6.3 CO3 Mem Hall Rehab CITY OF SALINA P~0UEST FOR COMMISSION ACTION DATE TIME 3/15/93 ~:00 P.M. AGENDA SECTION: Consent ORIGINATING DEPARTMENT: APPROVED FOR NO. 6 AGENDA: Engineering ITEM BY: Shawn O'Lear BY: Item Change Order No. 3 for Memorial Hall Rehabilitation, Cable Access Television System, Project No. 92-868. Background The City Commission approved the contract for this project on February 1, 1993 and work began on the project on February 11, 1993. The original contract amount was $210,200. Change Order No. 1, approved on February 22, 1993, reduced the contract amount to $201,061. Change Order No. 2, approved on March 1, 1993, reduced the contract amount to $196,892. This change order involves minor revisions to the heating system and repair of the existing wood floor of the studio area. This change order will not affect the contract time. RECOMMENDATION It is recommended that the City Commission approve Change Order No. 3 for the Memorial Hall Rehabilitation, Cable Access Television System, Project No. 92-868, in amount of -$669.90. COMMISSION ACTION MOTION BY SECOND BY TO: CHANGE ARO'iffECT Cl ORDER com cvo, o RE~ 0 P~O~: STATION P~SE (~ ;~) ~10 Ves~ Ash Sal~ Kansas DA~ ~rch 3, 1993 (~, =~) Hagb~n Consc~cclon, Inc. P. O. Box 53~ CO~DA~: ;eb~a~ 1, 1993 Saltna, Kansas ~7~01 CO~FOR: ~L DEP~~S OF ~0~ 1. Remove and relocate radiator on the north wall of the stage area to the east approximately 4'-0". Radiator to have new valve, trap and thermostatically controlled valves .... ADD .... $ 594.00 2. Plug existing wood floor where existing pipes were located ................................... ADD .... 15,00 Sub-total ............................. $ 609.00 3. Contractor's Overhead and Profit (10%) ......... ADD .... 60,90 TOTAL ADDITION THIS CHANGE ORDER NO. 3 .......... ~ 669.90 Tbeodsm~(ConmaSum) __: __ _ )was ........................ $ 210,200.00 Nm ~ by prg~iomly ~udmdzed ~ On:le~ ............................... $ 13,308.00 Thc (.Cmm.aa Sum) ( _n,P~ ~dor to thb Change Ord~ ~'as .......... S 196,892.00 · r~ ico~=-~ sum) ~ bc (ii~Ea) by th~ ~ Order ~ the mm~m~ o~ ........... ' ................. $ 669.90 The new (Conu-aa Sum) ( . _ ....... ___~q~aT~dudm8thmC~nseOrdctw~be . .$ 197,561.90 The Cram-a:, Time wia be (~ (~ b~ ( )days. The c~e o! Substan~d Compkt~on as o~ the date of dds Chanse Order the~Jote T~E SHAVER PARTNERSHIP HARBIN CONSTRUCTION, INC. CITY OF SALINA, KANSAS · ac~rrEcT CONTRaCtOR oun~Ea P. O. Box 1128 P.O. Box 534 300 West Ash Adde~ Ad,)_,~ Addee~ BY March 3, 1993 DATE ~ DATE Mdt IX3CiJi~dl' ~ · OM, HGE ~ ,, 19~? ElXl'IGN · AMo ,, C)Igi7 · Ti~ ~ .mTnnZ oe ~oitrEc-~ t?~$ NL, w ~ AVL. N.V~