Loading...
6.2 Appr Water Telemetry System CITY OF SALINA REQUEST FOR COMMISSION ACTION 'DATE TIME .... 03/23/92 4:00 P.M. AGENDA SECTION: Consent ORIGINATING DEPARINENT: APPROVED FOR NO. 6 Water and Wastewater- AGENDA: 2 BY: Don Hoff BY: ~~- Item Approval of Water Distribution Telemetry System, Project no. 91-820, and set date to receive bids. Back,round This project involves the installation of a telemetry system to monitor 15 water wells, 7 water towers, and 2 pump stations. The system will also provide for the monitoring of future facilities (Markley tower, new pump station, etc.). We currently monitor the water levels of the towers and are able to start/stop the wells by utilizing telephone devices. This system is obsolete and costly to maintain. The new telemetry system will utilize radio transmitters and receivers to monitor the towers, wells, and pumping stations. Tower monitoring shall include: (a) Water level elevation (b) Alarms for high/low levels (c) Intrusion alarm (d) Power failure alarm (e) Electric valve operation Water well monitoring shall include' (a) Water level elevation (b) Flow rate, gpm (c) Total gallons pumped per year (d) Intrusion alarm (e) Power failure alarm COMMISSION ACTION MOTION BY SECOND BY TO: ' CITY OF SALINA IREOLIEST FOR COMMISSION ACTION DATE TIME 09/23/92 4:o0 P.M. IAGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. AGENDA: Water and Wastewater IT1EM NO. BY: Don Hoff BY: (fl On/off pump controls (gl Total hours pump has run/year (h) Discharge pressure Pumping Station monitoring shall include: (al Discharge pressure (b) Suction pressure (c) On/off pump controls (d) Total hours each pump has run/year (el Intrusion alarm (fl Power failure alarm In addition to the radio controls, this project .will also include the installation of a water meter at each well location. State regulatory agencies require the installation of a meter at each well to accurately record the volume of raw water withdrawn from each well. This system was included in the scope of work for the expansion and renovation of the water treatment plant. As you may recall, the water treatment plant project has been postponed until the issue of a future water supply source has been resolved. Our existing telemetry system is obsolete and is capable of performing only limited functions. We believe the installation of this modern telemetry system will allow the water distribution division to effectively monitor the operation of our towers, wells, and pumping stations. Recommendation It is recommended the City Commission set Tuesday, April 21, 1992, as the date to receive bids for the Water Distribution Telemetry System, Project No. 91-820. Reserve funds in the water account will be utilized to finance this project. COMMISSION ACTION kK)TION BY SECOND BY TO: