Loading...
N. & S. Boundry Road Change Order 1 r- .> CHANGE ORDER LOCATION: North & South Boundary Roads (Tony1s Road and Beechcraft Road) PROJECT: North and South Boundary Roads PROJECT NO.: 91-839 CHANGE ORDER NO.: ONE (1) CONTRACTOR: J. H. SHEARS' SONS. INC..P. O. BOX 1095. SALINA. KANSAS 67402 THIS AGREEMENT, made and entered into this 11th day of OCTOBER .' 1993, by and between the CITY OF ~ALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated August 4. 1992 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated July 1992 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. 5 23 27 28 34 35 36 37 38 Description Add 69.5 square yards of 811 concrete pavement for additional pavement repair on Centennial Road. .Add 155 linear feet of chain link fence on the north side of the North Boundary Road per request from Airport Authority. Add 93.1 tons of asphalt surface course (BM-2) material on the South Boundary Road for additional overlay material between Hein ana the apron. Add 93.1 tons of asphalt base course (BM-2C) material on the South Boundary Road for additional base material between Hein and the apron. Add four (4) each special storm drainage inlets at driveway locations. Add one (1) lump sum to construct concrete drainage flume at driveway location including ditch grading adjacent to flume. Add two (2) tons of special asphalt patching over storm pipeline trenches. Add one (1) lump sum for special construction staking for realignment .' of the apron pavement markings. Add one 220 linear feet of additional concrete pavement expansion joints on the North Boundary Road. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: I I: ...." / /' CHANGE ORDER PAGE 2 ITEM UNIT ~ DESCRIPTION gUANTITY . UNIT PRICE TOTAL - - 5 CONCRETE PAVEMENT (8") 69.5 S.Y. $ 25.25 $ 1,754.88 23 FENCE (CHAIN LINK) 155.0 L.F. $ 8.90 $ 1,379.50 27 ASPHALT SURFACE COURSE (BM-2) 93.1 TON $ 34.00 $ 3,165.40 28 ASPHALT BASE COURSE (BM-2C) 93.1 TON $ 30.00 $ 2,793.00 34 SPECIAL INLET 4.0 EA. $ 1,945.00 $ 7.780.00 35' CONCRETE FLUME LO L.S. $ 814.00 $ 814.00 36 SPECIAL ASPHALT PATCH 2.0 TON $ 150.00 $ 300.00 37 SPECIAL CONSTRUCTION STAKING LO L.S. $ 458.90 $ 458.90 38 PAVEMENT REINFORCEMENT 220.0 L.F. $ 19.50 $ 4,290.00 CHANGE ORDER TOTAL: $ 22.735.68 2. Additional time for completion by reason of t~is change 30 days. 3. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY THE CITY OF SALINA, KANSAS CONTRACTOR, SECOND PARTY J. H. SHEARS' SONS, INC. By:--OJ;: ~R'?~ AYOR By4J~d.---- . JERRY A. FEUERBORN . ~r' w-I.....i~l iJiIHJnf';;::O . U\Qi\,)~~P~ (Office or position of signer) Attest: . \ i . __ tuo nHL~ ~\"~'LL- \ CITY CLERK IIIIIIIIIIIIIII