6.4 Install Traffic Control Dev CITY OF SALINA
REQUEST FOR COMMISSION ACTION DATE TIME
10/17/94 4:00 P.M.
AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR
NO. 6 AGENDA:
Engineering & Utilities
ITEM:
NO. 4
BY: Shawn O'Leary ~ BY: ~,
Item
Consideration of the installation of new traffic control devices.
Background
The recently completed subdivision improvements throughout Salina has also
warranted the need for new stop signs. Following is a list of five (5) locations
in which new subdivision streets are intersecting with existing arterial or
collector streets or where traffic patterns are established and visibility is
limited. Also included in the list is one location on 12th Street from which
numerous complaints have been received and the accident experience appears to be
increasing.
Location Description Justification
Huntington Rd. & Magnolia Install stop on Huntington New construction
for SB traffic
Austin Circle & Cloud Install stop on Austin Cr New construction
for SB traffic
Ray Ave. & Schilling Install stop on Ray Ave. New construction
for SB traffic
Tulane & Otto Install stop on Tulane New construction;
for SB traffic Existing stop for NB
Tulane & Yale Install stop on Tulane New construction;
'for NB & SB traffic Limited visibility
12th & Washington Install stop on Washington Limited visibility;
for EB & WB traffic Offset intersection
COMMISSION AC~ON
MOTION BY SECOND BY
THAT:
CITY OF SALINA
REQUEST FOR COMMISSION ACTION DATE TIME
10/17/94 4:00 P.M.
AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR
NO. AGENDA:
Engineering f Utilities
ITEM:
NO.
BY: Shawn O!,Leary BY:
Recommendati on
It is recommended that the City Commission approve the installation of new traffic
control devices as listed on the attached ordinance.
COMMISSION ACTION
MOTION BY SECOND BY
THAT:
1. Huntington Rd. & Magnolia
2. Austin Circle & Cloud
3. Ray Ave. & Schilling
4. Tulane & Otto
6. 12th & Washington