Loading...
8.4 CO5 Mem Hall Rehab CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 4/5/93 4:oo P... AGENDA SECTION: Administration ORIGINATING DEPARTMENT: APPROVED FOR AGENDA: NO. 8 Engineering NO.4 IBy: Shawn O'Lear BY: Item Change Order No. 5 for Memorial Hall Rehabilitation, Cable Access Television System, Project No. 92-868. Background The City Commission approved the contract for this project on February 1, 1993 and work began on the project on February 11, 1993. The original contract amount was $210,200. Change Order No. 1, approved on February 22, 1993, reduced the contract amount to $201,061. Change Order No. 2, approved on March 1, 1993, reduced the contract amount to $196,892. Change Order No. 3, approved on March 15, 1993, increased the contract amount to $197,561.90. Change Order No. 4, approved on March 22, 1993, increased the contract amount to $201,397.90. This change order involves the installation of air conditioning equipment for the master 'control rooms, edit bays, offices, training and conference rooms. Also, the hospitality room in the stage {studio) area will be finished. The total cost of this change order is $33,028. The CATS board has allocated the additional funds from their operating budget. RECOMMENDATION It is recommended that the City Commission approve Change Order No. 5 for the Memorial Hall Rehabilitation, Cable Access Television System, Project No. 92-868, in amount of $33,028.00. COMMISSION ACTION MOTION BY SECOND BY TO: CHANGE O E. [] ARCHITECT F] ORDER CONTRACTOR []-I FIELD [] AIA DOCUMENT G701 OTHER [] PROJECT: COMMUNITY ACCESS CHANGE ORDER NUMBER: 5 (name, address) TELEVISION STATION 410 West Ash DATE: March 24, 1993 TO CONTRACTOR:Salina, Kansas ARCHITECT'S PROJECT NO: 2034 00 (name, address) Harbin Construction, Inc. CONTRACT DATE: . February 1, 1993 P. O. Box 534 CONTRACT FOR: ALL DEPARTMENTS OF WORK Salina, Kansas 67401 The Contract ~ changed as follows: TOTAL A~DITION THIS CHANGE ORDER .................... 933,028.00 Not valid until signe~ by the Owner, Amhitect and Contractor. Thc odgir~ (Contract Sum) ((~mmem~k~mr=~ was ......................... $ 210,200.00 Net change by prev~u~y authorized Change Orders ............................... $ ( 8,802. i0) Thc (Contract Sum) ~a~~ pdor to th~ Change Order was .......... $ 201,397.90 The {Contract Sum) (~- ' will be (increased):(m:e~me~ (unchanged) by thb Change Order irt the amoullt of ........... : ................. $ 33,028.00 The new (Contract Sum) (O{lat~mle~t~}~ndud~g ttfis Change Order w~ be . .$ 234,425.90 The Contract Time will be ~~) (un~ by ( ) days. The date of Substant~ Comp~'tion as of the date of thb Change Order therefore NOTE: Thb sunwnary do¢s no{ reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Pdce which have bern authorized by THE SHAVER PARTNERSHIP HARBIN CONSTRUCTION, INC. CITY OF SALINA, KANSAS ~.RCHITECT CONTRACTOR OWNER O. Box 1128 P.O. Box 534 300 West Ash Address Addrt:~ Addrer~ Salina, Kansas 67402-1128 Salina,..~s 67402-0534 Salina, Kansas 67401 March 24, 1993 DATE DATE DATE ,aeaw~ m o~, ~ r't~s ~ vo~ ^vt. COMMUNITY ACCESS TELEVISION STATION - PHASE II SALINA, KANSAS ATTACHMENT TO CHANGE ORDER NO. 5 dated March 24, 1993 ADD 1. The following items shall include all equipment, insulated duct work, temperature controls, registers, grills, electrical, condensate and labor to make a complete job for a total addition of ......... $ 27,500.00 a) Install a Lennox HP 24 261 2-ton heat pump with 6 KW heater in AHU-4 in Rooms 20, 21 and 22; b) Install a Lennox HP24 461, 3-1/2 ton heat pump with 10 KW heater in AHU-8 in Training, Conference, Office and Copy Room; c) Install a Lennox HP24 261, 2 ton heat pump with 6 KW heater in AHU-7 in two Edit Bays and two Offices. 2. Area #3 (Hospitality Room) Complete the following work for a total addition of ...................................... 5,528.00 a) Walls - Furred and gypsum board - painted; b) Ceiling - Patched and painted; c) New carpet and vinyl base; d) Mechanical Work - Removal of radiator, ducts through the wall for heating unit; Kitchenette unit rough-in; e) Door - Door between Rooms 3 and 4 will be left in place; f) Stair #7 Enclose wall with existing door and frame installed, painted walls. Electrical for lights per Owner's selection; g) Electrical Work - Electrical fixtures per Owner's proposed changes. TOTAL ADDITION THIS CHANGE ORDER NO. 5 ~ 33,028.00