Loading...
8.4 CO1 2000 Latex Slurry Seal CITY OF SALINA REQUEST FOR CITY COMMISSION ACTION DATE_ TIM.E_ 05/15~00 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. AGENDA: 8 Engineering & General Services ITEM ~ NO. 4 BY: Shawn O'Lea~ BY: ITEM Change Order No. 1 for the 2000 Latex Modified Slurry Seal, Project No. 00-1209. BACKGROUND The 2000 Latex Modified Slurry Seal Project is in full swing. In fact, it is nearly complete. With this annual street maintenance project, approximately 10 miles of streets have been treated with crack seal and slurry seal applications. This preventative maintenance process extends the life of these asphalt streets by five to eight years before another application is needed. Minor problems were encountered last week on two of the street sections, East Crawford Street and West Republic Avenue. It was determined in the field that additional layers of slurry seal were necessary in order to address the pavement rutting on East Crawford Street and to adequately cover the Concrete pavement on West Republic Avenue. Due to the length of the East Crawford Street section, the quantity of additional slurry seal material is quite large. Approximately 1.5 lane miles of additional slurry seal or 23,795 square yards of material was placed. The attached Change Order No. I addresses the additional scope of work and costs for the project. The total amount of the change order is $45,210.50 or 23.5 percent over the original contract amount of $192,045.00. If approved, the adjusted contract amount will be $237,255.50. This project is one of several contract street maintenance projects included in the 2000 Street Maintenance Program. The 2000 Budget allocates $1,300,000 is special gas tax funds for the program. The budget for the 2000 Street Maintenance Program includes contingencies for each project which appear adequate to absorb this unforeseen cost increase without negatively affecting the feasibility of the other projects. RECOMMENDATION It is recommended that the City Commission approve Change Order No. 1 for the 2000 Latex Modified Slurry Seal, Project No. 00-1209, in the amount of $45,210.50. 2000 SLURRY SEAL Crowford St, Beotrice St. Lewis SL ' Ouincy SL Republic ,4 ye. Cloflin Ave. Monchester Rd. Seitz Dr. Applewood Ln. Brookwood Ln. Northwood Ln. Fairdole Rd. Foirdole Rd. Porkwood Ln. L )~n Dr. PociEc Ave. 2000 Latex Modified .Slurry Seal. NO. STREET FROM TO 1. Republic Ave. Osborne St. Beatrice St. 2. Crawford St. Roach St. Marymount Rd. 3. Beatrice St. RepUblic Ave. Martin Ave. 4. 'Lewis St. Martin Ave. McAdams Rd. 5. Quincy St. Wayne Ave... Kensington. Rd., 6. Republic Ave. Broadway Blvd. 133 Feet West of RR Tracks 7. Claflin Ave. Ohio St. Roach St. 8. Manchester Rd. Martin Ave. McAdam~q Rd. 9. Seitz Dr. Glen Ave. Pheasant Ln, 10. Applewood Ln. Georgetown Rd. Seitz Dr.- 11. ' Brookwood Ln, Georgetown Rd. Seitz Dr. 12. Northwood Ln. Fairdale Rd. Glen Ave. __" 13. Fairdale Rd. Crawford St" (1818)Fairdale Ct. 14. Fairdale Rd. Crawford St. Village Ln. 15. Parkwood Dr. Ohio St. Cloud St. 16. Lynn Dr. Briarwood Dr2 Parkwood Dr. 17. Pacific Ave. Front St" Ninih St. CHANGE ORDER LOCATION: SALINA, KANSAS PROJECT NO. 00-1210 PROJECT:SUBDIVISION IMPROVEMENTS/PART I-PAVING & DRAINAGE CHANGE ORDER NO.ONE(1) CONTRACTOR BALLOU CONSTRUCTION CO., INC., P.O. BOX 2300, SALINA, KS.67402-2300 THIS AGREEMENT, made and entered into this 9TH day of MAY , 1999, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated FEBRUARY 28, 2000, under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain Subdivision Improvements in the City of Salina, Kansas, dated JANUARY, 2000 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. ITEM DESCRIPTION 2 Add "LATEX MODIFIED SLURRY SEAL (TYPE B)" for a scratch coat on concrete street and to fill ruts on another existing street, 23,795 square yards. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices. CHANGE ORDER PAGE 2 ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRICE TOTAL 2 Latex Modified Slurry Seal 23,795 S.Y. $ 1.90 $ 45,210.50 (TYPE B) CHANGE ORDER TOTAL: $ 45,210.50 3. Additional time for completion by reason of this change 0 days. 4. Ail other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS BALLOU CONSTRUCTION CO., INC. BY: BY: MAYOR/CITY MANAGER (Office or position of signer) Attest: