Change Order No. 1
\,
~
CHANGE ORDER
--.:'
LOCATION:
PROJECT NO. 00-1248
PROJECT: Additional Proiect Aesthetics - North Ohio Street
CHANGE ORDER NO. 1 (ONE)
CONTRACTOR:
RFB. Construction Co.. 565 E. 520th Ave.. Pittsbura. Kansas. 66762
1. The specifications and drawings for street improvements in the City of Salina, Kansas, dated
December. 2006, are hereby amended in the following particulars only; all o~her terms and
conditions remain unchanged.
Item
No. Description Quantity Unit
12-1 Add Replace %" valves with 1" valves 1 L.S.
13-1 Add Control Wire 2,000 L.F.
14-1 Add 1 Day of Labor 1 LS.
2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to
complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with
the drawings, specifications, and contract documents, for the following prices.
- 1 -
i-
\
'i<
CHANGE ORDER
PAGE 2
Item
No. Description
Quantity Unit Unit Price Total
1 L.S. $5,105.21 $5,105.21
2,000 L.F. $ .19 $ 380.00
1 L.S. $ 500.40 $ 500.40
$5,985.61
12-1 Add Replace %" valves with 1" valves
13-1 Add Control Wire
14-1 Add 1 Day of Labor
TOTAL
3. The contract time for completion by reason of this change
o
days.
4. All other terms and conditions of the contract to remain unchanged.
OWNER, FIRST PARTY
THE CITY OF SALINA, KANSAS
CONTRACTOR, SECOND PARTY
RFB CONSTRUCTION CO.
BY: If&,
CITf MANAG
/'
BY:
. Attest:
~
-2-