Loading...
Change Order 2 CHANGE ORDER LOCATION: PROJECT NO. 07-1624 PROJECT: 2007 Arterial Street Sidewalk Improvements CHANGE ORDER NO. Two (2) CONTRACTOR: Davis Concrete THIS AGREEMENT, made and entered into this 21st day of November,2007 , by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated August 27, 2007 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for street improvements in the City of Salina, Kansas, dated July. 2007 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. Description Unit Quantity 2-2 Increase Concrete Sidewalk, 4" 498 S.F. 3-2 Increase Concrete Sidewalk, 6" 9 S.F. Decrease Remove & Replace Concrete I 5-2 Asphalt Pavement 30 S.Y. Increase Remove & Replace Concrete 6-2 Curb & Gutter 12 L.F. Increase Remove Existing Gravel 7-2 Pavement/Landscaping 35 S.Y. 14-2 Add Type ill Sidewalk Ramp 1 EA. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. - 1 - CHANGE ORDER PAGE 2 Item No. 2-2 3-2 5-2 Description Increase Concrete Sidewalk, 4" Increase Concrete Sidewalk, 6" Decrease Remove & Replace Concrete / Asphalt Pavement Increase Remove & Replace Concrete Curb & Gutter Increase Remove Existing Gravel Pavement/Landscaping Add Type ill Sidewalk Ramp TOTAL Unit Quantity Unit Price 498 S.F. $ 3.10 9 S.F. $ 3.55 30 S.Y. $ 10.75 12 L.F. $ 22.00 35 S.Y. $ 2.50 1 EA. $855.00 3. The contract time for completion by reason of this change 6-2 7-2 14-2 o days. 4. All other terms and conditions ofthe contract to remain unchanged. OWNER, FIRST PARTY THE CITY OF SALINA, KANSAS BY: CITY~~R BY: --..- Attes~ CITY CLERK CONTRACTOR, SECOND PARTY DAVIS CONCRETE ph OM/? ~/ (Office or position of signer) -2- Total $1543.80 $ 31.95 -$ 322.50 $ 264.00 $ 87.50 $ 855.00 $2459.75