Old Smoky Hill River Channel Study
I
I
I
I
I
I
I
I
i I
I
I
I
I
I
I
I
I
I
I ~//J~
OLD SMOKY HILL RIVER CHANNEL STUDY
,
FOR THE CITY OF SALINA, KANSAS
4' 3f V<\
..
,*~i,"
~"
11.
.
"
~r' .
>> .... ~ ""4,"<
.alii" i".
" 4$;'-
tlLSON
COMPANY
ENGINEERS
ARCHITECTS t
-------------------
.
'I
I
I
II
I
I
I
I
I
I
. I
I
I
I
I
I
.
,)
OLD SMOKY -Hill RIVER CHANNEL STUDY
PREPARED FOR
THE CITY OF SALINA, KANSAS
CITY COMMISSION
... -A..
JACK P. WEISGERBER - MAYOR
KEITH G. DUCKERS
DAN S. GElS
KAREN M. GRAVES
GERALD F. SIMPSON_
~
CITY OFFICIALS
NORRIS D. OLSON - CITY MANAGER
DEAN L. BOYER - CITY ENGINEER
PREPARED BY
"
\NILSON e: COMPANY
ENGINEERS a: ARCHITECTS
TABLE OF CONTENTS
Section 1 - Introduction
Figure 1.01 Old Smoky Hill River. Channel,
Iron Avenue Cutoff, Inlet and Outlet
Structures, etc.
Section 2 - Historical Background
Figure 2.01 Scenes on the Smoky Hill
River in the early 1900's
Figure 2.02 Scenes of the Old River
Channel in its Present Silted Condition
In accordance with the authorization of the Governing Body
of the City of Salina, Wilson & Company, Engineers & Archi-
tects, has prepared and herewith submits the Old Smoky Hill
River Channel Study Report. Wilson & Company gratefully
acknowledges the assistance of. the City Staff and the Kansas
City District Corps of Engineers in the preparation of this
study. We shall be pleased to serve you further in any way
we may be able, whether to assist in. the execution of the
recommended plan, or to assist in other endeavors.
Section 3 - Recommended Plan
Figure 3.01 Plan of Sedimentation Basin
Figure 3.02 Diagramatic Concept of Sedi-
mentation Basin
Figures 3.03 through 3.10 Recommended
Plan
Figures 3.11 through 3.16 Recommended
Plan Profile Sheets
Figure 3.17 Recommended Parkway System
Section 4 - Engineering Studies
A. Introduction
1. General
2. Problems
Figure 4.01 Photographs of Existing
Channel
Figure 4.02 Typical Constrictions in
Channel
3. Purpose and Scope
B. Hydrologic Analysis of Interior
Drainage
1. General
2. Hydrology
Table 4.01 Summary of Larger Drainage Areas
3. Rainfall
Figure 4.03 Rainfall - Duration Curves
Figure 4.04 Intensity - Duration Curves
C. Hydraulic Analysis
1. General
Table 4.02 Roughness Coefficients
2. Critical Velocity
3. Flood Protection
Figure 4.05 Drainage Area Map
~
,....~"O.S'~;;:~,..
,.,\~, .............<"4:'-
."q,;." ...~'~
:~:" RALPH B \~-;.
~~ f IllCKLEFS. JR.Jg:~
~"" \" 2 /.....l
'~ <1'.... "",-'~ ,,'
0, ~;J:"........~<:!J'..
. .......f; OF ....~.......
.'......11...
""""''''''''''
.....""tN J. AI......
....'=>'\ ...........("l';.~
l ...\.\CE.N".(o",o\
g :" ~ ~
:: : 7821 : ::
\11\1- /tt;j
\~......,Nst>-:...~l
.... ,s.s: ......... (j.*' ,,0
.......lONAL '(..~......
..,.............
@~14t<,
~1
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
IC'
'.,
I
Page No.
I
1.01
1.01
I
2.01
I
2.01
2.01
I
3.01
3.01
I
3.01
3.01
I
3.01
3.02
I
4.01
4.01
4.01
4.01
I
4.01
I
4.01
4.02
I
4.02
4.02
4.02
4.03
4.02
4.02
4.02
4.03
4.03
4.03
4.03
4.04
4.04
I
I
1
I.
I}
I~
,
Section 5 - Beautification and Recreation Enhancement
A. Design Concept
1. Beautification
2. Recreation Enhancement
Planning and Development Policies
1. Statement of Objectives
2. Policy on Environmental Quality
3. Policy on Recreational Use
C. Construction Sequence
Figure 5.01 Construction Sequence
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
D. Preliminary Development Plans
Figure 5.02 Stations 100+00 to 130+00
Figure 5.03 Stations 130+00 to 180+00
Figure 5.04 Stations 180+00 to 235+00
Figure 5.05 Stations 235+00 to 280+00
Figure 5.06 Stations 280+00 to 305+00
Figure 5.07 Stations 305+00 to 355+00
Figure 5.08 Stations 355+00 to 395+00
Figure 5.09 Stations 395+00 to 460+00
Figure 510 Stations 480+00 to 510+00
I
I
I
D. Alternative Concepts
Plan 1
Figure 4.06 Plan View
Figure 4.07 Profile
Plan 2
Figure 4.08 Plan View
Figure 4.09 Profile
Plan 3
Figure 4.10 Plan View
Figure 4.11 Profile
Plan 4
Figure 4.12 Plan View
Figure 4.13 Profile
Plan 5
Plan 6
Figure 4.14 Plan View
Plan 7
Figure 4.15 Plan View
Unreasonable Alternative Concepts
Table 4.03 Summary of Alternative Plans
E. Financing
F. Summary and Conclusions
G. References
I
I
I
I
I
I
I
I
B.
I
I
I
I
I
I
I
I
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
follows
Page No.
4.04
4.04
4.04
4.04
4.06
4.06
4.06
4.06
4.06
4.06
4.07
4.07
4.07
4.08
4.08
4.08
4.09
4.09
4.09
4.09
4.09
4.10
4.11
E. Special Details
Figure 5.11 Special Details: Rest Areas,
Wood Bridge
Figure 5.12 Special Details: Typical
Sections, Elevations, Wood Retaining
Wall, Culvert Crossing
Figure 5.13 Westbend Rest Area
Figure 5.14 Oakdale Park Rest Area
Figure 5.15 Riverside Park Rest Area
Figure 5.16 Lakewood Park Rest Area
Figure 5.17 Indian Rock Park Rest Area
1. Rest Areas
2. Bridges
3. Contiguous Hiking and Bicycle Paths
4. Separate Hiking and Bicycle Paths
5. Wood Retaining Walls
6. Fencing
7. Culvert Crossing
8. Lighting
9. Path Bollarding
D. Maintenance
E. Funding
follows
follows
follows
follows
follows
follows
follows
Section 6
A.
- Cost Estimates
Water Treatment Facilities and Water
Feature Enhancement Cost Breakdown
Parkway System Development
Total Cost Summary for the Recommended
Alternative
5.01
5.01
5.01
5.02
5.03
5.03
5.03
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.05
5.05
5.05
5.05
5.06
5.06
5.07
5.07
5.07
B.
C.
Appendix - Review of Previous Studies, Reports,
Recommendations, Etc.
A. Salina Board of Realtors
B. Public Meeting, Old Smoky Hill River Channel
Project
Figure A-I through A-5 Concepts A through E follows
C. Section 216 Feasibility Study, Kansas City
District Corps of Engineers, May 1977
D. Salina Area Chamber of Commerce
Page No.
5.07
5.07
5.07
5.07
5.07
5.07
5.07
5.07
5.08
5.08
5.08
5.08
5.09
5.09
5.09
5.09
5.09
5.09
5.10
6.01
6.01
6.03
6.06
A
A
B
C
C
D
v~
,- - - ... ... - - - - - - - - - - - - - -
I
I
SECTION 1 - INTRODUCTION
I
I
During January 1978, the City of Salina authorized Wilson & Company to
proceed with a study of the old Smoky Hill River channel. The objective of
the study is to evaluate concepts for beautification, recreation enhancement,
stabilization of the channel and banks, alternative concepts for dealing
with the problem of progressive siltation and aggradation of the old channel
and the maintenance of the water supply to the raw water intake at the
municipal water treatment plant.
The slope of the old channel flowline is relatively flat. The inlet pipe
located above Ohio Street is only 4 inches higher than the crest of the old
mill dam. This dam has formed a pool of slow moving water upstream, causing
the heavier sediment to settle out, resulting in a very shallow stream.
Below the old mill dam, the quality of water is somewhat improved and
considerably less sediment has been deposited.
I
I
I
Figure 1.01 shows the Old Smoky Hill River channel, Iron Avenue cutoff,
inlet and outlet structures, etc. The design and construction of the Smoky
Hill River flood protection, completed in 1961, included an inlet structure
located at the south end of Indiana Avenue, where Indiana turns west into
Arlington Drive. This inlet structure was designed to admit a maximum
inflow of water equal to 100 cubic feet per second (c.f.s.) to the old
river channel. The municipal water treatment plant uses up to 40 c.f.s. of
this water, while the remainder flows downstream and out through the outlet
works located east of Lakewood Park.
As part of this study, the amount of silt deposited in the old river channel,
the total capacity of the channel above the Western Star Mill dam and the
amount of silt deposited to this date were calculated. From these data, it
was determined the old channel above the dam would be completely full of
silt sometime between 1983 and 1984, terminating the supply of water to the
raw water intake.
I
I
I
Ecological changes that have occurred in the old channel, mostly above the
old mill dam, are similar to those commonly associated with isolated oxbows
created by meandering streams. Reduced flows in the channel do not provide
sufficient scouring action to keep it cleaned out.
I
I
As a result of the Iron Avenue 'cutOff, extensive sedimentation in the old
channel, especially in the reach~s above the old Western Star Mill dam, has
occurred. In the slow moving upstream reach, conditions now more nearly
resemble a wetland than a free flowing stream.
Vegetation characteristic of marshes has become established in the old
flowline. Woody plant materials normally associated with river bottom land
are able to encroach further down the banks than was possible prior to
construction of the project.
I
The extensive sediment deposits in the old channel originate from two
primary sources:
I
I
A. The water heavily laden with silt, flowing in from the river,
estimated at 130,000 cubic yards per year at maximum inflow.
A considerable difference of opinion exists regarding the desirability of
this new growth. Private landowners along the old channel make individual
decisions about\the management of adjacent banks. The City promotes a
selectively thinned and renovated timber and a mowed appearance consistent
with park maintenance in those reaches adjacent to the parks; some local
conservationists prefer to allow the riverbanks and old channel to undergo
a process of natural succession.
I
B. Storm runoff from the urban area, although this source contributes
approximately 3 percent of the total quantity.
I
I
I
1.01
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-.
,.,
STATE ST.
V,Wl
+
VICINITY MAP
NOT TO SCALE
W-& C-E
1'LS 0 N
COMPANY
ENGIN EE.R.S
ARCHITE.CTS t
~
"30
'000
'Goo
SCAL" ".., FEET
FIGURE 1.01
OLD SMOKY HILL RIVER CHANNEL, IRON
AVENUE CUTOFF, INLET AND OUTLET
STRUCTURES, ETC.
-------------------
I
I
SECTION 2 - HISTORICAL BACKGROUND
C.
Partial encirclement of the City with a levee north of Euclid'
I
Street.
I
Scenes of the Smoky Hill River, as it meandered through the City of Salina
during the early 1900's, are shown by Figure 2.01.
D. Modification of the river channel with a 1-1/4 mile cutoff channel
constructed on the east side of the City near Iron Avenue to bypass the
loop of the river passing through the City.
I
Before completion of the flood protection project in 1961, the Smoky Hill
River was one of Salina's principal recreation resources, serving boating,
fishing and other water-oriented sports. It was also considered a valuable
aesthetic asset to the City, especially through the scenic reaches contigu-
ous with Kenwood and Oakdale Parks. At the same time, flooding of the
Smoky Hill River constituted Salina's greatest single water resource problem.
E. Construction of two storm water pumping plants, one located east
of Lakewood Park near the levee and the other on Dry Creek northwest of the
City.
I
I
The project was completed in 1961.
I
Between 1895 and 1951, Salina experienced six major damaging floods and
numerous minor floods. Details pertaining to the 1895 flood are not avail-
able, however, the major floods occurring in 1903, 1927, 1938, 1941 and
1951 were caused by overflows from both the Smoky Hill River and Dry Creek.
Torrential rains fell between October 18 and 22, 1941, over an area 100
square miles south of Salina. Much of the City was flooded when both the
Smoky Hill River and Dry Creek overflowed. Rainfall over this 96 hour period
averaged 11.5 inches. Kanopolis Lake, a Corps of Engineers project con-
.
structed on the Smoky Hill about 25 miles southwest of Salina, was completed
in 1948 to provide flood control along the Smoky Hill and Kansas Rivers.
The storm of July 9 to 13, 1951 occurred in an area between Kanopolis Lake
and Salina producing more than 12'inches of rain. About half of the residen-
tial part of the City was inundated. Affected businesses did not return to
normal activity for more than three weeks.
Over the past 16 years, the newly created stream environment has been
slowly stabilizing. Reduced inflow and large quantities of silt carried
through the inlet have combined to reduce gradually the depth and width of
the original river channel. Figure 2.02 shows scenes of the old river
channel in its present silted condition.
I
I
I
In 1971, the Salina Board of Realtors adopted the improvement of the old
river channel as its project in a program sponsored by the National Associ-
ation of Real Estate Boards to "Make America Better." Local interests
requested the Corps of Engineers to study the continuing sediment deposition
in the channel. These early studies are abstracted in the Appendix.
I
I
I
B. Realignment of Mulberry and Dry Creeks west of Salina.
A study of the sediment deposition in the old channel was instituted by the
Corps in 1974. The study was concluded with a report by the Corps entitled
SECTION 216, FEASIBILITY STUDY, MAY 1977. The report verified that the
flood control project continues to function satisfactorily in the manner
for which it was designed. Because the flood control project continues to
meet its functional design requirements, and because the Corps has no
authority to participate in recreational enhancement work involving the old
channel, it was further concluded that the Corps need not modify the project
for flood control purposes and that the Corps cannot participate in any
improvement measures relative to the old river channel.
I
Construction of Salina's flood protection project began in 1957. Major
features of this project recommended by the Corps included the:
I
I
A. Construction of a diversion channel and levee south of Mentor.,
Kansas, to transport flows from Dry Creek into the Smoky Hill River.
I
I
2.01
en
C")
m
Z
m
en
o
-IZ
::1:-1
m::l:
mm::!!
>en~
:g"",,,,,
r-""m
-<0",
...~=
10-<-
0::1:
0_
-r-
"'r-
:g
<
m
:g
Z
- -
-
-
-
- -
-
-
-
'"
;r
.
"
~
~
~
r;;
,>,
~"
-
-
-
-
-
-
-
-
-
~~/
-
-~l
.
- -
-
-
-
-
-
-
-
Z
...J
WZ
ZO
Z.....
<
::1:0
t-'Z
a:0
Wt-'
g:>0
.-W
Na:.....
~O:::!
:::l...Jen
c:l0
- .....
"'WZ
::I:W
..... en
LLW
Oa:
c...
en en
w.....
Z-
W
t-'
en
-
-
-
-
-
-
-
-
-
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION 3 - RECOMMENDED PLAN
During the course of this study, all alternative solutions to the problems
associated with the old river channel, including that of doing nothing,
were investigated. These alternative solutions are outlined in detail in
Section 4 of this report. The alternative recommended to the City, as
being the most reasonable solution, corresponds to Plan 3 in Section 4E.
It contains these major elements:
Included in the advantages provided by the recommended alternatives are:
A. The plan would provide a beneficial addition to the water treatment
plant, allowing for expansion by increasing the river water intake.
B. The plan provides for utilization of the existing channel to convey
water to the treatment plant without silt buildup.
A. A sedimentation basin, as shown by Figures 3.01 and 3.02, would be
constructed near the inlet structure with a design gravity inflow of 50
cubic feet per second into the basin. The silt would be pumped out to
below the scour key dam in the cutoff channel. This disposal process is
subject to regulatory approval as defined in Section 4Al of this report.
An alternative disposal measure would pump the silt to the sludge pipeline
from the water treatment plant.
C. It would restore the old channel to an appearance similar to its
original character.
D. It would provide a predictable and manageable program for the recrea-
tional use of the old channel, including fishing, boating and other water
related activities.
B. The old channel between the sedimentation basin and the Western Star
Mill dam would be dredged and sloped. The recommended alternative plans
and profiles are shown by Figures 3.03 through 3.16.
E. It would provide an aesthetically pleasing water feature for the
parkway system.
C. The gates of the Western Star Mill dam would be closed in order to
increase the water level in the upper reaches of the old channel.
Restoration of the old channel can be accomplished in stages beginning with
the construction of the sedimentation basin. The dredging and sloping of
the upper channel, the cleaning and stripping of the lower channel and the
construction of the upper and lower weir dams would be accomplished in
phases to correspond to the construction phases of the parkway systems, as
described in Section 5. Right-of-way for the parkway system could be used
for haul roads for disposal of the silt and for stockpile areas for the
silt. Dredging in the upper channel would be minimal, except in those
areas adjacent to Kenwood, Oakdale and Founder's Parks where the ful~
bottom width would be dredged to a depth of 4 to 5 feet, as shown by the
cross sections on Figures 3.11 through 3.13.
D. The old channel below the Western Star Mill dam and above the outlet
structure would be cleaned of debris and stripped of aquatic vegetation to
minimize decomposition.
E. A parkway system would be established on either side of the renovated
river channel as shown by Figure 3.17. The parkway would link Indian Rock,
Kenwood, Oakdale, Founder's, Riverside and Lakewood Parks into one continu-
ous system. The parkway system would include hiking and bicycle trails,
rest areas, neighborhood picnic and playground areas, selective thinning
and renovation of existing timber and additional landscape planting.
3m
~
OI2:E.CTlON OF-
R.OTA',-\ON
t
e.LADE:S RAKE. ,\VICE
PER tZ:EVOLUTIOt-J
~
______------- ----7-"
CHECKE-RE:D PLA'TI:-
\VAL':''VAV
';
:-- -.;:"
@ REACTlOt..J Wc-LL
~ UPP~R 'e,LUDGE-
~ MIDDLE ":>L\.JDGf:
CD e.OTTOM 'e>LUOGe=
5.E.-'=' DE:"TAIL "y"
~.
Nu""e,E;R O~ RADIAL LA.UI>JOE~~
V,A.J2Y "-'ITH ME:CHA).J\~M 51"2.=
~~ OF- IAL
'51"Z.F: "'Ou..... D ~Q.u....~..
..,.""'...,..:;. ,....."-1>0:.
ME.CHAt-JI'5t-'\ 5IZE~ ).J~ 2:0
\HRU N~ 2.4, ~E:QUIRE
T\VO OUTLE.T RADIALS.
ME.CHA\>.JI'5Vo SI"Z.E to..I.~ \~
R.E:QUlRE'S Ot-JE.- OUiLET
~AO\Al.. (SEE- TAC3LE)
I
GiAXIMUM
- \VATeR LENEL
&..~
-.=- I"
I
'TOP OF- e.^~I"'" .....AI...L
I
I
E.....eR:.GoE:t.Jcv OVER:.F\..O\V \vell:!
, (OPTIO~""'L)
OloJ TANK \VALL- L.f:;:t.JGTH OF- \V&l~
A~ REQU\RtD ,0 HAt-..IDLE: ~PEC\F1EO
OVERFL.OW R:A'Te: 0 4" \-\E.....O.
OR:,\e-).JT TO 'SUI,
I
I
I
I
~AMPL'E: P\PI~c:!o (1)
I
PLAt--J
OUTLET POC.KeT
EI-JLARC;ED ~HE.)..J T'WO QUTLEi
RADIAL'5 ARE- USED
(ORIEI-JT To e.UIT)
I
''''
~o
~I
ZZ
Z~
<4
".
18
zo
< I
Z4
Z'
'"
'4 ~,pe
HA."-l.OtZA\L
''''
20
20
24
~4
,,"
T\JRe.It-..l~ prz'VE: MOTO~
4;, VAR.\ATIO"-l
...--CHE-MICAL FEED P\PI~G
(':5E:E- NOTE:)
~I'I '" -~-l-//j-- /1 /
-~- "'~-"',,: ~-~-~/ -
r
7'- co'- OVeRALL HEIGl-lT
~l =--_.uIl4,.!.._ I
n": ____1 ~
--rt -- -G;~;-~RE:EeoARD
INCLUOe:'50
OlJTLET RADIAL(S)
T
+--t + r~-t-I ~~ -<r--r-~-~-I -t- ~""t ::,.-..,..'~~-;-
r
OuTLE-T LA.U\.JDE:~
, ''42.. OUTLIE.T
INLE:T ( UNDf,;t2.
\VALK\VAY)
I i LJD~ 'NcH p,p, ---- --~~~ -:=:::- -
, ......Cd 5UPPOR,~ -1"'LE;l" PIPE- I~ OF-F-5ET TO HE:~
I ". i, \~j~_ J-- __ ~:-=-=~n ___ ,,:/ _I<.;~~;~~'~~~;-~~~~~-
~ ~^GE:~ '1~,,~f~~~~J~t;'~~ D~U,", J ~~"'!fSJfJ~'~' / '
---==-----_ -- -- -- ------ --- 'I -, -----."'.OIAll"-lG D. lZUM~.. .~~~ '''''. !, .
- r RA.'t::.E:- A-R.l1 ___ !U II u-V -------- , --===~;~.;--=--------- ~ 1 \ ~ _~=~~::x:::.--=--.
~ ~ ~i~;U~"[i,.,.,1~1't:/7'1S<1~~ " ~r'=- ' "C"OG' ,",,"
L---->-=----:O-_~J" .~;/'-J.\..:0.( \\11 ,,', ~\ 0..::-.1~~-~_ ..--=-__-----=-_==-- (PROVIDE: 'SUl"iAeLE:
I' 'l7z- - -----=~l?-~i.- ~- - - -- -;~~ c_ --=-- - ORA-It--.))
-~;:~:;;~;;~l9~j/~1 ~.:, '1 -SWOG' SUMP se","PEQ:
. lk'----f---~~~ _-S~CjD.:'""'__:'P'" ~~~L~U"'TRAT'~~-~-:-C~'O>J - -~=
7
!
OPTIOI<JAL BLC\V- BA.CiC.
~-~ ~
.1JJ~~JjT=----
DE. -5lUUG.It.JG
VALVE. _ Pt-JEUMATIC
OPEf<:A"TE:D, TlME:R
COl-J,r<:OLLEO
I
.....OTE:
I
CHE.......ICAL P'PI.....G ~HO.....N 1'5 FO~ ILLU'5T~"nvE:
PLlIC:PO:>E::. Ot.!Ly' PIPllo..lG F-uR:).JI'SoI..U:[) 'W\LL
~E: eUITED To .Joe. DUT'(..
@
@
I
COAGULANT
ALK.ALI FOR:
pH COt-J'T~OL.
@
LIME or.: 'SODA ASH F-O~ 50F"TEt.Jlt.JG.
I
@
COAGULAI>J'T A\O.
NO'Z."""AL FLCN RAt.JGE FOR THe~& MECHAWI'SM'5
"'7",00 TI-n.::w C:~OOO GPM - TAt.Jk:. 1iCA\JG1: 100'.0"
THti::U 21?'.O. ~OUt-.1D OR. '5Q.U"'~IC-.
I
02.IE:l..ITA,1'lO.... O~ 'VALKWAY ""'\T,", '....LE:T PIPE:
Ut-JOE-Rt.JE.ATH, QUTLE-'T, ~LUDGE-, ....."'-10 S....t""IP'-E
PIPE.:!> ""0 ~UrT ,Joe. 2E:Q.UIR..Et_M&"'-I"'S.
I
I
FIGURE 3.01
PLAN OF SEDIMENTATION BASIN
I
I
(If' , \ I I ,r
'"
iL I. ~ ~
...~~!,,:,
, ~~~
'\, '*ll
." 'iii 'I
if'
f"
"
:::;:
<l:
Cl
UJ
f-
UJ
0:
t)
Z
o
t)
~ ~ft ~1
~ ~A'7/}
~d:i j
~ i I J
t) ,
rJ) s,
~.
.
1 l~
n \~Il I'.,
~
r{l
,.I!'l
<l
"~,
,
I'i
~
rr
I
\. ,
r
.'1
~
'\\JrIWiB
"
ti
LL.
Oz
..... -
o...cn
w<
UlXl
",zz
<=!oo
""u_
w .. .....
a::~<
::>-.....
"''''''z
U::<w
~~
<-
a:o
c:=:lw
5cn
o
r
I
.~
z
Ui
<l:
co
Z
o
f-
<l:
f-
Z
UJ
:::;:
Cl
UJ
rJ)
,~ ,
'" rt
~
",It
II
er" iii
1}
'" ..
..to
d;
tl .1
,
,~~
C!
~
C\I
C\I
~
0 z
cD 0
C\I f-
C\I <l:
~ >
z UJ
...J
0 UJ
f=
<l:
>
UJ
...J
UJ
~
r
~l~lr.
.~
II) .""
....l1li
II
rP
II
Q
II
-------------------
-,
D
'"
III
,.
!'I
i~'
] I
r-~
....
/
~
..l
i
III r_ .
-~
.
-------------------
I
il";f "''1
Ie':~'
I
I
I
"
'" b~'
14~
,
"....j
.. I
I
B.M. '35~ CAP BEHIND
ELMHURST A~~RB CORNER
El. 1225.24 OHIO,
!:!
I
I
I
I
I'
1.,'
'l
I
I
I
I
I
I
f!
'"
1',
Ir
F:
If; i!
I
I
*,~
",,' 5TA. 117+00
, lS" CMP
r D.A.-S AC.
FLJOUT-1219:5
.
J
ell
I
.I,
.
11LS 0 N
COMPANY
ENGINEE.RS !
ARCHITE.CTS I
~
SCREEN PLANTING
AREA TO BE
CLEARED & SDREDGED.
HAPED
FIGURE 3 03
RECOMMENDED PLAN
I
-.-----------------
~
,
f
~ ~'J;.-
,
'" ' T.B.M.-WCal5~- ~\
, <::. 4L,.:
X 0 ;;1:, "
';'@'4"\
~'W.
c
m
W ADDITION
, ,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
......
I 11 LS 0 N
COMPANY
I ENGINEERS
ARCHITE.CTS t
IA ..CALC'''' ......T
[
~
,- -
'$ pLAT NO. 52
SURVEYOR
WES eNO
~
'~I,J;:I;"~.. ~I~
'~.if .'.'~'~;'I;' ,....~..'. ,~.......~;.~";.
:.&"..;/ ~\\ ".~
\~ ".~ . '.
;' ..H '" F"','
;.;.~" ~'r-'i~,.
;~.V ~J;."t.
'.' ",', .tJ!
'1,',;;.
_Tm_~___''HW.~ ~_ ,;",_....."v@",/nz. "'~'"
T B M -WC-2, "M" IN MUEllER ON T.B.M.-WC,15"M" IN MUELLER ON
FiRE HYDRANT NORTH SIDE YMCA FIRE 'HYDRANT CORNER ELMHURST
BUILDING, EL 1229.30 \AND WEST8END.E~: 1225.24
'.'Ii
~
~
'Ag '.$
;:
WESTCHESTER DRIVE
~~*
.' . " . ~,
;:',J.>#A t ~
i\ ,Xl \.,.,,::'<1 ~k
AREA TO BE DREDGED.
CLEARED & SHAPED
FIGURE 3.04
RECOMMENDED PLAN
..-----------------
I::::: ._
I
! ,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
11 LS 0 N
COMPANY
ENGINEERS
ARCHITECTS t
AREA TO BE DREDGED.
CLEARED & SHAPED
FIGURE 3.05
RECOMMENDED PLAN
I
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
11 LS 0 N
I COMPANY
ENGINEERS
ARC HlTECTS t
I ,.,
..c....... '''' .....tT
AREA TO BE DREDGED.
CLEARED & SHAPED
FIGURE 3.06
RECOMMENDED PLAN
-------------------
I
y;r
."
,~
...
I
.-.
""
I
I
I
I
I
I
I
I
~,'
~~
~~
~
I
I
I
I
VICINITY MAP
I
I
I
I,
I:
I!
I"
I
I
I
I
I
I
11LSON
COMPANY
ENGINE.ERS
ARCHITECTS 1
AREA TO BE DREDGED.
CLEARED & SHAPED
AREA TO BE CLEARED AND
STRIPPED OF DECOMPOSABLE
MATERIAL (1 FT.-2FT.!
FIGURE 3.07
RECOMMENDED PLAN
I
~(I
-.. - - - - - - - - - - - - - - - - - -
-
I
I:
...~'>
I
I
I
I
I
r
'I
I
, IIr
STA. 34~0 I ii. (
18" CM" hi" f ~~
D.A. -S A 1~
.->FL. OUT- 10:4~~r'. '{t
I;J !:s1 - 1 ~
"I " STA. 348-S0 .
t ~.~f2rif2'i1~r4"'RCBC ','~ ~ ..
o _~ FL IN-119S.S II
~ "~FL OUT-1195.5
o -
N9TE: RCBC IS PARTIALLY PLUGGED (APPROX. 2')
ill
11
;iT
I
I
I
~
STAt 351+00
lS""'cMP
.~
FL,ri1209.0
't
.t{\
II\; 8,M. 131 . CAP BEHIND WEST
,CURB ELM AND OHIO ST.,
t ~. 1211.92
V'I-& c,~
I
I
I
I
______~~~~_~AP_
I
I
I
11 LS 0 N
COMPANY
ENGINE.ERS
ARCHITECTS t
AREA TO BE DREDGED,
CLEARED & SHAPED
~ AREA TO BE CLEARED AND
STRIPPED OF DECOMPOSABLE
MATERIAL (lFT.-2FT.l
FIGURE 3.08
RECOMMENDED PLAN
I
I
.
-------------------
I
-
I
;q: &;
~~;f/h{A;
~,~
B.M.-WC-'lO"O" CUT IN TOP OF
RS w. Sloe PARKING AREA,' s.
e LAKE WOOD PARK, El. 1218.38
;;t' q',.
QlS~
fi' ,t,~
I
r.:
--;).. ,- -,,~
~
,
if3
~
I
vI!li ~~
,y",/ ~,.
,,', . ~.j
~ '~.,'..
~","'w
'~,~~
f'+i~
~
I
~
i!\I ~
D~ '
!iI
",'ill
'1\
~, -Ik
~
'#
'Fe.
I
"
I!:i
~
l!l
I
~
I
I
I
I
I
I
I
I
I
I
+'LS 0 N
COMPANY
- -EMG'NEERS-l---
ARCHITECTS
-I-
I
-
..C"...L"""'......T
""""'" AREA TO BE CLEARED AND
STRIPPED OF DECOMPOSABLE
MATERIAL (lFT,-2FT,)
FIGURE 3.09
RECOMMENDED PLAN
-------------------
I
T.B.M.-WC-12 RAILROAD SPIKE IN'
WEST FACE OF OIL WELL SERVI
POLE, EL. 1216.15 .
I
I
I
-
~
~
!r~W4'3j:rio ~;;:j r~
~6'; 118'4CMP 4",".~1f
1). ,;'(VITH 8: DROP INLET
~~~,~
i(itt!fN~\I<l)l}g4~. . .'
FL. OUT-1205,'
.+'*".~
-
_Ei~
-
Q
I
I
I
I
;
"II'
- .,..",
. ,
<~~~~'.' .
~,Ilf 1 ~\',
!
AIr ft;l.
"''1.",,''
>fI
r
"'",
(!l
)
I
'"'
I
ij!. or'"
r::
r~
ii'
~
'i:ij "
I
~
I
I
o ,.,.~
I]
I'~:
Itr-r
I
~
f"
I
I
I
11 LS 0 N
COMPANY
ENGINE.E.RS
ARCHITECTS t
I
I
"".",", AREA TO BE CLEARED AND
STRIPPED OF DECOMPOSABLE
MATERIAL 11FT.-2FTJ
FIGURE 3.10
RECOMMENDED PLAN
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
:\
~~I
1-'__~_~__~coL~_u
. I . .
. .
I
1
,
. , --1- .- .1. ::!::l::L t ' --HjtJi...:. ';i+!lj_ ,'llltLtil' l--lilL 111,'1.., il ,+1~'!--~ - il1,lj,:II,n,t--t*rL;I'I:i-:I;llllrH TIlT .-t'iJ,T~:I.Tt:'H~j.l!:ii-:i=lf:I-+t::II:ll-:tj:Hj!:'J.:i::lH:
uj..'.,' ' ---t!J~-:::I::+I+I-+I'-i 'I-t+f+ I'H+ ....).:i " - 1 i; ;"LillIl, I Tr'tTI ~-j"H-TIT'----t'[J.---IT.--"TT,-
, =tJ -- '1,1 . fT'I' , II' -' , --I _111..,11,_ 1111 -!, l-j- 11 I '[ I'J " I +,".[ I Til' .I'T' 1--11,-1-,' "I,ml-i i'I'L 1,--r,.,I!, ,-+ L -1"'I'-I-t'I-III. -:,n'I' ,::+1 _I I,!+ ::rrt
_-,. j J.j 'l' 1-, I "11 "I! ; I I 'I I Iii I , 1 I I I 1 I t' 1 i,: ~ ;:, ~ :-1: ' I Iii I , " i! 1 ,:; I
J= J.J -- --1- 1- -- -<-- t' :. , -'-1--- ."',"-I'I"8+1..:,i: -Tli! 1'-' J I' ['I" II'I'[T." i ,11-11'.'11 Trl--l1"1',;-'r-i-I-,-iTI;--'I-t-r-'-'I-:T'-'I'r"'-I'T,li';'!"! 1'-"
, +-,1- -- 11-1 -II!'-I-;-'! -I 'i'l! i-'T- ,I 1'1 I" '['1 I 'I 1:1, li.1 "'I ]11'-' ITI'j jl,,--:111':;-; 'I''''I'''';'-I'+'I':'TI'I-['[,I;:;
~i- --t- -+--j- -i- I 1-1 I,l-l-~'l; I -11 -!-I--r, I i I II II I, I) 't ;'~, j I; 1 r'IT'i 11, -,-:'-'~ ;-I--t--, 'I-tl', 't--j-t-i--"r-TTi - -tTr-r--'! ,. -t i') T-'t' :; :-1
.' -.' .,1,'-111_ [If'-I. '_II l',.r,I_, 1_,-:.,.1,-, " 11,11"'---..:.,' _1'_'11, '1',1 "1'''' 'I'll II II' II:' 1'111 [IIIIJ' 1III H:"-I Lilljil.,'!TI"TTH+i.JLlnll-II.'iH +jl-~'"-III''' n,i, il;...
- [f +-1-1..1 -- I: i-:~+LI- l'i,l,l, I ntl: 1[-' :,:1 I: II :; 'II I ILL t++.tIT~I: IT':'S L'I' [I"~' I l'm'II.II: . "111. "':II:I"ill_I~':I...'}i!IITnl!JTlrJ}JI'.Ui:lii Hi' .....,1 ...i}II..i'r;IT-i
----rr..+'i..]-- '-I'-1rIT',I:. -,-' -"II II "I +"'1+' , ".H-'["[ ',"-s' ' 1'H-+-1+-J";
--f-j ,..J-t+"'1'1'--1 iffll l't'I,- :-'i',:: I' I' III!,' 1.+1-1 III - 111.111. IT! '111"1 NI IHI..JI,FI,TI:ll-rTTTI' 111<1---lliL'1111111.J.h, .H+I.'HII."I'I'--l-
-=lr-l=f}j:Jl=i,,!!lii;22!O!:i, 1,1. i~ \1, ,iT Jll,nrl '..IL,illl'li 12~e.1 !\III,!'IIII'Cihill-1 J:WcIU-ffifITiIIF!l-FrF=],lill::j::=I=
.t-i l+r+1- i . -I-,IJ I :J 1111 j 'I i, l! i '!Ii. -!'\, i 'Ii:: J U )-il!1 I...IJI r I i I I. ill IT: i II i II II li+ ,Jc...IA-k ,II: Ii Y:L ~L' =iLLI..... j j 'LJ:L'J. :'= ...!~ 'lll): J:ili.... It
... -- It<,II, I! : '[ i: 'II,!! i tffiil H", i i t,I.,i 'I' ,I,'.! i!1 I liT: II Iii 1'111' illl 1'1 ,[ II I, ;1 'I' I ~'!I'+ I TJ'I"f+11 It, l'il+1 'lH8'1..-tl T!J + .+.1..1'1-1 .1-tlr,.....I...
-i--;; "_j' Lj'"j j'T-jt-jl-ti Iii' :;,"'!- 11": 'i-i~--:'i-il"tl...t"'lr-i: "i'-I,,-,j--l'~'j "I ; - I ,- I' li'i-+- T-!t~- ;-t- i tj'jl--tl--- un --~---t--I--I--'l-t-l~n.-t'-"-I--l-' -.---.LT't-- j-
-I." I I' Ilil pa,...I!.:! !rl..'.fll.....~.t~\~LLI...\..'-.. ,.,/I.II-I,.,111! [I i. ,t 1'1111' !I~'"..rfll .i.;_~!i:,llll+LLL iiLI'L'i.!llT...-i'I..Jn -1....-1--.
---H. I';i": .i"1 [I'll. 'I,: hi _1_ iT III"'-',\\!I I ;'iL'I' iil! II:! : ii, I'i-: .'i Iii . ,Hil '[1 -rll[111 I. ill\"; "I'III"r.--L""'l"-'
---.. . III, LI~, "1'; I'" '1'-;, '--I'" ii', "-I" i. '1 II III I'" I ,I I 10' I I :. ,II "III '[TI' T II [ I '1"1 I'L'" '.- ',"+" -I 1-
+':1; :1':' 1!!i,l. ,121O,hl-+,H-I..'j."I:f" I' i 'i ,1'1 'I ", 'I L.1It'(' ,1;I,,1111ITI'.T':'I"lr-['---I-I-;-i
"'j!t".'~!::f ::.,! 1,':'1 1,I"!ll! :1:II'Fltlln.ulJ1~I~ I1J J'I,: : Iii !il~ Iii:' :!,,!,'~111:1o~i[i ihl :,,11 1!12~IIL"ldilul',+j!I'111 11~IHljrl-I.!_!+j
t,. I.', '" ';"L.:J-'--i' II' iCROS,,':lI-il.;[IUIIIID,,-nn ... , "--'--.;..~-+.J' ii.,_" IL'I 1,1 " I" if --II' ,":: --li/-l"1111
LI-" '. L j ,i i! I '.f '. I:' ii" I II ,i, , "1 I ' I: ';; I 11.1 i ~Id If" i 'ITI Ii.' I II f III' I IIIIIII,,!-IIII+ -
1II11I :[1' ::' TI :'1." il! !:;iq:I!!:,: !:~I ::I:~ i ' i: !,I! ;II~'~! illl! III!!'III:I'!I,I!'!II: i:1 II, III !II!I!!-'-'II:~:. [.f! ilJ 11,lil!1
I. : '1' : ' ... -r: .,." . .... '.' '. ' '.' I ',' '. '..' ',' '.' '.' -i' " i, '. 'ffi l ':tIll",:::.!. I I I' 'I I' [. >t" 1: II ,I i it" : -+-t" , i : I I' I I ,,[,. 'i I :1' i~;
, '1--: 'I . , . I ' 'I" Ii' '1--' " : ,..... I " ,I:JI' "I" 'I :'~' I . ' I'll i'::' : !!;: 1 I. i , 1:1 i i I
'1.1,..,_ :1' 'i ." ,., '-;::-1 ','.-;::- , ,i' Ii:, .,': i.!!; ','2 '. i" II" ..i,.'" Ilil ii', 'i , ".1 it: -I "1,1'111 ,,0/. I I '1"1 'i
:; ! I; i ~T.'. ;-i: ..; I ~,; :Vol~: i: I h-i-:TT\T+'[' i~! I i ,-i--:I-~, ; I:. ~ I, rTIlli'lJl1 ri1lt t~~ I H-li'li:l:lllI: Ii i I il'~ i i II' i~ IT; :!.! lib""11"1 iJI'
j, 11~2!'01.,'. Ii,. . " ,"11 'I" .. "i' "; ,,[ [., II'i;:' " I I, l,tjI , I I' '~I.,..., I II I"" I i'll i' I
- -1 ~ , : :! I: I :; 3t- 1 ! B. I! 1 Ii' j "I! it:! j i PI :; I ~ Ii'; "i j ; Iii ill i i i-I t' i 1- i\ l : t : ' 't' i rr j - ill t 1'22, ',I 1
:11 II' i .1' ','. ' ; R II Ii II III i I I: i i ; :1 i III! ' ~ G: i i ! I : b I:: i I: i I III i j ~ i Iii I . i II[ ~ j i 11'[1 ,II. i i I '11, i !! II I 1[, 1.1 !. .'1
I' I:. ii · Ii.. 'I I I !' I" I I I , ,I 'I ,V. i I I' i. Ii, I' i^i I I " II I I 'I I '" I 'I '. I II:. , I' 1 I' I' . I I
II:: ,: I, I, i [:'! I f 'I:" 1 I I I Iii ',/ I I II I II I', ii i I!, II f 1.1 . III ' Iii I.~/j, II
1I111 i 1 i II ,I i i ! !TI~I' i !~ ~~:l., I' fl' ! I ! i ,Ill.' III Ii i! i III1 -H[! [""'II i I': Ii i : I! I.:V:I I Ii, II Iii ! I II ! ! 1111 II II! Iii I i I I I I jlllj Iii 11II ! Ir~,I" i'libll
I 1 121 PilI 1 i . , , - I ! i ': t . i 1 ii" 1 I It] ! i I : ii' j j ii' i i t i; " 1 t _I -..l-1 ~ L W.;....J ~ 2 . 't
1111: Ii rlJ l.'f['~ i:ii I:i; , ri- illlnLU1 !1~_ln~rr Ili:i_~~&~I&i:jJ}I~ ~;~~. ~:: :::: :!!! ;': Ii i::I: :.11:,: I:tt I I111
I, I, "I' ! I I,. .: ! I . : 1 'lFl I ~ 101, I i 1'1 ",.' 'i i II I I 11'1 iii' I I' ,I:, ' I,., :" ! I 'I ! i !' II i I I f Ii I I ,I I I II I! !I III I ,I II I,
II 1.00' ill ,i 'q,l. ;11, " i Ii: 1 I II J I i Ii I ! i ! I i I ! I I i I ! i i I IfJ,; ~; I ,:! Ii.. : I,! ! , Ii" I I I: I III, I! I i ,"'1 : I
~I: : i ii~n;__n:_,_',_._nn :::;1 i I'/I'!I 11111111111 1llll~tlj:1 ',!I !i:II:,::: ::: I,U..Jlt; ill 1 ! ii!lliii i i Ilil
! :' : f I , ' ~' :; I i ,ii I [II I j i i III !! ! iii, ! i . . . :' i, 1 ~I',,! II Iii, I:' i I ! i I!, I Ii II ! I
J" , !! :iil ;:!I: j [lli iii: II: i i:: [I: ' :;.~ FIGURE3.1~ 7::
I I !' 1 "I . I I' ; j i i I! ' ! ., I: I
n-[___n_____, un n___:__;_ F:--,- - " 'li..'.. ~+j.-+ .H-i-j +l-L~ ,"l'n.- ,-.-- ---.- --------------- ,---- RECOMMENDED PLAN PROFILE -____...
i. ,'," :. " . i ". SHEETS,
'. ' " ,'. . . .J I ' . ... i
.. ....~T.l i. .... . ..... . . ... ... ..iu .... .flc-c.. .
- " . , : : i i 1';'
.
: .
,,' .
.......~--,-,-
. .
I
....rhcf. .
!, :i.... i. !
1-;-__ _.n__ ....
.---- -
. 1
.
r>-.---'
T i
. ,
100+00
110+00
120+00
130+00
Iqo+oo
150+00
160+00
!
eni
0'
+ "
0"
0',
,
,
i
I
!
I
I
I
I
.....
0'
+
0'
0'
,
,
I
I
001
0'
+
0'
0'
. .
CD
0'
+
0'
0',
I
1----
...,
0'
0"
+
0'
0'
...,
0'
+
0'
0'
--
...,
...,
0'
+
0'
0'
-
.
- -
'~-,="
--
. .
. .
-
.
.
. .
. .
. .
.
I.......
,
.
'j
!
i ..
.i
.
.
1+-'-
I
I
c-' '
. ,- 1---'-.
i
i
1 .
_I
--'-
_.~~c-.
_ ..t
~
c
~_'
--~-
i
i I i
i'
.'
~.'
-----'-~; I i
~-:' :
i,
, i
, ,
1 . _ ,
,
t-H- 4-'
. .
~-
..1.
,
l ~
-i
.e
,
~- ,
..:-: ~i~-'
__ _.._._1-__
,
....n.1-- .-
.- -j--. ~-
,
I
.
.. ..1..--
~!.=.r :n
". :=1=:::
I
.
..... un___
, ;
- i_,- +-
1_:
,
, ,
,
. -~~ :
.._-,
, i"
J !
:1: ..:...;.. .1: ,
I
, ,
I.
::ICl
m
C")
o
3:
3:
m
z:
cnc
:J: m
me
m
-l""C
cnr-
>
z:
""C
::ICl
o
"T1
r-
m
-
ii"
, 1
V
!'I
i'
.."
C>
c:
""
m
Co>
, !
,
, ,
~
...,
--- .
1
I
I
.. .
-
-
.---..
~...
.
,i.
---" _i... . c-
I
I
I,
1
I
I'
,
! 1
I
, I
1
, ,
,
, ,
, 1
.
, i
,
, ,
i I
, !
i '
-l-'
1
I I ,
, ' ,
I! !
1--:-'
-
! i
, !
, ,
!
,
, !
I I I i
i
, ,
,
i'
, I
, 1
, ,
;
II
, I
, ,
c~~
-
""
CT
0-
. .
! '
I I!
, ,
.... !
~-f~' , i m-
__'I oC c'cjl-'--LL 0-
i - -, ---- .--- .
-.
--'--~ '
I i I
~~
I -r-t h-i
i'
,
-
. :~ L_ ;it)+-
+' '1, I
: I I
, '
1
" ,
I i I
" I
, ,
,
I j:
, ,
, ,
! ,
,
! !
,
-
ii'
++
, '
-
,;-;-
, !
! ,
, ,
,
1 ,
I
II
,,,
I
I
,
"
1 !
I
II
I: I i
, I
i'
+t+
L
'~n:
'.1'_
~ I I
,+-++-+:
~i_+
,
,
;t
--l-.
, 1
, i
-
-
I : I
-
,
1
,I I
, ,
,
"m'
, I
,
-~.!..
! ,
r"--;-"1--
ttr-L ~
I
I T I
ill]"
! ,
+ .
II
I,
: :
; !
-M-
-
..... '
,.__L...J,.......'
"1 I
__;.__1
, '
L-Lt---t- ,t I
_,n_ --l-+-L~_!,_
',: - ;...r'
-LL..'.,
!.
i ,
~-i-
~
..--;
Tr---:
1;--1-'"
I, I
I I
i i
'*
I
i~
~
, ,
-
-
! ,
1
I I
-
~;
1
~
-
1 ,
,
-
-
, -- -- --
, I ,
, I , I , , -,--- ,-- ..
-- -- ; I -- --..
, - ---
! ,
I , -'- -- ---
I , -
-- -'-'-'-- '
, w -'---
, I ..J -
L&.. -'-. ,
I , Cl --- ~-
- I I cc:: --,---
I c.. --
I :z
CO> < - -- c_
, - ..J V,l -, --
I
N
00 -
o
+
o
o
. --
: !
! ;
I I
,
, I
-.....
._.._---:-~
-~
N
'"
o
+
o
o
:.-f.-
........1.
_...l..
~.- --f-."
----...1.
(0)
8
+
o
o
.........-
~:_.l
....... 1....-.
- .....-
..- .-...
(0)
o
+
o
o
--::-- -J
~-l
......1
j--
I
-i--
I
f-- .-::r
...+-.
I-
r-
f-..
1--.
1-----. .
1--.
f---..
-.........
. .
..,
-.
i I i
, .
I ,
~',
I,
-', -+-'
I' ;
I ,
i. t!
I I
, I
I
;~-f...!-
, !
I
~4-+
,-..
..-.....
...:.._:-.::....~-
(0)
N
o
+
o
o
--.+
___'_1_.
-:--::t::::- ..
---t--
-- ... 1:.=-"-.
I
-.... ..
~....._...
..... ...
'-'-r-:
-i----+-I
.. ..::: ..;.;.;
(0)
(0)
o
+
o
o
1-,. .1..
";-"'.:"-i"
I
..
(0)
.f=
o
+
o
o
...,...,..,
~.
--
.. __.
._.... _1
-
.... ...-
--, -
;- ,..
I
!
'1
~..
...
--
-
::D
m
C")
o
:s:
:s:
m
z
enO
::I:m
mo
m
..c_~ -1"'tl
. -'- -'- en r-
-_~ ):>0
. . - Z
"'tl
::D
o
"TI
r-
m
...- ..
....:....
...--
~-'-
---
...-
... +
.....:-1-
-
, ;
I: I
I I!
~ 'I
, I
I
~_+_I i
-~. , I ;
~~ I I
, ,
I'
I I
I'
I
I I I
I
I I
, ,
,
I ;
: ,
~ I i
I ~ I
, I
I ! I
I
1- -1
I I
1'1
, I
I ;-iT
I
!--. ~
)~
, ,
,
, ,
, ,
; I
,;
"
, I
I I'
-
I
I
; ,
i
o
I
, I
:! I
I I
_-i-:
- I :
I
-n
C>
c:
'"
m
(0)
...
....
I I
I
__ -;_ ~ I
-
: i
,
I
I I I
: :
, I
I
,
, I
I
I I ,
,
I I
,
I'
I
I I
,
I
,
, ,
" I
I
-
...:...:-
! I j
I ,
I I i
I I
I I I
I
,
.,
I I
I
i I I
: I 1
I
8=,-;.
,
I I I
,
, I
i! I i
I I I I
,
, ,
, I
: :
,
I
I I
Iii
I
-N-L-;-+-;- '
~----:j-'i
, ,
-
I I
I I
I I I
, I
I
: I I
, :
I
I; I
_I :
"
'-H
A1.
'---r+
~'
I I
,
I
"
,
,
, I I
, I I
: !
I ,
!
,
, I
I I
I I!
I
, I
N
N
0,
LL+-~ -+-
18"
,
.'-J..l
NP (RT)
, I
I
Ii I
, I
, ,
, I
.,
, ,
,
"
: I
,
! I I
I
! I
I
I I
, ,
,
I I i
, ,
i'
, I
, ,
! I
,
:: I
__ ~.. J..'_...L.J...i-+ ~' I
;-- '""""-r-, i '_Li, i !
: I l-f-t-j T---:- I
I I I I : :' i
-
-
-
-
~
,_'_;:'
I I
...,
I I
,
I:
"
-
-
+
,
, ,
i! I
, I
i I
; I
I
i I
, I
; i
:+
,
, ,
I
, I
ti
+
-
~
~
I
, '
I' I .,.,
__IT+ -"
~ I I L'
i -tfL'
,;-H-
1-/
I I.
I
N
"S
I. i
I
I ~
r:,~ I
,
, '
-
-1
'f"1'
I I
,
I
'---1-1
I : '-l-t
J
r-
'!'"j-
,
..s::,j- +
i I (...':.,_~
,
r:--~' -.-
~:.-X~.L:..: -
~
, ,
~
~,
;
+-H
~...
I I
-_: ~_.L -i-- I ! : 1'b
o~--~., I .' +---! -'-- -Q+-t ~
. '. ! I ';
,~: +cH,. ;+!-
1-,'
r
I I
c
,
J'
I
, ~+ L
'I L'LL
~---r ~T i I
I,
,
,
I
I I
,
I I
I
, "
i i";""
./,
-
"-
I
~~++- __I I
: ;~+_..
llTT
-
-
I ,
.m
I
, ,
II I': ,I I
Lt !'_~~-rT
: ~ ;~TT
, '.q:
'.:,-1....=1$.
I, !_.:...j
':""-1 .. ~_ '
: I:' ~++-I
:: :J--:-+
i II 1J.-Lll::'~
I ! i ! i I :T ~.tt=
I : : ;Tr-.t-Ii.
i l_j LLl .=+
,t- t-t-++--L- -"--+
! i I jl
I ,~tt-0:t
., '+=1-1+
, ,'i-j-
.:...i.I_1- I. I
'. I.!' I'
i ,r-----;---rr
n,.
~~
I I
, ,
I
I: '
, ,
, ,
, I
, ,
-+-
,
I
I I I 1
I
.--1_.1.
1"+
,; I'
.'-
H' . J.
.J~T
'10 II
,:t+-+-+++
II~-I I
ii- j,--;--:- I
',++-.H
1-1--->--1 :-:--"T
1 , a; ,-..,.'T
.. 1:
..zR-'::P
I: I
"'1
=+
,....
, ,
.'.tT.
,
:: I -+--t:
, r -++,
-,j-;-t
'm
.i:_ -:::-1 ' :
~, -U-t,i-L
-.-c-j-
.___1
~ -t-+.
.___1 I
.H'.
I I I
I I
~j-+
t+
I
,
,
t
, i I
1 Tl i
..J..J
i:p:
I I
-
-
-
H j-
1---1-- I I
-LW~ 1-1-
I, I I
UJ ++
I ~; ,
, ,
, I
L
-1.
1
i
,1
II ,
, ,
,
"
H
, ,
-
-
,
~
_L
+
,
, ,
,-
;;-
_L
, I
j
j~-:
~,
c.
,
-'"
. ,
,
-.....
-
-
.,
,
,I I
TfT
L_.
,
,
, ,
, '
,
,
,-.1_
,
-;- --+
i--';-
tt:-
-'7T
--+-T--'
'i--r-j-
.
~i
,
,
,
,
!
! I i I
'-++1
J
-r -~_~
,
I-r
,
T-
'~Cj
-
-
i i
u
IN
.....
,
, ,
, ,
,,; I
-~,
I TiT
, ,
,
,
"~
-~:-t
-0
I' j! I
..:~~=C -=;~~[C:-
, ,
:-.:~~~ -
. ,
+t++
I,
'j
I I!
!Jill
., )-
=J
,
,.....
~
, ,
!
, ,
,
".-,-.
,
" '"
-11- I
I l-til
, ,
I
, ,
J=j_
-
~
~__' I I
,
.)-+ I.
,
---I
0'
N
N
,.,..
-
i-n--r .
~
, I
'_LU
. I I I
,
, :
iN
'_'n._ -.-- . 0
.--.."
,
i
,
""j
"T"
,
i
'::-::L
:-
,
t-
...........1_
. i
.-1
~"-- -.-
,
__I
.-,
I
._._._ -I
H_~ I.
-::-!--
, ,
: ,
_nn ----I
! ,
,
,
I
,
,..;....c.f----
"
....-1....
.1--.
,
, ,
,
,
, I
1
-~ -- --.-- - i
I
r
1-
------;--~-_.-
----..-i
,
---~-I-
,
T":--F:::
.---1----
r'"
'-I-
, .
~, ,
- -i~-i~
,
'--1'----
",_n.___.
------.--.-1
-t-,-n.__.
'-:--,-'-1.-'--.'
-+-.....,---,--,--.
__..______..u...
T
;--;-
. ~_Jn
, ,
-,-::::j
I~'
_i."":_
,
-;.~~-+
-c--t
----(D-,
--.~
--_~~:F-C-
_-----""l..
J
-1-:-:-- .
,
,
I
IT
i'l
____ ~L-_ _+_____
_I
'1
~------r---
,-+_L +~:
1:01;
-
01
N'
'''''1
-
, , I
en:::: :t~. -
----+----'-------.-
-
-.l!___+____
I
I
I
01
0;
~I.
0'
eni
-
-
-
.,.,
~
W
...J
U.
I:)
CC
CI..
:z
Scn
Cl..1-
W
Cl W
W::I:
Clcn
:z
W
:!:
:!:
I:)
Co-'
W
CC
'"
w
a:
=>
'"
u:
1
1
I
:.1______.
I
i
,
-I
i
o
o
+
o
o
::t-
i
I
,
I
i
--f---'-'-'-
,
I
I
I
o
o
+
o
en
'"
---i
,
I
10
10
,+
10
I~
~-I
"4
,
. .
~,t~-.,'.,'...'.':
. '!' .....
'. I '-1
---------1 I
I . :
1 '0
. I 10
----,.-- I J
i I....
I'"
,
.)
T
,
I
----- -+
~
I
I
,
-j-
o
~~.9
o
<0
:(W)
I
I
i
----:--~_+----_:_n-
i
,
,
,
,
,
I
I'..
--' -'~-
-
-
I
I
1 ..!
, ----------J
I ... I
, 1
I i
....1'. I
... ", . ]!
. . . I . 0
. . t . 0
-~-----7--~~~-~ +
Ie>
I I u>
I '"
!
o
o
+
o
::t-
'"
-
-
I
-
-
-l=
o
o
...
o
o
, ,
,
+
+
~
, ,
,
I
I I; It:
Ii f-j-i
1-1--+ ii+T , i
--"-,
LL
LLf+ 'LI'
I f--r-I .
. H-t--
! I I
,
, t
+If-+-
-l=
o
...
o
o
-l=
,."
o
...
o
o
-l=
W
o
...
o
o
-LI+
: I I
, I
, , -:
!
,
, ,
,
, ,
, ,
,
,
, ,
i i
! I
, ,
, ,
" ,
,
,
I
I
, I
, I
I I i
1+,
, ;
I ; I
, '
--1_1- I.
'I' ur
-j+~li
, I,
, "
m
,
'I
~
, I
L_ !
,
---t-r
-1
, ,
,
! I I
,
, ,
, ,
, ,
: ,
i j
I
,
I I I
, ,
, ,
I I !
, ,
I i I :
I I I I
, '
I I I I
......;.-;-
--t-+-;
-l=
-l=
o
...
o
o
, ,
I I I I
'" '+'
+-t--H~ 'I: :
I I i I
: I l I
i 71
-l=
'"
o
...
o
o
-l=
'"
o
...
o
o
-
, ,
,
,
, ,
,
I I
I,
, !
, ,
I ! L.!
I;
,
, ,
: --!.'
, , j i --Y--i'
I I I
, ,
, ,
I,
I
-L-
, ,
IT
i-Li
,,,-
"
I
,
, ,
-
..L
_r
!
" " ,
~
m
C")
c
3:
3:
m
z:
cnc
:J:m
m CI
~"'tl
cn>~
z:
"'tl
~
C
."
r-
m
" ,
-
I i I
, ,
,
I-
,
:.-1.- !
1"1 I I
, ,
, ,
, ,
! ,
I I!
! I I
I I I !
: I I
,
: j
i
,
, ,
, ,
, ,
,
..L
" ,
,
" ,
! I
I
~_! I
,
, ,
"
C>
c:
:>:l
m
W
, ,
-
,
,
, '
,
, ,
)
I !
I, ,
, ,
,
, I
" i
i'
,
-
! I
,
I : I
I I ;
"
H....._L 1
.,..
, \
,
,
\ I
, :
"'
!
"
, ,
, '
, ,
,
,
I
, ,
,
, ,
, ,
I i I
,
, ,
" ,
" ,
,
:' I
,
,
;--;--;-:
,.'
" I
,
, ,
+i I
, ,
I
I
, ,
,
" ,
,--r-;-
"
" ,
"
I I I'
I I J
,I i
, ,
,! I
, ,
, ,
, ,
, ,
,
,
, ,
,
, ,
,
,
- ,
-
_u~....L __~~.:-
,."
~:~:' ~ g
) ,
,
,
)! ;
-.-
"
, !
, i
I
, "
, "
, I
.
'll
..,
,
, ,
-
-,,-
, ,
I'
, ,
j I I
l
t i I
,
! ,
,
I ! i
, ,
: I I I
, ,
, ,
,
i
I i
, '
, ,
,
" ,
! ,
,
, ,
,
! :
, ,
, ,
,
, ,
! ,
~ I I
, ,
, ,
I I:
, I
! I
! ,
, ,
" ,
, I
,
I
" ,
, ,
, ,
, ,
i ,
" ,
,
, i
-
_Ln'_.!...
-,-
Ii!
, '
" I
,
, I
i
,
, ~ I
, ,
, ,
I I I
, ,
, i
! I i
, '
,
I I
,
,..,.. l..LJ_J-ll
C>~ :-l 'T "
! ,
,
,
I Iii
,
, ,
, ,
,
"
,
i
" ,
, ,
'i 1......_
+"1
,
, I
i I I
, ,
I'
"
" ,
, ,
, ,
---
, ,
"
~
, ,
I,
: i' I
! ~
, ,
,
I I tl ~-~:
! I I
!
I I!
" I
, I
, I
I 1,1
I
I
, I
t-+++
, ,
" ,
" ,
Ii:
,
, ,
, ,
,
, ,
, I
ii' ,
, H4
, ,
" ,
-
-, ,
I,
, -r
I
~
i \ 1
: i
, ,
, ,
, ,
I p::
'-
,:$3=
I ,-+
I ~LL -t-:
~~-;-
I _ --,--_; r-'--
e--
, '
-t-+I
, I
" ,
,
---.--
-j- i
_1.. _,+_'
_H_ __
, ,
-h-
, ,
LL-L'
I: ; i
~ Ll-+.
I ,
I! I
I I; I
; I ;
.J.-t-l--L
iT,
! I I
-t+T'
I i I
" ,
,
--L.;
, I '
.----- '~- ---,--r,---'- "
---:-: - n. '-l-h--_'~:!
:- -,' , -i-+----j
~~'-;._~:-
.-.' I; :rr-I -
__ '"_-----;-_ I:;, .n:_
. '11~--
~'-,~-- : ~!~. , :
Ii" ' , ~. '.'7/L:-
! I
Ilii I Ir~-r~
I! !! r ;'"
+--:-. ': ! , -- -'-~ ~/. .:~::=
~~ _~ I e- ;;;-" ==1-1, .
~LL:= +D+ --tt;:j' --_:~:-~ _ :=__:'::.,
. ~-c', i< : ,[ Lj-:'c ,. H__ _:-::::::::
T{:--J .... .'.d,V.:d'::-._ ~:_
! '-[i;;'- -.. -, , -- --
: ,- , i
i .f:---:'-i- ~_, T i:::~
I-+-h-I I. ,'~T:'; ;
1 .. 1 .~-L.: . i. t ;':.. __ _:
, ; j:'
.-.+
d "_
l~
__.L
,
i-t--'-
: i
.__.n.____
--.- .
~-~-- ---
I
~:..: I
~
0;....' ,
CD! i.+
iC(.'~
, t i
-H- :~- :
I
,
I'
1-+-_-
+---r-
,
! !
-r-rt-,.-:
:J
~;_..
f.;.' ,
_.l------J
"',
I.' .
o
.--+
--:t
,
; ,
I
: :+'~-'
i I .....
--- -,
~_m~_:.:..".,
~I-;--- " '-
d_ ._,__
. .
--.- -
1-.-
I
d :I:.-C
'j;
I-!.
~
i i
"" ...--
" ~- -..-
1. \- -- :-
--.-:.1_':-
~_'_'_n
, '
, ,
, ,
, '
,
. !' '.
-;-~
~.
, I
I!
.. -
T_
+--- .
--
----!--'----
I -
1-
,-t- ----
.ll' .-
.,.------
1.----
-r----- .--
, ,
, i
n._ _
- - --
- ------'---
, ,
1-'
-,-
---- --e-
1----
._:--'+m_.__.__
~
I
L __ ..1
==t
r-
COUNTY RD. ----
-=1=-
-----j
.-
i-
1
I
_ _ -. --I
I
- ~_m -1 .-- -
:--:::/:: ----
--.:-1=
: j ..=::-
.- _ --I-.m ....
--
---
1----
$'--
. '-i- _ .... --
.---- :t-
-- =~=+
-j---- --~.
.-:1= . -0-----
--. 1------
0.
:.---
--
._.__L_
,
~
,
,
-T-
- I.
=i
l.
.-1=.
t-
,
_.
----
d_ _____ ____.
--~
---
~...
N-.--
0.-
, ,
u_ -c-
.,-
,-- -
1-.
____I
,
____. j"_n._ uu_
ni--
i- ----
-r--- -
t--
-- --
- - -- ---
n. ..:;c _.. _..
J-H ;-'-
. -l i- -'-1
--., ---'
- -'-J - =:--:
- _,_._ _. __mI. ,-
- --+--.-
-~-'=I----j:
--,- ~.~.. -!-t-- -~-
1m-I: ..'-
I---I---f _________-d.
. ,
:'" .-. -----+ ,.
__ -,". d___, .+_
-.. h__ .-t .., -- iI- .--
- 7---- It--
:;;-:":" /L =~--:: -l---:=d
-i./dd-- II .---f.
if ~- ----li--'
,. - - II ---
n_ -,"":>.:: _~~~- __=.-. ~. =--F~. =--= ._
-- :--=-=: -,-; c-'-......,: -- - t----- --: _:.
___ n. ___ _ _.~ _.___-j _ ___
:,_1
-..--
.
- ---
L
t
,
--- -'
----
t--
, '
,
'---.
1---.
=t--
~
..L
- I
'-r;-
~.
<h'
CI) ----
M- .
m
.-. M'
. .- "'1'--
:::: u !i-"
. <> - -- ""
f -l=
CO .
~-.
_ n _ .._ Q.. _ _
.~_.
'LEV~E
,-
-
----
" -
~-
..
--
--
'-'- 1
-C- -===1=-
___ m_
m_.
-r ----
-:r
..1.:---:-
-- --==:::=t
-- .-'--j-
:
._u.--m--
.--.
-..-
.-.-- --'-
..
,-
_Co!_
"j
.____1 m'_
--I- ,-
....l.:-.--
i-
,---
'1:= :-
-,-- -.
t-
I
,
--
.---"-, -
..0..
-- ~-
--- -
=t= n --- .-. -- .n.
---+-----'t:::~~___I-
, ' '; I '
.
, --
-~----
-~~ -.
--
-
-
-
-
-
-
-
-
-
I
I
I
I
Restoration of the old channel utilizing the recommended alternative has a
total construction cost of $1,745,900. Annual pumping costs for silt
removal will increase by 10 percent and the annual water softening cost
will increase by 2 percent, however, these increases will probably be
offset by the use of less chemicals in the pre-sedimentation process at the
water treatment plant and the more extensive use of the lower-cost river
water in lieu of well water.
I
I
I
I
Construction cost of the parkway system is $2,999,000 making the total
project cost $4,744,900. Of this amount, $1,753,000 in Federal funding
would be available in the form of Land and Water Conservation Funds and
Community Development Funds, reducing the project cost to $2,991,900.
I
I
The recommended construction sequence, project costs and time schedule for
the project are:
I
I
I
I
.T~
I iLa \
I
~"
I
.---'
-,,,,P~
~"'--
.,.,'"
I
,,'
I
I
r""',<"'->
~,;-.~. -'~:.~.
....-.,.--
Construction Item
A.
Construct Sedimentation Basin
B.
Restore Upper Reaches of Channel
Phase 1. Parkway System
Federal Funds
C.
Restore Lower Reaches of Channel
Phase 2. Parkway System
Federal Funds
D. Phase 3. Parkway System
Federal Funds
E. Phase 4. Parkway System
Federal Funds
F. Phase 5. Parkway System
Federal Funds
TOTAL
'~'-----
.'~ "
Time in
Cost Years
$1,000,700 2
$ 515,700
1,033,000
$1,548,700
516,500
$1,032,200 2
$ 229,500
507,000
$ 736,500
507,000
$ 229,500 2
$ 532,000
266,000
$ 266,000 2
$ 492,000
246,000
$ 246,000 2
$ 435,000
217,500
$ 217,500 2
$2,991,900 12
3.02
~
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~~
~~~\.'~;' .':
~4"
~-'~
.k
'~"~"d;;;i
'r ".. "" "it"
~:i ,~< .
~J
..
mmi
.
~
,.,
STATE ST.
~,\~
~
EXISTING CITY PARKS
PROPOSED PARKWAY SYSTEM
PROPOSED REST AREAS
ADDITIONAL PICNIC AND
PLAYGROUND AREAS
~
-j-.
VICI N ITY MAP
NOT TO SCALE
f' LS 0 N
W-1. C-E COMPANY
ENGINEERS i
ARCHITECTS I
"30
.000
2000
ac....L..E IN FEET
FIGURE 3.17
RECOMMENDED PARKWAY SYSTEM
-------------------
I
I
The Corps of Engineers conducted a feasibility study (see Appendix) that
evaluated the operation of that portion of Salina's flood control system
allowing water to flow into the old Smoky Hill River channel. Measures to
renovate the old channel were examined. Corps of Engineers' data, hydro-
logic results and hydraulic calculations proved to be a valuable check of
Wilson & Company's calculations. The Corps looked at several alternatives
and recommended a plan to the City (see Section 4E, Plan 4). Since the Corps'
study was general and schematic in concept, Wilson & Company was retained
by the City to study the hydrologic and hydraulic aspects of the old channel
in detail, recommend certain other physical improvements and recommend a
plan for beautification and recreation enhancement.
SECTION 4 - ENGINEERING STUDIES
I
A. Introduction.
I
1. General. This part of the study deals with the engineering
aspects of the problem of progressive siltation and aggradation of the old
channel and the evaluation of different alternative concepts to solve this
problem taking into account interior storm drainage, water to the Water
Treatment Plant and aesthetics of the old channel. From past reports and
public meetings, it appears that public opinion is in favor of restoring
the old channel.
I
I
I
I
The existing flood protection system for the East side of Salina consists
of a levee along the Smoky Hill River and a 1-1/4 mile cutoff channel con-
structed near Iron Avenue. This system prevents a design flood flow of
50,000 c.f.s. (cubic feet per second) from entering the loop of the river
passing through the City. To maintain a water supply to the municipal
Water Treatment Plant, a 54-inch conduit was placed through the levee and a
scour key dam was constructed in the cutoff channel to allow enough head to
provide a maximum inflow of 100 c.f.s. into the abandoned river loop. A
storm water pumping plant is located east of Lakewood Park near the levee
to pump storm water from interior drainage over the levee in times of high
flows in the Smoky Hill River. This pumping plant with the available
storage in the old river channel and Lakewood Park provides a high degree
of flood protection in the area draining into the old river channel.
The construction of obstructions, dredging and discharging effluent in a
natural water course with a flow of over 5 c.f.s. are subject to both
Federal Regulation and Kansas Statute. A Section 404 permit (40 CFR 230.1)
must be issued by the U.S. Army Corps of Engineers, and a state permit from
the Chief Engineer, Division of Water Resources, as defined in KSA 82a-30l
et. seq., must be obtained. In addition, a letter of water quality certifi-
cation from the Kansas Department of Health and Environment must be obtained.
I
I
I
From preliminary discussion, with the proper authorities, there should be no
problem obtaining these permits with proper project design and construction.
The law requires that these permits be obtained before any construction can
proceed.
I
I
I
b. to provide interior storm water drainage and flood protection;
2. Problems. The existing Smoky Hill River Channel through the city
is used as a water supply to the Water Treatment Plant and a natural waterway
for the storage and moving of the interior storm drainage. The channel is
progressively transforming from a riverine to a wetlands environment as a
result of the high inflow of silt and the low water velocities in the old
channel to move this silt. Without a costly maintenance program by the
City to keep this channel open, the inlet and channel to the Water Treatment
Plant will eventually become completely clogged forcing the City to continuous
cleaning of the old channel, or to find another supply line to the Water
Treatment Plant (which obtains 60 to 70 percent of its water supply from
the intake at the old channel and 30 to 40 percent from wells). Besides
I
The old Smoky Hill River channel serves three functions:
I
a. To convey river water from the cutoff channel to the Water
Treatment Plant;
and
I
I
c. to act as a desilting pond for the Water Treatment Plant.
About 70% of the total sediment load in the old channel settles out between
the inlet and the Water Treatment Plant.
I
4.01
~
TYPICAL PICTURES SHOWING SILTATION AND AGGRADATION OF
THE OLD SMOKY HILL RIVER CHANNEL
INTAKE STRUCTURE AT
WATER TREATMENT PLANT
1D'x1D' R.C.B.C.
ELM STREET
TYPICAL OUTlET FOR
INTERIOR STORMWATER DRAIN
84" C.M.P. YMCA
DRIVE
FIGURE 4.01
PHOTOGRAPHS OF EXISTING CHANNEL
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
12'x12' R.C.B.C.
N. OHIO STREET
96" C.M.P. ACCESS RD.
OFF E. NORTH STREET
FIGURE 4.02
TYPICAL CONSTRICTIONS IN CHANNEL
I
I
blocking most of the water supply for the City of Salina, this wetland with
its mud bars and aquatic weed growth is aesthetically displeasing and
prevents public access to water as a recreation resource (See Figures
B.
Hydrologic Analysis of Interior Drainage.
I
I
4.01-4.02).
1. General. The water surface elevations were determined by apply-
ing synthetic storms to the drainage areas under consideration and comput-
ing the rate of runoff produced by the storm at the drainage area collection
points along the old channel. The design procedures and techniques, which
are described below, are based on accepted and proven engineering principles.
I
Present conditions for flood protection from interior storm drainage cause
no problems. . This flood protection may become critical and should be
evaluated in the case any of the following occur:
I
I
d.
Additions of drainage system not presently draining to the
2. Hydrology. The Rational Method, the hydrograph synthesis method
of the Soil Conservation Servicel, the U.S. Bureau of Public Roads2 and the
Corps of Engineers3 methods were compared for different sizes of drainage
areas to determine an acceptable method for computing runoff. Results of
the Rational Method and the Soil Conservation Service hydro graph method
produced the most reasonable.range of runoff rates and volumes, and their
results were comparable except for large drainage areas (over 500 acres)
where the Rational Method was smaller. The Soil Conservation Service
hydro graph method was used throughout the study because it gives a hydro graph
for each drainage area. The runoff curve numbers (CN values shown in table
4.01) were estimated for each drainage area. The time parameters were
estimated from slopes and approximate times to fill detention storage.
Inasmuch as the drainage systems could not convey the design flow, the time
of concentration was adjusted to allow time for detention storage and
overland flow. Hydrographs were routed through the old channel by the
"Tabular Method" described in "Urban Hydrology for Small Watersheds -
Technical Release No. 55,,1 by the Soil Conservation Service. When constric-
tions in the channel reduced the flow, such as the 84-inch CMP (Corrugated
Metal Pipe) at the YMCA Drive crossing, the channel was treated as a reservoir
and the channel storage was taken into account as described in "Design of
15
Small Watersheds" by U.S. Bureau of Reclamation.
I
a. The addition of constrictions in the channel (such as the
pipe at YMCA Drive).
I
b.
Development of areas draining into the channel increasing
runoff.
I
c. The upgrading of existing drainage system draining into the
old channel, such as the slough draining into the old channel from the
south of Second Street.
I
old channel.
I
e. The addition of high protection (100 year design storm
protection) buildings such as the YMCA and Bicentennial Center near the
channel.
I
I
3. Purpose and Scope. The engineering study described herein was
conducted to analyze the existing drainage system described in Section 1
with regard to the siltation process and the interior storm drainage; and
to evaluate reasonable alternative concepts for stabilization of the old
channel and water supply to the Water Treatment Plant. Each alternative
takes into account flood control, siltation and aggradation of the old
channel, technical feasibility~ construction cost estimates, maintenance
cost estimates, operation cost estimates, water supply to the Water Treat-
ment Plant and land acquisition to construct and maintain the project.
3. Rainfall. Rainfall data used in this study were taken from
4
Technical Paper No. 40, U.S. Weather Bureau. Rainfall - Duration curves
for designated recurrence intervals are shown by Figure No. 4.03.
Intensity - Duration curves for designated recurrence intervals are shown
by Figure No. 4.04. A 24-hour, Type II storm was used in- the Soil Conserva-
tion Service hydrograph method.
I
I
I
I
I
4.02
8.0
FREOUENCY-INTENSITY-DURATION CURVES
7.0 FOR SALINA, KANSAS
RA INFALL-FREOUENCV-oURATlOH CURVE DATA FROM T.P. H~O
FOR SALlNA,KANSAS 7.0
DATA FROM T.P. N~O
8.0
8.0
5.0
'&0 '1\1..
5.0
~.O llj'll.
. ~
=
~ -
z
~ \0 'f", ~.O
~
c ..
~ !::
~ S'l\l.. ~
c 3.0 z
~ '"
....
~
1'1\1.. 3.0
2.0
IYR.
2.0
1.0
1.0
0
2 3 ~ 5 6 12 2~
DURATI ON (NOURS) DURA nON ( OURS)
0
2 3 ~ 5 8 12 2~
FIGURE 4.03
RAINFALL - DURATION CURVES
FIGURE 4.04
INTENSITY - DURATION CURVES
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The recurrence interval indicates the intensity of storm that has been
exceeded on an average of once per number of years shown. There is no
implication that these storms come at regular intervals. The recurrence
intervals used were: 100-year for residential and public buildings needing
high protection (YMCA and Bicentennial Center); 25-year for major thorough-
fares; and IO-year for minor streets.
TABLE 4.02
Roughness Coefficients
Type of Channel
Manning "n"
I
TABLE 4.01
Summary of Larger Drainage Areas into Old Smoky Hill River Channel
Approx. Peak Rates of Runoff (cfs)
Drainage Pipe Size Capacity CN (1.8") (3") (4.3")
Area Area (Ac.) @ Channel of Pipe(cfs) Value 5 yr. 25 yr. 100 yr.
1 216 42" RCP 70 75 232 387 555
2 900 72" CP(brick) 250 75 740 1,233 1,767
3 249 66" RCP 300 75 697 1,161 1,664
4 66 21t1 CI 20 82 158 280 392
5 69 24" RCP 20 82 109 196 271
6 57 60" RCP 110 82 181 325 450
7 305 54" RCP 70 75 524 873 1,251
8 117 54" RCP 120 75 320 534 765
9 116 48" RCP 60 75 266 444 636
10 27 30" CMP 70 75 58 96 138
11 20 30" CMP 30 75 54 90 129
12 28 3011 RCP 25 75 90 150 215
13 23 24" RCP 10 75 58 96 138
14 30 42" RCP 30 75 68 114 169
15 35 36" RCP 60 75 72 120 172
16 45 36" CMP 73 75 124 207 297
Concrete Box
Concrete Pipe
Cast Iron Pipe
Corrugated Metal Pipe
Grassed Channel (Excavated)
Natural Channel
0.013
0.013
0.013
0.022
0.030
0.050
I
I
Head loss and flow conditions at the street crossings were determined by
the "WSPIN" computer program. The appropriate entrance and exit coeffici-
ents were determined through research of available literature.6-8
I
The side drain flow capacities and conditions were determined with use of
6-8
appropriate culvert nomographs, charts and hydraulic formulas.
I
I
C.
Hydraulic Analysis.
2. Critical Velocity. (To move sediment through channel) The silt
load carried by the Smoky Hill River was estimated from samples taken by
the Corps of Engineers, January 1974, and samples taken by Wilson Labora-
!ories, January 1978. It was estimated, assuming a constant inflow of 100
c.f.s., that 130,000 cu. yds. of sediment would be drawn into the old river
channel annually. Sediment samples collected in the old channel by the
Corps of Engineers13 indicated that 93 to 100 percent of this inflowing
sediment was deposited in the channel. Of the total sediment load, about
90 percent precipitates above the old Western Star Mill dam. Thirty to
sixty percent of the sediment is classified as fine to medium sands while
the remaining particles are silts and clays. From the samples at the
inlet, a settling curve was made to estimate detention time to size a
"
I
I
I
I
I
1. General. Water surface profiles and hydraulic data for the old
Smoky Hill River Channel are shown in Figures 3.11 through 3.16. The water
surface profiles were determined by the Soil Conservation Service computer
program "WSPIN,,5 which uses the Standard Step Method for backwater computa-
tion. Coefficients for use in the Manning equation are listed in the
computer printout and shown in Table 4.02.
sedimentation basin. The fall velocity
estimated from the section on IISediment
of the sediment particles was
9
Transport", Advanced Hydrology
and
I
the required velocity in the channel to move the sediment was estimated.
I
I
I
4.03
I
3.
Flood Protection. The old Smoky Hill River Channel drains 3,000
I
1"1
..,,~~--~~
OUTlET
acres of residential, commercial, recreational and agricultural areas (see
Figure 4.05). The existing channel, without any constrictions, allows a
flow of 1,200! c.f.s. at bankfull. The predominate hydraulic feature of
the old channel is its considerable amount of storage; the channel below
th~ Western Star Mill dam and the outlet plus Lakewood Park storage can
hold all the present runoff from a 100-year storm at an elevation of 1,214!
(see profile Figures 3.11 to 3.16). However, the potential problems with
flood protection occur when the water is routed from the upper rkaches to
the Lakewood Park area, where most of the storage is available. This is
principally due to constrictions in the channel and the increase in peak
discharge from drainage areas.
I
OEPllt
OF
WATER
AT
INLET
CRITICAL VELOCITY OF CHANNEL
.
r= -------~,
I
w = FALL VELOCITY
I
INLET
I
DIAGRAM SHOWING CRITICAL VELOCITY
I
In order to transport most of the material analyzed at a 100 percent effec-
tive capability would require a velocity of 4.0! feet per second. Over 90
percent of the sediment can be transported through the outlet with a velocity
of 2.0! feet per second. In conclusion, a velocity of at least 2 feet per
second is required to move the sediment coming in at the inlet effectively
through the old channel on through the outlet.
The existing channel presently contains a 100-year storm without overflowing
its banks, so that storms of lesser recurrence intervals were not considered.
Should any major revisions be made to alter the amount of inflow into the
old channel an analysis should be made to determine their effects on flood
protection in the old channel.
I
I
I
D.
Alternative Concepts.
I
The critical slope required to obtain the critical velocity (2 ft/sec.)
with the existing inlet (max. inflow 100 c.f.s.) would be between 0.00067
to 0.00072 ft/ft. The existing slope is much less than the critical slope
as can be seen in Figures 4.11 to 4.16 (0.00001 ft/ft. to 0.0004 ft/ft.).
The minimum flow required to obtain critical velocity using only the inlet
and outlet flow lines assuming all the constructions in the channel are
removed is estimated at 1,000 c.f.s. (the average flow in the Smoky Hill
,River is 463 c.f.s.). Therefore, a periodic flood is required to flush the
sediment downstream.
Plan 1. General Description. The flow into the old channel would be
increased and all constrictions in the old channel would be removed (at
North and South Ohio Streets, YMCA Drive, the Western Star Mill Dam, Ash
Street, Elm Street and the access road off East North Street). Utilizing
the existing slope, a, flow of 1,000! c.f.s would be required to obtain
the critical velocity of 2 f.p.s. Since the average flow in the Smoky Hill
River is presently around 500 c.f.s.10 it becomes obvious that some change
must be made to the old channel to increase the flow required to obtain the
critical velocity of 2 f.p.s. (see Figure 4.06).
I
I
I
I
Sediment introduced to the old channel from interior storm water runoff
proved to be a small percentage (!3%) of the'sediment normally carried by
the old channel. No provisions were taken to remove or limit this sediment
carried into the old channel. Due to this inflow of sediment it is possible
that dredging be required in the future, especially around the weir dams.
For this alternative to be effective, the inlet structure would be removed
and replaced with a double 6'x6' reinforced concrete box culvert with
control gates. The outlet structure would be replaced with the same struc-
ture. All the constrictions in the channel would be removed and replaced
with bridges. The channel would have 161,000 cu. yds. of silt excavated,
I
I
I
4.04
I
\ \ \\ II r=lhY4'~111 J1J Il/iF""li~I'Y'I'I"""~ \
~ _ _'i\_J~_" , , C-F1-~jr~-IJdi::t:iJ'P':~5~~fJ~tt
'\~ . \: . - '. ~L
, . '\ irg~ "~r:~~\j>~~~l~~\ DL=:~
j, \i\ [I ~~O~~:j!~1~ . ;r-isqrrl
r- \; \ \ f1;~~~L_"J JlJULJULJ\"~_._._'-'-'-'-.-~-i-'-i:\;~~~L~~,
\ ~, ,I I I ['''~rr:JU~J I I lC" -.,j
) 1111 ----/~~~.=.)~D~IJI'1 'J[~I~-"JRF".":]jj 1:~r_{JBd~ ~:c~:~D~
.~ :f~;>::---~ I I r ~r~ ~, C"=[L-~l ~11,~~~ :~111nl! I!: I: f' :':'~i 1,(
J i , _ ' j-, ' _,~I, rJ _,..:;.__ ~_~-' liC IU JJu LI,L-' I~ ~,=:JUL
r -'- :r'll.:,'jJ-~lBE9EJ!~I~ -=.::" Ulr-~E:3D~~ln~n
/ :/ I ~- - ]~ I Ib--- IL=:~=:J ,",~~ !lE~lc=J ~jfl
(1 it I' tu -~Bc: m~'~Ci I~-li
( , I ! C:J! '=-'=.:'J r-''jJ;J.BGJ~j "se" I' ,
1I I \ I' [-"I JI'Jr-- - 11~7J -------,-I',r.-Irr-::-!'t ~--- I
b \\ \ . rl~J hrll'~ ' I" , " -':::J i~ ~:~S~j.bJ uti) I (~l IC~~::
\~ \ \ i C~FJ~~=~~ ~~~~~~~~II!~~~~ ~i~
: ~ ~\ ~~knr"ii"'1fl~JC~1mi I[F'1'-I~ l,n'[rJ[~-~I~-mnmml'[I'~V1 rr=
l'- '\\~ I~ ~ I :D U~~DD iL~,SII. ~ l 'UlJJUJW~ r~ I!b'r
! ..,em. \\\\ Li~f~[L,'i']!-lD' DI~lFI:!'- I jlE~:Lqi ::"'~D! CT':iT!n:[T1I.~ I, j'i j :i~ I
: ~l/~ '>-. \:C ~F~~ jll' ~ tl'juD :~ lU IJL [:1~jWlJJLU I , 'L L ~Lj
I ~~n-1 ", /:c:/ "'\ l'nnnr [:'"]S::,JrT-~"ICJ~"'" .: I l ["II IfU'mDJmrn 'll]~[Jij ~~:
i ;1 b-AJ I \ y~ I hJ f~1 J= :1~'[11i11 (i'[T: l'[idLillmlJ!lJ[]]'U~~
II~I: l-~~: \ ~f1f' I'mj;t';J;~"~~~ -+ 111'~;+" I'Jo~jrIIJDr:JID-:-:'rnwFH1~ I
.~_~l U~I \ 'dq~, ~=nf ,:l~lJU~~~I, ILl ~ i'e, i LLj~i ~
]rlfl ~rl-ltn)LL-o~- ",. Jr 1f~IF ';\I~="::i - ) JJ"l!"i:L, Ii I' Jli~I~~ffi1lF{]~: ~l !
]~m!I'IJ\~J .1\' dl ~ ~:~ I I ()~~-,r;"'/t1:!! tIDr lefim~h[['l :flf1iIL:'!
L!JEJEJrJ~c~~ _) _ ~, ; .,'''~ )rr~[I~~,.l=1 . .".,~ r';),) } ~1.)~"JnU !~JtJJuJLJ -:~Jll~C1L; I
1.~,~Tl ' .",- ~; ~l\ 'l[j~t-il~I' ~[~) ~lfl;;~" ~/I,IIIIIII f:, -I lL I :' ~UIJ ~ ]D]i":'ID' L[, I', il i II~ j'
L.-J1iJ ~' fj I' Ill, ~ ." IJ ".*' '''i' l~l.-IJLI LJ I' ~" -, '<--.Jo I
~}(/IS'7i~ ,~. I (I I I...!....I ~jp ~ 1/"" r~ I JL) - -- _ rr or7WV11 ,'^' I
L~';"'J1J ,,_ ~u~, ,j : . ~.&~ITI~nJg:I:' \l~~~~ QdI~Ll;;)-1. IrTi~: rrl.~ I~ nl.: '~~8~1 J~kJ! ! J
~81 __ 0 r,k,-:::'-'~b..it!~1tl_ Jr:JI1J I:~ ~r II I III i I il I, i ,~I. IICJCJ[~ []!IJL) ,
~~j' i, C ,.:. -'-'l ~ ':~L'[OJ1~~'~g~~~:i::~~:J[~ i I Il~TlFillTLirF-!-jilll~~[if'~~li[J[~r '
~l ~l}JU,\::r!7/ J tjL~ -~ '1~1~ll~~BhJ~jj,Ull :m1llliDfO "7]UE1b1f~J~i-II~I~rnrn[
""" t' r1r-= .7 ~'1'--l::: - ~IlLI O::::J '-:=J~ D' ,1:=1 [' =-1 ' 1 ~ 11'11' r~ F1 [J i""'I 'I t:'iClJfT! ': :
.~ ~~ ," ( fj ~I ~, l_JL::=JL, L:=:J I I! I III1 . I I D LlI ~Jr,l,l~ I
-"- - f-,,' -- .,r n · Jl-=J~ :' :.;;)~, I ,. -,I' i-L:"[ ll-:..jf....h..,..L~[='J [h [
y'" \ ~,:] I I:.o!': X: X ,II, ' ", ~ 1.1 ", - [""'] I/LI u '" '"
'.' ,w, I ~ '- _.J~L,L",_ :;:./-"_' _WJ.,.. ,II" ElDI7LJL~ ",'.
,,/; >),' ::T~r r mki~11!r f mni i Uf flllilJDj1..:11~~ ':
JD, ~"""""" -:J=.l5 "":'""":'1-1 u, .I" -1 [Jr....!:. 1 fit II 1, IIV, ~
~-- r7=--~" '---'-iTlf" lOr ]';-'j=r-~ ~;~~~~tfJLTiifrn"'1 L",' I rnDR~,:~r]rrwllrfllin~ "
I' 1;1 ,.. 6 ~~ \~; ~ l~ ~i~I~'r ' 1m! fJl ~L 11_ JL Il_:l_ ~lJ~iJ&11 ~JJ~
'I...... - _...:. - - - !=- "~ ,-.:",", ~r"'f"L' 'LU' - i.,[ '1'll]'IJmmm
, i:i. ,: _ :1--.....1..... ;"l=~Nil.R~.;; ""): ,.! ;' ~. ~J1U~?l-1 ! ~ ~ _I! II! i tLj ~V~l z ~:-;
'~ _____..&ii~' ~~' '~" '," ",....11 ",dO ~E'iCJ I. o..'v
, ill' i Ii "\"ow ~ /;'<''':ID~~'''''' I':: --;:-:' 1I cr~ L~ CJ "r I r Fi15-) ~ .. . .
1\ :::L n, 111' ~lt'C ~~_=<_o,~~~~"".L l:mm]]~dIJ [ltLDl/~~dJ,~,J ~3H ~
:tilr"~il' l'L~.,~,"~u !./;~;" / ~llrDI iU r;r:(iIIJt[lf-J :>'"' ~
i IL~ JI r-~-,.Q,,;~d1-:1,/'--U'H ,.:;.-n'~m:D". DLll I ['IC1 rr "I'lr 1"- .;,N Z
I ' . ,. ~ d ,~ - ~ \......r/--------------~, I U LIJ I I , w
;y~+\r'm".1~;;;=~~~<J~ 'T ~_u:j IF~:~ ~[.jN~~ ~r!E!~I]Dm[]j~D:', ~
~~/ :' :;:~~/~ - Jr, 't" "u~~,: !~~,j~tL'l"1LjJi~[t}: Eni~[J.....JrTI...iOJLJ '" '.M ;:.~
~~~/ - -l:'L__ - - -- I Ii :;.~I'~il.' '111 '! II
~-'L: --JL~ F ~ Ii ~mrrlll~~ji:[~ ~
-- ~Ii #::::.:: --~# ='~' =.::o-::,~ l :Ji:~;l:;;;-'w'm~t.:'"
C\..
c:c
:!:
"'c:c
C> w
..ice
wC:C
a:w
=>c:l
=:1c:c
"'z
c:c
ce
c
....--~
o
-------------------
:""""""";,'",,,',""";' INDICATES AREAS TO BE I
EXCA V A TED AND SHAPED.
(SEE PROFILE)
I
I
I
I
I
I
~
I I
.
,-,
I
STAlEST.
~;\,.p
-}.. I
I
VICINITY MAP
NOT TO SCALE
I
I
11LS 0 N I
W-" C-E COM PANY
ENGINEERS
ARCHITECTS t
I
0 000 1000 ,...00 I
~ :2000
SCALE 'N FEeT
I
FIGURE 4.06 I
PLAN 1 - PLAN VIEW
I
- '-
'"tI
r-
)>
Z"T1
c;
....c::
:>:l
m
'"tI....
::l:l .
CO
'TI....
r-
m
-
1-
,-
,'''
10
,
,
i !
? -----------1------------1---- ..--..
g I !
, .
, ,
I '
i i
1 I
L__ .. ..nT' ---- -+----.
!
! i - -f-~\ I
: J I \
1---1--------- --- i__
I
I
,
-
-.
__no
N
o
o
+
o
o
I
I--
I
I
gi
+
01
0,
I
I
<=
o
o
e
o
I
i .~
, t
... .. ..- r'." ...-
j I, .
I I :
I / I ~ UI~
I I '" I
, 2S I I
__J____I-.,;_~--S .--+1._.___--.- '
" 1 '
I r i
-'" d': all. ,,:..on
S. OHIO STREET
-
-
-
-
-
-
1-
iN
.0
.0
:~
'",
,<.0
''''
i
I I
I
I
I
I
I
z
o
-<
IT>
~
"
i
I
I
I
,
I
,
I
~s~
o c 0
~ ~:
<:> ~.--
~ g~;
C '"
~ - ?;
~ ~ ~
I
I
~/
~~~(
,..
'" -
IT> Z
V> C>
'" '"
,.. ,..
IT> Z
<:> IT>
- .--
I ,..
z
<:>
.
,
~
11
'~'
~
'''fo
.0
"
5~
I
I
~
I
i
j
.,1.
J
I
.0
"
5~
-
-
-
-
-
-
-
-
-
- -
N 'N
-
0 .'"
,
,
,-
)~
I
5~. RCP INLET STRUCTURE I
- ... --or
I
!
,
,
I
.,- ---.-.----... 1- -------',--1-
i
I
I
!~
o
'- l
N
'"
0
i !
I
--.. !
,
i
,
,
,
. .
i
. ----- -
,
I
I
I "'1<>
I .0
"
I ~
I n
I ~
~
I
I
,
I rz. (; 8~. CMP
I YMCA DRIYE
~ GREELEY AYENUE
BRiDGE
~ ~ROPOSED RCBC
Tltj MIDWAY
~ OAKOALE AVENUE
BRIOOE
f -=====:::-/
I
I
,,1
.0',
" I
~i
~I
~I
I
I
J
r- --_::>
I~ _.
I
I
-
~.
~~
!~
:"
~ MULBERRy STlEET
BRIDGE
I
~ WAUlUT STREET
BRIDOE
;v
~ ROIl STREET
BR OOE
~ WESTERN STAR
MILL DAM
~ 12xl2 RCBC
ASH STREET
I
~ 10xl0 RCBC
ELM STREET
-l
-
-
~ I'xl' ""
N. OHIO STREET
E2l5I
t 'BRIOGE LAKiWOOO OR.
\
~mr-
~ 96" tNP ACCESS ROAO
?FF E. RORTlt STREET _
I
~ 78" RCP OUTUT STRUCTURE
1
_I
I
the channel would be cleared of all debris and fallen trees, and then
I
depending on the width of the channel.
The equalizer pipe
of 2-3 f.p.s.
(48-inch CMP)
4) Excavation (dredging of silt)
161,000 c.y. x $6/c.y.
=
966,000
I
shaped to adjust to a slope of 0.04%
cient of 0.03. A flow of 500 c.f.s.
(see Figure 4.07) and a Manning coeffi-
would have a velocity
between Lakewood Park and the channel would need to be increased to a 6'x6'
reinforced concrete box culvert due to the shortening of the travel time
for interior drainage to proceed downstream.
5) Clearing, grubbing, stripping and
sh~ping of channel $500/ac. x 80 ac.
I
=
40,000
Costs for Plan 1
6) 6x6x70 RCBC Equalizer between Lakewood
Park & Channel'
I
=
$
12,500
I
A) Metal Pipes: S. Ohio St., YMCA Dr., Access Rd. off E. North
Total
Engr. Admin. & Legal
Other Costs
2,333,700
350,000
466,700
I
1) Removal of Structures:
1) 400 L.F. @ $7/L.F.
2) Excavation 6,000 c.y. @ 1.50/c.y.
3) Pavement removal 50 s.y. @ $4/s.y.
= $ 2,800
= 9,000
= 200
I
$3,150,000
Total Construction Costs
I
Total
$12,000
Annual Cost
B) Reinforced Concrete Structures: Ash St., Elm St., N. Ohio St.
Total Costs
o
$3,150,000
I
I
1) Concrete Removal 714 c.y. @ $7/c.y.
2) Excavation 8,600 c.y. @ $1.50/c.y.
3) Pavement Removal 1,800 S.y. @ $4/s.y.
4) Western Star Mill dam 500 C.y. @ $7/c.y.
5) Other costs
= $ 5,000
= 12,900
= 7,200
= 3,500
= 5,600
$34,200
Advantages. This alternative would restore the old channel to its original
character and average flow depth. No desilting device or maintenance would
be required. There would be no annual cost or dependence on power for this
alternative to work.
I
Total
I
2) Bridges:
S. Ohio
YMCA
Midway
'Ash
Elm
N. Ohio
Access Rd.
off E. North
Street
100'xlOO'x$25js.f.
50'x100'x$25js.f.
50'xlOO'x$25js.f.
70'xlOO'x$25js.f.
60'x100'x$25js.f.
70'xlOO'x$25js.f.
=
=
250,000
125,000
125,000
175,000
150,000
175,000
I
3D'xlOO'x$25js.f.
75,000
Disadvantages. This alternative has a high initial expense. It reduces
the amount of storage for flood protection because it requires 5 hours to
drain the old channel making the flood storage susceptible to human error
which could result in serious flooding. The excavating in the channel
would require a dredging machine to be mounted on the banks every 75-100' .
This excavation would require an access road for trucks and a clearing of
trees of approximately IS' to allow equipment to the channel. Due to the
unstable nature of the silt in the channel, heavy equipment can move upon
it only with difficulty. There are possible problems with access on
privately-owned land, conservation of trees to be cleared to get equipment
into the site, and the removing and disposing of the excavated silt.
I
=
=
=
=
=
I
3) 2-6x6@ Inlet & Outlet 450 L.F.
770 c.y. x $200jc.y. = $154,000
plus gates $10,000 each
=
194,000
I
I
4.05
I
Plan 2. General Description. River inflow would be reduced to 50
c.f.s. and pumped up into a sedimentation basin at the inlet. The effluent
would flow by gravity to the old channel and the silt would flow by gravity
to some point below the scour key dam in the cutoff channel. A weir dam
would be installed in Oakdale Park above the Water Treatment Plant inlet
and the gates at the Western Star Mill dam closed to raise water depth to
between 3 to 4 feet over the entire bottom of the old channel. (see Figures
I
I
I
I
I
4.08 and 4.09).
I
Costs for Plan 2
I
Sedimentation Basin (includes the basin, internal
pumps, pipes, feeder lines, landscaping, fencing, lights,
etc.) $
Weir Dam in Oakdale Park
Stripping & Clearing 1-2' of Vegetative Cover in Upper Reaches
Stripping & Clearing 1-2' of Vegetative Cover in Lower Reac~es
I
I
Total
Othet, Cos ts
Admin., Engr., Legal
Construction Cost
Annual Cost $38,000 (assume
the cost will double in 10 yrs.
to get average)
Present Worth Factor for 20 yrs.
@ 6% = $11.47 76,000 (11.47)
Total
I
Total
I
I
Disadvantages. This alternative increases the annual pumping cost for the
Water Treatment Plant by 27 percent ($27,000 in 1978). The sedimentation
basin is basically in a residential area, however with proper care in
engineering, landscaping and construction the basin could be aesthetically
pleasing and relatively noise free (see Figure 3.01).
Plan 3. General Description. This is the recommended plan described
in detail in Section 3. The inlet river flow would be reduced to 50 c.f.s.
and would flow by gravity into a sedimentation basin at the inlet. The
effluent would flow by gravity to the old channel and the silt would be
pumped to the cutoff channel below the scour key dam. The plan requires
that the City excavate or dredge the silt from the old channel to lower the
!
water surface elevation at the sediment~tion basin and to assure a depth of
. !
,
3 to 4 feet. The gates at the old Wes~ern Star Mill dam would be closed to
increase water depth (see Figures 4.10 and 4.11).
884,400
20,000
100,000
170,000
1,174,400
102,200
176,200
1,452,800
Costs for Plan 3
Sedimentation Basin (includes basin, internal pumps,
pipes, feeder lines, landscaping, fencing, lights, etc.)
Excavation (dredging) minimum = 63,000 c.y. x $6/c.y.
Remove and Reset 84" CMP at YMCA Dr.
Stripping & Clearing 1-2' of Vegetative Cover'in Lower Reaches
871 ,600
$ 2,324,400
Total
Other Costs
Admin., Engr., Legal
Advantages. This plan has a reasonably low initial cost. This would be a
highly'predictable method of determining the intake and controlling the
water surface elevation. The problems with silt removal, as explained in
Plan 1, would not be encountered. The stripping and clearing of the channel
could be phased with the beautification and recreation enhancement plans in
this report.
I
I
I
I
I
I
I
Total Construction Cost
Annual Cost $21,300 (assume the
cost will double in 10 yrs. to
get average)
Present worth factor for 20 yrs.
at 6% = 11.47 42,600 (11.47)
Total
$ 833,900
378,000
4,000
170,000
1,385,900
152,100
207,900
1,745,900
488,600
$2,234,500
4.06
'~"'.~'l.'
. ...4
~'R
~f
:mm~:::
AREA TO BE CLEARED AND
~l~:~J~~ ?iF~~2CF~~POSABLE
I ~ ~
" .
;;;
,.,
STATE ST.
~_\~
SI<<)<<IH'LLRIIER
MOllTHSTREET
COlllITty CLUD RD.
STUDY AREA
CUWFORDSTREET
-J.
VICINITY MAP
NOT TO SCALE
W-I. C-E
11 LS 0 N
COMPANY
ENGINEERS
ARCHITECTS t
~
''''00
2000
,
SCA....", ON FEET
FIGURE 4.08
PLAN 2 - PLAN VIEW
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
--_--:- -
~
r-
:I>
z::!!
N~
, ::lO
m
~...
;:g.
00
:!!'"
r-
m
-----
-
-
-
o
o
+
o
o
i
~I
~ r---~--
-
-
-
=~I~
~ 18
I
<<>
o
+----
---
f-------
-f---------T
L ~
I
,
I
!
I
I
'" I
0
0
+
0 i
0
,
I
I
""
o
o
+
o
o
,
! J
I \
I I~',
I i
i :
I I
i I
i \
! \
\
\
\
:
~
, I
I
1 I
I I
I I
I
I
,
I
I
I
I
I
I
I
I
/
I
I
I
I
I
I
I
\
-r-
,
/-'
I
I
I
- --- ~- --------
I
I
I /
.....--1.....
, ,
, '
,~--~
I '
/ I
/ i
/
/
/
I
I /
--~,y
I
I
i
~
!
I
i
!
I
I
i
!
i
I
:
!
,
I
I
I
1
I
,
-
-
-
- -
-
-
-
-
-
-
I...,
o
'"
~--,..::- -----u---T::.-------'
I'.) iN 1~
(5 I;; ;0
I I
, I
-_l t 50- RCP "~ET STRUCTURE
." ,
I
1-
...,
...,
'"
...,
'"
, 0
,
~Io
"
"
i<:
I
_ __-.I
It Sq" CMP I
S. OKlO STREET
I
I
i
--~~
,
\
\
I
I
i
I
I
----'------- --
~ 80- CNP
YMCA DRIVE
----- ------
i
I
--,---_._--
I
-.._----
---'1------- ---
I
,
I
I
I
I
-- ______ __1_ ------- ---+ - ---.. -. ---
I !
F -- _n _n =- E4- ~ PROPOSED Rcec
I I TlIE MIDWAY
I I
! I .1
: : !, io
ill
" "
\li
I I
I t GREELEY AVEJUE
8R1DGE
I
I!:
~~
------!-------- ----
I
i
I
I
I ,
-+-~ OA'DALE AVEIIUE _____
I BRIDGE
I
I
I
-;
I
---- ---
,
I ,
i
I
i
0~ !
~-
~<
em
n~
2_
~z
.0 m);!.
II :-:~
g~
"10
I
~ WAutUT STREET
8R1DGE I
----
( IRON STREET
8R1DGE
i !
I ,
I ~ /r4JLBERRY STREET
8R1DGE
I
( 'OxlO RC8C
I ELM STREET
i ~ WESTERN STAR
MILL DAM
t-----i
. I
I I
I I
I
i
I It 12xl2x HeBe i
I ASH STREET ]
I 1
,
------
! I
i ,
I
I i
I
I ,
<>
"
_.. __.. - - __ ,_______ ~_ --t" ____ __~___:--_-- ___'0.__'
I I
,
!
It 12xl2 ReBe I I
N. OHIO STREET I I
i I I I I
! I I I
I I i I
--- -----!----_._---_._~---_._~~---'
I I -
I ' I
: I
I r:zo>--~ 8RiDGE LA'EWOOD DR.
I i
"-..t.".. 1-- ---. !
i
I
I
I
I
is
'I<
------ -
- -
i)
iT
L-_~__
l---
I
I
,
i
!---..----.----
________ --I
,
- - -- - ~
, ,
, ,
-- ----- ----+-- -_.~ -.---.- '---~._.~-
I
I
,
I
~ 96 - CNP ACCESS ROAD I
OFF E. HORTl! STREET !
-(~~ -;: J~T ST~U:TUREI
I I
u__ -----r u_ ---t---- ..
I I
m__
~~~;mm~
,.,
STlTEST.
~,\'IP
~
INDICATES AREAS TO BE
EXCA V A TED AND SHAPED.
(SEE PROFilE)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
AREA TO BE CLEARED AND
STRIPPED OF DECOMPOSABLE
MATERIAL (1FT.-2FTJ
-.
\,11)
KORTH STREET
COUlITlYClUDRD.
STUDY AREA
CRAWFORD STREET
+
NAGKOllAROAD
VICINITY MAP
NOT TO SCALE
W-I. C-E
tllS 0 N
COMPANY
EN GIN E ERS
ARCHITECTS t
'600
2000
FIGURE 4.10
PLAN 3 - PLAN VIEW
-
-
-g
~
>
Z "T1
~ C5
c:
'"
m
-g ...
:I:l ~
0 ~
::!!
~
m
-
-
o
o
+
8
N
o
o
b
o
-
-.-
-
-
-
-
-
-
N
o
'"
N
o
-
'tto
I~
1 t Sq- ~CP INlEJ ~TR~C"!:lJRE_
I
I
I
,
I
I
I
~ 8~' Cl4P I
s. OH 10 STREET
l~ 1~
0
,
---- ....___j._.__ moo -.---
,
I i
:
I !
I :
I ,
;
I
i~
"Ie
~Ie
o
11--
~
o
'I\"
~ 8~' Cl4P
Yl4CA DRIYE
(Q
o
I..
o
o
,-
';9 ~
~~
,6;,_
~ --- ---- ~.
'!!
;;!
I---H
-
-
~ GREELEY AYENUE
8RIDGE
"f'
--1----
~ PROPOSED RC8C
THE MIDWAY
"10
o
"
o
""!
0~
-<-
~<
C~
n~
2_
~z
~-<
~
Cz
. ~
:-'
:"
~ OAKDALE AYENUE
BRIDGE
~ IIJL8ERRY STllEET
8RIDGE I
~ WAutUT STREET
8RIDGE
.
'" 'II<
,
I .- ~ WESTERN STAR
,,-
/- MILL DAM
" /
'" ,,- -
0 1'2"2 RC8C
0 .-
+ ASH STREET
0
0 I
I t ~,~ it 10"0 RC8C
, IEut STREET
f
,
J 1
I
J
I \
\
c5
o
b
o
(Q
'"
r----- - -
I
I
I
t-n-n- .u_ ._
I
I
I
I
---+--- -----
i
I
I
I
i
I
I I
1---- n I
I
I
+---
~
~
~
----r- ----
-<
i
I
.----- ---I
I
/
,
----
-------+----- 1'\-
i \
I~\I
I I
! f
----+-
, I
I I
I
I I
I J
I I
i I
I ;
i I!
---+--4+
, I
I I
i I
I I
I _ ----+----___._----I-___'__._~____
-------
I
I
I
I
--LL-~---
\
/
,
I
I
I
~,'l
~
1__________
~~
~~~~ ~
j~
~
~
~
~~~~
,
~y
_u ___ ______._
12xl2 RCBC
N. OHIO STREET
.--
~
~ "
lB
1!'Z9--~ 8RIDGE LAKEWOOD OR
-
-
-
I
___n_
.-
------
I ROM STllEET
RIDGE
~___ ____~+-u-- _______ ______ _____
!
~ 96' Cl4P ACCESS ROAD
Off E. NORTH STREET
1----
~ 78' RCP OUTLET STllUCTURE
_n
------- .--
.------- --
__ ju____
--.-- ------
- ----
-------------------
Advantages. This plan would eliminate the silting process in the old
channel and would provide a manageable program for water supply and recrea-
tional use of the old channel. The annual cost would be at a minimum
because of gravity flow and low maintenance.
Disadvantages. This plan would provide a very slow moving (almost stagnant)
flow in the channel. Except for the channel around Oakdale, Kenwood and
Founder's Park, the channel would appear much as it does now with the
cattails, mud bars and small stream flow. This plan would limit the water
feature aspect of beautification and recreation to the Oakdale-Kenwood Park
area. The excavation of the silt problems described in Plan 1 and Plan 2
would pertain to this Plan except to a lesser degree. With the use of a
pipeline to transport water from the cutoff channel to the Water Treatment
Plant, the siltation process experienced in the channel would not occur.
Therefore, the sediment load would~settle in the sedimentation basin at the
Water Treatment Plant. With this extra sediment load and the increasing
demand for water, an additional sedimentation basin may be required at the
Water Treatment plant. This plan limits the expansion of river intake at
the Water Treatment Plant to the capacity of the pipeline.
I
I
Costs for Plan 4
Advantages. This plan would eliminate the silting process in the old
channel and would provide a relatively clear running river. The annual
cost would be at a minimum because of the gravity inflow and low mainten-
ance. The dredging could be done in phases with the beautification and
recreation phasing of this study. With the excavation of the old channel,
additional flood protection would be provided.
I
Sedimentation basin (includes basin, internal pumps, etc.)
Weir dams 3 @ 20,000 each
Excavation (dredging) of old channel
Pipeline to Water Treatment Plant (includes pipe, excavation,
sheeting, channel crossings, pavement removal, etc.)
Stripping & Clearing 1-2' of Vegetative Cover in Lower Reaches
Total
Other Costs
Admin., Engr., Legal
I
I
Disadvantages. This plan depends on the excavation and shaping of the old
channel to control the water surface elevation (see Figure 4.22 for estimated
profile). As described in Plan 1, many problems in construction, land
easements or acquisition for construction and disposal of silt would occur.
These problems were reflected in the estimated. cost, however they are
subject to uncertainties. Pressure may develop from local interest groups
due to the clearing of trees to move equipment, installation of haul roads
to move silt out, and locations to dispose of the silt. The sedimentation
basin would be in a residential area, but as in Plan 2 any adverse impacts
could be minimized with proper engineering, landscaping and construction.
Total
I
Total Construction Costs
Annual costs $2,400fyr. (assume
it doubles in 10 yrs. to get
average)
Present worth factor 20 years
at 6% = 11.47
4,800 x 11.47
I
I
I
I
Plan 4. General Description. The inlet flow would be reduced 5
'c.f.s. and allowed to flow by gravity into a sedimentation basin at the
inlet. The effluent would flow by gravity to the old channel and the silt
would be pumped to the cutoff channel below the scour key dam. A weir dam
would be installed around the periphery of Oakdale and Kenwood Park and the
gates closed at the Western Star Mill dam to increase water depth. The
City would excavate and strip the channel to get 3 to 4 feet of water depth
to limit aquatic weed growth and extend the inlet to the Water Treatment
Plant by pipeline to provide water for the Treatment Plant (see Figures
4.12 and 4.13).
I
I
I
I
I
I
I
I
I
$ 350,000
60,000
300,000
620,000
170,000
1,500,000
300,000
255,000
2,025,000
55,000
2,089,000
4n7
INDICATES AREAS TO
EXCAVATE BE
(SEE PROF~E~ND SHAPED.
=,=,==,:::::%',:,':,.:.:-:....
:m::m:~
AREA TO BE
STRIPPED CLEARED AND
MATERIAL ?:F~~;F~~POSABLE
.
-.
"
~
.
,-,
STATE ST.
"{.;\\lP
SIIOKYHllLRIYER
HOllTHSTREET
COUlITllYCLUIlRD.
STUDY AREA
CU.WFORD$TREET
-}-.
VICI N ITY MAP
NOT TO SCALE
W-I. C-E
TILSON
COM PANY
ENGINEE.RS !
ARCHITECTS
~
000
SCALE IN FEET
''''00
2000
FIGURE 4.12
PLAN 4 - PLAN VIEW
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
7
- -
""C
r-
):>
z.."
.j>oc;
, c::
""
""Cm
~...
0:'"
"TIc..>
r-
m
-------
-------
- --
- .. ~ .. - - -
u; .. .. .. ..
'" 8 - .. .. Co>
0 '" '" 0 '" 0 '" 0
0
0 It 5"- RCP INLET STRUClURE
8 , ,
,
,
I ~I~
I
I <>
I "
, , ~
I
- ---"" It 8~' CMP
-- -- " S. OHIO STREET
\
\
I
I I
lit 8RIDGE UKEliOOD DR.
I '
I I
, ( I
J--H--- -~~- -~ In
! i I I
, I I I I
I : / I
I i I I ! I
-1--- '-T T~-,
I ! I,
I " . I It 96' CMP ACCESS ROAD '
i ) !/- C:":J_.-r--1 - ~ __
I I I I
u_+ u~-l;----- --l ! - 1
I , i I I
: I' I I
i i i!
It 8~' CMP
YNCA DR I VE
..
o
o
8
It PROPOSEO llCBC
THE MIDWAY
- .-
I "
~
Co>
8
+
8
A
, ~
I
)
/ -"
-- /
--
/"
(
I
I 1'-' "
I
I
I
I
I
\
\
\
I \
I '-
I I
I
I
:
I <>
I "
I ~
I "10
I
<>
"
~
'if' I
~ I
'$:>~'-~ ~
I
!
0~
;1:<
em
"~
2_
~z
m-<
.
..~
. m
<> -<
~-:-I
"~ lit WESTERN STAR!
iMILL DAM
. 4; 12)(12 ReBC i
ASH STREET ,
,
i
It 10xl0 RC8C !
ELM STREET i
i
I
I
I
I
,
I
I
I
I
I
I I
lit 12xl2 RCBC J
I M. OHIO STREETI
i ,
I ,
i '
I
..,
o
o
+
o
o
--1---'---
1----
I
, It GREELEY AVENUE
I BRIDGE
!
It OAKDALE AVa UE
I BRIOGE
It MULBERRY STREET
BRIDGE I
It WALNUT STREEr
BRIDGE I
It- IRON STREET
BRIDGE
-
I
-~---------~
-I
!
-- - ------
1
I
Plan 5. General Description. This plan is the same as Plan 4, except
the inflow would be closed and the channel allowed to drain dry. The
channel would be used only for interior drainage and a pipeline would
transport the water supply to the Water Treatment Plant.
I
I
I
Costs for Plans 5
Costs for Plan 6
Total Costs
$ 620,000
124,000
93,000
837,000
0
$ 837,000
It
The
Pipeline to Water Treatment Plant (includes pipe,
excavation, sheeting, channel crossings, pavement
removal, etc.) $
Pipeline from outlet to inlet to recirculate water
(includes pipe, excavation, pumps, intake structure, etc.)
Weir dam in Oakdale Park
Stripping and clearing 1-2' of Vegetative Cover in Upper
Reaches
Stripping and Clearing 1-2' of Vegetative cover in Lower
Reaches
I
Pipeline to Water Treatment Plant (includes pipe, excavation,
. sheeting, channel crossings, pavement removal, etc.)
Other costs
Admin., Engr., Legal
620,000
I
Total Construction Costs
Annual costs
468,900
20,000
100,000
I
170,000
I
Advantages. This plan has a low initial cost and no annual costs.
provides a reliable supply of water to the Water Treatment Plant.
siltation of the existing channel would be discontinued.
Total
Other Cost
Admin., Engr., Legal
1,378,900
275,800
206,800
I
Disadvantages. This Plan replaces an existing natural waterway with a
pipeline to supply water to the Water Treatment Plant. No provisions would
be allowed for the water aspect of beautification and recreation of the old
channel. The existing mud bars, cattails and debris in the bottom of the
old channel would remain as is. With increased sediment load and demand,
an additional sediment basin may be required at the Water Treatment Plant
as described in Plan 4.
Total Construction Cost $1,861,500
Annual costs $16,000 (assume
doubles in 10 yrs. to get
average)
Present worth factor for 20
years @ 6% = 11.47
32,000 (11.47) 367,000
I
I
I
Total $2,228,500
Plan 6. General Description. This Plan would use a pipeline to the
Water Treatment Plant as a water supply. The inlet and outlet (except
during periods of rainfall) would be closed and the water would be recircu-
lated by a pump and pipeline from the outlet to the inlet (10 million
gallons per day). Clear water would be added to the channel from the Water
Treatment Plant as needed to get required water depth. The construction of
a weir dam in Oakdale Park and the closing of the gates at the Western Star
Mill dam would increase the water depth. (see Figure 4.14).
Advantages. This plan would introduce no more silt than is already in the
channel. A reliable supply of water would be furnished the Water Treatment
Plant.
I
I
Disadvantages. The Plan would take continuous supervision to control water
depth and interior runoff. Implementation of this plan would result in
the same problem as Plan 4 with the increased sediment load on the existing
sediment basin at the Water Treatment Plant.
I
I
I
I
4.08
I
~
I .'.'..,'.'.....w...-...... INDICA TES AREAS TO BE
EXCA V A TED AND SHAPED.
(SEE PROFilE)
I AREA TO BE CLEARED AND
~~~~:::~:~: STRIPPED OF DECOMPOSABLE
MATERIAL (lFT.-2FTJ
I
I
I
I
I
I -.
,-,
I MDRTKSTREET
STATE ST. COUlfTRY CLIID RD.
~_\>lP STUDY AREA
I CRAWfORD STREET
-{
MAGMOllARO.I.D
I
VICINITY MAP
NOT TO SCALE
I
I
I 11 LS 0 N
W-L c-, COMPANY
ENGINEERS
ARCHITECTS t
I
I 0 000 '000 2000
1""1 .J
SCAL.E IN FEET
I
I FIGURE 4.14
I PLAN 6 - PLAN VIEW
I
Plan 7. General Description. This plan transports water from the
inlet to the Water Treatment Plant by pipeline. The sediment from the
water is removed by using the sedimentation basin at the Water Treatment
Plant. A weir dam would be placed below the outlet from the Water Treatment
Plant to increase water depth through the park area. The Plan requires
that 5 c.f.s ! be pumped from the outlet at the Water Treatment Plant
to the inlet of the old channel to provide minimum movement of water in
old channel. The Western Star Mill dam would be closed to provide water
depth. Clearing and stripping 1 to 2 feet of vegetated areas in old
channel bottom would be accomplished to prevent decomposition (see
Figure 4.15).
Disadvantages. The water flowing in the old channel depends on the excess
from the Water Treatment Plant. In periods of high demand (summer months)
the water flowing in the channel would be reduced making the water almost
motionless. This Plan resembles Plan 4 with the increased sediment load on
the existing sedimentation basin. The water in the old channel would have
a very slow velocity, becoming almost stagnant.
I
I
I
Other alternatives considered that proved to be unreasonable were:
I
1)
Plans have been proposed suggesting that the City use existing maximum
I
$ 620,000
flow of 100 c.f.s., open the Western Star Mill dam gates and regrade, line
and straighten the channel. This plan would be effective from the inlet to
the Western Star Mill dam, but below the dam the absence of slope would
cause the suspended silt to precipitate. This plan would serve only to
move the silting process from the upper reaches of the channel to the lower
reaches of the channel.
I
Costs
Pipeline to Water Treatment Plant (includes pipe,
excavation, sheeting, pavement removal, etc.)
Pipeline from outlet to inlet to recirculate water
Weir dam below Water Treatment Plant
Clearing and Stripping channel in Upper Reaches
Pipeline from W.T.P. to inlet (includes pump,
pipe, excavation, intake structure, etc.)
Clearing and Stripping Channel in Lower Reaches
I
20,000
100,000
I
304,000
170,000
2) Plans have been proposed suggesting that the City construct a skimming
weir riverward of the levee, in the vicinity of the diversion ditch to the
old channel. In addition, a dike riverward of the levee would be constructed
to prevent water from entering the diversion ditch in periods of high flow.
A sedimentation basin would be constructed inside the levee to remove the
remaining silt. This plan would allow the clearer water in the cutoff
channel into the diversion ditch to the old channel if the flow is tranquil.
However, if the water were turbulent, as generally occurs during periods of
high flow, the top portion of the cutoff channel would carry the same
sediment load as 'the bottom portion. Therefore, the sediment basin would
have to be designed for the same sediment load as the basin in Plans 2 and
3, resulting in no savings. The skimming weir would be extra cost with
little effective result in sediment removal.
I
Total
Other cost
. Admin., Engr., Legal
$1,214,000
242,800
$ 182,100
I
Total Construction Costs $1,638,900
Annual Cost $6,000fyr.
(assume it doubles in 10
years to get average)
Present worth factor 20 yrs. @
6% = 11.47
12,000 x 11.47 138,000
Total $1,776,900
I
I
I
I
Advantages. This plan would provide a reliable source of water for the
Water Treatment Plant. The old channel would have a water depth of 3 to 4
feet above the Western Star Mill dam.
E.
Financing.
I
It is anticipated that the necessary funds for water supply and water
treatment will be provided by issuance of general obligation bonds which
will then be retired by general tax revenue. This would include the sedi-
mentation basin and its appurtenances. The dredging, bank stabilization
I
I
4.69
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,I
.............:,.:.
~::~::::::::.:.:.:...... ..
~~~~~:~~DA~~~S STH~:~D.
(SEE PROFILE)
CLEARED AND
AREA TO BEF DECOMPOSABLE
STRIPPED 0
MATERIAL (1FT.-2FT.l
~
~
~
I " .
.
'.1
5Nl1KYKILLRIYER
KllRTHSTREET
COUMUVCLUDRO.
STUOYARfA
CRAWFORD STREET
STAlEST.
,oJ>
,.
-j..
IlAGMDlIAROAO
VICINITY MAP
NOT TO SCALE
w-.. C-E
tl LS 0 N
COMPANY
ENGINEERS
ARCHITECTS t
~
""30
""00
SCALE IN FEET
FIGURE 4.15
PLAN 7 - PLAN VIEW
($1,000)
I
I
I
ANNUA L PRESENT WORTH
CONSTRUCTI ON COSTS ANNUAL COST 20 YR. TOTA L COST
PLAN OESCR I PTI ON AOVANTAGES 01 SADVANTAGES COST (1978) 6% INTEREST (20 YRS., 6%)
I REMOVE ALL CONSTRICTIONS IN CHANNEL: RESTORES CHANNEL TO PAST BEAUTY; HIGH COST: REDUCES FLOOD PROTECTION:
INCREASE INFLOW: INCREASE SLOPE. NO ANNUAL COSTS. EXCAVATION AND DISPOSAL PROBLEMS 3,150 - - 3,150
WITH SILT
.
2 PUMP 50 CFS INTO SEDIMENTATION BASIN AT REDUCES THE SEDIMENT LOAD AT THE W.T.P. INCREASES ANNUAL PUMPING COST FOR W.T.P.
INLET: PLACE WEIR DAM IN OAKDALE PARK ALLOWING POSSIBLE EXPANSION OF RIVER " BY 27% I ,~52.8 38 871.6 , 2.32~.~
TO INCREASE WATER DEPTH. PARTIALLY CLOSE INTAKE: NO EXCAVATION OF SILT IS REOUIRED
OUTLET STRUCTURE TO INCREASE WATER DEPTH. PROVIDES 3-~' WATER DEPTH IN CHANNEL
.
/'
3 GRAVITY FLOW 50 CFS INTO SEDIMENTATION BASIN REDUCES THE SEDIMENT LOAD AT THE W.T.P. PROBLEMS IN EXCAVATING LAND ACQUISITION
AT INLET: EXCAVATE CHANNEL TO LOWER WATER ALLOWING. POSSIBLE EXPANSION OF RIVER AND DISPOSAL OF SILT FROM OLD CHANNEL I,H5.9 21 .3 ~88.6 2.23~.5
SURFACE ELEVATION AT THE OUTLET OF INTAKE; REDUCES ANNUAL COSTS TO A MINIMUM
SEDIMENTATION BASIN AND TO GET 3-~' WATER (10% INCREASE IN W.T.P. PUMPING COST):
DEPTH. PARTIALLY CLOSE OUTLET STRUCTURE PROVIDES 3-~' WATER OEPTH IN CHANNEL:
TO INCREASE WATER DEPTH. INCREASES STORM WATER STORAGE
~ PIPE WATER FROM CUTOFF CHANNEL TO W.T.P.; PROVIDES A MANAGEABLE PROGRAM FOR WATER PROVIDES A VERY SLOW MOVING (ALMOST
GRAVITY FLOW 5 CFS INTO SEDIMENTATION BASIN SUPPLY AND RECREATIONAL USE OF THE OLD STAGNANTi FLOW IN THE CHANNEL; ONLY
AT INLET; PLACE WEIR DAMS AND EXCAVATE TO CHANNEL: THE ANNUAL COST WOULD BE MINIMUM; GIVES WA ER DEPTH IN OAKDALE-KENWOOD
GET WATER DEPTH. PARTIALLY CLOSE OUTLET PROVIDES 3-~' WATER DEPTH IN CHANNEL. PARK AND FOUNDERS PARK AREAS, THE OTHER 2,025. 2.~ 55 2,080.
STRUCTURE TO INCREASE WATER DEPTH. AREAS WILL BE AS THEY ARE NOW; INCREASED
SILT LOAD TO THE W.T.P.
/
5 PIPE WATER FROM CUTOFF CHANNEL TO W.T.P.; LOWEST COSTS; PROVIDES A RELIABLE SUPPLY NO WATER FEATURE TO THE BEAUTIFICATION
CLOSE I NLET AND LET CHANNEL GO DRY. OF WATER TO THE W.T.P. ANO RECREATIONAL ENHANCEMENT OF THE OLD 837 - - 837
CHANNEL, INCREASED SILT LOAD TO THE
W.T.P.
-"
6 PIPE WATER FROM CUTOFF CHANNEL TO W.T.P. PROVIOES RELIABLE SOURCES OF WATFR FOR REDUCED FLOOD STORAGE; INCREASED SILT
CLOSE INLET AND OUTLET; PIPE WATER FROM THE W.T.P.; 3 - ~, WATER DEPTH I N CHANNEL. LOAD TO THE W.T.P. 1,861.5 16 367 2,228.5
OUTLET TO RECIRCULATE WATER; PLACE WEIR
DAMS TO GET WATER DEPTH. PARTI ALLY CLOSE
OUTLET STRUCTURE TO INCREASE WATER DEpTH. .
\
7. PIPE WATER FROM CUTOFF CHANNEL TO W.T.P. PROVIDES RELIABLE SOURCE OF WATER FOR INCREASED SILT LOAD TO W.T.P.; DEPENDS
DUMP EXCESS WATER INTO CHANNEL; PIPE WATER THE W.T.P.; 3 - ~, WATER DEPTH IN CHANNEL. ON EXCESS FROM W.T.P. AS SOURCE OF WATER 1,638.9 6 138 1,776.9
FROM W.T.P. TO INLET TO RECIRCULATE; PLACE
WEIR DAM BELOW W.T.P. TO INCREASE WATER
DEPTH IN LOWER SECTION. PARTI ALLY CLOSE
OUTLET STRUCTURE TO INCREASE WATER DEPTH.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE 4.03
SUMMARY OF ALTERNATIVE PLANS
I
I~
I
I
I
and shaping of the channel would be phased with the Beautification and
Recreation Enhancement Section of this Report, Section 5, and would be
accomplished as the funds became available through General Revenue,
Community Development Funds, Revenue Sharing Funds or funds from contribu-
tions from interested groups and individuals.
The study investigated two means of transporting water to the Water Treat-
ment Plant: 1) by pipeline from the inlet, and, 2) by the old channel with
a sedimentation basin at the inlet. The pipeline from the inlet was the
most economical but it had the following disadvantages:
I
I
F. Summary and Conclusion.
1) The silt that usually settles in the upper reaches of the old channel
would have to be removed by the sedimentation basin at the Water Treatment
Plant. This extra load on the existing sedimentation basin could cause
overloading as the demand for water increases.
I
The purpose of this section of the study was to examine the problems of
progressive siltation and aggradation of the old channel and their effect
__on the water supply to the Water Treatment Plant. Without alterations to
the existing system, the old channel will become completely clogged in the
near future. Therefore, the alternative concepts consider a method for
conveying water to the Water Treatment Plant, taking into account beautifica-
tion, recreation enhancement, interior storm water flood protection and
technical feasibility. The cost of each alternative concept has been
developed into costs for water supply and costs for beautification and
recreation enhancement. The costs for water supply must be financed locally,
but the costs for beautification and recreation enhancement would be eligiable
for federal funding in part. Several alternative concepts have been evaluated
in subsection 4E and a plan was recommended in Section 3.
2) The increased sediment load would increase water softening chemical
costs and would increase the amount of sludge to be piped to the Sewage
Treatment Plant. The Pipeline solution tends to be unpredictable and
limiting to future expansion, while construction of the sedimentation basin
and the use of the old channel would be predictable and would allow other
possibilities for use of the upper reaches of the channel up to the raw
water intake. The sedimentation basin and use of the old channel appear to
be the best means of transporting water to the Water Treatment Plant.
I
I
I
I
I
The old channel drains 3,000 acres of residential land, commercial land,
agricultural land and recreation areas inside the dike system. It is an
integral part of the City's drainage system. The predominate hydraulic
feature of the channel is its flood storage. However, the constrictions
placed in the upper reaches of the channel may become potential problems as
the systems and areas draining into the channel are upgraded.
The sedimentation basin can be sited in two ways" 1) at a higher elevation
so the inflow would be pumped in and the silt would flow by gravity to the
cutoff channel, or, 2) at a lower elevation so the water would flow by
gravity into the basin and the silt would be pumped out. The pumped inflow
basin would require no dredging of silt in the old channel, however, it
would have a higher annual pumping cost. The gravity inflow basin would
have a lower annual pumping cost but would require the dredging of the old
channel to lower the water elevation at the outlet for the basin to operate
at maximum efficiency.
I
I
I
I
The minimal slope (.0003 ft/ft.) of the channel and the high sediment load
of the Smoky Hill River water cause the problem of siltation and aggrada-
tion of the old channel. In order to get the velocity required to cause
the scouring necessary to move the silt on through the old channel, a flood
flow is needed. Therefore, methods of removing the silt from the intake
and increasing the slope were investigated.
Problems with dredging the old channel would be: 1) the clearing of trees
and the altering of the banks to provide access for machinery; 2) construc-
tion easements on or acquisition of private land for haul roads, stockpiling
and equipment storage; 3) the disposal of the silt after removal.
I
I
I
I
4.10
I
With the use of the trailways for the parkway system described in the
Beautification and Recreation Enhancement section of this study as haul
roads and using proper planning in construction, the problems in removing
the silt can be minimized.
I
I
I
In both the basin configurations, the silt would be disposed into the
cutoff channel below the scour key dam. This method of disposal would
require the necessary regulatory permits, described in subsection 4B1,
paragraph 2.
......~-----
~
I
I
I
I
.-_~'n__
I
I
REFERENCES
1
"Urban Hydrology for Small Watersheds."
2"Peak Rates of Runoff from Small Watersheds."
9"Principles of Hydrology" Water Information Center, Port Washington, N.Y., 1970.
I
3
"Study of Runoff from Bottom Land and Hillside Terrain."
4"Rainfall Frequency Atlas of the United States."
S"Water Surface Profile "WSPIN", SCS."
6
"Elements of Drainage and Culvert Design" Kansas Dept of Transportation, 1976.
7"Handbook of Concrete Culvert Pipe Hydraulics" Portland Cement Association, 1964.
8"Water Resources Engineering" Linsley and Franyini, McGraw-Hill, Inc., 1964.
10
"Water Resources Data for Kansas, Part 1, Surface Water Records" U.S. Dept.
of the Interior Geological Survey, 1973.
11"1977 Heavy Construction Cast Tile" Van Nostrand Reinhold Company, 1977.
12
"Salina Water Study" Wilson & Company Engineers & Architects, 1968.
13"Flood Protection Project - Smoky Hill River Basin - Salina, Kansas"
Department of the Army, K.C. District, Corps of Engineers; May, 1977.
14
"Water Treatment Plant Improvements for Salina, Kansas" Wilson & Company,
Engineers & Architects, 1970.
lS"Design of Small Dams" U.S. Dept. of Interior, Bureau of Reclamation, 1973.
I
I
I
I
I
I
I
4.11
I
I
I
SECTION 5 - BEAUTIFICATION AND RECREATION ENHANCEMENT
a. Recreational Stand Improvement. The term, recreational
stand improvement, refers to those practices in developing woodlands for
recreational use. The objectives of recreational stand improvement are as
follows:
I
A. Design Concept.
I
The basic design concept for the beautification and recreation enhancement
of the old Smoky Hill River channel is to establish a recreation corridor
linking Indian Rock, Kenwood, Oakdale, Founder's, Riverside and Lakewood
Parks into one continuous parkway system. This concept is shown on Figure
3.17. The design concept for the improvement of parkway system is divided
into t~vJ principal elements: beautification and recreation enhancement.
(1) Open the stand sufficiently to provide the optimum
recreational benefit.
I
I
(2) Maintain the density of the stand for optimum growth
and vigor.
I
1. Beautification. Principal items in the beautification include
the articulation of space to provide an interesting, flowing pattern,
screening of private property and objectionable views, a gradual unfolding
and enframement of desirable views, control of light intrusion and erosion
through the use of sculptured land forms and plant material. It is also
proposed that more detailed landscape plantings be accomplished in areas
adjacent to the pedestrian and bicycle paths, creating a linear arboretum
which would add interest to the user.
(3) Maintain a natural appearance.
I
(4) Leave cover and a source of food for small game and
songbirds.
I
(5) Prevent exposing the stand to wind damage and sunscald.
This may require the stand to be opened in stages over a period of years.
I
I
Further beautification can be achieved by maintenance and renovation of the
existing woodlands and individual trees and shrubs associated with the old
river channel.
In some cases within the proposed parkway system, these objectives may
conflict with one another, depending on the composition and density of the
stand. The health of the stand should take priority over other objectives,
because without a healthy stand, the other benefits will be short-lived.
I
I
The woodlands and individual trees and shrubs associated with the old river
channel have the potential of providing greater satisfaction to the user of
the existing parks and proposed parkway system than the best man-made
planting. They have the additional advantage of being avail~ble for use at
a relatively small cost for development. The recreation value of these
woodlands and individual trees and shrubs is incalculable when one considers
I
I
the replacement cost and the number of years required for introduced plants
to reach maturity. With proper cultural practices, these can be maintained
in a near natural condition and still provide a highly desirable environment
for recreational purposes.
b. Selection of Trees to be Retained. Selection of trees to be
retained should be on the basis of site adaptability, vigor, form, foliage,
longevity, susceptibility to adverse conditions and recreational purpose.
Dead trees or trees that have been severely injured by storms, drought,
insects, diseases or others that represent a hazard to life and property
should be removed regardless of recreational requirements. American or
English Elms infected with Dutch Elm Disease should be removed as soon as
the disease,is detected in order to reduce the rate of spread of the fatal
disease to healthy trees.
I
I
I
c. Removing Cull Trees and Shrubs. The cull trees and shrubs
should be removed with hand tools. Experience shows that in performing
recreational stand improvement with a bulldozer, even the most conscientious
~I
5.01
I
The cull trees and shrubs should be severed no higher than two inches above
ground level. Live stumps should be painted with an appropriate herbicide
to prevent sprouting. Where access is available, a stump chipper should be
used to remove the stump to below ground level. Branches, trunks and other
debris can be disposed of with the use of a portable chipper. The chips
resulting from either operation make excellent mulching material for newly
planted trees and shrubs.
Wherever possible, the banks sloping to the newly established water level
should be shaped to a 3:1 or less steep slope. It will not be possible to
achieve this criterion in all areas throughout the parkway system, however,
it should be accomplished in all possible cases. In addition it should be
accomplished with minimal removal of desirable species of trees and shrubs.
I
operator will seriously injure many of the trees and shrubs designated to
remain. Injuries, such as debarked trees, exposed roots and broken limbs
are always present in bulldozer operations.
I
I
As soon as possible following the shaping of the river banks a perennial
groundcover, such as crownvetch or honeysuckle should be installed to
provide bank stabilization on slopes of 3:1 or steeper. On slopes less
steep than 3:1, a perennial grass species or grass mixture, capable of
being maintained by mowing, should be installed as soon as possible follow-
ing bank shaping.
I
I
I
d. Pruning. Pruning is usually required to remove dead, diseased,
broken, interfering and weak branches that are subject to wind breakage and
are a hazard to life and property; and to achieve the recreational function
of the tree. Pruning should be conducted in accordance with guidelines set
forth in the Kansas State University Cooperative Extension Service Bulletin
No. C-550, All About Pruning Deciduous and Evergreen Trees, Shrubs, Vines
and Groundcovers, January 1977.
2. Recreation Enhancement. Pedestrian and bicycle paths are to be
the primary recreational improvement to be included in the proposed parkway
system. These will run the entire length of the project.
I
I
e. Repairing Wounds. All pruning and mechanical wounds over
one inch in diameter should be treated with a tree dressing to hasten the
healing process and to prevent wood destroying fungi from entering the
exposed wood. Old wounds require special attention since fungus may have
already become established. After shaping the old wounds, as much of the
discolored tissue should be removed as is practical. A tree wound dressing
should be placed on the wounds to provide protection against insects and
diseases. Wounds should be inspected annually and the dressing replaced
when necessary.
Five rest areas will be provided as shown on Figure 3.17. Facilities
provided in each rest area include permanent benches, a drinking fountain
and facilities for parking and locking bicycles. With one exception, i.e.,
the rest area located near station 140+00 in the Westbend Addition, all
rest areas are located in close proximity to public restroom facilities. A
restroom is proposed to be constructed near the rest area located near
station 140+00.
I
I
I
f. Replacing Critical Plants. In woodland recreational areas,
a few trees and shrubs die periodically due to natural or man-made causes.
In order to perpetuate the woodland, it may become necessary to interplant
with young trees and shrubs as soon as the native plant materials show
signs of rapid deterioration.
Where possible, two separate paths will be constructed: a nine foot wide
bituminous surfaced bicycle path and a five foot wide concrete pedestrian
walkway. The two paths will be combined only where right-of-way is limited
or where they would come together to cross under a structure or cross ,a
street. Even at these locations, some physical separation will be provided
in the form of a curb, a variation of surface texture or other effective
methods. A concerted effort will be made to take advantages of all avail-
able public right-of-way, existing physical features and views to make the
use of the paths as eventful as possible.
I
I
I
I
I
I
5m
.'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Other active recreational development within the parkway system will include
three neighborhood playground and picnic areas located as shown on Figure
3.17 .
2. Policy on Environmental Quality.
A lighting system will be included in the design concept. Benefits of
lighting include longer daily trail use, improved security and path
delineation.
a. Desirable trees, shrubs and green areas presently within the
parkway system should be preserved, renovated and enhanced to the greatest
extent practicable.
b. The adverse visual effect of overhead utility lines and
substations that cross or parallel the parkway system should be minimized.
B. Planning and Development Policies.
Recognizing the potential social, economic and environmental impacts the
proposed channel improvements and parkway system can have on the City of
Salina, the following policy statements, if followed, will give assurance
that the impacts will be positive in nature. The following policy state-
ments have been formulated recognizing the following objectives:
c. Landscape plantings, earth sculpture and landforms should be
introduced into the parkway system so that:
(1) The parkway system takes on the character of a greenway
and open space link between Indian Rock, Kenwood, Oakdale, Founder's,
Riverside and Lakewood Parks.
1. Statement of Objectives.
(2) The seasonal changes which occur locally are fully
reflected in a variety of plant materials.
a. The proposed parkway system is to be part of the overall
City open space system and hiking and picycle trail system.
(3) Recreational facilities, such as trails, rest areas,
playground and picnic areas, incorporated into the parkway system will have
a park-like setting.
b. Development and aesthetic treatment of the old Smoky Hill
River channel and the proposed parkway system will be important to Salina's
image for residents and visitors alike.
(4) Adjacent eyesores are screened from view.
c. Policies which guide the changes in the proposed parkway
system will affect the manner in which people will continue to live,
especially in the areas of pedestrian and bicycle circulation and recrea-
tion patterns.
(5) Privacy can be given to residential property through
fencing and landscape screening.
(6) Pedestrian and bicycle movement is guided and informed
by significant placement of plant masses.
d. Extensive coordination between the local, state and federal
agencies with aid from private citizens will be required if the parkway
system is to be appropriately developed and maintained.
e. Pictorial signs or symbols should be used along the hiking
and bicycle trails to relay information to the pedestrians and cyclists.
f. The park furniture to be incorporated into the rest areas,
playground, picnic areas and trail system should be durable and of a coordin-
ated design.
5.03
I
g. Paved surfaces should give scale and interest appropriate to
their function. For example" the surfaces of paths, rest areas and parking
areas should be differentiated and should not appear as a continuation of
one another.
C. Construction Sequence.
I
I
The parkway system construction can be divided into five construction
phases as shown on Figure 5.01. These phases, listed in the order of their
construction priority are:
I
h. All lighting fixtures should be selected on both functional
and aesthetic qualities.
i. The direction and intensity of lighting should be controlled,
so as not to adversely affect adjacent land uses.
Phase 1. Beginning at the YMCA Drive and Kenwood Park Drive intersec-
tion, through Kenwood and Oakdale Park and terminating at trail access
point in Founder's Park.
I
I
3. Policy on Recreational Use.
Phase 2. Beginning at the trail access point in Founder's Park,
through'the City Maintenance yards on Ash Street, through Riverside Park,
along the Riverside Drive right-of-way and terminating at the intersection
of Riverside Drive and North Ohio Street.
I
I
I
a. The three neighborhood playgrounds and picnic areas should
be designed to meet the recreational needs of nearby residents.
b. Passive as well as active recreation facilities should be
provided in these areas.
Phase 3. Beginning at trail access point in Indian Rock Park near the
inlet structure, south along the cutoff channel right-of-way to a signalized
crossing on South Ohio Street, around the bend behind the YMCA building and
terminating at the intersection of Kenwood Park Drive and YMCA Drive.
I
c. Following the improvement of the old channel and the desilta-
tion of the water in it, an adequate stocking and management plan should be
implemented to re-establish the fisheries resource in the old channel.
d. All facilities provided as part of the parkway system should
complement the existing public and private recreational facilities.
Phase 4. Beginning at a signalized trail crossing at the intersection
of North Ohio Street and Riverside Drive, southeast to Lakewood Park,
through Lakewood Park and terminating at the outlet structure east of
Lakewood Park.
I
I
e. The Salina Park and Police Departments should maintain and
police the various facilities to be included in the parkway system.
Phase 5. Beginning at the outlet structure east of Lakewood Park,
south behind the Board of Trade Building, through Indian Rock Park and
terminating near the inlet structure in Indian Rock Park.
I
f. Where appropriate, under-bridge crossings, plantings,
architectural barriers, fencing and other devices should be used to separate
vehicular circulation and private property from the parkway system.
D. Preliminary Development Plans.
I
I
g. Connecting or branch hiking and bicycle trails should be
planned to connect other areas of the City to the parkway system.
In order to facilitate the review of the preliminary plans, they are presented
in a consecutive order, beginning at the public access point station 102+00
near the inlet structure in Indian Rock Park, following the old river
downstream through Kenwood, Oakdale, Founder's, Riverside and Lakewood
Parks and returning along the Iron Avenue cutoff channel, through Indian
Rock Park to the point of beginning.
I
I
~~
I
I
0
0
0
, w
u
Z >-- Z
z VI::.' 0 w
'" '" " "' 0 0 :l
4 . u !
w w w w w
W W ~ w" 0
(f) (f) (f) (f) (f) "- Ul ~ ~ 1: , W
<( <( <( <( <( <(w -'0 o u , ~ CI)
:I: :I: :I: :I: :I: ::;;~ , <=>
"- "- "- "- "- _ z. ,
U ~:: uJ< ""
>-'" 1 Z
1-0 , W 0
-~ a::
z~ ,
r'l n r' I.'j I . ::> ~
""'" (30 0
,", _Z c:l U
. ~. "" > , u:
'.. ",' :l
,'. '''' - 0
, ' "', Stl"1 0 a::
, ~
~ CI)
" :. Z
" 0
;: u
,
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
I
.As indicated on Figure 5.02, Stations 100+00 to 130+00, the separated hiking
and bicycle trails continue from Phase 5 into Phase 3 on the left bank of
the river channel. A public access point is located where Indiana Avenue
turns into Arlington Drive. The trails continue to be separated until they
nearly reach Ohio Street where they merge into a contiguous path in order
to effect the South Ohio Street crossing where a pedestrian accuated signal
will be used. A neighborhood picnic and playground area will be provided
in the open space adjacent to where Elmhurst Boulevard turns into Delaware
Drive. Fencing will be provided behind the dwellings located along Delaware
Drive and behind the dwellings, retail and service business located in the
Wilbre Addition. The area behind the dwellings located along Delaware
Drive and across Elmhurst Boulevard will be extensively landscaped. The
timber behind the Wilbre Addition and in the vicinity of the Four Square
Church will be selectively thinned and renovated.
be installed in order to provide the necessary space for the trails. No
landscape planting is anticipated for this reach of the parkway system,
however, an extensive amount of native timber selective thinning and renova-
tion and bank sloping and stabilization will be required.
I
I
I
Figure 5.03 shows the parkway system from stations 130+00 to 130+00. The
City has acquired recreation easements behind the Dental Clinic, Kenwood
View Nursing Home, a vacant tract of land in Westbend Addition and the
YMCA. The private property on the left bank from South Ohio Street to
Prescott Avenue, and on the right bank from YMCA Drive to Greeley Avenue,
should be acquired. The hiking and bicycle trails remain contiguous for a
short distance beyond the South Ohio Street crossing. They remain separated
until they merge into a contiguous trail in order to cross YMCA Drive,
where the trail is raised to provide a speed bump. The trails ~eparate
again a short distance past the crossing. No crossing signal will be
provided at this point. Public access will be provided at the South Ohio
Street crossing, the YMCA Drive crossing and at the rest area near the
point where YMCA Drive turns into Westbend Avenue. Schematic drawings of
this rest area are shown by Figures 5.11 and 5.13. A neighborhood picnic
and playground area will also be provided near this rest area. Fencing
will be installed behind the retail and service businesses and residentail
uses on the left bank from South Ohio Street to Prescott Avenue and between
the timber and vacant land on the right bank from YMCA Drive to Greeley Avenue.
Because of right-of-way constrictions in the vicinity of the South Ohio Street
crossing and the YMCA Drive crossi~g, wood retaining walls or cribbing must
Preliminary development plans for the parkway system from stations 180+00
to 235+00 are shown by Figure 5.04. Land to be acquired includes the
private residential property on the right bank between Greeley Avenue and
The Midway, between the Midway and Kansas Avenue and between Penn Avenue
extended and Oakdale Drive extended. The hiking and bicycle trails remain
on the left bank in Kenwood Park until they cross the old river channel
between stations 229+00 and 230+00 on a wood bridge crossing into Oakdale
Park. The trails merge near the at-grade street crossings of Greeley
Avenue and The Midway, wUere speed bump crossings will be provided. The
trails merge again where they cross Oakdale Avenue under the bridge and
again at the bridge crossing into Oakdale Park. Fencing between private
property, as described earlier, and parkway land will be provided. Since
the trails remain in Kenwood and Oakdale Parks throughout this segment,
public access is continuous. Wood retaining walls or cribbing must be
provided in certain areas in Kenwood Park where available usable space for
the installation of trails is constructed. Landscape planting will be
provided throughout most of the parkway reach through both Kenwood and
Oakdale Park. Timber, mostly on the right bank, will be selectively thinned
and renovated. River banks will be sloped and seeded to appropriate grasses
or groundcover materials.
I
I
I
I
I
I
I
I
I
Preliminary plans for parkway development between stations 235+00 and
280+00 are shown on Figure 5.05. Private property must be acquired on the
left bank between Kenwood Park and the City Water Treatment Plant property,
between South Street extended and Third Street, between Third Street and
Second Street and between Second Street and Front Street. Private property
must be acquired on both banks between Front Street and Second Street and
Second Street and Third Street. The trails continue on the right bank
through Oakdale Park, on public right-of-way from Oakdale Park to Walnut
Street and on acquired land from Walnut Street to Third Street. The trails
merge and make at-grade street crossings ~ear the footbridge between Kenwood
I
I
I
I
I
~~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
r
~
i1
I
JIll
It f'
,
v
,v
.I
;.'
11 LS 0 N
COMPANY
ENGINEERS 1
ARCHITECTS
, 0" WIDE)
BICYCLE TRAIL (9 -
B - '-0" WIDE) , .. WIDE)
H - HIKING TRAIL (5 HIKING TRAIL (14-0
CLE AND
- COMBINED BICY
B&H SED FENCING
- PROPO
FIGURE 5'~~MENT PLANS
PRELIMINARY DEVEio TO 130+00
STATIONS 100+
.00
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.~,~
,~D:'{,t": ,~,-,r
r\' w~ '
NO. 52
EyOR'S pLAT
SURV
't':"" "~ t.t
" ~ '.
_ >, \ ',' :,,, _t::
,
11 LS 0 N
COMPANY
ENGII'lEERS
ARCHITECTS t
B - BICYCLE TRAIL (9'-0" WIDE)
H - HIKING TRAIL (5'-0" WIDE)
B&H - COMBINED BICYCLE AND HIKING TRAIL (14'-0" WIDE)
- PROPOSED FENCING
ISW,'i;::i REQUIRED LAND AQUISTION
'h~.~
~'J~1~,' 'i"
,\'1~;t\1 " Jl;!~
\\l\ "~:B+ m %'4
'~,'&'~~'\
~ lld" I
, . -.' ,~. "', ..'~' ",','
r" ,
._ . ~r:
, ,
'll
, a::.
"
"
1-,'
---'-
VICINITY MAP
FIGURE 5.03
PRELIMINARY DEVELOPMENT PLANS
STATIONS 130+00 TO 180+00
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~. ',i:-?~
~~
, B
""':'~~, ~ lJ!..
,"I"" H
=
I
I
11LSON
COMPANY
ENGINE.ERS
ARCHITECTS t
B - BICYCLE TRAIL (g'-O" WIDE)
H - HIKING TRAIL (5'-0" WIDE)
B&H - COMBINED BICYCLE AND HIKING TRAIL (14'-0" WIDE)
- PROPOSED FENCING
1'2!i';;>1 REQUIRED LAND AQUISTION
FIGURE 5.04
PRELIMINARY DEVELOPMENT PLANS
STATIONS 180+00 TO 235+00
-
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I,
i:
II
I'
I
I
I
I
I
11LSON
COMPANY
ENGINEERS
ARC H1TECTS t
B - BICYCLE TRAIL (9'-0" WIDE)
H - HIKING TRAIL (5'-0" WIDE)
B&H - COMBINED BICYCLE AND HIKING TRAIL (14'-0" WIDE)
- PROPOSED FENCING
I,'.::,!;}" I REQUIRED LAND AQUISTION
FIGURE 5.05
PRELIMINARY DEVELOPMENT PLANS
STATIONS 235+00 TO 280+00
~
I
and Oakdale Parks. Speed bumps will be provided at these crossings. The
trails merge again to pass under the footbridge between South Street and
Oakdale Park and to make street crossings under the bridges at Mulberry and
Walnut Streets. They remain merged after crossing under the Walnut Street
Bridge. Public access is continuous throughout Oakdale Park and public
right-of-way to Walnut Street. Past that point public access is limited to
Second and Third Streets rights-of-way. A rest area with a drinking fountain,
benches and wood bollard bicycle racks will be provided near the restrooms
in Oakdale Park located at the north end of the footbridge between Oakdale
and Kenwood Parks. Schematic drawings of this rest area are shown by
Figures 5.11 and 5.14. Fencing will be installed between the parkway
system and all private property described earlier in this reach of the
parkway. Wood retaining walls or cribbing will be necessary where the
trails change grades in order to pass under the Mulberry and Walnut Street
bridges and between Front and Third Streets where available space becomes
constricted. Landscape plantings will be utilized along the trails through-
out Oakdale Park and the public right-of-way extending to the Walnut Street
Bridge. Selective thinning and renovation of existing timber, along with
bank sloping and stabilization, will occur behind the private property and
the left bank from Kenwood Park downstream to Front Street and on both
banks from Walnut to Third Streets.
parkway system the trail system remains merged except for a small segment
in the City maintenance yard and the segment between Ash and Elm Streets.
Public access is available at South Third Street, in Founder's Park and the
municipal park lot east of the Park and at Ash and Elm Streets. Fencing
will be installed between all acquired lands and the adjacent private
property. Fencing would also be installed between the parkway system and
the City Maintenance yards. Wood retaining walls or cribbing will be
utilized from Third Street to Iron Avenue and for a small segment immedi-
ately north of Ash Street where the right-of-way available for trail
installation is constricted. Very little landscaping will be required for,
this reach of the parkway system, however, considerable selective thinning
and renovation of the existing timber will be required. Banks on either
side of the old channel will be sloped, shaped and stabilized with either
grass or groundcover.
I
I
I
I
I
I
I
Figure 5.06 shows the preliminary development plans for the parkway system
from stations 280+00 to 305+00. Privately owned land on the right bank of
the old channel would have to be acquired between Third Street and the
public alley immediately west of Third Street, between the public alley
immediately west of Second Street and Second Street and between Second and
Front Street. Privately owned land on the left bank would have to be
acquired between Third and Fourth Streets. Privately owned land on'both
sides of the old channel would have to be acquired between Ash and Elm
Streets. The trail system would cross Iron Street under the Iron Street
Bridge and proceed into Founder's Park. From there, it would proceed
through the municipal parking lot east of Founder's Park, cross the old
channel below the Western Star Mill dam on a wood bridge, through the City
Maintenance Yards, cross Ash Street at a pedestrian actuated signal and on
the acquired land on the left bank to Elm Street. During this reach of the
Preliminary development plans for the parkway system from stations 305+00
to 355+00 are shown by Figure 5.07. Privately owned land on both sides of
the old river channel from Ash to Elm Streets must be acquired for parkway
right-of-way. On the left bank of the old channel private land to be
acquired for parkway right-of-way consists of industrial tracts extending
from station 332+75 to 336+70, from station 338+80 to 346+50 and station
349+10 to 355+00. The trail system crosses Elm Street from the left bank
of the old channel by way of a pedestrian actuated signal into Riverside
Park on the right bank and follows the public right-of-way of Riverside
Boulevard to North Ohio Street. Here the trail system crosses North Ohio
Street by way of a pedestrian actuated signal to the left bank. The trails
are merged only at the Elm and Ohio Street crossings. Public access is
available to the area south of Elm Street at Elm Street. Public access is
available from Elm to Ohio Streets on public park and right-of-way lands.
Access to the area east of Ohio Street is available at Ohio Street. A rest
area, with a drinking fountain, benches and bollard bicycle racks, is
located near a severely vandalized restroom building. Schematic drawings
of this rest area are shown by Figures 5.11 and 5.15. A playground and
picnic area are located on the Riverside Boulevard right-of-way between
Kansas and Des Moines Avenues extended. Fencing will be installed between
acquired and land the City presently owns and privately owned and Urban
I
I
I
I
I
I
I
5,06
/
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
#:
"
i1lfl
,~
~
~
;jl~
11LSON
COMPANY
ENGINEERS
ARCHITECTS t
B - BICYCLE TRAIL (9'-0" WIDE)
H - HIKING TRAIL (5'-0" WIDE)
B&H - COMBINED BICYCLE AND HIKING TRAIL (14'-0" WIDE)
- PROPOSED FENCING
kiXii REQUIRED LAND AQUISTlON
FIGURE 5.06
PRELIMINARY DEVELOPMENT PLANS
STATIONS 280+00 TO 305+00
-------------------
I
I
I
I
I
I
I
I
II
I
I
I
I
I
I
I
I
I
I
IP
"
(l
iii
III
If!
W~& C-E
TILSON
COMPANY
ENGINE.ERS
ARCHITECTS t
B - BICYCLE TRAIL (9'-0" WIDE)
H - HIKING TRAIL (5'-0" WIDE)
B&H - COMBINED BICYCLE AND HIKING TRAIL (14'-0" WIDE)
- PROPOSED FENCING
i"/?X::>I REQUIRED LAND AQUISTION
FIGURE 5.07
PRELIMINARY DEVELOPMENT PLANS
STATIONS 305 + 00 TO 355 + 00
~
Renewal land. Some wood retaining wall or cribbing, will be required
immediately west of the North Ohio Street crossing where right-of-way
available for trail installation becomes constricted. Landscape plantings
will be fairly extensive in Riverside Park and along the Riverside Boule-
vard right-of-way. The existing timber on both sides of the old channel
will be selectively thinned and renovated. The banks will be sloped,
shaped and stabilized with grass or groundcover.
remain separated until they are merged to cross the narrow strip of land at
the east end of the lake. They remain merged to cross the old channel to
the right bank On a culvert crossing. They proceed merged, except for two
small segments, to the top of the flood control levee. Public access is
continuous throughout Lakewood Park. Access is again available at the
access road from East North Street and on the flood control levee. Fencing
will be installed between the acquired land and remaining private property.
Some landscape plantings will be required in the reach of the parkway
system immediately west of the flood control levee. The existing native
timber on both sides of the old channel will be selectively thinned and
renovated. Banks will be sloped and shaped and stabilized with groundcover
or grass.
Figure 5.08 shows the preliminary development plans for the parkway system
from stations 355+00 to 395+00. Private land on the left bank of the old
river channel must be acquired from station 355+00 to Lakewood Drive.
Private land on the right bank of the old channel must be acquired from
station 366+30 to Lakewood Drive and from Lakewood Drive to station 395+00.
The hiking and bicycle trails remain separated except where they merge to
cross Lakewood Drive on a speed bump. Public access to the trail system is
available on acquired land on the left bank from station 355+00 to Lakewood
Drive. Public"access to the trail system is continuous throughout Lakewood
Park. A rest area, shown in detail by Figures 5.11 and 5.16, with a drinking
fountain, benches and bollard bicycle racks, is located near a severely
vandalized restroom building. A playground and picnic area is located on
the Riverside Boulevard right-of-way between Kansas and Des Moines Avenue
extended. Fencing will be installed between acquired land and the privately
owned land described above. A wood retaining wall or cribbing will be
required near the inlet/outlet structure from the old river channel to the
lake where trail right-of-way becomes constricted. Landscape plantings
will be limited to' the parkway system through Lakewood Park. Existing
timber on both sides of the 'old channel will be selectively thinned and
renovated. Banks of .the old channel will be sloped, shaped and stabilized
with grass or groundcover.
Figure 5.10 shows preliminary development plans for the parkway system from
stations 480+00 to 510+00. The parkway system from stations 460+00 to
480+00 is not illustrated. No land acquisition is required for this reach
of the parkway system. The trails are contiguous, except for a small
segment south of the Board of Trade Building, until they reach the north
boundary of Indian Rock Park. The trails follow the top of the flood
control levee, cross East Iron Avenue under the East Iron cutoff bridge,
proceed behind the Board of Trade Building to Indian Rock Park. They
proceed through the Park to the point of beginning. Public access will be
provided at Iron Avenue and will be continuous throughout Indian Rock Park.
A rest area will be located near the crest of Indian Rock Hill, near station
520+00. Details of this rest area are shown by Figures 5.11 and 5.17.
Facilities will include benches, a drinking fountain and bollard bicycle
racks. No fencing will be required, and wood retaining walls or cribbing
will be necessary only where grade is changed to pass the trails under the
East Iron cutoff bridge. Landscape planting will be required south of the
Board of Trade Building and throughout Indian Rock Park. No existing
timber selective thinning and renovation will be required.
Preliminary development plans for the parkway system from stations 395+00
to 460+00 are shown by Figure 5.09. Private land acquisition must occur on
the right bank of the old channel from stations 395+00 to 441+35.. Acquisi-
tion of privately owned land on the left bank of the old channel must be
made from the east boundary of Lakewood Park to station 430+30 and from
stations 437+85 to 442+20. The hiking trail and bicycle trail continue to
E. Special Details.
Figures 5.11 through 5.17 cover a range of special details relating to
special features on the parkway system. These details will be followed
during the preparation of the final constuction plans.
5.07
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
!liD
-,
:0~
1'2f""r:;r-"' -
-- -
r
'"
,J!)~ 01
p>
- ij'-'~" ',-" .-
F~
,
I
f
III')
"~
. CONTINUE PHASE 4
~^
fjff
~
'II
.
l'l
Ii! iIi iii ~
., ".I
;r; .. ~~~
rim tj i^. KEWOOD
,;" il;'~ .~
'11 i\ "
:ti.l~
PARK
n
n
III
?t
:I
~
CI
"' _.."IJf! .'" ~ 1.I
~;,e
"y~
i!i
VICINITY MAP
l' LS 0 N
COMPANY
ENGINEERS
ARCHITECTS t
B - BICYCLE TRAIL (9'-0" WIDE)
H - HIKING TRAIL (5'-0" WIDE)
B&H - COMBINED BICYCLE AND HIKING TRAIL (14'-0" WIDE)
- PROPOSED FENCING
I;YI;;;''1 REQUIRED LAND AQUISTION
FIGURE 5.08
PRELIMINARY DEVELOPMENT PLANS
STATIONS 355+00 TO 395+00
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,~~
t ~
.~~
~
~'1I
.. ff:,~
~,."
11 LS 0 N
COMPANY
ENGINEERS
ARC HITECTS t
~';jjJ'.' .~.-
'Pi "if.... 0.
Mi ~
M L
""""-
t
k~
"EXISTING ':EN.,gE ~
~.t,~ .. \
. ..-.,.~~!
l:...s;'~" ,~
, NOlir,..,.1;,; if*'~
~~~T' ~..
":An ~.~~
,flI ~
t
~
'l:
r
/'
r':
~~,
4,
~j
,....1
I
I
I,
I:
I'
I'
I
I
I
I
I
B - BICYCLE TRAIL (9'-0" WIDE)
H - HIKING TRAIL (5'-0" WIDE)
B&H - COMBINED BICYCLE AND HIKING TRAIL (14'-0" WIDE)
PROPOSED FENCING
bR.'iij,i! REQUIRED LAND AQUISTION
FIGURE 5.09
PRELIMINARY DEVELOPMENT PLANS
STATIONS 395+00 TO 460+00
-------------------
11 ~
mil
~3P
"
~
1\1
4ft
RI"
. " J
~ ti IV
IIIl'Iil ~
B
~"
l
l, \, ..
. ~ I
.! ~I~
~ L'r< f
" ,sV"" ':,
CI.l
Z
CCI:)
.....1:)
A-+
....1:)
z....
wit)
:!Eo
oA-....
'":01:)
"'.....1:)
w W +
a:>
=>WI:)
"'ceo
U::>"""
a:CI.l
ccz
zl:)
:!Ei=
_CC
..... ....
wCI.l
a:
A-
w
c
:l:
"
,
;.
::
...J
<
a:
I-
(!l
Z
W S<
r
c w c
== c z
0 :l: <(
w (!l
, " z
iE ...J
, () (3
...J 19 >- z
< () W
...J iii u.
a: < c
I- a: c
I- W W
W II)
...J (!l Z 0
~ z iii 0-
S< ::; 0
() 0 a:
iii r () 0-
:I:
m :I: ..
m
z >---;
z . c
o 4 ~:il
"- We
U) ~ ~ ;:
= 0 ~ ~
:s U uJ<i
bd .
-------------------
-------------------
I
I
I
PRDPOSEDORINKINGFOUNTAIN
I
I
I
I
WESTBEND
REST
AREA
APPROX. STA. 1~5.00
I
I
PROPOSED DRINKING FOUNHIM
I
PROPOSED8ENCH
I
I
I
I
J
I
I
RIVERSIDE PARK REST AREA
APPROX.STA.317.00
I
I
I
OAKDALE
PARK REST AREA
APPROX-STA.239+00
LAKEWOOD PARK REST AREA
APPROX.STA..379+00
REST
AREA
SCHEMATICS
NOT TO SCAlf
r-~9''''II~"ill"l'
I II""
PILING
PROPOSED WATER LEVEL
}--'-cc'""""'i
SILT
l(J
tr
-ry
v
WOOD BRIDGE SCHEMATIC
SCALE: IN". 1'.0"
f1ROPOSEDSHRUBS
PROPOSEO
REUININGWALL
PROPOSED
BICYCLE RACK
EXISTING TREES AND
ROCk OUTCROPPING
INDIAN
APPROX. STA. 506+00
FIGURE 5.11
SPECIAL DETAILS: REST AREAS, WOOD
BRIDGE
-------------------
I
I
\000""'''"''''
llGKTflXTURE
I
I
I
I
(ID .~
.--SI6MS
I
REST;?
AREA[]
I
9'-0' BlTUMlllOUS
BICYCLE PATH
I
,'~
!;'.O"r.nNClIFTF
HIKINGI'ATH
o
TYPICAL ELEVATION
SEPARATED HIKING AND BICYCLE PATHS
I
I
I
I
I
I
I
I
I
I
\LIGIITFIXTURE
(]J
SIGNS
9'BITUHINOUSBICYCLEl'ATH
~COMI'ACTED EARTH flLLj
CULVERT CROSSING
5'-0"
-SLOPE AT a/S"/FT.
TYPICAL SECTION
CONCRETE HIKING PATH
9'-0"
..'0'
TYPICAL SECTION ~s:I~:::~US
BITUMINOUS BICYCLE PATH
'-,'
I
1
I
I
I
0~~ ~ %'&
::q::l
.-'-T
I I
I I
, )
v
96" CORRUIlATED IoIETHI'IPE
STAHDARDEHOSECTIOH
------ ------7
FLl1<<L1HEOF
EXISTIHGCHAHNEL
.
;;:
SINIlUSIlNO.lRO/
LIGHT FIXTURE
'''"'~[~)
OAkOALE
PARK
9'_0' BITUMINOUS BICYCLE PATH
5'-0" CONCRETE
HIKIIlGI'Al"
"
'...,;;..;.
','-.,,:.. ',..'" ;:'--'.-.' iP~~ :w-<\~
~ :0,~ WA~;::0\
3'ROlLEoCURB
~-0'';'"
,""
~
TYPICAL ELEVATION
CONTIGUOUS HIKING a BICYCLE PATHS
GUARORAll
I
(
I
\
I
r
~
-
-=;:.r-
-.-+-r
I I
U
m~a::~~ ~,~~~
-tt:r-
T+r
I I
l,~)
-r+-T
I I
l,:)
WOOD RETAINING WALL OR CRIBBING
FIGURE 5.12
SPECIAL DETAILS: TYPICAL SECTIONS,
ELEVATIONS, WOOD RETAINING WALL,
CULVERT CROSSING
-------------------
<
w
cr
<
."...--,:
./ ',I-
/ " en
____ __:-_.J \ ~
\ 0
I~
J ~
/ ~
/ a.
./
.....
c:..___
j
--------,
I
,
,
I
I
I
,
I
,
I
I
I
I
I
J
I
J
/
I
I
I
/
/
/
/
/
/
/
-.-
~
f
f--s
1:.0
~
lol
"',.'~
..
.~ ~
~
':l!
ElIi'll
ill
tei
a~
~
;.II
MI
/1
~ ~-
0--11'''
-
H ~ -;"~~w. ~~;t'~ ~;~-.:""
",' , . ~~ W
" ,9I1J10'A. ".>'1" ...~ ~. ."Q
'~'~"l -1'~
.. '!*'0l:;" "~ " ;~'fr
,..'" '\4<-1""
If"? FI;' III rA '0
.. P \i "~I
~.~
<
w
a:
<
",I-
~ en
'W
ll)a:
W
D:C
~Z
-W
""cc
I-
en
W
3:
'"
-
w
,
()
I
..
,
;<
...
,
-' "'
II ~~ r:! :o,1P' >>~' '
,I- tt ~ ~G+"l /iiii
~e w\!il!:o .1if!d JI:
(,) ..,.
~ ".I'l~ 'b..'t.~
co
.~
o
w
" "en
o
a. ~
o
cr
a.
!:I
lJ
tr.
~ l!J
,
"b
.
..t""'j"l!
"
",CI
11II
'01
zen
,.< <
.0 w
_cr
z<
(,)
7<J ii: ~
#@5
encr
O<!:l
co." >-
IOItO.<
ocr -' ~
a. a.
~
; I ~
0
0
f0-
Ul
Z"- UI
Z <1\ ~ ~
o 4: ~ u Z
0. .. 0
If) ~ ~ ~
..J 0 Cl u ~ UI
~::~: J
cl
0
~ IfI
11
.lI 0
.lI
I
J
:2
o
o
cr
I-
en
w
cr
-
o
w
en",,~
0,.1"'
a.
o
cr
a.
. J
I
,
If'
...
..
..
~.:~ ;'t' t
,
.."
~"h7J; ,
II IlIII ~
I
IIIl
D
'i",~fiiI
iP III
II
~
."
~
I
~~
~~
If!
r
... .. i.i I:::
E:~
~
>1
&~'
- A . 'Jf'~~":'
~....
;.." I ,~--,
q ',"
,
I
':'e
"
...?,
}
.,~
!;i
JI
r~ p
..rii
u;-.:. il
I
'"i
I
...,
--
IJ
!il'-
,...
'!""I"
'"
-,,4!i':'~
'L $I .';t. '9':",
..~~,~
. ,
-
) I
.,. !
"
~')
<!:l
~
(,)
Z
W
I..L.
o
W
en
o f!'-
~\
1
· I
. 'f#'
~ .'~
. 1#
;.~
J
III
,
~
U
tt
~
r
..
,
Ell
'!f':.-A
.:t;
~ !Ii...."
Iff ~..
~
!
EI
"
'lc
,
~.
-------------------
-------------------
~ .,
L
t;
r
\
.. '3-0
'-M
~\ \
\\
~
f-.,,\
,
,
I
I
l ~:.. f/
.
.It,
.
~
[
,
~
~
o
I
~
'Ot
...
!
-I
-
<C
ex:
I-
'~\~
-w
(/)
o
a.
o
,;'5-
F;
n
~IP
c.
'"
..
t
'I
"
"
I
I ..j
f\
I lU9
III
I'
l
~,
.' ;J/'
~ll ~
SJ:\\aJ
C~ """,11.1 t,.
- ~ -
~. ~
~ iii
~~ I:l'
~
.
'"
n Ql CO
a
f:} ,
~
.
III
- .(1
<C
w
t:C
<C
I-
eI)
....w
o-:t:C
on
w~
a::t:C
=><C
C> a..
U:W
...J
<C
c
~
<C
o
....!!:!I
....
-i
l
~
I(
r
h#
-
, ~~...'!'
1
~
~
\ '\
. "
""l!
#,
I[j
~\ ~\ "
~
EI
~
"
~
\
n-"'tt<'"
\ 11
'\ a
~ _ .:_b.
i "
,.
II
15 ] i:l
. . It, .
'K" --
C'
c
,
.
~.
\
~.~;~
7-b,7- ~
L1
-------------------
c~~.. ~a
J lJ I:J ;"L,_
t'\'" I.i r.'
I:l .:J
I:)
" .0
~" !"!
<'t,; IC,
a
d'
\
l
(/)
:2
o
o
ex:
I- _~
~ ~.t;
~-
I'" (!) ,~
~ ~zf rr.,,~ ';
f!!
I'
~
'I
\
\.
..
~
~
(!)
z
-
C/)
C/)
o
· ex: ,
i- 0
-I
~
!(lex:
I-
a
~w "-
II< ~ "" t , \~'
a. "iJj
o 'T'
ex:
o.(l~"M
; 'If(
, ~
1..
~
i
b
-
W
glb
~
L;
.
~~ 0
ex: "
<C 0>
....
I- -I
'~"{,\.. ~~6tl
't 8" o~!IO. ,
a. >-:L"
~, ,~" I:f
a.' "
a ~
'1< ..\~.
t 0.\' ~ 10
'.~ \ ~
\.'{
\
~] \.
~
rl
tv
~,'"
:!)
~
;I"" ~ ~
.L. \ .....,J ~ J "
l, LA ~r;;::,. ::;. j.~ ~ 'I:
i \,
\I,r '-:-_ ::~':. J 'j'
\{ . ~. '-' _I,
':t ., _ t:.\, '- '. 1:!\?" ~ '"'
'" .', "/ 1f'lIh~'~~,l" "Ill
~l '~.4
~ " ~
I r,' -"'\
il ~I
a III it II ,~ f' H " '"
\;
\
L
.. ~
4
,
I
1~
ln~
~. I
p
[;-
.~
~
:::
~
Ii
~
-
t ~'
iIlt,~
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~ - - ~v- ",",-".-- ~ )
~f "~
~ !'JI /
... I
I of }I'
..
1 o~ I
~
~
"
~<,
~
~
l"
I
III
a
~
II" i
..
..
". i
"'"
.
"
. \
I 1 'I
."
,.
, -
--
]"
9
, ,
(j) ,
~
~~
'b 1 III
,
~ &.
J
a
ill
\ II
~t.
'"
PROPOSED
REST AREA
\:
..
II
t\ "0\* '"
<,jl""l,:\ ., ~
"6'~ "'h" 1
OQt:1 ~~IP
ll. J.
~
III
Ill!
'" ~
'Ii.. t""
<,jl~' r'
"IS' ~
.0
o
...
"
:ll
.1
111
""""J.
,.r
.)
f
.11
l.-_
-
'Ej
\
\:
) 'Q
~
\
,
--
",. -
...l..... .'" --..-- ---
".., - - - - -- ..
7:
-
.: · ~.R."", ~\
U' u --J 1iI_
"Ct J ~ ~ ~- ~f
Q f r; """
~ l~ ~:-'- ~, .
~). I'. .
'~\ ,",--+\4-
~ ,_ I.~. T
PROP?\,:~ED BICYCLE TRAIL (\Z~:'D~' L..';-:
'J .,
PROPOSED HIKIN~RA'~ ~t~.~'DE:
::; . gl'
;;J'1J"r,... ~ d\ c::..
~_!lD' _
D .:r"
"
I,
l
]
,
\
L
'l
e
~
~
11 LS 0 N
COMPANY
ENGINEERS
ARCHITECTS t
o 50
jloj---~
----
SCALE IN FEET
1," ,,lI
-
"'L~ 1fW- -- ~
J1 t' ~ ~ ~ 1"
\l 1 c',:' ~ r .'.. ( ~:- '
, -;: ' .......f_ *' ~ I \ l.,(..
; 1 \. \1:
p... ~ ~
__ I;
I --.
1
}:
~
~
~ ~ J
-
IgD
W-& C-E
f d"
"zl_
.,
,...I;
,.~~ p ~
,
L !""'"
I!""M
a
-II
'"
IP
l,
D
"
( .
l\ ~f
r;U ~(
G ~1~~"\. ;; 11\
ell
l1li
II
i=3 l t,')F'" ,~o,
\, '" "1 A , ~r--4I
, fe" ~ _'~
1
~ ':trTi
~
~
tl
--
100
I
FIGURE 5.15
RIVERSIDE PARK REST AREA
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~ -~-1F~\\~~l'~r~
:tI (1'
I
~
.
1
1
)
o
~"
.
~V
-~ _._---~~:""" ."
"'
~:".,
i-4
~
!!
.,,;. ~
'.
$<
.;
it
;
~
,
~ I
,
w-& IC-E~' lit,' .
Jo
e~ ~
"'x EXISTING RESTROOM
~1' ~
< fi " "
If'""', r iJ
..... 4, \:I
- -
-
~.1M
1
~
II;: g
<I I!I
I!:' ,
,
.
n
~.,
~
"'"
~
~1 j L
Ill\.
:II
... ~"
,
:w
9-~t'
~
Ljl ~
m
PROPOSED BICYCLE TRAIL (9'-0")~E\.
~
"
,.
Il
><
!f1'
~
"
PROPOSED PARKING LOT
,1
.
,.
~li
L
/'
,.
///
V
')
:Ji
l.
~ 00
10"
~1
I
L
1:1
..I.
~
~
~
~
) .
r:.
'.
~~ ~"".\ ~
ill
I
fq DI P.'I
f" J~
382:.60'~.1 <
;!,~....
II
III'
"\ ~;8 '\ ..30
fl. .:'I i.Id
~
,
J
.
~ JD
1:1
380+00
,
-
1
]
,.
n
~
[l
III
.
r
~
"'"
,
PROpOSED FENCING
II
"
~
a
o~
1,,0
,:?>1
r
\~;:P~N~
ENGINEERS
o 60 100
IW___.... I
~---I!!!! I
SCALE IN FEET
FIGURE 5.16
LAKEWOOD PARK REST AREA
~
r-
C""
l
.JI
-
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
[1
iili
.
t:-;
I
-
~II'JJ
""
'"
--_:
--'''',. .,
"-
Q:
- 7i~TJ
''ll
.
".., ~
"
.
~~ ..: ,"""""
I:l
7l'1
....u.", "'" < -
LJ ... -
'1:1
~ '
'*' I..
tJ
I::i
II
If
~
,3'1
I
ioiIIi
~
1
'ti
Iii\
~
~
~
~
1Il 4'"
t;;,
-, """
~~.......Jtt-
,..:,
"i>
'I
r;-
((,
,.
" ~
~
It,;!o.,'
JF
IJi
1:., II
~
~
II".T
~1
,'Ii
,
""
til dI
C.:;,; ~
~
I:l
;.;,;
iJ
~' "" \!O'
'1!1
..
III
III
<,
....0
'"
~"'-"" '~
,?~
r:
'j'
'~
...
6..41.7
[:l
f"\>JCl
I
1<- ,~
II
..
II
f3 ' <
~ 'r't"S
ill ... II
~~ ,~
'!:If!! 1'- '1 ~
.. ~
JrI 1'Je;
r
f' .')
~'J.~
',,:' "y;,e
.. c 87:f:lJ I
.,..,!:C'
1;
!l!
rI
r
,.."""
!"'1\t~iI .,.
~ .,tt! 'oi
"rt. ~ ~;,,,.
!.~, ~
I r"'" N
.... "I -'I' l;
. ~/ (~~j;
"'''f~~''
:~)~,
. ~p;':
. t'l'd' - !,~:f~'"
.... ~ II "'"
,~1I'''J:I ""--..' ~ rJ
X \I ~~ t3
~ Ill< l'I
.f~':"\,:: ::~<, ~ liP, III :!L
':"\~... I'l ~+~ ti ''Ii:
\. ~:: ~)
~S,;" rI
.
..
PROPOS ED
REST AREA
~'"
,
/I
"
- \~/
-~ /
rJ
, t I'
5.06+0 ' J,' "I ./ --
~ '11' ~
i: ii, ~
Il,~'
r-,11
. I!,
J
l
~.
~-
-
~
~
\oM ,~
,~
:t'""
~~ 'Ii>
~';t,
'" ~-
~ bI.P"
!!!' "
~
~
.----
iI. -
"
""
'"
~'"
"
""
~
~'
>>." .:::';'.'" ',;'~
",..'j(. ,
,Ji'
~
~~
I
- :-
~
....
~
,
.
iBiI
..
..
..
)<
""
PROPOSED BICYCLE TRAil (9'-0"WIDE)
't
rr
'~.
,
:<(
PROPOSED HIKING TRAil (5'-0" WIDE)
....
[Ji
~
. ~ -~J
]ILSON
COMPANY
ENGINE.ERS
ARCHITECTS t
C> 5C>
1-1---;..1
----
.c>c>
I
FIGURE 5.17
INDIAN ROCK PARK REST AREA
SCALE IN FEET
I
a. Benches. Benches are proposed to provide a place for people
to sit, relax, converse, etc., while engaged in the activities offered by
the parkway system. Basic construction of the benches is to be wooden
slat/spacer construction bolted together. Benches will be free standing
and supported by metal posts and support brackets.
2. Bridges. See Figure 5.11. Two wood bridges will be constructed
to provide trail crossings over the old river channel. One bridge will be
located where the trails cross from Kenwood into Oakdale Park. The other
is located immediately below the Western Star Mill dam where the trails
.cross from the parking lot east of Founder's Park to the City maintenance
yards on east Ash Street. Construction will be of treated lumber in a
rugged and simple manner.
I
1. Rest Areas. See Figures 5.11 and 5.13 through 5.17. Rest areas
have been located at five different locations throughout the parkway system.
All are located on presently City-owned land. All rest areas are provided
with toilet facilities or will be near existing toilet facilities. Among
other facilities provided at the rest areas are the following:
I
I
I
c. Trash Enclosures. One trash enclosure will be located in
each of the five rest areas in order to provide an attractive, maintenance
free enclosure in which individual trash receptacles can be placed and be
readily accessible for use and service. Trash enclosures will be con-
structed of wooden timbers placed vertically and bolted together to form a
solid rectangular enclosure. Letters and graphic signing will be routed
i
into the structures' vertical sides.
3. Contiguous Hiking and Bicycle Paths. See Figure 5.12. In certain
areas where the parkway corridor is so narrow as to prohibit separate
meandering paths, the separate paths become adjacent and contiguous to one
another. The problem presented by this situation is one of separating the
different uses of hiking and bicycling. To separate these two different
activities, a three inch rolled curb is proposed to elevate and separate
the hiking path from the bicycle path, thereby reducing the number of
voluntary crossovers by cyclists onto the hiking path. As a matter of
safety, a rolled curb has been chosen over the use of a more vertical
element, since there is less chance of a cyclist being injured in the event
of a bicycle or pedestrian accident. Another problem encountered with
contiguous paths is providing a smooth, yet distinct, transition where the
two paths separate or merge. Design elements used to control this transition
include a change in grade in the form of a three inch rolled curb, a change
in path widths, change in path colors and textures, use of signing and
lighting and careful placement of plant material.
I
I
b. Water Fountain. One water fountain will be located in each
of the five rest areas in order to provide a source of drinking water that
is attractive, while being sturdy and generally maintenance free. Fountains
will be stock manufactured items with all plumbing enclosed within an
exposed aggregate shell and with a concrete stepping block for small children.
The fountain assembly is to be freeze-proof.
I
I
I
I
I
4. Separate Hiking and Bicycle Paths. See Figure 5.12.
I
d. Wood Bollard Bicycle Racks. Wood bollard bicycle racks will
be located in each of the five rest areas in order to provide a structure
for the short term storage of bicycles in the same character and theme as
the other pieces of outdoor furniture found along the parkway system.
Bicycle racks are to be constructed of vertical wood timbers set in concrete.
Each .timber will be provided with a heavy duty eye bolt installed horizon-
tally through the timber in order that bicycles may be locked.
a. Concrete Hiking Path. The use of portland cement concrete
for the hiking path was established to assist in delineation of the two
pathways for their respective users. The path will be given a textured
finish to provide an abrasive surface desirable for exterior walkways.
I
I
I
b. Bituminous Bicycle Path. The bicycle path was established
at nine feet to accommodate use by maintenance vehicles and permit machine
placement of bituminous materials. This width will also be sufficient to
carry two-way bicycle traffic.
I
I
5.08
I
I
I
I
5. Wood Retaining Walls. See Figure 5.12. In certain areas, where
the trail system must change grade to cross the old river channel, cross
under a bridge or where the pa~kway corridor is too narrow to permit the
trail system to occupy the high bank, wood retaining walls will be used.
Construction will be of treated wood and accomplished in a simple and
,
rugged manner in the same character and theme as that of the bridges.
Illumination of the paths will average approximately two foot-candles with
higher intensity levels occurring directly under a lumina ire and diminishing
to a relatively low level between standards. Where possible, standards
will illuminate both the bicycle path and the hiking trail simultaneously.
However, where the paths diverge, separate standards will be utilized.
I
I
I
6. Fencing. All right-of-way land, existing or acquired, abutting
private property will be fenced with a four foot high woven wire fence with
wood posts. Construction will be similar to that outlined in the Kansas
Department of Transportation's Current Design Standard No. 670, Woven Wire
Type A Fence.
Selection of luminaires will be made to minimize objectionable spill light
into adjacent residental property. The standards will be manufactured
using materials primarily designed to resist vandalism. Lenses for the
luminaires will be either tempered glass or high impact plastic.
I
I
7. Culvert Crossing. Where the trail system crosses the old river
channel from the east boundary of Lakewood Park into the. acquired land to
the east of Lakewood Park, the installation of a 96-inch corrugated metal
pipe culvert with standard end sections will permit the trail system to
cross on a fill. A culvert will be permitted below the Lakewood Park Lake
inlet/outlet since it will not become an obstruction to the flow into
ponding areas, as any obstruction above that point would become.
The luminaires will be installed at an elevation not to exceed 16 feet
above the surface of the paths. Lamps in luminaires shall be 175 watt,
deluxe white mercury and will operate from ballasts energized at 240 volts.
I
I
8. Lighting. The proposed lighting system for the parkway system
has been developed to provide safety and path delineation. The project
will utilize standard luminaires, standard luminaires with double units,
bridge mounted units and special lighting units. All control of luminaires
will be automatic, utilizing magnetic contactors energized by astronomically
compensated time switches.
9. Path Bollarding. Bollarding will be placed in the bicycle trail
at periodic intervals to prevent small automobiles and, to some degree,
motorcycles, from encroaching on the path. Bollards will be made of six
inch minimum diameter treated poles with rounded tops. Thirty inches will
be set in concrete, with thirty inches remaining above the surface of the
path. Bollards will be set three feet apart.
I
I
D. Maintenance.
I
I
The entire project will be supplied electrically from power sources outside
the project by transformers furnished by Kansas Power and Light Co., the
local utility. Wherever possible, the transformers will be pole top mounted
with underground secondary service supplied at a distribution and control
point within parkway system boundaries. The system will be 240-volt,
single-phase. All distribution will be underground with direct buried
conductors.
Maintenance responsibility of the parkway system, including the existing
Western Star Mill dam and the proposed weir dams, will be that of the City
of Salina Park Department. This department is directly responsible to the
Director of Services. Since a portion of the parkway system will occupy
lands presently the responsibility of the Flood Works and Levee Department,
close cooperation should be maintained between this Department and the Park
Department. This cooperative effort should be a simple task, since both
Departments are directly responsible to the Director of Services.
I
I
I
I
I
5.09
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
In addition, close cooperation must be maintained between the Park Depart-
ment and the Water Department, since the latter will be responsible for the
operation and maintenance of the desilting facility, the raw water intake
and the Water Treatment Plant. The Salina Water Department is directly
responsible to the Director of Utilities.
E.
Funding
All recreational aspects of the parkway system, including land acquisition,
planning and construction of physical facilities, are eligible for 50 percent
funding by the Heritage Conservation and Recreation Services' Land and
Water Conservation Fund. This fund in the State of Kansas is administered
by the Park and Resources Authority. A surcharge of 5.3 percent (in fiscal
year 1978) is made by this agency for the cost of administration.
Phase 2 of the parkway system would be eligible for up to 100 percent
funding through the Department of Housing and Urban Developments Community
Development Block Grant Program, since this phase of the parkway system,
more or less, encompasses a neighborhood of low to moderate income persons.
5.10
I
I
I
SECTION 6 - COST ESTIMATES
A.
Water Treatment and Water Feature Enhancement Cost Breakdown.
Preliminary estimates of costs for water treatment facility alternates,
water feature enhancement alternates and the parkway system development
have been prepared as a guide for the City of Salina to assist in the
evaluation and programming of the proposed improvements. Cost estimates
were based on unit costs applicable to the Salina area for similar categor-
ies of work during the construction season of 1977.
Clarifier Basin
Clarifier Internals
Clarifier Erection
Force Main
Polymer Feeder
Cyclone Fence
Lights
Landscaping
Seeding
Building
Low Water Dam
Sand Blast & Paint
Cathodic Protection
Electrical
Intake Structure & Screen
Sludge Pump Station
Sludge Pumps
Sludge Draw Piping
GRAVITY SYSTEM SEDIMENTATION BASIN
(Included in Plan 3)
I
Description
I
I
Cost estimates for the parkway system development have been subdivided into
phases corresponding to those outlined in Section 5, paragraph C.
I
I
Preliminary estimates of annual operation and maintenance costs have also
been prepared and are included in this section. Operation and maintenance
costs for the parkway system development have been subdivided into phases
corresponding to the construction sequence described above.
I
I
It is recognized that substantial maintenance costs can result from acts of
vandalism in the parkway system and such costs should be reflected in the
preliminary estimates. Actually, little specific data are available on
costs due to vandalism on similar projects. In developing the preliminary
design of the improvements, special effort was made to select materials and
configurations which would be durable and not subject to functional damage.
It is anticipated that damage due to vandalism will still occur. however,
and an allowance has been made for this item in the maintenance cost estimate.
I
I
I
I
I
I
I
I
I'
ESTIMATE OF COST
Total
Engineering, Adminis-
trative & Legal
Other Costs
Total Costs
Costs
$283,200
280,000
54,000
23,000
20,000
6,600
10,000
30,000
2,100
8,000
10,500
19,000
17,000
13,000
10,000
37,000
8,000
2,500
833,900
125,100
41,700
$ 1,000,700
6.01
PUMPED SYSTEM SEDEMENTATION BASIN
(Included in Plan 2)
ESTIMATE OF COST
Description
Clarifier Basin
Clarifier Internals
Clarifier Erection
Polymer Feeder
Building
Fence
Lights
Landscaping
Seeding
Low Water Dam
Sandblast & Paint
Cathodic Protection
Electrical
Water Pump Station
Water Pumps
Gravity Sludge Line
Total
Engineering, Admini-
strative and Legal
Other Costs
Total Costs
COST FOR PIPELINE FROM RIVER TO W.T.P.
(Included in Plan 4 - 7)
Description
6400' 42" RCP $40/LF
Exc. ($40/LF for avg. depth 16') Trenching
M.H. 2 @ $1,250/Ea.
Wetwell @ 5,000
3 river crossing
Pavement removal & replacing 2,000 soy. @
$14/soyo
Intake @ river
=
=
=
=
=
=
Total
Engineering, Admini-
strative & Legal
Other Costs
Total Costs
6002
Costs
= $ 36,000
= 14,000
= 307,400
= 12,000
= 5,000
= 94,500
468,900
70,300
93,800
367,000
$1,000,000
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
COST OF PIPELINE TO RECIRCULATE WATER FROM OUTLET TO INLET
(Included in Plan 6)
Description
Costs
10 MGD pumps 3 @ 12,000
Intake Structures & Pumping House
Pipeline (30" CI) ($58/LF) (5 ,300)
Gravity Pipeline (S = .8%) 24" RCP
Vel = 3 fps $12/LF (1,000')
Manhole
Excavation (avg. 7' deep shale) ($15/LF)
$230,500
280,000
54,000
20',000
8,000
6,600
10,000
30,000
2,100
10,500
19,000
17 , 000
23,500
92,200
50,000
31,000
Total
Engineering Admini-
strative & Legal
Other Costs
Pumping Cost $16,OOO/yr.
Present Worth (20 yr, 6%)
32 ,000 x 11. 47
Total Costs
884,400
COST SYSTEM TO PUMP WATER FROM W. T . P. TO INLET
(Included in Plan 7)
132,700
44,200
$1,061,300
Description
2,250 GPM (3.2 MGD)
16" CI Total head = 28' Pump Size 8, 20 hp
Intake structure (includes shed, gauges,
structure)
7,150' 16" CI @ $32/LF
Excavation @ $3/LF
Pavement removal & replacing
Costs
256,000
300,000
5,000
5,000
10,000
Total
28,000
16,000
Engineering, Admini-
strative & Legal
Other Costs
Annual Cost 6,000/yr.
Present Worth (20 yr. 6%)
12,000 x 11.47
$620,000
Total Costs
93,000
124,000
$837,000
Costs
= $ 10,000
= 15,000
= 228,800
= 22,000
= 28,000
$ 303,800
45,600
60,800
137 ,600
$ 547,800
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B.
Parkway System Development.
1. Construction and Land Acquisition.
Phase 1 - Stations 172+00 to 287+75
1. Bicycle trail, 4" asphalt, 9' wide,
10,925 l.f. @ $5.10
2. Hiking trail, 4" concrete,S' wide,
10,975 l.f. @ $7.50
3. Wood retaining walls, 10' sections,
14' deep 323 sections @ $650.00
4. Woven wire fencing,S' high
10,250 l.f. @ $2.50
5. Periodic trail bollarding, 18 locations
@ $95.00
6. Trail crossing, speed bumps,S locations
@ $25.00
7. Under bridge crossings 2 each @ $750.00
8. Wood bridges 1 each @ $24,000.00
9. Trail lighting 10,950 l.f. @ $15.00
10. Trail clearing & parkway cleanup
33.52 acres @ $4,000.00
11. Landscape planting l.s.
12. Seeding, K-31 fescue & Crownvetch
33.52 acres @ $1,200.00
13. Rest area, concrete surface, drinking
fountain, wood benches, bicycle rack,
trash receptacle, l.s.
Total Construction Cost
Other Costs
Engineering, Administrative & Legal Costs
Land acquisition, 8.19 acres
@ $1,000
Total Phase 1
Say
Phase 2 - Stations 287+75 to 348+00
1. Bicycle trail, 4" asphalt, 9' wide
5,650 l.f. @ $5.10
$ 55,718.00
2. Hiking trail, 4" concrete,S' wide
5,750 l.f. @ $7.50
82,313.00
3. Wood retaining walls, 10' sections,
14' deep, 63 sections @ $650.00
209,950.00
4. Woven wire fencing,S' high
6,050 l.f. @ $2.50
25,625.00
5. Periodic trail bollarding
10 locations @ $95.00
1,710.00
6. Pedestrian activated trail crossing
signal 2 each @ $9,000.00
7. Wood bridges 1 each @ $24,000.00
125.00
1,500.00
8. Trail light+ng 5,900 l.f. $15.00
9. Trail clearing and parkway cleanup
13.83 acres @ $4,000
24,000.00
164,250.00
10. Landscape planting l.s.
134,080.00
11. Seeding, K-31 fescue and crownvetch
13.83 acres @ $1,200
.15,000.00
12. Rest area, concrete surface, drinking
fountain, wood benches, bicycle racks,
trash receptacle, l.s.
40,224.00
13. Picnic and playground area, l.s.
4,431.00
$ 758,926.00
113,839.00
151,785.00
14. Restroom renovation, l.s.
Total construction cost
Other costs
Engineering, Administrative
& Legal Costs
Land acquisition 6.14 acres
@ $1,200
8,190.00
$1,032,740.00
Total Phase 2
$1,033,000.00
Say
$ 28,815.00
43,125.00
40,950.00
15,125.00
950.00
18,000.00
24,000.00
88,500.00
55,320.00
15,000.00
16,596.00
10,501. 00
8,000.00
5,500.00
$370,382.00
55,557.00
74,076.00
7,368.00
$507,383.00
$507,500.00
6.03
Phase 3 - Stations 102+00 to 172+00
1. Bicycle trail, 4" asphalt, 9' wide
6,800 l.f. @ $5.10
2. Hiking trail, 4" concrete, 5' wide
7,050 1.f. @ $7.50
3. Wood retaining walls, 10' sections,
14' deep 60 sections @ $650.00
4. Woven wire fence, 5' high
6,125 l.f. @ $2.50
5. Periodic trail bollarding
8 locations @ $95.00
6. Pedestrian activated trail crossing
signal, 1 each @ $9,000.00
7. Trail lighting, 6,950 l.f. @ $15.00
8. Trail clearing and parkway cleanup
14.23 acres @ $4,000.00
9. Landscape planting, l.s.
10. Seeding, K-31 fescue and crownvetch
14.23 acres @ $1,200.00
11. Rest area, concrete surfacing, drinking
fountain, wood benches, bicycle rack, trash
receptacle, l.s.
12. Picnic and playground area, 2 each
13. Restroom facility, l.s.
Total construction cost
Other costs
Engineering, Administrative and Legal Costs
Land acquisition, 2.87 acres @ $2,000.00
Total Phase 3
Say
6.04
,
Phase 4 - Stations 348+00 to 419+00
$ 34,680.00
52,875.00
39,000.00
15,313.00
760.00
9,000.00
104,250.00
56,920.00
15,000.00
17,076.00
1. Bicycle trail, 4" asphalt, 9' wide
6,975 1.f. @ $5.10
2. Hiking trail, 4" concrete, 5' wide
7,200 l.f. @ $7.50
3. Wood retaining walls, 10' sections,
14' deep, 15 sections @ $650.00
4. Woven wire fencing, 5' high
7,300 l.f. @ $2.50
5. Periodic trail bollarding, 7 locations
@ $95.00
6. Pedestrian activated trail crossing signal,
1 each @ $9,000.00
7. Trail crossing speed bump, 1 each @ $25.00
8. Trail lighting, 7,087 l.f. @ $15.00
9. Trail clearing and parkway cleanup
15.84 acres @ $4,000.00
10. Landscape planting, 1.s.
11. Seeding, K-31 fescue and crownvetch
15.84 acres @ $1,200.00
4,585.00
12. Rest area, concrete surface, drinking
fountain, wood benches, bicycle rack,
trash receptacle, l.s.
16,000.00
24,000.00
$ 389,459.00
58,419.00
77,892.00
5,740.00
$ 531,510.00
Total construction cost
Other costs
Engineering, Administrative and Legal Costs
Land acquisition, 13.02 acres @ $3,000.00
Total Phase 4
I
Say
$ 532,000.00
I
I
I
$ 35,573.00
54,000.00
9,750.00
18,250.00
665.00
9,000.00
25.00
106,305.00
63,360.00
15,000.00
19,008.00
I
I
I
I
I
I
I
I
I
I
I
I
I
I
4,606.00
$ 335,542.00
50,331. 00
67,108.00
39,060.00
$ 492,041. 00
$ 492,000.00
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Phase 5 - Stations 419+00 to 510+00
1. Bicycle trail, 4" asphalt, 9' wide
8,550 l.f. @ $5.10
2. Hiking trail, 4" concrete, 5' wide
8,000 l.f. @ $7.50
3. Wood retaining walls, 10' sections,
14' deep, 20 sections @ $650.00
4. Woven wire fencing, 5' high
5,000 l.f. @ $2.50
5. Periodic trail bollarding, 16 locations
@ $95.00
6. Under bridge crossing, 1 each @ $2,200.00
7. Trail lighting, 8,500 l.f. @ $15.00
8. Trail clearing and parkway cleanup
4.36 acres @ $4,000.00
9. Landscape planting, l.s.
10. Seeding, K-31 fescue and crownvetch
4.36 acres @ $1,200.00
11. Rest area, concrete surface, drinking
fountain, wood benches, bicycle racks,
trash receptacle, l.s.
12. Culvert Crossing, 1 each
Total Construction Costs
Other Costs
Engineering, Administrative and Legal Costs
Land acquisition, 5.58 acres @ $2,000.00
Total Phase 5
Say
SUMMARY TABLE
PRELIMINARY ESTIMATES
$ 43,605.00
Phase
60,000.00
1 2 3 4 5
13 ,000. 00 Bicycle Trail $ 55,718 $ 28,815 $ 34,680 $ 35,573 $ 43,605
Hiking trail 82,313 43,125 52,875 54,000 60,000
Wood retaining walls 209,950 40,950 39,000 9,750 13 , 000
12,500.00 Woven Wire Fence 25,625 15,125 15,313 18,250 12,500
Periodic trail bollarding 1,710 950 760 665 1,520
Pedestrian activated signals 18,000 9,000 9,000
1,520.00 Trail crossing speed bumps 125 25
Under bridge crossings 1,500 2,200
2,200.00 Wood bridges 24,000 24,000
Trail lighting 164,250 88,500 104,250 106,305 127,500
127,500.00 Trail clearing & parkway cleanup 134,080 55,320 56,920 63,360 17,440
Landscape planting 15,000 15,000 15,000 15,000 15,000
Seeding 40,224 16,596 17,076 19,008 5,232
17,440.00 Rest areas 4,431 10,501 4,585 4,606 4,889
Picnic & playground areas 8,000 16,000
15,000.00 Restroom renovation 5,500
Restroom facility 24,000
Culvert crossing 11 ,000
5,232.00
Total Construction Cost $758,926 $370,382 $389,459 $335,542 $313 ,886
Other costs 113,839 55,557 58,419 50,331 47,083
Eng., Admin. & Legal Costs 151,785 74,076 77 ,892 67,108 62,777
4,889.00 Land acquisition 8,190 7,368 5,740 39,060 11,160
11 ,000 . 00 Total $1,032,740 $507,383 $531,510 $492,041 $434,000
$ 313,886.00 Say $1,033,000 $507,000 $532,000 $492,000 $435,000
47,083.00
62,777 .00 Total Parkway System Cost $2,999,000
11 , 160 . 00
$ 434,906.00
$ 435,000.00
6.05
In the State of Kansas, the Land and Water Conservation Funds are
administered by the State Park and Resources Authority.
2. Annual Maintenance
Phase
1 2 3 4 5
Personal Services $ 9,745 $ 5, U5 $ 5,845 $ 5,845 $ 8,040
Contractual Services 3,700 2,040 2,310 2,310 3,025
Materials and Supplies 1,070 560 645 645 885
Other Expenditures 50 25 30 30 35
Capital Outlay 870 455 520 520 720
Vandalism 270 165 190 190 180
Total $ 15,705 $ 8,360 $ 9,540 $ 9,540 $ 12,885
3. Proposed Methods of Funding. The development of the parkway
system as a public recreation facility is eligible for Federal funding, as
follows:
TOTAL PARKWAY DEVELOPMENT PROJECT.
H.C. and R.S. Land and Water Conservation Fund
H.D.D. Community Development Fund
City Funding
C. Total Cost Summary for the Recommended Alternative.
Water Supply and Water Feature
Enhancement, Plan 3, Construction
Costs
Beautification and Recreation Enhancement,
Parkway System
Total
L. & W.C. Funding and C.D. Funding
Total Costs
Phase 1. $1,033,000.00
H.C. and R.S.* Land and Water Conservation Fund (50%) $ 516,500.00 ~
City Funding (50%) $ 516,500.00
Phase 2. $ 507,000.00
H.C. and R.S. Land and Water Conservation Fund $ 253,500.00
H.D.D. Community Development Funds $ 253,500.00
Phase 3. $ 532,000.00
H.C. and R.S. Land and Water Conservation Fund $ 266,000.00
City Funding $ 266,000.00
Phase 4. $ 492,000.00
H.C. and R.S. Land and Water Conservation Fund $ 246,000.00
City Funding $ 246,000.00
Phase 5. $ 435,000.00
H.C. and R.S. Land and Water Conservation Fund $ 217,500.00
City Funding $ 217,500.00
*Heritage Conservation and Recreation Service, U.S. Department of Interior.
6.06
$2,999,000.00
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
$1,499,500.00
$ 253,000.00
$1,246,500.00
$1,745,900.00
2,999,000.00
$4,744,900.00
1,753,000.00
$2,991,900.00
I
I
I
I
APPENDIX - REVIEW OF PREVIOUS STUDIES, REPORTS, RECOMMENDATIONS, ETC.
e. The inlet structure near Indian Rock Park should be replaced
with a structure that would allow a flow of water comparable to the normal
volume prior to the construction of the flood protection system. The new
inlet structure should be designed to be capable of regulating the flow
during times of discharge from Lake Kanopolis.
I
I
A. Salina Board of Realtors. This organization prepared two reports
regarding the old Smoky Hill River Channel:
I
1. Recommendations to the
were made to the Corps following
see Item B of this section.
Corps of Engineers. These recommendations
the public meeting held on April 30, 1974,
f. The old mill dam should be designed to allow periodic flush-
ing of the river channel.
I
I
a. The City should acquire all present privately owned property
along the old river channel between the inlet structure near Indian Rock
Park and the outlet structure east of Lakewood Park. The City should
obtain the necessary temporary construction easements for access to the
bank areas and should obtain disposal areas for trash and debris and excess
excavated material.
g. Grouted rip rap outfalls should be constructed at all storm
drains emptying into the river. If necessary, riprap protection should be
provided at all bridges.
I
I
h. The city should enact an ordinance making it unlawful for
any person or persons to throw trash or refuse into the old river channel.
The City should prohibit the water department from disposing lime sludge or
silt into the old river channel.
I
b. The gates at the inlet structure should be closed and the
gates at the old mill dam should be opened to allow the channel to be
drained and dried. This would permit construction to be accomplished in a
dry situation which would expedite construction with a subsequent lowering
of cost.
2. Recommendations to the Salina City Commissioners. This report
was formulated as part of the Salina Board of Realtors' participation in
the National Association of Real Estate Boards' program entitled "Make
America Better." The old Smoky Hill channel beautification was chosen as
the Salina Board's local project. Their original plan was to sponsor a
one-day clean-up campaign during October of 1970, using volunteer workers,
city employees and city equipment to remove debris from the river banks and
the channel bed itself. Many civic and service groups, college and high
school students, and individuals expressed interest in helping with the
project. The clean-up campaign was postponed first because of inclement
weather and later in favor of achieving a permanent solution.
I
I
c. The banks should be cleared of all brush and trees and
sloped to at least a 2:1 slope. All trees landward of the top of the new
slope should be preserved. The channel bottom should be cleared of all
trash and debris and excavated to a uniform width and graded to a flowline
to permit the desired rate of flow.
I
I
I
I
d. The culverts at North and South Ohio Streets'and at Ash and
Elm Streets should be replaced with bridges similar to those at Oakdale
Drive and Walnut Street.
The Salina Board recommended the City undertake three basic plans of action
directed toward solving the problems associated with the old. Smoky Hill
River channel. These were stated:
I
I
a. Removal of Pollution (lime deposit) being put in the river
at that time so the river will support marine life.
I
A
I
b. Return the normal flow of water in the old channel, clean up
the old channel, install landscape plantings and ground cover, and develop
recreational areas.
A general presentation of the current study underway and the problems
currently associated with the old river channel was given by Corps person-
nel. Five solution or partial solution concepts were presented, as follows:
I
I
c. Establish the City's permanent maintenance responsibility.
C. of E. Concept A. See Figure A-I. This concept would retain an open
channel through the City. From the inlet structure to the Ash Street
crossing, the banks would be shaped as illustrated. The reach below the
Ash Street crossing would remain essentially as it is at the present time.
Water would be de"silted near the site of the inlet structure, and the flow
would be increased. A recreation parkway would be established from the
inlet to the Ash Street crossing. Concept A would be the least expensive
of all concepts.
I
B. Public Meeting, Old Smoky Hill River Channel Project. The Kansas City
District Corps of Engineers, conducted a public meeting reg~rding the old
Smoky Hill River channel at the Salina Community Theatre on April 30, 1974.
The meeting was conducted as part of a study by the Corps which was requested
by local interests. The study was to have addressed methods to reduce and
control the accumulation of silt existing in the old river channel. Results
of the study were to have provided the following:
I
I
I
1. Data relative to methods for reducing sediment buildup.
2. A maintenance program for keeping the channel cleared.
3. Recommendations for developing the channel to improve its func-
tional operation and promoting its aesthetic potential.
C. of E. Concept B. See Figure A-2. An open channel all through the City
is also used in this concept, however, the banks would be shaped into
low-flow and high-flow levels which would extend the entire reach of the
old channel. The water would be de-silted and decreased in flow. Recrea-
tion activities for this concept are about the same as that of A. Concept
B would cost about the same as A, but maintenance costs would be increased.
I
I
I
Among the topics discussed at the public meeting were the following:
The overall plan along the flowage easement of the channel.
C. of E. Concept C. See Figure A-3. The banks would be shaped as shown.
The water would be de-silted. In order to increase the flow of water, the
dam in the cutoff channel would have to be raised. Increased flow would
require the modification of the inlet and outlet structures as well as at
least four street crossing structures. The recreation potential of this
concept would be better than that of A or B. The cost of this concept
would be about one and a half. times the cost of A, but the maintenance
costs would be at least twice as much as A.
I
1. The amount of water that should be allowed to flow through the
old channel.
I
2.
I
3. The kind and location of recreation facilities to be provided
along the old channel.
I
4. Retention or elimination of the old Western Star Mill dam.
C. of E. Concept D. See Figure A-4. This concept would be similar to the\
treatment of Brush Creek in Kansas City with a small paved pilot channel
down the center and the banks paved approximately 100 feet on either side
---
to provide a flood channel. The recreation potential of this concept would
be about the same as B. The cost would be three to four and a half times
that of A. Maintenance costs would be about the same as A. Water flow
I
5. The promotion of more cooperation and responsibility among
individuals toward keeping the channel and banks clean in the future.
I
I
I
B
I
J
I
I
would be lessened, and it would be
of pipeline to take water from the
plant.
necessary to lay about a mile and a half
A.
Smoky Hill River into the water treatment
"Since completion of the project, silt deposited in the old
channel from inflowing water has altered the physical character-
istics and biological environment from a riverine to a small
stream drainageway. Local interests prevailed upon the Corps to
investiga~ solutions for renovating the old channel and to
determine whether it could participate in funding a remedial plan
through a cost sharing agreement.
I
I
I
C. of E. Concept E. See Figure A-5. This concept would also provide
water to the treatment plant through a pipeline similar to Concept D. All
the storm sewers and trunk storm sewers would drain into a concrete box
buried in the old river channel to pick up all the storm runoff. No inlet
structures would be required, since no flow could come in. The non-water
oriented recreation potential for this concept would be excellent. Construc-
tion costs for this concept would be nearly prohibitive, approximately 15
times that of Concept A.
"Consideration was given initially to prepare the 207 of the
Flood Control Act of 1962. However, because the attainment of
funding for such study under this authority ata completed pro-
ject would have required a congressional study. resolution, the
ensuing evaluation of the old channel operation was included
within the scope of the Section 216 provision. Recent policy
changes regarding Federal participation in nonlake recreation
preclude the Corps of Engineers from participating in any of the
old channel enhancement work which was studied.
I
I
I
General public reaction and response reflected the desire to see the old
river channel restored to the same condition as it was prior to the flood
control project completion as nearly as could be possible.
I
I
C. Section 216. Feasibility Study, Kansas City District, Corps of Engineers.
May 1977. The following is a copy of the synopsis of this study:
I
"The adequacy of the Smoky Hill River flood control project
completed in 1961 to protect Salina, Kansas has been evaluated
under provisions of Section 216 of the Flood Control Act of 1970.
"It is apparent that the old river channel can
never be transformed to its original flow characteristics without
sacrificing the flood control capabilities of the project. Water
oriented recreation facilities of limited scale could be developed in
the channel to augment the city's existing park system. Since the
Corps has no means to provide monetary assistance, the burden of
funding the channel development would revert to the city or other
governmental entity."
I
I
"Results of this study reveal that the project continues to
operate up to its designed capabilities. This urban levee protects
the city from a river discharge of 50,000 c.f.s. with a 3 foot
freeboard.
Although statements made by the public at the public meeting held on April
1974 indicated a local desire for greater flows in the channel, the Corps
recommended the following development plan:
I
I
"The water supply requirements set forth by the local interests
are met by a diversion system which was endorsed by the city when
the project was planned. This system utilizes that portion of
the river channel bypassed by the project to convey water to the
municipal treatment plant.
1. First, the amount of water passing through the inlet should be
reduced to that minimum which would provide a flowing stream after allowance
for losses due to evapotranspiration and infiltration. An inflow approach-
ing 51 c.f.s. may be sufficient to fulfill these requirements. This would
decrease sediment deposition to about 6,500 cubic yards annually in lieu of
I
I
I
I
c
--,
,
~ :.~~'~ :~~:.;::.~~-
.~ llPIlJlil ~Nt$I'!~
. .CONNEl'l"lIffl) TRlJNif
_,r. -...., -'""_ .....
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
. .'
v
." {)
-,
CONCRETE PAVI
I VARIES
[--
PLANtiNG AREA: -
'4
VARIES VARIES
_~_ 10/ IS!
12d TO 2401
VARIES
VARIES
J
_~R!1S_____ i 5' .6'
12cT TO 24d
VARIES'
~IEs
J-I
CHANNEL CAPACITY lS APPROXIMATELY I
10 C F S WITH ABOUT L5 FtET Of
FREEBOARD AT lESS THAN 2 FOOJT
DEPTH
" .
_m ~___~_
NOTE:
FIGURE A-4
CONCEPT 0
NOTE: CHANNEL CAPACITY IS APPROXIMATELY
120 C. f. S. WITH 1 FOOT OF fREEBOARD
AT A DE?T OF 5 FEET.
CONCEPT A
CONCEPT 0
FIGURE A-1
CONCEPT A
L_____
12dTO 240'
NOTE: CHANNEL CAPACITY IS APf'RQXIMATt1Y.,
50 C. F. S. WITH 1.5 fEET OF FREEBOARD
AT A DEPTH OF 3 FEEf.
CONCEPT B
0"________ CONeJfT E
FIGURE A-2
CONCEPT B
FIGURE A-5
CONCEPT E
"
L
iloltO 24U
" -."j
:'~ING.G:OE:~~T=~O A~_:~~" ~~
" . I
I
.
KANSAS CITY D1SrRICT CORPS OF ENGINEERS
SMOKY HILL RIVER CHANNEL CONCEPTS
APRIL 1974
I
I
-.---!!"""....
-
FIGURE A-3
CONCEPT C
'i~
t;~
,.
CONCEPT C
---.-------.,
,-
I
I
I
the present deposition of many times this quantity. A comparatively small
settling basin or series of basins could be constructed between the inlet
and Ohio Street to trap the major volume of silt. These basins would
require a dedicated annual maintenance program for cleanout and disposal.
Mud bars and aquatic weed growth, by products of this evolution, are
aesthetically displeasing and prevent public access to water. Without a
maintenance program to keep the channel open, the inlet will eventually
become completely clogged.
I
I
2. Impoundments of water about the periphery of Oakdale Park could
be developed using small dams or weirs. The channel could be cleaned out
in these areas to form ponds of sufficient depth to limit aquatic weed
growth. An additional ponding area could be created by retention of the
old mill dam and removal of the sediment upstream. Another possible alter-
native for providing water in these ponds while alleviating sediment
collection would involve pumping water from a well placed into the river
alluvium.
The Corps observes in this report that the City could provide both a pleas-
ing addition to its park system and an efficient method for withdrawal and
transportation of water supply through adoption of a development plan
similar to that outlined above.
I
I
3. Water to meet the requirements of the water treatment plant would
be conveyed by a pipeline from the river. The initial expense of laying
the pipeline and installation of the intake and pumping facilities would be
substantial. However, this expense prorated over a period of years would
afford an efficient means to acquire water while helping to create a more
manageable program for recreational use of the channel.
Because the flood control project continues to meet its functional design
requirements, and because the Corps has no authority to participate in
recreational enhancement work involving the old channel, it was concluded
that the Corps need not modify the project for flood control purposes and
that the Corps cannot participate in any improvement measures regarding the
old river channel.
I
I
I
I
The initial basis for conducting this study was to resolve whether the
flood protection project continued to meet the designed capabilities. As a
result of an inspection held in 1970, there was doubt whether the levee
above the Iron Avenue cutoff provided sufficient freeboard during flooding.
Prompted by the request from City officials for the Corps to analyze pro-
blems associated with the old channel, it was decided to include this
analysis as part of the study authorized under Section 216 of the Flood
Control Act of 1970. The current study verifies that the flood control
project continues to function satisfactorily in the manner for which it was
designed. Operation of the old channel as a conveyor of water to the
City's raw water intake to meet the water rights existing at the time of
project completion continued in a comparatively efficient manner through
1970. However, with the annual admission of an estimated 80,000 to 130,000
cubic yards of sediment since project completion, the channel now exhibits
ongoing transformation from a river environment to a small drainage way.
C. Salina Area Chamber of Commerce. In a letter dated August 2, 1977,
the Chamber recommended to the Salina City Commission that a study be
prepared by a competent engineering firm to address the problems of the old
Smoky Hill River channel as it flows through Salina. The objective of this
study is that of making the old channel a more attractive and usable stream
which would beautify and enhance the recreational use of the old channel
without decreasing the degree of flood protection provided by the present
system.
I
I
I
The scope of this study should include a consideration of two plans, each
plan describing the general features, engineering requirements, advantages
and disadvantages and estimates of cost for each plan. Technical feasibil-
ity and effects on the flood control system should be described for each
plan. Both plans should be based on a review of the present river flow and
configuration, with presentation of the hydraulic conditions presently
existing under low, average and maximum river volume conditions. The
requirement for water supply to the Salina Municipal Water Treatment Plant
should be considered in each plan.
I
I
I
]
I
D
-~-----------------
,I
I
1
Plan A shall be developed on the premise that the flow should be
increased by some factor which would maintain a greater volume of flow with
sufficient velocity to maintain a stable channel. The plan shall develop
the proper gradients, consider stream volumes, channel stability, deposi-
tion of silt and flow control. Consideration of silt removal, possible
recirculation and construction of additional gatewells at the inlet struc-
ture shall be included.
State of Kansas. . . ROBERT F. BENNETT, Governor
I
I
DWIGHT F. METZLER, Secretary
Topeka, Kansas 66620
[ID~[FJ&OOlT[Ij]~ IT [IDl? DG~&[LlTDG &[)i][ID ~[)i]\VJ~OO[ID[)i][Ij]~[)i]lT
1
Plan B shall be based on the premise that the flow of water will be
maintained at some relatively constant volume with a reduction of velocity
and increase in water volume. The water in the old channel will be ponded
over a larger area and depth. The water will be clarified and the old
river channel stabilized into a series of pools by damming or otherwise
containing the flow. Additional pool vo~ume will be maintained to assure
adequate internal drainage within the flood protection levees of the City.
Construction of desilting facilities near the intake structure shall be
considered.
Mr. Robert P. Selm. Partner
Wilson and Company
P. O. Box 1648
Salina. Kansas 67401
23 May 1978
I
Re: Smoky Hill River Study
WCEA File 77-179
I
Dear Mr. Selm:
I
This is in response to your letter of 27 March 1978 in -which you requested
conceptual approval for development of a settling basin at the gatewell en-
trance of the Smoky Hill River. with silt and 0.1 mg/l of an approved
potable wa-ter cationic polymer being discharged back to the main stem
Smoky Hill River and the clarified water being discharged to the cut-off
channel going through the city of Salina.
1
The study should be presented as a printed volume showing river profiles,.
maps, stage levels and other illustrations, description of each plan,
estimates of cost and engineering information. The engineer's recommenda-
tions should also be presented in the report.
We can find no objections to the concept of your proposal subject to the
following considerations:
I
1. Final plans and specifications must be submitted for approval through
this office. An NPDES discharge permit will be required.
I
2. It should be understood that silt sludge discharges back to the main
channel will have to be of a continuous nature and "slug" discharges
will riot be permitted.
I
3. Corps of Engineers permits must be pursued through their normal
course of action for the intake and discharge structures to the river.
I
If you have further questions or wish to discuss other matters concerning
this project please let us know.
Sincerely yours,
I
NJB:ht
cc: Herman A. Janzen
livi. 'ronmenl
, J k Burris~~~ector
u au of Wa ter Supply
I
I
I
I
E
1
\
-------------------
; . f