Change Order No. 1 /' J:..!! CHANGE ORDER LOCATION: PROJECT: CONDUCTOR-IN-DUCT INSTALLATION PROJECT NO. 08-2711 CHANGE ORDER NO. One (1) CONTRACTOR: Mid-Kansas Underaround. PO Box 1411. Manhattan. KS. 66505 THIS AGREEMENT, made and entered into this 12th day of September 2008, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated July 28. 2008 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for street improvements in the City of Salina, Kansas, dated June. 2008, are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. Description 2-1 Decrease Trenching, 37" 3-1 Decrease CID in Trench 4-1 Increase Bore, 1" Diameter 5-1 Increase CID at Pole Bases 8-1 Add Concrete Encasement Quantity 111 111 261 6 10 Unit L.F. L.F. L.F. EA. L.F. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. - 1 - . ,~.;"l CHANGE ORDER PAGE 2 ," Item No. Description 2-1 Decrease Trenching, 37" 3-1 Decrease CID in Trench 4-1 Increase Bore, 1" Diameter 5-1 Increase CID at Pole Bases 8-1 Add Concrete Encasement Quantity Unit 111 L.F. 111 L.F. 261 L.F. 6 EA. 10 L.F. Unit Price $ 1.80 $ .30 $ 8.50 $80.00 $ 5.50 TOTAL 3. The contract time for completion by reason of this change o days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY THE CITY OF SALINA, KANSAS CONTRACTOR, SECOND PARTY MID-KANSAS UNDERGROUND BY: ~~ Cf(y MANAGER ----- 4#hlltd ~~ (0 ice or p Ition of signer) BY: - 2 - Total -$ 199.80 -$ 33.30 $2,218.50 $ 480.00 $ 55.00 $2,520.40