The final breakdown has been filed by the City Engineer for Engineering Project
91-836, for street and utility improvements' in Meyer, King and Mayfair Additions,
and street improvements on the connecting link of the frontage road parallel with
South Ninth Street, and street improvements of the connecting link of Sprecker
Drive from the South line of Republic Avenue to the north line of Bradshaw
Drive.
The total cost of the project is $186,050.32
Property Owner's Share : $1.86,050.32
~ City's share = $ '" ~0.00
:'A public hearing on the proposed assessments is to be scheduled for 4:00 p.m.
'Monday, February 1, 1993.
At .th~ conclusion of the public hearing on February 1, 1993, :an assessment
' ~rd{~'de ShOUld be introduced for first reading. The assessment ordinance will be
scheduled for adoption on February 8, 1993 and publication on February 12, 1993.
On that date the property owners will be mailed a notice giving them an
opportunity to pay the principal cost of the improvement with no interest cost.
March 1§, 1993 the 30 day period ends to pay cash with no interest costs.
March 22, 1993 - the City Commission will be asked to set April 12, 1993 to receive
bids on the sale of General Obligation, Internal Improvement Bonds.
May 20, 1993 is the scheduled date for bond closing.
Recommended action
Set Monday, February 1, 1993 for a public hearing on the proposed assessments
and instruct the City Clerk to publish a notice of the public hearing, and to mail
a notice of the public hearing to each property owner in the benefit district.
COMMISSION ACTION
MOTION BY SECOND BY
TO:
FINAL QUANTITIES
PROJECT NO. 91-836
STREET, WATER AND SANITARY SEWER
1. COMMON EXCAVATION 861.2 C.Y. @ $ 11.75 = $ 10,119.10
2. BORROW 600 C.Y. @ 13.25 = 7,950.00
3. CONCRETE CURB & GUTTER 2,264.9 L.F. @ 7.00 = 15,854.30
4. ASPHALT PAVEMENT, 8" 4,001.4 S.Y. @ 14.35 = 57,420.09
5. REGRADE MANHOLE i EA. @ 350.00 = 350.00
6. SPECIAL TRENCH COMPACTION 476 L.F. @ 2.25 = 1,071.00
7. 6" DUCTILE IRON PIPE 444 L.F. @ 13.00 = 5,772.60
B. RESILIENT SEAT/WEDGE VALVE, 6" 2 EA. @ 375.00 = 750.00
9. FIRE HYDRANT & VALVE ASSEMBLY i EA. @ 1,700.00 = 1,700.00
10. C. I. FITTINGS .18 TON @ 3,600.00 = 648.00
11. CORPORATION STOP, 1" 9 EA. @ 80.00 = 720.00
12. CURB SHUTOFF VALVE & BOX, 1" 12 EA. @ 85.00 = 1,020.00
13. COPPER SERVICE LINE, 1" 282 L.F. @ 12.50 = 3,525.00
14. COPPER SERVICE LINE, 2" 95 L.F. @ 8.00 = 760.00
15. 2" x 1" x 1" COPPER WYE I EA. @ 200.00 = 200.00
16. 2" BORE 90 L.F. @ 12.50 = 1,125.00
17. 2" SADDLE, CORPORATION & BOX i L.S. @ 450.70 = 450.70
18. CLAY PIPELINE, 8" 341.5 L.F. @ 9.00 = 3,073.50
19. CLAY TEES, 8" x 4" 3 EA. @ 54.00 = 162.00
20. CLEANOUT I EA. @ 300.00 = 300.00
21. TRENCH & BACKFILL (0'-6') 341.5 L.F. @ 3.35 = 1,144.03
22. TYPE II MANHOLE 2 EA. @ 1,500.00 = 3,000.00
23. REMOVE & REPL. BITUMINOUS PVMT. 15.2 S.Y. @ 32.00 = 486.40
24. REMOVE & REPLACE SOD 50 S.Y. @ 6.00 = 300.00
25. WATER i L.S. @ 1,000.00 = 1,000.00
26. PAVEMENT REMOVAL 203 S.Y. @ 6.00 = 1,218.00
27. PAVEMENT MILLING 583 TON @ 22.00 = 12,826.00
28. ASPHALT PAVEMENT, 2" 567 TON @ 33.00 = 18,711.00
29. CRACK/JOINT SEALING 4,506 S.Y. @ .75 : 3~379.50
SUB TOTAL: $155,036.22
15% ENGINEERING & CONTINGENCIES: 23,255.43
TEMPORARY NOTE INTEREST: 7~758.67
TOTAL: $186,050.32
DON HOFF, DIRECTOR OF ENG. & UTILITIES
SUBSCRIBED AND SWORN TO BEFORE ME THIS I~'~ DAY OF December , 1992.
JACQUELINE SHIEVER, OMC
CITY CLERK
FINAL QUANTITIES
PROJECT NO. 91-836
STREET, WATER AND SANITARY SEWER
CHARGEABLE TO PROPERTY OWNERS:
1. COMMON EXCAVATION 861.2 C.Y. @ $ 11.75 = $ 10,119.10
2. BORROW 600 C.Y. @ 13.25 = 7,950.00
3. CONCRETE CURB & GUTTER 2,264.9 L.F. @ 7.00 = 15,854.30
4. ASPHALT PAVEMENT, 8" 4,001.4 S.Y. @ 14.35 = 57,420.09
5. REGRADE MANHOLE i EA. @ 350.00 = 350.00
6. SPECIAL TRENCH COMPACTION 476 L.F. @ 2.25 = 1,071.00
7. 6" DUCTILE IRON PIPE 444 L.F. @ 13.00 = 5,772.60
8. RESILIENT SEAT/WEDGE VALVE, 6" 2 EA. @ 375.00 = 750.00
9. FIRE HYDRANT & VALVE ASSEMBLY i EA. @ 1,700.00 = 1,700.00
10. C. I. FITTINGS .18 TON @ 3,600.00 = 648.00
11. CORPORATION STOP, 1" 9 EA. @ 80.00 = 720.00
12. CURB SHUTOFF VALVE & BOX, 1" 12 EA. @ 85.00: 1,020.00
13. COPPER SERVICE LINE, 1" 282 L.F. @ 12.50 = 3,525.00
14. COPPER SERVICE LINE, 2" 95 L.F. @ 8.00 = 760.00
15. 2" x 1" x 1" COPPER WYE I EA. @ 200.00 = 200.00
16. 2" BORE 90 L.F. @ 12.50 = 1,125.00
17. 2" SADDLE, CORPORATION & BOX 1L.S. @ 450.70 = 450.70
18. CLAY PIPELINE, 8" 341.5 L.F. @ 9.00 = 3,073.50
19. CLAY TEES, 8" x 4" 3 EA. @ 54.00 : 162.00
20. CLEANOUT I EA. @ 300.00 = 300.00
21. TRENCH & BACKFILL (0'-6') 341.5 L.F. @ 3.35 = 1,144.03
22. TYPE I) MANHOLE 2 EA. @ 1,500.00 = 3,000.00
23. REMOVE & REPL. BITUMINOUS PVMT. 15.2 S.Y. @ 32.00 = 486.40
24. REMOVE & REPLACE SOD 50 S.Y. @ 6.00 = 300.00
25. WATER I L.S. @ 1,000.00 = 1,000.00
26. PAVEMENT REMOVAL 203 S.Y. @ 6.00 = 1,218.00
27. PAVEMENT MILLING 583 TON @ 22.00 = 12,826.00
28. ASPHALT PAVEMENT, 2" 567 TON @ 33.00 = 18,711.00
29. CRACK/JOINT SEALING 4,506 S.Y. @ .75 = 3~379.50
SUB TOTAL: $155,036.22
15% ENGINEERING & CONTINGENCIES: 23,255.43
TEMPORARY NOTE INTEREST: 7~758.67
TOTAL: $186,050.32
DON HOFF, DIRECTOR OF ENG. & UTILITIES
SUBSCRIBED AND SWORN TO BEFORE ME THIS (~ DAY OF December , 1992.
JACQUELINE SHIEVER, CMC
CITY CLERK
F~NAL QUANTITIES
PROJECT NO. 91-836
STREET, WATER AND SANITARY SEWER
CHARGEABLE TO CITY:
NONE
DON HOFF, DIRECTOR OF ENG. & UTILITIES
SUBSCRIBED AND SWORN TO BEFORE ME THIS ~'~ DAY OF December , 1992.
JACQUELINE SHIEVER, CMC
CITY CLERK
(Published in The Salina Journal January 14, 1993)
NOTICE OF HEARING ON PROPOSED ASSESSMENTS
STREET AND UTILITY IMPROVEMENTS
[ Engineering Project 91- 836 ]
TO ALL PERSONS CONCERNED:
The Board of commissioners of the City of Salina, Kansas, will meet
in the City Commission Meeting Room, Room 200, City- County Building,
300 West Ash Street, Salina, Kansas, on Monday, the 1st day of February,
1993, at four o'clock p.m., C.S.T., to consider the proposed assessments for
the following improvements, to-wit:
MEYER ADDITION
AND
REPLAT OF MEYER ADDITION
Curbing, guttering, paving, grading of MEYER DRIVE from the
south line of Martin Avenue to the end of the cul-de-sac.
Installation of a water main and water service to serve Lots
through 6, Block 1, Replat of Meyer Addition.
Installation of water main and water service to serve Lots 11 and
12, Block 5; and Lots 29 and 30, Block 6, Meyer Addition.
KING ADDITION
Instailation off water service line of Lot 4, Block 1, King
Addition.
Installation of Laterai Sanitary Sewer 667 to serve Lots 4, 5, 6
and 7, Block 1, King Addition.
MAYFAIR ADDITION
Curbing, guttering, paving and grading of BENTLEY AVENUE
from the east line of Shalimar Drive to the west line of Linden
Drive.
as authorized by Resolution Number 91-4371, passed by the Board of
Commissioners on the 26th day of August, 1991.
The curbing, guttering, paving and grading of the Frontage Road
from the south line of J-J Chevrolet and Imports, South 320 feet.
as authorized by Resolution Number 91-4369, passed by the Board of
Commissioners on the 26th day of August, 1991.
The curbing, guttering, paving and grading of SPRECKER DRIVE
from the South line of Republic Avenue to the North line of
Bradshaw Drive.
as authorized by Resolution Number 91-4370, passed by the Board of
Commissioners on the 26th day of August, 1991.
The total cost of such improvements to property owners is
$186,050.32.
The extent or boundaries of the proposed improvement district to be
assessed is:
Lots 1, 2, 3, 4, 5, 6, Block 1, Replat of Meyer Addition
Lots 11 and 12, Block 5, Meyer Addition
Lots 29 and 30, Block 6, Meyer Addition
Lots 4, 5, 6, 7, Block 1, King Addition
Lots 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, Block 4, Mayfair Addition
Lots 1, 2, 3, 4, 5, North 35' of Lot 6, the North 40' of Lot 15,
and all of Lots 16, 17, 18, 19, Block 7, Mayfair Addition
SULLIVAN ADDITION
The South 7.2 acres of the North 17.2 acres of Lot One (1), Block
One (1), Sullivan Addition to the city of Salina, Saline County,
Kansas, described as follows: Beginning at a point four hundred
eighty-three and eighty-eight hundredths feet (483.88') South of
the Northeast corner of said Lot One (1); Thence South along the
East line of said Lot One (1), three hundred forty-seven and
eighty-one hundredths feet (347.81'); Thence West nine hundred
one and fifty-one hundredths feet (901.51') to a point on the West
line of said Lot One (1) which is four hundred ~_inety-four and six
tenths feet (494.6') North of the Southwest corner of said Lot One
(1); Thence North along said West line three hundred fifty and
85/100 feet; Thence East nine hundred and forty-six hundredths
feet (900.46') to the point of beginning.
MEYER ADDITION
Lots 1, 2, 3, 4, 5, 6, 7, 8, Block 7
Lots 1, 2, 3 and 4, Block 8,
DOW ADDITION, REPLAT OF BLOCK ONE (1) LOTS ONE (1) THROUGH EIGHT (8)
North 12.5 feet of Lot 4 and all of Lots 5, 6, 7, 8, 9, Block 10
Lots 1, 2, 3, 4, and the West 73.5 feet of Lot 5, Block 12
Written or oral objections will be considered at the meeting and
thereupon the amount of the assessment will be finally determined.
The proposed assessment roll is on file for public inspection in the
Office of the City Clerk, Suite 206, City-County Building, 300 West Ash
Street, Salina, Kansas.
Jacqueline Shiever, CMC
City Clerk