Change Order 1 90-819i
CHANGE ORDER
LOCATION: General
PROJECT: Curb & Gutter/Conc.Pvmt_
PROJECT NO.: 90-819
lacement CHANGE ORDER NO.:One l
CONTRACTOR: WILSON CONSTRUCTORS,1INC., BOX 1967, SALINA, KS 67402
THIS AGREEMENT, made and entered into this 20th day of
May 1991, by and between the CITY OF SALINA, KANSAS,
Owner, and the above named Contractor, modifies the existing contract
dated December 17, 1991
under the above subject, project
and project number in the following particulars to wit:
1. The specifications and drawl gs for certain street improvements in
the City of Salina, Kansas, dated November , 1990 are
hereby amended in the following particulars only; all other terms and
conditions remain unchanged.
Item No. Description
1. Deduct 700 linear feet of "Remove and Replace Concrete Curb and
Gutter" die to this pavemnt being monolithic concrete with no
separate curb and gutter tection-
2.
Add 186.5 square yard of 'Remove and Replace 6" Reinforced
Concrete Pavement" to com ensate for the deduction in Item No.
1.
3. Add 399 square feet of "Removal of 4" Concrete Sidewalk." This
sidewalk is located at intersection corners and along the curb
line and was removed in order to properly construct the new
curb and gutter.
5
Add 320 square feet of "Construct 4" Concrete Sidewalk" to
replace the sidewalk removed in Item No. 3. The quantity
differs from Item No. 3 because handicap -accessible ramps
replaced some of the existing sidewalks.
Add 3 each "Handicap-Actesible Sidewalk Ramps" where the new
curb and gutter ties into existing sidewalk.
CHANGE ORDER
PAGE 2
2. The undersigned proposes to furnish all tools, appliances, equipment,
materials, and labor required to complete the construction in a thorough,
workmanlike, and satisfactory manner in accordance with the drawings,
specifications, and contract documents, for the following prices:
ITEM UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE TOTAL
1. , Remove & Replace Concrete C & G 700 L.F. $12.00 =$-8,400.00
2. Remove & Rep. 6" Reinforced Conc. Pvmt. 186.5 S.Y. 33.80 = 6,303.70
3. Remove 4" Conc. Sidewalk 399 L.F. 2.00 = 798.00
4. Construct 4" Concrete Sidewalk 320 L.F. 2.00 = 640.00
5. Construct Sidewalk Ramp 3 EA. 450.00 = 1.350.00
CHANGE ORDER TOTAL: $ 691.70
3. Additional time for completion y reason of this change 10 days.
4. All other terms and conditions f the contract to remain unchanged.
OWNER, FIRST PARTY
THE CITY OF SALINA, KANSAS
BY:
MAYOR
Attest:
CITY CLERK
ONTRACTOR, SECOND PARTY
ILSON CONSTRUCTORS, INC.
Office or position of signer)