) improvements may be made to the east half of Second Street (running north from Crawford). The west half of the street is already scheduled for replacement as part of the original project. Options: Option A: No change in scope of project as originally planned. The west half of iSecond Street would be replaced; the east side would be left in its current condition Added Project Cost: Zero Option B: Replace west side as planned. In addition, remove east side concrete and replace with new concrete at the same time. Added Project Cost: $94,000 (est.) Option C: Replace west side as planned. In addition, remove and replace only the . curbs, gutters, driveways, etc. on east side, leaving the concrete roadway on the east half as a base. Overlay street on both east (new) and west (existing) halves with asphalt. Added project cost: $58,000 (est.) · Staff Recommendation: Staff has no specific recommendation as to whether the street should be fully replaced at this time. It is very much a policy and preference decision on the .Commission's part as to whether this is a place you wish to spend $58,000 - $94,000. However, if your decision is to charge the project scope and improve the full street, staff believes Option C to be the most cost-effective. .... COMMISSION ACTION MOTION BY SECOND BY TO: