Loading...
6.4 Install Traffic Control Dev CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 10/17/94 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. 6 AGENDA: Engineering & Utilities ITEM: NO. 4 BY: Shawn O'Leary ~ BY: ~, Item Consideration of the installation of new traffic control devices. Background The recently completed subdivision improvements throughout Salina has also warranted the need for new stop signs. Following is a list of five (5) locations in which new subdivision streets are intersecting with existing arterial or collector streets or where traffic patterns are established and visibility is limited. Also included in the list is one location on 12th Street from which numerous complaints have been received and the accident experience appears to be increasing. Location Description Justification Huntington Rd. & Magnolia Install stop on Huntington New construction for SB traffic Austin Circle & Cloud Install stop on Austin Cr New construction for SB traffic Ray Ave. & Schilling Install stop on Ray Ave. New construction for SB traffic Tulane & Otto Install stop on Tulane New construction; for SB traffic Existing stop for NB Tulane & Yale Install stop on Tulane New construction; 'for NB & SB traffic Limited visibility 12th & Washington Install stop on Washington Limited visibility; for EB & WB traffic Offset intersection COMMISSION AC~ON MOTION BY SECOND BY THAT: CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 10/17/94 4:00 P.M. AGENDA SECTION: ORIGINATING DEPARTMENT: APPROVED FOR NO. AGENDA: Engineering f Utilities ITEM: NO. BY: Shawn O!,Leary BY: Recommendati on It is recommended that the City Commission approve the installation of new traffic control devices as listed on the attached ordinance. COMMISSION ACTION MOTION BY SECOND BY THAT: 1. Huntington Rd. & Magnolia 2. Austin Circle & Cloud 3. Ray Ave. & Schilling 4. Tulane & Otto 6. 12th & Washington