Loading...
8.9 CO1 94 Subdiv_i., CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 10/24/94 4:~P.M. AGENDA SECTION: ORIGINA~NG DEPARTMENT: APPROVED FOR NO. 8 AGENDA: Engineering rr~M: BY: Shawn O~Leary BY: Item Change Order No. 1 for the 1994 Subdivision Improvements, Project No. 94-892B. Background The project involves street and storm drainage improvements in seven (7) different subdivisions throughout Salina. The City Commission approved the contract on February 15, 1994. The contractor, J. H. Shears' Sons, Inc. completed the project in accordance with the plans and specifications and on schedule. Before the contract can be completed, a change order is necessary to correct the final quantities of contract items to reflect the actual amounts installed. It is normal in a project of this scope to slightly over or under estimate the amounts of bid items actually needed. In this case, the contract overrun is $11,288.11 or 1.9% of the original contract amount of $599,019.70. Also included in this change order are two new items, one for storm pipe adjustment and one for special grading. These additional items became necessary in Golden Eagle Estates due to a design error by the owner's private engineering firm. RECOMMENDATION It is recommended that the City Commission approve Change Order No. 1 for 1994 Subdivision Improvements, Project No. 94-892B, in the amount of $15,489.36. COMMISSION AC~ON MORON BY SECOND BY THAT: CHANGE ORDER LOCATION: New Subdivisions. PROJECT NO ..... 94~892B PROJECT: 1994 Subdivision Improvements-Streets . CHANGE ORDER NO.ONE (1) CONTRACTOR: J. H. Shears' Sons, Inc., P. O. Box 1095, Salina, KS 67402 THIS AGREEMENT, made and entered into this 17th . day of October 1994, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated February 15,. 1994, under the above subject, project and project number in the following particulars to wit: 1. The ~specifications and drawings for certain street improvements in the City of Salina, Kansas, dated January .... - 1994 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. Item No. Description 1 - 24 Typical minor overruns and underruns of contract 54 - 57 items including coffee, on excavation, curb and ~utter, storm pipeline, asphalt pavement, etc. 58 Add one (1) lump sum for Special Pipe Adjustment where the contractor was required to remove and replace approximately 40 (?) linear feet of 18"~RCP (?) in Golden Eagle Estates due to a design error by the private engineering firm. 59 Add one (1) lump sum for Special Grading where the contractor was required to fill and recompact part of the road bed in Golden Eagle Estates due to a design error by the private engineering firm. 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction in a thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifications, and contract documents, for the following prices: CHANGE ORDER PAGE 2 ITEM UNIT NO. DESCRIPTION QUANTITY UNIT PRI~E TOTAL 1-24 Combined Overruns/Underruns - - $ - $11,288.11 54-57 58 Special Pipe Adjustment 1 L.S 1.,480.00 1,480,00 59 Special Grading 1 L.S. 2,721.25 2,721.25 CHANGE ORDER TOTAL: $ 15,489.36 3. Additional time for completion by reason of this change 30 days. 4. All other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS J. H. SHEARS' SONS, INC. BY: BY- MAYOR (Office or position of signer) Attest: CITY CLERK