Change Order 1 90-819i CHANGE ORDER LOCATION: General PROJECT: Curb & Gutter/Conc.Pvmt_ PROJECT NO.: 90-819 lacement CHANGE ORDER NO.:One l CONTRACTOR: WILSON CONSTRUCTORS,1INC., BOX 1967, SALINA, KS 67402 THIS AGREEMENT, made and entered into this 20th day of May 1991, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated December 17, 1991 under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawl gs for certain street improvements in the City of Salina, Kansas, dated November , 1990 are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. Description 1. Deduct 700 linear feet of "Remove and Replace Concrete Curb and Gutter" die to this pavemnt being monolithic concrete with no separate curb and gutter tection- 2. Add 186.5 square yard of 'Remove and Replace 6" Reinforced Concrete Pavement" to com ensate for the deduction in Item No. 1. 3. Add 399 square feet of "Removal of 4" Concrete Sidewalk." This sidewalk is located at intersection corners and along the curb line and was removed in order to properly construct the new curb and gutter. 5 Add 320 square feet of "Construct 4" Concrete Sidewalk" to replace the sidewalk removed in Item No. 3. The quantity differs from Item No. 3 because handicap -accessible ramps replaced some of the existing sidewalks. Add 3 each "Handicap-Actesible Sidewalk Ramps" where the new curb and gutter ties into existing sidewalk. CHANGE ORDER PAGE 2 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRICE TOTAL 1. , Remove & Replace Concrete C & G 700 L.F. $12.00 =$-8,400.00 2. Remove & Rep. 6" Reinforced Conc. Pvmt. 186.5 S.Y. 33.80 = 6,303.70 3. Remove 4" Conc. Sidewalk 399 L.F. 2.00 = 798.00 4. Construct 4" Concrete Sidewalk 320 L.F. 2.00 = 640.00 5. Construct Sidewalk Ramp 3 EA. 450.00 = 1.350.00 CHANGE ORDER TOTAL: $ 691.70 3. Additional time for completion y reason of this change 10 days. 4. All other terms and conditions f the contract to remain unchanged. OWNER, FIRST PARTY THE CITY OF SALINA, KANSAS BY: MAYOR Attest: CITY CLERK ONTRACTOR, SECOND PARTY ILSON CONSTRUCTORS, INC. Office or position of signer)