Loading...
8.2 Awd Bituminous Overlay CII'Y OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 9/24/90 4:00P.M. AGENDA SECTION: Administration ORIGINATING DEPARTMENT: APPROVED FOR NO. 8 AGENDA: ITEM Engineering NO. 2 BY: Don Hoff BY: ~ Item w/[w-a-Fd of contract for Bituminous Overlay Project No. 90-811. Background This project entails a 2-inch asphalt overlay of the existing pavement on Cloud Street from Ohio Street east to Parkwood Avenue. This street has become an on- going maintenance problem for-the General Services Department. It is felt that if the pavement is not rehabilitated at this time, it may require total reconstruction within a few years at a much higher cost. One valid bid was received for this project on Tuesday, September 18, 1990, as follows: J. H. Shears' Sons, Inc. of Salina $25,537.50 Commence September 24; 45 Calendar days The 1990 budget allocates $600,000 in special gas tax for the 1990 street improvement program. The Engineer's estimate for the projec~ is $33,500. In addition to this bituminous overlay project, other contract maintenance in 1990 includes crack sealing and slurry seal over 10 miles of pavements, railroad crossing resurfacing, manhole ?egrading and concrete pavement repair. Recommendation It is recon~ended that the City Commission award the contract for Bituminous Overlay Project No. 90-811 to J. H. Shears' Sons, Inc. of Salina in the amount of $25,537.50. COMMISSION ACTION MOTION BY SECOND BY TO: