N Santa Fe Arcade Roof Replacement
1_
~",i
....
CONTRACT
THIS AGREEMENT, made and entered into this _08_ day of _August_ inthe year two Thousand
seven by and between
THE OWNER:
City of Salina
300 West Ash Street
Salina KS 67401
THE CONTRACTOR:.
S&S Contracting .
921 Bishop
Salina KS 67401
THE PROJECT:
North Santa Fe Arcade Roof Replacement
100 block N Santa Fe
Salina KS 67401
SCOPE OF WORK:
The Contractor shall furnish all labor and materials, equipment and related services to perform and
',complete all of the Work, as described by the Drawings and Contract Documents entitled "_North Santa Fe
, Arcade roofreplacement_, Project #07-2632" and dated 8 August 2007, subject to the following:
It is hereby further agreed that the undersigned anticipates that materials and equipment will be on hand at
the site in sufficient quantities to commence construction on _5 November_, 2007; and the completion of
the construction, ready for acceptance will require _30_ calendar days. '
CONTRA~T AMOUNT:
The Owner shalI pay the Contractor for the faithful performance of the Work, upon satisfactory completion
and acceptance of the Owner; the total lump sum of "_fifteen thousand four hundred dollars & no cents_"
($15,400.00), subject to additions and deductions by change order as provided in the conditions, of the
Contract Documents. . .
CONTRACT DOCUMENTS:
The Owner and the Contractor agree that any reference herein to the Contract shalI include alI Contract
Documents listed and prescribed in the referenced General Conditions and the ~ontract Documents as fully
as if set out at length herein. . .
IN WITNESS WHEREOF, the parties hereto have caused execution of this instrument in three (3) original
counterparts as ofthe day and year above written. .
OWNER:
City of Salina
300 West Ash Street
Salina, Ks 67401
By
~~.sUU"~ .~~.4<f?7
(printed name,& title)
ByllJb1 f.. ~
' A 14(\ E'. J\' 1<4 \ tv\4'1 y
(printed name & title)
] copy Contractor, I copy City, I copy Facilities Superintendent
v'
'\.
100 block N Santa Fe Ave Arcade Roof Replacement - 2007
Project #07-2632
8/08/2007
The project consists of removing the existing poly-vinyl membrane system with insulation and
installing new tapered insulation and a mechanically fastened single ply poly-vinyl membrane roofing
system with related stack flashings, drain boots, two way vents, curb flashing/termination bar and etc..
The insulation shall slope to the east roof drain to the roof edge at the Alley on the west. The insulation
shall be a foam type with a minimum slope of 1/8" p~r foot and a minimum density of] .5#. The roof
membrane system shall have a minimum 15 year Factory Warranty for materials and a Contractors
complete 2 year Warranty covering materials and labor.
The Arcade and adjoining building will be occupied during construction. Precautions will be made
to insure the safety of the building occupants and the Public: Precautions will also be made so the building
is maintained in a weather tight condition and does not receive internal damage due to weather
The removal and proper disposal of all construction materials will be the responsibility of the
Contractor. The site is to be maintained in a clean and orderly manner.
The City does not have an electrical supply for the use of power tools and equipment available at
this site.
The Contractor shall submit. (prior to Contract) product data sheets on each item to be used, to the.
City representative. Include details of base flashings and membrane terminations.
The Contractor shall be a qualified installer, approved by the roofing system manufacturer to
install the manufacturer's product, and is eligible to receive standard roofing manufacturer's warranty.
Contractor shall submit work history data showing having successful warranted installation experience of
the system specified, and of being authorized by the roofing system manufacturer to install the specified
manufacturer's material. The Contractor shall use adequate amounts of such qualified workmen who are
thoroughly trained in the crafts and techniques required to properly install the type of roofing system
proposed for use and other work required to complete the work specified and within the specified time. The
Contractor shall have an experienced, pre-qualified, thoroughly trained superintendent having experience
installing the roofing system specified, who is familiar with the requirements of this project, on the job at
all times when roofing work is in progress. Training for the superintendent shall include certification of
completion of manufacturer's in-house course and on-site training.
Provide primary flexible sheet factory prefabricated roofing system from a single manufacturer
that has successfully manufactured raw materials into specified .products for not less than five (5) years.
No secondary private labels are acceptable. Provide secondary materials, such as but not limited to
insulation, vapor barriers, etc. as recommended and approved by manufacturer of primary materials.
The Contractor shall arrange for the manufacture's representative to provide inspection of the
roofing system installation. Upon completion of the installation, an inspection shall be made by a Quality
Assurance Specialist ofthe membrane manufacturer at no extra charge to the building Owner. The
inspection is to ascertain that the visible elements of the roofing system have been installed in accordance
with the membrane manufacturer's published specifications and details. A written report shall be provided
to the Owner. The report shall include the date, time and the name; address, and phone number of the
inspector who inspected the project. All corrective work defined by the manufacturer's inspector shall be
considered a part of the project work which must be completed before final acceptance by the Owner.
s;!J
Warranty:
1) Manufacturer's minimum 15 year warranty. A written warranty, without cost to Owner, to
promptly repair any leak in the roof system due to materials or workmanship.
2) Contractor's 2 year total system guarantee. The Roofing Contractor agrees to provide a 2
year guarantee, commencingwith the date of substantial completion. This covers both
materials and labor necessary to effect water tightness, without limits to amount required to
effect repairs over the warranty period.
Subject to compliance with requirements, manufactures offering products that may be incorporated into the
work include, but are not limited to, the following: .
1) Duro-Last Roofing, Inc., 40 mil membrane product
2) . IB Systems, 50 mil membrane product
Products:
Mechanically fastened, polyester-reinforced flexible sheet compounded from not less than 50%
PVC resins and plasticizers, stabilizers, fillers and pigments, of the following speCifications.
1) Thickness: 40 mil nominal minimum
2) Exposed face color; Manufacturer's standard white
3) Tear strength: 45 Ibf (245N) min. ASTM D-751, Procedure B
4) Elongation at Break: >27%, ASTM D 751
5) Breaking Strength: 2001bf, ASTM D 751, grab method
6) Dimensional Stability: <1%, ASTM 0-1204
7) Low Temperature Flexibility: no cracks -40F, ASTM D-2136
8) Dynamic Impact: 250#, Fed. Std 10lE, Method B
9) Water Vapor: .30 US Perms, 0.087 g/hr/sqm, ASTM E96 WVT, procedure B method A
10) Accelerated Weathering: no cracks, crazing or blistering, ASTM 0-5388 2000 hrs
11) Factory Mutual Research: Class 1 1-90, ASTM EI08
12) Underwriters Laboratory: Class B UL-790
13) Exterior Fire-Test Exposure: Class A; ASTM EI08, for application and slopes indicated
Auxillary Materials:
1) Sheet flashing: Manufacturer's standard sheet flashing of same material, type
2) Bonding Adhesive: Manufacturer's standard
3) Miscellaneous Accessories: Provide termination bar, battens, fasteners, pourable sealers,
preformed cones and vent sheet flashings, termination reglets and other accessories.
The Contractor is required to visit the site and make himself familiar with the job. All questions
are to be directed to Byron Erickson, Facilities Superintendent, 420 E Ash, ph 785-309-5768.
Upon completion of Final Inspection, with the City's representative and Contractor, submittal for
payment in full may be filed with and approved by the Facilities Superintendent and payment
issued.