Loading...
8.1 Subplan & Amend 2000 CIPCITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE TIME 03/06/00 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. 8 AGENDA: CITY MANAGER ITEM NO. 1, la BY: Jason Gage BY:,=~:~-~/t/t_~ Item: 8.1 - Approval of 2000 Capital Improvement Program as amended 8.1a- Acceptance of 2000 Capital Improvement Program subplans, authorizing Staff to implement plans and solicit bids as required by City policy. Backqround: A revised 2000 Capital Improvement Program (C.I.P.) is proposed for Commission consideration. This is the current year component (2000) of the multi-year C.I.P. It has been revised to include the latest project cost estimates and other project updates as presented to the City Commission at your February 28th study session. Also included are the C.I.P. subplans and funding update report information, as previously provided. The recently proposed Par - 3 golf course project is currently included for Commission consideration in the revised C.I.P. Capital funding for this project is estimated to be $600,000, with a contribution of $200,000 from the City and $400,000 from outside grants and donations. The primary emphasis of this project is to enhance golf opportunities for Salina's youth, many of whom are not currently able to participate for various reasons. The course is proposed to be operated in coordination with the national "First Tee" program. The C.I.P. also includes a reduction in estimated cost for the South Ohio Street Corridor and Drainage Project. The initial cost estimate for this project was $4,500,000. Our revised estimate is $4,000,000. This reduction is due to excellent construction bids which have recently been received for the project. Planning for the multi-year C.I.P. (2000 - 2004) is scheduled to occur with the City Commission in upcoming study sessions. Recommendation: Staff's recommendation for the City Commission is to take the following action: 1) Approve the 2000 Capital Improvement Program as amended; and 2) Accept the 2000 Capital Improvement Program subplans, authorizing Staff to implement the plans and solicit bids as required by City policy. Staff recommends these items be addressed by separate motions. Attachments: 2000 Capital Improvement Program 2000 C.I.P. Funding Update Report S. Ohio Street Corridor Project Financial 2000 C.I.P. Subplans CITY OF SALINA 2000 CAPITAL IMPROVEMENT PLAN GENERAL SPECIAL GAS TAX FLOOD & INFO. SOLID GOLF WATER & G.O. REVENUE PROJECT FUND PARKS FUND DRAINAGE BI-CENTER SERVICES SANITATION WASTE COURSE WASTEWTR. OTHER BONDS BONDS TOTAL Street Repair Program Sl.300.000 $1.300,000 curb & gutter, crack sealing brick asphalt & concrete repair, curb ramps, seals end RR cross~r, gs S~dewalks & Ramps S200 000 $200,000 . I Ne~ghborhoo~l Parks $168.000 I $168.000 I ~a~ Improvements S50 000 550.000 Buildings & Facilities $350.000 S80.O00 $70.00(3 $500 000 Vehicles & Equip S650 000 S16 000 $117.500 $103.000 $106 500 S320.403 $1 313 400 Computers/'r echnology $110 000 $237.000 S40,000 $387.000 E._n.n.t r~,'va yl M ed ,a n Improve. men,~$ $125 000 ! ~. $125. I C I P Planning. $150.000 J .. $150 000 Stor__mwater .Prolects & Planmng S32 000 S300 000 .... S332.000 Traffic Signal Upgrades $175.000 1' --i-- -!'1- $~1.000 $2~.0~' Water System Enhancernents I S650 000 ~ 5650 000 I Wastewater System Enhancements S515 000 S515,000 N 9th Street Bridge Design S50 000 $50.000 South Orllo Comdor & Drainage $4 000.000 $4.003.000 Par - 3 Got~ Course $150.000 S50 000 S400.000 (2) $600000 Sch~n9 Bridge $200,000 $800.000 (1) 51.000.000 J I Conbn~le~c~' $100 000 J S100.000 (1) KDOT (2) Pdvate Donations / Grant Funds Revised: February 28, 2000 2000 Capital Improvement Program (CIP) Funding Update Report March 6, 2000 Provided below is an overview of 2000 CIP items in which amended funding allocations from the original plan (approved in July of 1999) are requested. These items are included in the recommended CIP and CIP subplans. 1. Sidewalks and Curb Ramp-~ Fund: Gasoline Tax Description: Financial: This annual program provides for sidewalks along city property and curb ramps at numerous locations as included in the CIP subplan. Original = $60,000 Proposed = $200,000 Note: The funding change is due to combining both sidewalks and curb ramps into one category and the need to continue an aggressive approach to making our pedestrian walkways more ADA accessible. A strong year-end fund balance in the Gas Tax Fund makes more ramp work possible without reducing street projects. 2. Nei_~hborhood Parks Fund: General Description: This item includes construction costs for one new neighborhood park in the Meadowlark School area and the completion of Schilling Park (carryover 1999 project) and Kennedy Park (carryover 1999 project) as included in the CIP subplan. Financial: Original = $75,000 Proposed = $168,000 (1999 carryover of $93,000) Note: The funding change is due to a carryover of Schilling Park and Kennedy Park. Both parks were begun in 1999 and are projected to be completed by April. Meadowlark Park is to be completed this Fall. 3. Vehicles and Equipment: Funds: General; Gas Tax; Water/Wastewater Sanitation; Solid Waste; Golf Course; and Description: This program provides for annual replacement of the City vehicle fleet and funds major equipment needs as included in the ClP subplan. Financial: Original = $1,052,500 Proposed = $1,313,400 (General- $650,000; Gas Tax - $16,000; Sanitation - $117,500; Solid Waste - $103,000; Golf Course - $106,500; and Water/W.W. - $320,400) Note: The funding change is due to implementation of a capital replacement program for the Golf Course and the full inclusion of WaterNVastewater Fund equipment needs. The 2000 Vehicles and Equipment Plan has not changed from that approved by the City Commission in December of 1999. 4. Entrywa¥1Median Improvement.= Fund: General Description: This program will provide for aesthetic improvements at South 9th Street, Broadway and other city locations. It may involve signage, plantings or other improvements. Financial: Original = $25,000 Proposed = $125,000 Notes: $100,000 in funding and projects is carried over from the 1999 budget and CIP. The funding carryover will provide a better opportunity to improve the aesthetic appearance of the City's entryways and roadway medians along highly visible arterial streets. 5. Stormwater Projects and Plannin.n Funds: Flood and Drainage; and General Description: Financial: This annual program funds feasibility reports, analysis, design and actual construction of smaller stormwater improvements as listed in the CIP subplan. May also include City share of bond payments or special assessments on larger projects. It is funded through Flood and Drainage Fund established in 1998 budget. Original = $300,000 Proposed = $332,000 (Flood & Drainage - $300,000; General- $32,000) 2 Note: The funding change is due to the inclusion of three minor projects to be funded by the General Fund. These projects relate more to general flood control system maintenance than enhancement. 6. Traffic Signal U ) rade- Funds: General and Water/VVastewater Description: Financial: Notes: This item provides for our annual program of safety-related upgrades to existing traffic signal systems as included in the CIP subplan. Upgrades may include the change-out to L.E.D. bulbs, adding of over- intersection cross-arms, controller changes, or similar projects. Projects will primarily be accomplished by General Services/Traffic Control employees. Funding may also be used for matching KDOT/Federal grants for traffic signal safety improvements. Original = $100,000 Proposed = $236,000 (General - $175,000; Water/W.W. - $61,000) The funding change is due to the need to replace two signal systems and upgrade three signal systems, including projects originally planned for 1999, but carried over to 2000. The signal system replacement at Santa Fe and South ($61,000) is to be funded through the Water/Wastewater Fund. 7. Wastewater System Enhancement Fund: Water / Wastewater Description: Financial: Notes: Annual program for wastewater collection system line replacements, minor lift stations, etc. Original = $400,000 Proposed = $515,000 The funding change is due to the carryover from 1999 to 2000 of the Front Street Sewer Improvement project ($115,000). 8. N. Ninth Street Bridge Desiqn Fund: General 3 Description: Financial: Bridge design for the west side of the N. Ninth Street bridge over Mulberry Creek. Construction is tentatively scheduled for 2002. Original = $50,000 Proposed = $50,000 Notes: The funding change is due to a carryover from the 1999 CIP. 9. South Ohio Corridor and Draina.qe Funding: General Obligation Bonds Description: Financial: Project to address both transportation, and flood and drainage improvements in the area of Ohio and Magnolia. Original = $4,500,000 Proposed = $4,000,000 Notes: The funding reduction is due to excellent construction bids being received, which allow a reduction in the total project cost estimate. 10. Par- 3 Golf Course Funds: General; Special Parks; and Other Description: This item is for the construction of a new Par - 3 golf course in coordination with the national First Tee Program. Financial: Original = $0 Proposed = $600,000 (General - $150,000; Special Parks - $50,000; Private Donations/Grants - $400,000) Notes: The new program item is due to the recent availability of donations and grant funding to assist in project construction. February 25, 2000 4 DEPARTblENT OF ENGINEERING AND GENERAL SERVICES SHAWN O'LEARY, P.E., Director 300 West Ash Street · P.O. Box 736 · Salina, Kansas 67402-0736 TELEPHONE (785) 826-7290 · FAX (785) 826-7244 SOUTH OHIO STREET CORRIDOR IMPROVEMENTS Financial Summary - March 6, 2000 PROJECT ACTIVITY Design Engineering Construction Utility Relocation Land Acquisition Construction Engineering Contingency Total ORIGINAL CURRENT ESTIMATE AMOUNT NET SAVINGS/ 1111811999 0310612000 INCREASE :$399,500.00 $360,226.00 $ 39,274.00 $3,719,507.00 $3,037,401.10 $682,105.90 LOa,4- Lei, 00~ $61,000.00 -~ $225,000.00 -$164,000.00 $150,960.00 $180,000.00 -$29,040.00 $0.00 $0.00 $0.00 $216,000.00 _~- $139,740.00 $76,260.00 $4,546,967.00 $3,942,367.10 $604,599.90 Notes: 1. Actual KPL utility relocation costs still pending. 2. Land Acquisition costs still pending. 3. Construction engineering to be completed with city staff. 4. Some design engineering costs paid with previous CIP funds. 2000 STREET REPAIR PROGRAM Sub ClP- 2000 Gas Tax Gas Tax Gas Tax Gas Tax Gas Tax Gas Tax Streets Streets Gas Tax Streets Gas Tax Streets Gas Tax Streets Gas Tax Streets Gas Tax Streets Gas Tax Streets Gas Tax Gas Tax Sas Tax Streets Streets Streets Street Reconstruction - Baker St. ~Walnut to South.~.~ Bdck Street Repairs - Miscellaneous Streets Concrete Patching - Miscellaneous Streets Railroad Crossings- N. Ohio St. Railroad Crossin s - Cloud St. at Fourth) Railroad Crossings - Claflin St. ~ Railroad Crossings - W. Ash St. ~~ Railroad Crossi~ Miscellaneous ~0 at Numerous Locations Contingency $46,00( $160,000 $140,000 $180,000 $135,000 $150,000 $24,000 $25,000 $42,000 February 28, 2000 2000 PARK IMPROVEMENTS / NEIGHBORHOOD PARKS PROGRAM Sub CIP- 2000 General General 3eneral General BUDGET: Parks Parks Parks-Rec $318,000 Parks-Rec Parks-Rec Parks Parks-Rec Parks Parks-Rec Parks-Rec Parks-Rec Parks-Rec BUDGET: $100,000 TOTAL BUDGET: $418,000 Park ~ Park Meadowlark Park Construction Par - 3 Golf Course TOTAL GENERAL Oxbow Park - Irfi~em for Soccer Field Parker Park - ~rovements Oakdale Park - Ornamental Grass Garden Lakewood Natural Area and Discover~ Center Par-3 Golf Course TOTAL SPECIAL PARKS $31,000 $5,000 $10,000 $11,000 $50,000 $100,000 $418,000 $o - Fall 2000 Completion - Fall 2000 February 24, 2000 2000 BUILDINGS AND FACILITIES PLAN Sub CIP- 2000 Bi-Center Bi-Center Bi-Center Bi-Center Roof Exhaust Fan Bi-Center Bi-Center BUDGET: $80,000 Geneml Geneml Fire General Fire General Fire General General General Renovate Restrooms in Lower Lobby TOTAL BI-CENTER FUND General General General 3eneral BUDGET: BUDGET: Stations #1 and #2 Station #1 Truck Exhaust Removal System - Station #-4 Services Roof Construct Roof Over Salt Spreaders Parks and Rec. Parks and Rec. Carver Center - Roof Re.,olacements Burke Park - 24' X 30'. Park Steam Engine - Paint Police TOTAL BUDGET: $500,000 $80,000 $25,500 $350,000 TOTAL GENERAL FUND Water Rehabilitation of 2 well houses $70,000 $70,000 TOTAL WATERJW.W. FUND $70,000 ,;5O0,00O FUNDING STATUS KEY Phase = Recommended phasing for authorization in 2000 (i.e., Phase 1, 2 or possibly 3) F.R. = Recommended for further review N.F. = Not recommended for funding at this time. Possibly review in future years. February 24, 2000 2000 VEHICLES AND EQUIPMENT PLAN Sub CIP - 2000 Finance Fire 1/2 Ton Ext. Cab, Fire Infrared Camera Fire Fire Fire Parks General Parks General Parks Parks-Rec. Parks-Rec. Parks-Rec. Police ' Bed Lawn Mower Truckster Loader Watch Commander Vehicle Police Police Police Street General Street Street Traffic Control BUDGET: $650,000 , Patrol Car - White Traffic Radar Unit 1-Ton Truck wi Flatbed and Hoist ! Van TOTAL REQUESTED EXPENDED 1 to Permits & Ins., F.R./2 1 I/F.R. One camera - Ph. 1, F.R. for second. 1 F.R./2 Conversion of F.D. ambulance chassis. Traffic Control BUDGET: $16,000 Golf Course Golf Course Golf Course Golf Course 3olf Course Golf Course Thermokit Street Marking Material Tank TOTAL REQUESTED EXPENDED ~offCou.__~r~ ~olf Course GoffCourse Goff Course BUDGET: $106,500 Fairwa Mowers 2 $26,000 each Tractor - 50 H.P. Greens Mower TOTALREQUESTED EXPENDED Sanitation Refuse Truck - 20 C.Y. Sanitation Dump Truck wi 10-yd. Bed TOTAL REQUESTED BUDGET: $117,500 EXPENDED Solid Waste Waste Solid Waste 3/4 Ton Service Truck Solid Waste Solid Waste Stormwater Pump - 6 inch J TOTAL REQUESTED BUDGET: $103,000 EXPENDED Water Plant Water/~N.W. Water Water/VV.W. Wastewater Pla WaterAN. W. ~/astewater Pla Water/VV.W. Wastewater Water/VV.W. Wastewater Z Water/W.W. Wastewater INater/W.W. Meter Readi?~..~._.~g BUDGET: $320,400 TOTAL BUDGET: ~nine Forkl~ ~rane Sewer Jet Unit Sewer Vacuum 1-TonPicku w/Dum Bod MaterReedi?_~._.~gEquipment TOTAL REQUESTED EXPENDED S25,0..__~_.~ $12,00( $25,00.~C S120,0~ $75,~ $30,00~0 $18,400 $320,400 $0 FUNDING STATUS KEY Phase = Recommended phasing for authorization in 2000 (l.e, Phase 1, 2 or possibly 3) F.R. -- Recommended for further review N.F. = Not recommended for funding at this time. Possibly review in future years. 2000 COMPUTERS/TECHNOLOGY PROGRAM Sub CIP- 2000 General Info. Services General Info. Services General Info. Services General Info. Services ~,rts & Humanities Communi Dev~ent Info. Services General Info. Services General Info. Services General Info. Services General Info. Services General Info. Services Fire Finance & Administration Human Resources Parks & Recreation General Info. Services Human Relations ~eneral BUDGET: BUDGET: Info. Services Info. Services BUDGET: Info. Services $110,000 Info. Services Info. Services $40,000 Info. Services Info. Services $237,000 $387,000 TOTAL BUDGET: TOTAL GENERAL Water Customer Accounting TOTAL WA TER / WASTEWA TER Lease Pumhase Payment- AS/400 ~ TOTAL INFORMATION SERWCES $0 $500 $0 $0 $33,850 $19,500 $4O, OOO $108,O00 $237,000 $387,000 $o February 15, 2000 2000 STORMWA TER PROJECT PROGRAM Sub ClP. 2000 Flood & Drain. Flood Control Flood & Drain. Flood Control Flood & Drain. Flood Control Flood & Flood Control Flood 8, Flood Control Flood & Drain. Flood Control Flood Flood Control Flood 8, Drain. Flood Control BUDGET: $300,000 General Flood Control BUDGET: $32,000 TOTAL BUDGET: $332,000 Gates, Founder's Park Creek - S. of Cloud Jisition - S. Ohio Corridor Ph. 2 ~ Area Ditch Creek Overflow Channel..._(Thomas Pa~_ TOTAL FLOOD and DRAINAGE Miscellaneous TOTAL GENERAL $36,000 $10,000 $121,000 $300,000 $32,000 $32,000 $332,000 Eastgate Outlet Ditch, Dry Creek (N of Old Hwy. and Dry Creek (N. of West North St.) $o February 24, 2000 2000 TRAFFIC SIGNAL UPGRADE PROGRAM Sub CIP- 2000 General Traffic 3eneral Traffic General Traffic Traffic General Traffic General Traffic BUDGET: $175,000 Traffic BUDGET: $61,000 TOTAL BUDGET: $236,000 9th & Iron $20,000 & South $10,000 TOTAL GENERAL System Replacment - Santa Fe & South $61,000 TOTAL WA TER / WASTEWA TER $61,000 $236,000 $o February28,2000 2000 WATER/WASTEWA TER SYSTEM ENHANCEMENTS PROGRAM Sub CIP- 2000 Water/VV.W. Water ~ Re~ Watermains - School Pro'ects $500,000 Oakdale, Whittier, & Coronado Schools WaterAN. W. Water Replace Watermains - Vadous Locations $150,00--~'~-~' ~ ~ TOTAL WATER $650,'~'~"'~' ~ ~ Wastewat --' ~StatJon No. 40 $70,0~ WaterAN. W. Wastewater Replace Manholes $20,O00 Wate~?.~V.W. Wastewater Line Interceptor Mar, holes $300,000 WaterAN. W. Wastewater Vacuum Unit Unloading Pad $10,000 Water/W.W. Wastewater Front Street Sewer Improvements $115,000 Carryover from 1999. TOTAL WASTEWATER $515,000 February 24, 2000