8.9 CO1 94 Subdiv Improvements CITY OF SALINA REQUEST FOR COMMISSION ACTION DATE TIME 8/15/94 4:~ P.M. AGENDA SECTION: ORIGINA~NG DEPARTMENT: APPROVED FOR NO. 8 AGENDA: Engineering BY: Shawn0'Lear BY: Item Change Order No. 1 for 1994 Subdivision Improvements, Phase II, Project No. 94-898. Background The attached change order involves the extension of the public water system to serve McArthur Park Addition P.D.D. The extension of the water system was a condition imposed on the owners, Jean and Rex McArthur, when the P.D.D. was approved by the City Commission on November 15, 1993. The water system will provide fire protection and domestic water service to three new residential lots. The new water line will also replace an existing undersized pipeline currently serving some homes on Mount Barbara Road. The total cost of the change order with Smoky Hill, L.L.C. of Salina is $13,156.00. Of that amount, the City's share is $6,341.77 for the portion of pipeline serving the existing homes. The McArthur's share is $6,814.23. The City's share is proposed to be allocated from the Water and Wastewater C.I.P. fund. RECOMMENDATION It is recommended the City Commission approve Change Order No. 1 in the amount of $13,156.00. COMMISSION ACTION MORON BY SECOND BY THAT: CHANGE ORDER LOCATION: McArthur Park Addition P.D.D. PROJECT NO. 94-89~ PROJECT: 1994 Subdivision ImprQvements, Phas~ II CHANGE ORDER NO.ONE CONTRACTOR:Smok? Hill. L.L.C.. 645 East Crawfo~, Salin~. Kansas. 67401 THIS AGREEMENT, made and entered into this 15th day of . August , 1994, by and between the CITY OF SALINA, KANSAS, Owner, and the above named Contractor, modifies the existing contract dated MaY 16, 1994 , under the above subject, project and project number in the following particulars to wit: 1. The specifications and drawings for certain street improvements in the City of Salina, Kansas, dated April - 1994 , are hereby amended in the following particulars only; all other terms and conditions remain unchanged. I~em NO, Description 15 Add 380 linear feet of 6" Water Pipeline 17 Add 0.14 tons of Water Pipeline Fittings 23 Add 1 each Fire Hydrant and Valve Assembly 24 Add 1 each 1-1/2" Corporation Stop 4lA Add 20 linear feet Special Trench Compaction 42A Add 1 lump sum Construction Staking 43A Add 1 lump sum Water 44 Add I each 8" x 6" Tapping Valve & Sleeve 45 Add 1 each 1-1/2" Curb Shutoff Valve & Box 46 Add 11 sq. yds. Removal of Asphalt Pvmt. 47 Add 1 lump sum for Mobilization 2. The undersigned proposes to furnish all tools, appliances, equipment, materials, and labor required to complete the construction ina thorough, workmanlike, and satisfactory manner in accordance with the drawings, specifiCations, and contract documents, for the following prices: CHANGE ORDER PAGE 2 ITEM UNIT NO, DESCRIPTION QUANTITY UNIT PRICE TOTAL 15 6" WATER PIPELINE 380 L.F. $ 14.60 $ 5.548.00 17 WATER PIPELINE FITTINGS 0.10 TON 4,400.0Q 440,00 23 FIRE HYDRANT & VALVE ASSY. 1 EA. ~.320.00 ~ 24 CORPORATION STOP, 1-1/2" 1 EA. 368.00 968.00 4lA SPECIAL TRENCH COMPACTION 20 L.F. $, 0.0 100 · 00 42A CONSTRUCTION STAKING 1 L. S. 500.00 ~00,00 43A WATER 1 L.S. 50.0D ~0.00 44 8" x 6" TAPPING VALVE/SLV. 1 EA. 1,70Q,QQ 1,700.00 45 CURB SHUTOFF VALVE/BOX, 1-1/2" 1 EA. 200.00 200,00 46 REMDVE ASPHALT PAVEMENT 11 S.Y. 20.0.0 220.00 47 MOBILIZATION 1 L.S. 2,710.0.0 2,710.00 CHANGE ORDER TOTAL: $ 13,156.00 3. Additional time for completion by reason of this change 30 days. 4. Ail other terms and conditions of the contract to remain unchanged. OWNER, FIRST PARTY CONTRACTOR, SECOND PARTY THE CITY OF SALINA, KANSAS SMOKY HILL, L.L.C MAYOR (Office or position of signer) Attest: CITY CLERK