Loading...
Cloud Street Grad Crossing Improvements Agreementi Public Road Improvement 12/04/00 Fixed Costs - Prepaid Form Approved -AVP Law Improvements to Existing Public Road At Grade Crossing For Cloud Street, DOT 815069Y M.P. 548.98 SID Industrial Lead Salina, Kansas THIS AGREEMENT, executed in duplicate this day of , 2002, by and between UNION PACIFIC RAILROAD COMPANY, a Delaware corporati ( r nafter the "Railroad"), and CITY OF Sgt, a municipal corporation of the State of KANSA (hereinafter the "Political Body"), WITNESSETH: �ikLl h�fa �, 2 - �o RECITALS: b L The Political Body has requested the Railroad to improve the existing Cloud Street crossing, at grade, along, over and across the Railroad's track and right of way at Mile Post 548.98 SID Ind. Lead, DOT No. 815 069Y in City of Salina, Saline County, Kansas to which the Railroad is agreeable, but solely upon terms and conditions hereinafter set forth. AGREEMENT: NOW THEREFORE, in consideration of the premises and of the promises and conditions hereinafter set forth, the parties hereto agree as follows: 1. The Railroad shall furnish all labor, material, equipment and supervision for, and shall (a) remove the existing timber crossing, (b) install a 65 ft. precast concrete crossing, (c) field weld rail, (d) relay track at crossing with 133# rail, (e) renew the crossties, and (f) surface the track with new ballast, all at the intersection of the Railroad's SID Ind. Lead with Cloud Street at Mile Post 548.98 in Salina, Saline County, Kansas, as shown generally on Railroad's print dated May 29 2002 mar ed Exhibit A, hereto attached and hereby made a part hereof. �Ja." �I I 2. Upon the execution of this agreement the Political Body shall pay the Railroad a firm and fixed sum of Twenty Two Thousand and Ninet 'Dollars ($22,097.00) for the work performed and materials supplied by the Railroad pursuant to Section 1 above, as such work and materials are described in the attachment dated March 3, 2002, marked Exhibit B, hereto attached and hereby made a part hereof. 3. The Railroad, at its cost, shall maintain the crossing between the track tie ends. If, in the future, the Political Body elects to have the surfacing material between the track tie ends replaced with paving or some surfacing material other than timber planking, the Railroad, at the Political Body's expense, shall install such replacement surfacing. 4. The Political Body, at its sole cost and expense, shall provide traffic control, barricades, and all detour signing for the crossing work, provide all labor, material and equipment to install concrete or asphalt street approaches, and if required, will install advanced warning signs, and pavement markings in compliance and conformance with the Manual on Uniform Traffic Control Devices. 5. If Political Body's contractor(s) is/are performing any work described in Section 4 above, then the Political Body shall requirelits contractor(s) to execute the Railroad's standard and current form of Contractor's Right of Entry Agreement. Political Body acknowledges receipt of a copy of the Contractor's Right of Entry Agreement and understanding of its terms, provisions, and requirements, and will inform its contractor(s) of the need to execute the Agreement. Under no circumstances will the Political Body's contractor(s) be allowed onto the Railroad's premises without first executing the Contractor's Right of Entry Agreement. RMATA\Ag .Wm Cloud S.11 einem Eoc t Public Road Improvement 12/04/00 Fixed Costs - Prepaid Form Approved -AVP Law 6. Fiber optic cable systems may be buried on the Railroad's property. Protection of the fiber optic cable systems is of extreme importance since any break could disrupt service to users resulting in business interruption and loss of revenue and profits. Political Body or its contractor(s) shall telephone the Railroad during normal business hours (7:00 a.m. to 9:00 p.m., Central Time, Monday through Friday, except holidays) at 1-800-336-9193 (also a 24-hour number, 7 day number for emergency calls) to determine if fiber optic cable is buried anywhere on the Railroad's premises to be used by the Political Body or its contractor(s). If it is, Political Body or its contactor(s) will telephone the telecommunications company(ies) involved, arrange for a cable locator, and make arrangements for relocation or other protection of the fiber optic cable prior to beginning any work on the Railroad's premises. 7. The Political Body, for itself and for its successors and assigns, hereby waives any right of assessment against the Railroad, as an adjacent property owner, for any and all improvements made under this agreement. 8. Covenants herein shall inure to or bind each party's successors and assigns; provided, no right of the Political Body shall be transferred or assigned, either voluntarily or involuntarily, except by express written agreement acceptable to the Railroad. 9. The Political Body shall, when returning this agreement to the Railroad (signed), cause same to be accompanied by such Order, Resolution, or Ordinance of the governing body of the Political Body, passed and approved as by law prescribed, and duly certified, evidencing the authority of the person executing this agreement on behalf of the Political Body with the power so to do, and which also will certify that funds have been appropriated and are available for the payment of any sums herein agreed to be paid by Political Body. IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the date and year first hereinabove written. ATTEST: UNION PACIFIC RAILROAD COMPANY By Title: CHIEFii ieW a CITY OF SALINA 4JLGC//11�t I I�LL'�cv� By City Clerk Title: -71 Pursuant to Resolution/Order rP 74 r • :a dated OQ -59q,5- OF 5845OFhereto attached. h ? O%GANIZFb i9 C3 : e �' 1870 6 ►�+ :' `dip C6 9I ATA�.Tl.d S. e®[ovm1.M[ S. 4& -5.1 7'o Ss/.n4 Svb. N goo 49 114r10 -A. F, e - BG led, To e. e•T /✓o �ca�e FILE0 GRADE ❑PR VATEEPARATION CROSSING: ®PUBLIC: STATE Ks CITY STREET/HWY C/cod 5 MP s¢8 98 siyGd. SUB ROT 0,6 • ' DATE: 2002-03-07 ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK G BY THE UNION PACIFIC RAILROAD DESCRIPTION OF WORK: INSTALLING 64 -FT. OF CONCRETE CROSSING AT CLOUD STREET IN SALINA, KS. M.P. 548.96 ON THE SID IND. LEAD CITY OF SALINA AND UPRR 50% EACH ON LUMP SUM ESTIMATE PID: 42558 AWO: MP,SUBDIV: 188.00, SALINA SERVICE UNIT: 14 CITY: SALINA STATE: KS DESCRIPTION QTY UNIT LABOR MATERIAL RECOLL UPRR TOTAL ___ -.__ ________ _______ _____ _____ SIGNAL WORK MAIL STORE EXPENSE SALES TAX SIGNAL TOTAL SIGNAL TRACK & SURFACE WORK BILL PREP EQUIPMENT RENTAL FIELD WELD LABOR ADDITIVE MATL STORE EXPENSE OTM RAILROAD EQUIP. USAGE RDXING SALES TAX TRANSPORTATION CHARGES WELD XTIE TOTAL TRACK & SURFACE _______ ________ LABOR/MATERIAL EXPENSE 23290 20917 ------- -------- RECOLLECTIBLE/UPRR EXPENSE 22097 22110 ------- ESTIMATED PROJECT COST 44207 EXISTING REUSEABLE MATERIAL CREDIT 0 SALVAGE NONUSEABLE MATERIAL CREDIT 0 RECOLLECTIBLE LESS CREDITS THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED, UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE. I 3 1 2 3 4 2 2 4 762 108 435 435 -------- 870 _______ ________ 762 ________ 115 ________ 436 439 877 300 150 150 300 851 425 426 851 126 63 63 126 10039 5016 5021 10039 518 255 260 518 1045 3625 2334 2336 4670 2156 1093 1093 2186 54.00 IF 3260 7122 5191 5191 10382 620 309 311 620 1100 550 550 1100 3071 780 1925 1926 3851 50.00 EA 4687 4000 4343 4344 ________ 8687 -------- _______ ________ 22528 ________ 20802 21659 21671 43330 _______ ________ LABOR/MATERIAL EXPENSE 23290 20917 ------- -------- RECOLLECTIBLE/UPRR EXPENSE 22097 22110 ------- ESTIMATED PROJECT COST 44207 EXISTING REUSEABLE MATERIAL CREDIT 0 SALVAGE NONUSEABLE MATERIAL CREDIT 0 RECOLLECTIBLE LESS CREDITS THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED, UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE. I FO& SPO P;FONT 7;SCPI 15;SLM .50;EXIT;' FORM 30-1 PAGE 01 MORE WORK ORDER AUTHORIZATION -DETAIL OF ESTIMATED EXPENDITURES PROJ NO: 42558 EST START: 02-25-02 A.W.O. N0: EST COMP: 12-31-02 W.O. N0: q B.I. N0: 02EN10 RAILROAD: UPRR CO. LOCATION: SID IND. LEAD CLOUD STREET STATE: KS DEPARTMENT: ENGINEERING SERVICES SERVICE UNIT: 14 ------------------------------------------------------------------------------------------------ VAL SEC: 1403 INSTALLING 64 -FT. OF CONCRETE CROSSING AT CLOUD STREET IN SALINA, KS. M.P. 548.98 ON THE SID IND. LEAD CITY OF SALINA AND UPRR 50% EACH ON LUMP SUM ESTIMATE FORM 30-1 PAGE 02 MORE WORK ORDER AUTHORIZATION -DETAIL OF ESTIMATED EXPENDITURES PROD NO: 42558 EST START: 02-25-02 A.W.O. N0: EST COMP: 12-31-02 W.O. NO: B.I. NO: 02ENIO RAILROAD: UPRR CO. LOCATION: SID IND. LEAD CLOUD STREET STATE: KS DEPARTMENT: ENGINEERING SERVICES VAL SEC: 1403 ________________________________________________________________________________________________ --- SCOPE OF WORK -------------------------- PROJECT VAL M.P. M.P. JOINT NUMBER SEC STATE FROM TO SEGMENT FACILITY 42558 1403 KS 188.00 188.00 4588 0 I FORM 30-1 PAGE 03 MORE WORK ORDER AUTHORIZATION -DETAIL OF ESTIMATED EXPENDITURES PROS NO: 42556 EST START: 02-25-02 A.W.O. EBT COMP: 12-31-02 W.O. N0: : B.I. NO: 02EN10 RAILROAD: UPRR CO. STATE: KS LOCATION: BID IND. LEAD CLOUD STREET VAL SEC: 1403 DEPARTMENT: ENGINEERING SERVICES -------------------- ------------------------- _--------------------------------------------------------------------------- LABOR PLAN ________-_________________ GANG GANG TYPE GANG NUMBER WORK WORK CODE GANG DAYS DIRECT TYPE ____ DESCRIPTION ____________ NBR IN ___ _______ GANG CODE DESCRIPTION ____ ----- _------ ALLOWED --------- LABOR -------- $ RDX008 B PERSON ROAD 0 8 10005 XTIES-RENEW 2.06 4528.55 RDX008 8 PERSON ROAD 0 8 10006 XTIES-LOAD/ 0.07 161.28 RDX008 8 PERSON ROAD 0 8 14005 DIM RELAY/R 0.23 530.06 RDX00B 8 PERSON ROAD 0 8 14006 DIM LOAD/PI 0.01 23.05 RDX008 8 PERSON ROAD 0 8 20005 RDXING,PUB- __________ 1.53 ------- 3261.04 ____ SUB -TOTAL 3.99 8503.98 SIGCUS SIGNAL 5 MAN G 0 5 30004 SIG GENERAL 1.00 762.15 WLD002 2 PERSON WELDI 0 2 13004 FIELD WELD 0.24 126.47 WLD002 2 PERSON WELDI 0 2 13005 WELDS -RENEW 5.85 3071.64 WLD002 2 PERSON WELDI 0 2 14005 OTM RELAY/R __________ 0.80 ___________ 493.39 SUB -TOTAL 7.03 3691.50 0 I ' - FORM 30-1 PAGE 04 MORE WORK ORDER AUTHORIZATION -DETAIL OF ESTIMATED EXPENDITURES EST START: 02-25-02 PROJ N0: 42558 EST COMP: 12-31-02 A.W.O. NO: W.O. NO: RAILROAD: UPRR CO. B.I. NO: 02EN10 LOCATION: SID IND. LEAD CLOUD STREET STATE: KS DEPARTMENT: ENGINEERING SERVICES VAL SEC: 1403 ------------------------------------------------------------------------------------------------ ------------------------- STOCK MATERIAL PLAN _ -------------------------- .__------_ITEM ITEM ITEM UNIT DIRECT NUMBER DESCRIPTION COST QTY UM -- MATL $ -----' -------- 09065100 ------------------------------------------ TAPE, ELECTRICAL PLASTIC 2.39 ------ 1 RL 2 09135650 2363 J,SLEEVE,4-6,REDUCING 0.68 10 EA 7 09136370 2367 J SLEEVE,SPLICING,4-4 0.68 10 EA 7 09874890 STAPLE, COPPERWELD 3/e X 1 3/4 X 0.16 12 EA 2 13054000 TIMBER SPIKE, TORXHEAD 3/4" X 12" 0.95 144 EA 137 50279990 XTIE 7"X9"X10' PREPLT FOR 6" RAIL 80.00 50 EA 4000 50361010 ECL2055 GALV PH E -CLIP PA 2.40 200 EA 480 52003190 BOND WIRE, 7 INCH LONG, 5/16 DIA. 3.73 10 EA 37 52005690 BOND WIRE, 7 STRANDS 0.42 100 LF 42 52007040 WEB WELD BOND WIRE TK.CIRC.CONN. 2.80 4 EA 11 54013010 CROSSING,CONCRETE 133-141# RL (30 873.23 8 ST 6986 55016480 RAIL ANCHOR 6" BASE HD CHANNEUJC 0.81 960 EA 778 55255260 FIELD WELD KIT, 133# ONE SHOT 60.07 12 EA 721 55264570 PACKING SAND, PRE -MIXED (PER SACK 22.54 2 CA 54 55264930 REFRAC'T'ORY PASTE 1.83 3 EA 5 55317160 133# INS JT PLUG HH LH ANGCUT 15- 592.06 2 EA 1184 55317180 133# INS JT PLUG HH PH ANGCUT 15- 592.00 2 EA 1184 TOTAL 15,637 MATL STORE EXP 378 SALES TAX 625 RESOLUTION NUMBER 02-5845 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE AN AGREEMENT WITH THE UNION PACIFIC RAILROAD COMPANY FOR THE CLOUD STREET RAILROAD CROSSING REPLACEMENT, PROJECT NO. 02-1359. BE IT RESOLVED by the Governing Body of the City of Salina, Kansas: Section 1. That the Mayor is hereby authorized to execute an agreement with the Union Pacific Railroad Company for the Cloud Street Railroad Crossing Replacement, Project No. 02-1359, subject to the terms and conditions of the agreement. Section 2. That this resolution shall be in full force and effect from and after its adoption. Adopted by the Board of Commissioners and signed by the Mayor this 10' day of June, 2000. (SEAL) listin M. Se ton, Mayor ATTEST: Lieu Ann Nicola, City Clerk I hereby certify that the above and foregoing is a true and correct copy of Resol tion No..02-5845 passed by the Governing Body at its reg on June 10, 2002. %crw¢ 137 J 's, 1870 Lieu Ann Nicola 2 City Clerk a