8.14 CO1 YMCA River Crossing CITY OF SALINA REQUEST FOR COMMISSION ACHON DATE TIME 12/20/93 4:00 P.M. AGENDA SECTION: Administration ORIGINATING DEPARTMENT: APPROV~.D FOR NO. 8 AGENDA: Engineering NO. 1 q BY: Shawn 0 ~Leary BY: I tern Change Order No. I for YMCA Drive River Crossing, Project No. 93-881. Background This project involved the replacement of the Old Smoky Hill River crossing on YMCA Drive after it was washed out during a heavy storm in July. The river crossing collapsed on July 7, 1993, and was totally replaced and back in service on August 27, 1993. The attached change order in the amount of $5,770 includes additional structural concrete for the box culvert, additional concrete curb and gutter to restore the street drainage and additional concrete pipe to extend an existing storm inlet lateral to the end of the new culvert. These alterations have been reviewed and approved by the City Engineer. The source of funds for this project and the change order is the special gas tax fund. The total project cost is $65,562. RECOMMENDATION It is recommended that the City Commission approve Change Order No. I for the YMCA Drive River Crossing, Project No. 93-881 in the amount of $5,770. COMMISSION ACTION MOTION BY SECOND BY THAT: CHANGE ORDER LOCATION' YMCA Drive PROJECT NO.' 93-881 PROJECT: YMCA Drive River Crossing CHANGE ORDER NO.: ONE CONTRACTOR: STEVENS CONTRACTORS~ INC.~ P. O. BOX 6197~ SALINA~ KANSAS 67402 THIS AGREEMENT, made and entered into this 20TH day of DECEMBER , 1993, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated July 26, 1993 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated July - 1993 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. Description 8. Add 5 cubic yards of Class I Concrete for the reinforced concrete box culvert end section. 10. Add 125 linear feet of removal and replacement of concrete curb and gutter. 12. Add 18 linear feet of 30" reinforced concrete pipe to extend existing inlet lateral. 13. Add i each 30" reinforced concrete pipe end section to extend existing inlet lateral. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: CHANGE ORDER PAGE 2 ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRICE TOTAL 8. CLASS I CONCRETE 5 C.Y. ~ 700.00 ~ 3,500.00 10. C & G REMOVAL & REPLACEMENT 125 L.F. 10.00 1~250.00 12. 30" RCP 18 L.F.I 40.00 ~ 720.00 13. END SECTION, 30" RCP I EA. 300.00 300.00 CHANGE ORDER TOTAL: $ 5~770.00 2. Addit'ional time for completion by reason of this change 20 days. 3. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS STEVENS CONTRACTORS, INC. BY: BY' MAYOR (Office or position of signer) Attest: CITY CLERK